CN109868837A - A kind of rib column formula anchored bolt retaining wall of no cutting - Google Patents

A kind of rib column formula anchored bolt retaining wall of no cutting Download PDF

Info

Publication number
CN109868837A
CN109868837A CN201910278676.XA CN201910278676A CN109868837A CN 109868837 A CN109868837 A CN 109868837A CN 201910278676 A CN201910278676 A CN 201910278676A CN 109868837 A CN109868837 A CN 109868837A
Authority
CN
China
Prior art keywords
rib column
grid
shear structure
mounting hole
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910278676.XA
Other languages
Chinese (zh)
Inventor
易朋莹
李珂
胡晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING GAOXIN ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Original Assignee
CHONGQING GAOXIN ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING GAOXIN ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd filed Critical CHONGQING GAOXIN ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Priority to CN201910278676.XA priority Critical patent/CN109868837A/en
Publication of CN109868837A publication Critical patent/CN109868837A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of rib column formula anchored bolt retaining walls of no cutting, including grid made of being cross-linked as rib column and crossbeam, the retaining structure that is arranged in the grid and the capping beam for being connected to the grid tops, the more anchor poles for anchoring into side slope are connected in the grid, shear structure is connected at interval of certain distance in the grid, and the shear structure extends into side slope, mounting hole is formed in the grid, the shear structure is worn in the mounting hole, and the shear structure is fixedly connected with the grid, the corner dimension between angle and the anchor pole and grid between the shear structure and the grid is consistent.Its remarkable result is: by the shear structure of design to substitute dark rib or half dark rib constructing structure, effectively saving the artificial and duration, reduces project cost, improve construction efficiency, effectively prevent the deformation that anchor bar is generated by shear stress.

Description

A kind of rib column formula anchored bolt retaining wall of no cutting
Technical field
The present invention relates to rock side slope support technology fields, and in particular to a kind of rib column formula anchored bolt retaining wall of no cutting.
Background technique
Rock side slope support engineering often uses rib column formula or lattice anchored bolt retaining wall, it is by anchor pole (or rope), rib column (or lattice) and panel composition, i.e., be arranged anchor pole in rock mass, connects adult in anchor pole external end head rib column.Rib column enhances anchor The whole stressed effect of bar, improves the overall stability of side slope.In rib column design, rock slope is embedded in by code requirement rib column The specifications such as face 100mm~300mm or even highway subgrade design specification " JTGD30-2015 ", which have been made, to be distinctly claimed, and is needed Dig out deep 100mm~300mm rock slope quarter, on the one hand the slot of wide 300mm~600mm makes rib column embedded, make outside coagulation Native panel is smooth, more important is ensure rib column in the construction process or side slope operation during safety, from mechanical mechanism side Face meets structure self stability requirement.
However, rock slope slope surface inclination angle is generally 45 °~90 ° in practice of construction, need to carve chisel on high escarpment It so long and narrow rock trough and carries out template and fixes, provided by the cohesive force that rib column is embedded in rock mass part and scar enough Shearing strength acts on rib column 1 in gravity load to offset as shown in Figure 1, dash area, that is, rib column 1 is embedded in rock mass part in figure With shear stress existing for scar.But difficulty of construction is big for cutting process mechanism, generally requires to expend a large amount of artificial and durations, and work Journey cost is higher, inefficiency.Especially in the more demanding project of timeliness, enough duration progress cuttings can not be provided and applied Work.Thus the design of traditional rib column haves the defects that certain in practical high precipitous rock slope harnessing project.
In addition, since the height of rib column 1 is larger (often greater than 15.0m) in harnessing project, very big, meeting of being self-possessed after height is larger Generate larger shear stress, but anchor bar cannot provide shear strength, can only tension or compression, if this stress meeting Anchor bar is deformed, reinforcing bar tension efficiency is will lead to and strongly reduces, lead to the self stability existing defects of rib column.
Summary of the invention
In view of the deficiencies of the prior art, the object of the present invention is to provide a kind of rib column formula anchored bolt retaining wall of no cutting, the knots Mechanical mechanism of the structure according to rib column (lattice) during slope construction and operation, is not required to carry out cutting in scar in construction, And can increase anti-shear ability of the rib column along slope surface, meet in construction and self stability requirement during operation.
In order to achieve the above objectives, The technical solution adopted by the invention is as follows:
A kind of rib column formula anchored bolt retaining wall of no cutting, key are: made of being cross-linked as rib column and crossbeam Grid, the retaining structure being arranged in the grid and the capping beam for being connected to the grid tops, connect in the grid Have the more anchor poles for anchoring into side slope, be connected with shear structure at interval of certain distance in the grid, and the shear structure to Extend in side slope.
Further, it is formed with mounting hole in the grid, wears the shear structure in the mounting hole, and should Shear structure is fixedly connected with the grid.
Further, the angle between the angle between the shear structure and the grid and the anchor pole and grid is big It is small consistent.
Further, the mounting hole is formed in the rib column, and the forming position of the mounting hole be connected to it is same The alternate setting of the anchor pole in rib column, the position being adapted in the side slope with the mounting hole drills out accommodating hole, described The extension of shear structure is protruded into the accommodating hole, the shear structure and the mounting hole, accommodating hole inner wall between It pours and is formed with concrete layer.
Further, the lateral distance between the adjacent mounting hole of any two with vertically apart from consistent, and The aperture of the mounting hole is consistent with the anchor hole aperture of the anchor pole.
Further, the total length of the shear structure is not less than 1.5m, and the shear structure is located at the mounting hole The length of inner part is not less than 200mm.
Further, the mounting hole is formed in the junction between the rib column and the anchor pole, the shear structure In hollow structure, at least one avoid holes is offered in the shear structure, and the avoid holes are located in the mounting hole, institute State that anchor pole is arranged in the shear structure and its main reinforcement passes through the avoid holes and is fixedly connected with the stirrup of the rib column, described Concrete has been poured between anchor pole and shear structure.
Further, the mounting hole is located at the junction of the rib column and crossbeam, and adjacent described of any two Lateral distance between mounting hole with vertically apart from consistent.
Further, the aperture of the mounting hole is consistent with the anchor hole aperture of the anchor pole.
Further, the total length of the shear structure is not less than 1.5m, and the shear structure is located at the mounting hole The length of inner part is not less than 200mm, and the avoid holes are rectangular opening, and the width of the avoid holes is 40mm~70mm.
Remarkable result of the invention is: by the shear structure of design to substitute dark rib or half dark rib constructing structure, as The carrier of the vertical shear-carrying capacity of highly larger rib column, and using rigid connection between the shear structure and rib column, to mention Enough shearing strengths are supplied, compared to traditional rib column formula barrier wall structure, it is no longer necessary to cutting construction is carried out, it is effective to save It the artificial and duration, project cost is reduced, construction efficiency is improved, effectively prevents what anchor bar was generated by shear stress Deformation, so that the self stability of rib column greatly improves in high precipitous rock slope harnessing project.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of barricade in the prior art;
Fig. 2 is the structural schematic diagram of the embodiment of the present invention 1;
Fig. 3 is the A-A cross-sectional view of Fig. 2;
Fig. 4 is the structural schematic diagram of the embodiment of the present invention 2;
Fig. 5 is the B-B cross-sectional view of Fig. 4;
Fig. 6 is the connection schematic diagram of rib column described in embodiment 2 and shear structure;
Fig. 7 is the connection front elevation of rib column described in embodiment 2 and shear structure;
Fig. 8 is the connection plan view of rib column described in embodiment 2 and shear structure.
Specific embodiment
Specific embodiment and working principle of the present invention will be described in further detail with reference to the accompanying drawing.
Embodiment 1:
As shown in Figure 2 to 3, the rib column formula anchored bolt retaining wall of a kind of no cutting, including be cross-linked by rib column 1 and crossbeam 2 Made of grid, the retaining structure 3 that is arranged in the grid and the capping beam 4 for being connected to the grid tops, in the rib The lower end of column 1 is formed with basis 5;The more anchor poles 6 for anchoring into side slope, the end bending of the anchor pole 6 are connected in the grid It is welded and fixed afterwards with the stirrup of rib column 1 using welding by both sides form, is connected with shearing resistance knot at interval of certain distance in the grid Structure 7, and the shear structure 7 extends into side slope, and concrete, the shearing resistance knot have been poured between the shear structure 7 and side slope The specific set-up mode of structure 7 are as follows:
Be formed with mounting hole 8 in the rib column 1 of the grid, and the mounting hole 8 be connected to it is described in same rib column 1 The alternate setting of anchor pole 6, wears the shear structure 7 in the mounting hole 8, suitable with 8 phase of mounting hole in the side slope The position answered drills out accommodating hole 8a, and the extension of the shear structure 7 is protruded into accommodating hole 8a, in the shear structure 7 With the mounting hole 8, accommodating hole 8a inner wall between pour and be formed with concrete layer, and the shear structure 7 and the rib column 1 Between angle and the anchor pole 6 and rib column 1 between corner dimension it is consistent.
It can also be seen that the barrier wall structure is additionally provided with drain hole 9 and expansion joint 10 from Fig. 2, the drain hole 9 Diameter is 100mm, spacing 2.0m*2.0m;10 width of expansion joint is 2.5cm, is filled out in the expansion joint 10 equipped with pitch Hemp cut.
In this example, lateral distance between the adjacent mounting hole 8 of any two with vertically apart from consistent, the peace The aperture for filling hole 8 is consistent with the anchor hole aperture of the anchor pole 6, and whether the mounting hole 8 runs through the rib column 1 and the shearing resistance Whether structure 7 exceeds 1 surface of rib column, can require to be configured according to owner's landscape planting, but to guarantee enough bonding strengths Length is not preferably less than 200mm.
Preferably, the rib column 1, crossbeam 2 are consistent with the size of capping beam 4, and the total length of the shear structure 7 is not Less than 1.5m, and the shear structure 7 is located at the length of 8 inner part of mounting hole not less than 200mm, so that it is guaranteed that having foot Enough shearing strengths.Above-mentioned shear structure 7 can select H-type fashioned iron or I-steel.
The work progress of the present embodiment are as follows:
Since shear structure 7 is independently of anchor rod system in this example, specific steps in the construction process are as follows:
The construction of barricade should be carried out by absolute altitude, and first construct base foundation 5, rib column 1 of then constructing again and crossbeam 2 successively divide Layer carries out, and connects retaining structure 3 and grid sufficiently, forms whole stress;When slope rock mass is crushed, retaining structure 3 is used Breast boards, when slope rock mass is complete, retaining structure 3 uses m esh-hanging sprayed concrete mask;
In the process, it carries out drilling out accommodating hole 8a with the position being adapted in the middle part of the rib column 1 in side slope, aperture is not Less than 200mm, depth is 2.0~2.5m;Then the pre-buried seamless steel pipe in rib column 1, the weldering of two sides up and down in the middle part of seamless steel pipe Connect positioning crotch, it is ensured that the depth that seamless steel pipe is embedded to rib column 1 is not less than 200mm~300mm;Start to make after seamless steel pipe positioning Make 1 reinforcing bar of rib column and template, and seamless steel pipe and rib column 1 are poured together, in forming the mounting hole 8 in seamless steel pipe;
It is in the accommodating hole 8a in side slope and fixed that the shear structure 7 i.e. H-type fashioned iron or I-steel self installation hole 8 is protruded into Then the mortar being stirred is injected the bottom accommodating hole 8a, poured outward from the bottom hole of accommodating hole 8a by position, until in the shearing resistance knot Structure 7 and the accommodating hole 8a, mounting hole 8 inner wall between pour to form concrete layer.
This example is by the shear structure 7 that connects in rib column 1, to substitute dark rib or half dark rib constructing structure, as height The carrier of the vertical shear-carrying capacity of larger rib column 1, and using rigid connection between the shear structure 7 and rib column 1, to provide Enough shearing strengths, compared to traditional 1 formula barrier wall structure of rib column, it is no longer necessary to cutting construction is carried out, it is effective to save The artificial and duration, the deformation that anchor bar is generated by shear stress is avoided, so that high precipitous rock slope harnessing project middle rib The self stability of column 1 greatly improves.
Embodiment 2:
As shown in Fig. 4~Fig. 8, a kind of 1 formula anchor pole of rib column, 6 barrier wall structure of no cutting, including handed over by rib column 1 and crossbeam 2 Grid that mistake is formed by connecting, the retaining structure 3 being arranged in the grid and the capping beam 4 for being connected to the grid tops, The lower end of the rib column 1 is formed with basis 5, and the more anchor poles 6 for anchoring into side slope, the end of the anchor pole 6 are connected in the grid It is welded and fixed with the stirrup of rib column 1 using welding by both sides form after portion's bending, is connected in the grid at interval of certain distance Shear structure 7, and the shear structure 7 extends into side slope, the specific set-up mode of the shear structure 7 are as follows:
Mounting hole 8 is formed in the rib column 1 of the grid, specific location is between the rib column 1 and the anchor pole 6 Junction, lateral distance between the adjacent mounting hole 8 of any two with vertically apart from consistent, the shear structure 7 one end is threaded through in the mounting hole 8, and the extension of the shear structure 7 is protruded into the anchor hole of anchor pole 6, that is to say benefit It uses the anchor hole of anchor pole 6 to carry out installing fixation as to shear structure 7, avoids newly drilling in side slope again, work can be reduced Sequence shortens the construction period, and the shear structure 7 is in hollow structure, at least one avoid holes 11 is offered in the shear structure 7, And the avoid holes 11 are located in the mounting hole 8, the anchor pole 6 is arranged in the shear structure 7 and its main reinforcement is kept away by this It allows hole 11 and the stirrup of the rib column 1 to be fixedly connected, has poured concrete between the anchor pole 6 and shear structure 7.
It can also be seen that the barrier wall structure is additionally provided with drain hole 9 and expansion joint 10 from Fig. 4, the drain hole 9 Diameter is 100mm, spacing 2.0m*2.0m;10 width of expansion joint is 2.5cm, is filled out in the expansion joint 10 equipped with pitch Hemp cut.
Referring to attached drawing 5, between the angle and the anchor pole 6 and rib column 1 between the shear structure 7 and the rib column 1 Corner dimension is consistent, interferes to avoid between shear structure 7 and anchor pole 6.
In this example, the aperture of the mounting hole 8 is consistent with the anchor hole aperture of the anchor pole 6, and whether the mounting hole 8 runs through Whether the rib column 1 and the shear structure 7 exceed 1 surface of rib column, can require to be configured according to owner's landscape planting, But length is not preferably less than 200mm.Meanwhile in this example, the mounting hole 8 can be a virtual hole, that is, need not exist for Material object only needs that the hollow shear structure 7 can be accommodated.
Preferably, the rib column 1, crossbeam 2 are consistent with the size of capping beam 4, and the total length of the shear structure 7 is not Less than 1.5m, and the shear structure 7 is located at the length of 8 inner part of mounting hole not less than 200mm, so that it is guaranteed that having foot Enough shearing strengths.In addition, the avoid holes 11 are rectangular opening, the width of the avoid holes 11 is 40mm~70mm, length and shearing resistance The length that structure 7 protrudes into rib column 7 is adapted, consequently facilitating avoid holes 11 open up, to improve construction efficiency.Described in this example Shear structure 7 is round fashioned iron.
The work progress of the present embodiment are as follows:
Since shear structure 7 is contained in anchor rod system in this example, specific steps in the construction process are as follows:
The construction of barricade should be carried out by absolute altitude, and first construct base foundation 5, rib column 1 of then constructing again and crossbeam 2 successively divide Layer carries out, and connects retaining structure 3 and grid sufficiently, forms whole stress;When slope rock mass is crushed, retaining structure 3 is using gear Native plate, when slope rock mass is complete, retaining structure 3 uses m esh-hanging sprayed concrete mask;
In the process, it carries out drilling out anchor pole anchor hole with the position being adapted in the middle part of the rib column 1 in side slope;In anchor pole First pre-buried seamless steel pipe, that is, shear structure 7 after the completion of 6 drillings, and shear structure 7 is fixedly connected with 1 reinforcing bar of rib column, in nothing It stitches and positioning crotch is respectively welded on the upper and lower sides outer wall of steel pipe, that is, shear structure 7 to ensure that shear structure 7 is embedded to 1 depth of rib column not Less than 200mm~300mm;
Pre-buried shear structure 7 places into anchor pole 6 after positioning, anchor pole 6 should be more than the length of pre-buried seamless steel pipe, that is, shear structure 7 Degree is not less than 175mm~275mm;The main reinforcement of anchor pole 6 is bent up in 1 surface side of rib column, and passes through the (dotted line in figure of the avoid holes 11 It is shown) it is welded and fixed afterwards with 1 stirrup of rib column, the mounting hole 8 is formed between rib column 1 and shear structure 7 at this time;
Round fashioned iron is poured together with 1 reinforcing bar of rib column after making 1 tripartite's template of rib column after fixation, and in shear structure 7 Inner wall and the anchor pole 6 between pour to form concrete layer;Mortar is used between anchor hole inner wall and the outer wall of shear structure 7 It fills.
This example is by the shear structure 7 that connects in rib column 1, and the shear structure 7 is contained in existing anchor rod system, with Substitute dark rib or half dark rib constructing structure, the carrier of the vertical shear-carrying capacity as the larger rib column 1 of height, thus can either Enough shearing strengths are provided, so that the self stability of rib column 1 greatly improves in high precipitous rock slope harnessing project, compared to Traditional 1 formula barrier wall structure of rib column, it is no longer necessary to carry out cutting construction, effectively save the artificial and duration, avoid anchoring The deformation that reinforcing bar is generated by shear stress.
Technical solution provided by the present invention is described in detail above.Specific case used herein is to this hair Bright principle and embodiment is expounded, method of the invention that the above embodiments are only used to help understand and its Core concept.It should be pointed out that for those skilled in the art, in the premise for not departing from the principle of the invention Under, it can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection of the claims in the present invention In range.

Claims (10)

1. a kind of rib column formula anchored bolt retaining wall of no cutting, including grid made of being cross-linked as rib column and crossbeam, it is arranged at this Retaining structure in grid and the capping beam for being connected to the grid tops, more are connected in the grid and anchors into side slope Anchor pole, it is characterised in that: be connected with shear structure at interval of certain distance in the grid, and the shear structure is to side slope Interior extension.
2. the rib column formula anchored bolt retaining wall of no cutting according to claim 1, it is characterised in that: be formed in the grid Mounting hole wears the shear structure in the mounting hole, and the shear structure is fixedly connected with the grid.
3. the rib column formula anchored bolt retaining wall of no cutting according to claim 1, it is characterised in that: the shear structure with it is described The corner dimension between angle and the anchor pole and grid between grid is consistent.
4. the rib column formula anchored bolt retaining wall of described in any item no cuttings according to claim 1~3, it is characterised in that: the installation Hole is formed in the rib column, and the setting alternate with the anchor pole being connected in same rib column of the forming position of the mounting hole, The position being adapted in the side slope with the mounting hole drills out accommodating hole, and the appearance is protruded into the extension of the shear structure Set in hole, the shear structure and the mounting hole, accommodating hole inner wall between pour and be formed with concrete layer.
5. the rib column formula anchored bolt retaining wall of no cutting according to claim 4, it is characterised in that: adjacent described of any two Lateral distance between mounting hole with vertically apart from consistent, and the anchor hole aperture one in the aperture of the mounting hole and the anchor pole It causes.
6. the rib column formula anchored bolt retaining wall of no cutting according to claim 5, it is characterised in that: the overall length of the shear structure Degree is not less than 1.5m, and the shear structure is located at the length of the mounting hole inner part not less than 200mm.
7. the rib column formula anchored bolt retaining wall of described in any item no cuttings according to claim 1~3, it is characterised in that: the installation Hole is formed in the junction between the rib column and the anchor pole, and the shear structure is in hollow structure, in the shear structure On offer at least one avoid holes, and the avoid holes are located in the mounting hole, and the anchor pole is arranged in the shear structure Interior and its main reinforcement passes through the avoid holes and is fixedly connected with the stirrup of the rib column, has poured between the anchor pole and shear structure Concrete.
8. the rib column formula anchored bolt retaining wall of no cutting according to claim 7, it is characterised in that: the mounting hole is located at described The junction of rib column and crossbeam, and the lateral distance between the adjacent mounting hole of any two with vertically apart from consistent.
9. the rib column formula anchored bolt retaining wall of no cutting according to claim 8, it is characterised in that: the aperture of the mounting hole with The anchor hole aperture of the anchor pole is consistent.
10. the rib column formula anchored bolt retaining wall without cutting according to claim 8 or claim 9, it is characterised in that: the shear structure Total length is not less than 1.5m, and the shear structure is located at the length of the mounting hole inner part not less than 200mm, the avoid holes For rectangular opening, the width of the avoid holes is 40mm~70mm.
CN201910278676.XA 2019-04-09 2019-04-09 A kind of rib column formula anchored bolt retaining wall of no cutting Pending CN109868837A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910278676.XA CN109868837A (en) 2019-04-09 2019-04-09 A kind of rib column formula anchored bolt retaining wall of no cutting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910278676.XA CN109868837A (en) 2019-04-09 2019-04-09 A kind of rib column formula anchored bolt retaining wall of no cutting

Publications (1)

Publication Number Publication Date
CN109868837A true CN109868837A (en) 2019-06-11

Family

ID=66922245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910278676.XA Pending CN109868837A (en) 2019-04-09 2019-04-09 A kind of rib column formula anchored bolt retaining wall of no cutting

Country Status (1)

Country Link
CN (1) CN109868837A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684843A (en) * 2021-08-27 2021-11-23 中钢集团马鞍山矿山研究总院股份有限公司 Beam-anchor combined reinforcing method for slope landslide control

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916297A (en) * 2006-09-04 2007-02-21 陈洪凯 Method for composite skid proof treatment for nail and anchor, and treating structure
CN102251525A (en) * 2011-04-12 2011-11-23 兰州理工大学 Framework prestress anchor rod-reinforced supporting structure for gravity type retaining wall and construction method thereof
JP2011246948A (en) * 2010-05-26 2011-12-08 Toko Geotech Corp Construction structure of reinforcement insertion work using composite reinforcement
CN103485349A (en) * 2013-09-20 2014-01-01 兰州理工大学 Lime nail composite frame prestressed anchor tube structure and construction method for reinforcing weak slope
CN203729324U (en) * 2014-01-02 2014-07-23 中交第二航务工程勘察设计院有限公司 Anchor rod lattice type retaining wall structure
CN205804372U (en) * 2016-06-21 2016-12-14 中钢集团马鞍山矿山研究院有限公司 A kind of piled anchor beam integral structure being suitable to non-coal open-pit slope landslide control
CN210507514U (en) * 2019-04-09 2020-05-12 易朋莹 Rib column type anchor rod retaining wall structure without groove

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916297A (en) * 2006-09-04 2007-02-21 陈洪凯 Method for composite skid proof treatment for nail and anchor, and treating structure
JP2011246948A (en) * 2010-05-26 2011-12-08 Toko Geotech Corp Construction structure of reinforcement insertion work using composite reinforcement
CN102251525A (en) * 2011-04-12 2011-11-23 兰州理工大学 Framework prestress anchor rod-reinforced supporting structure for gravity type retaining wall and construction method thereof
CN103485349A (en) * 2013-09-20 2014-01-01 兰州理工大学 Lime nail composite frame prestressed anchor tube structure and construction method for reinforcing weak slope
CN203729324U (en) * 2014-01-02 2014-07-23 中交第二航务工程勘察设计院有限公司 Anchor rod lattice type retaining wall structure
CN205804372U (en) * 2016-06-21 2016-12-14 中钢集团马鞍山矿山研究院有限公司 A kind of piled anchor beam integral structure being suitable to non-coal open-pit slope landslide control
CN210507514U (en) * 2019-04-09 2020-05-12 易朋莹 Rib column type anchor rod retaining wall structure without groove

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鲁春梅编著: "高层建筑施工技术", 31 August 2008, 哈尔滨:东北林业大学出版社, pages: 70 - 72 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684843A (en) * 2021-08-27 2021-11-23 中钢集团马鞍山矿山研究总院股份有限公司 Beam-anchor combined reinforcing method for slope landslide control

Similar Documents

Publication Publication Date Title
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN111254966A (en) Mountain abutment and pier column foundation structure and construction method thereof
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN105040712A (en) High-pressure washing anchor planting and recharging comprehensive biological protection structure of soft and hard smashing interbedding type composite rock slope and construction method of structure
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN109931077B (en) Support system for tunnel repair and construction method thereof
CN109578011B (en) Supporting structure in municipal tunnel and construction method thereof
CN208136903U (en) A kind of precast prestressed formula diaphram wall
CN214784154U (en) Pile support buttress type retaining wall structure with ground anchor
JP6370645B2 (en) Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements
CN109868837A (en) A kind of rib column formula anchored bolt retaining wall of no cutting
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN100473787C (en) Connecting structure for use in piled anchor supporting system and construction method thereof
JPH11222861A (en) Execution of retaining wall to existing banking and retaining wall executed by the same
CN110409462A (en) A kind of pattern foundation pit supporting structure reinforcement means and foundation pit support system
CN210507514U (en) Rib column type anchor rod retaining wall structure without groove
CN212052850U (en) Mountain area abutment and pier stud foundation structure
CN204311463U (en) A kind of Composite Bolt stake for slope reinforcement
KR200263526Y1 (en) Hanging semi down up system
CN207659988U (en) Crane beam on rock wall for underground power house present situation foundation reinforcing structure
CN112854258A (en) Existing railway cutting slope reinforcing structure and reinforcing method thereof
CN112095638A (en) Prefabricated anchor rope frame
KR20100040230A (en) Reinforced earth retaining wall system connecting to earth bolt with panel and geosynthetics on steep slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination