CN109863081A - The system and method for supplying fuel gas for ship - Google Patents

The system and method for supplying fuel gas for ship Download PDF

Info

Publication number
CN109863081A
CN109863081A CN201780061379.9A CN201780061379A CN109863081A CN 109863081 A CN109863081 A CN 109863081A CN 201780061379 A CN201780061379 A CN 201780061379A CN 109863081 A CN109863081 A CN 109863081A
Authority
CN
China
Prior art keywords
cooling water
engine
cooling
fuel gas
primary heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201780061379.9A
Other languages
Chinese (zh)
Other versions
CN109863081B (en
Inventor
金宗铉
朴永圭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hanhua Ocean Co ltd
Original Assignee
Daewoo Shipbuilding and Marine Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020160128368A external-priority patent/KR101876973B1/en
Priority claimed from KR1020160128367A external-priority patent/KR101876972B1/en
Application filed by Daewoo Shipbuilding and Marine Engineering Co Ltd filed Critical Daewoo Shipbuilding and Marine Engineering Co Ltd
Publication of CN109863081A publication Critical patent/CN109863081A/en
Application granted granted Critical
Publication of CN109863081B publication Critical patent/CN109863081B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • F17C9/02Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
    • F17C9/04Recovery of thermal energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M21/00Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form
    • F02M21/02Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form for gaseous fuels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M21/00Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form
    • F02M21/02Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form for gaseous fuels
    • F02M21/06Apparatus for de-liquefying, e.g. by heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • F17C9/02Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/38Apparatus or methods specially adapted for use on marine vessels, for handling power plant or unit liquids, e.g. lubricants, coolants, fuels or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0107Single phase
    • F17C2225/0123Single phase gaseous, e.g. CNG, GNC
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • F17C2227/0309Heat exchange with the fluid by heating using another fluid
    • F17C2227/0316Water heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • F17C2227/0309Heat exchange with the fluid by heating using another fluid
    • F17C2227/0316Water heating
    • F17C2227/0318Water heating using seawater
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0367Localisation of heat exchange
    • F17C2227/0388Localisation of heat exchange separate
    • F17C2227/0393Localisation of heat exchange separate using a vaporiser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/06Fluid distribution
    • F17C2265/066Fluid distribution for feeding engines for propulsion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/30Use of alternative fuels, e.g. biofuels

Abstract

A kind of system for supplying fuel gas for ship is disclosed.The system for supplying fuel gas for ship includes: vaporizer, for making liquefied natural gas vaporization with by natural gas supply to engine;Primary heater, for exchanging heat between the cooling water being discharged and the fluid as the heat medium in vaporizer after cooling engine to heat fluid;And fresh water generator, for by obtaining fresh water with part or all of heating seawater of the heat source for the cooling water for having passed through primary heater after engine discharge, wherein vaporizer to exchange heat so that liquefied natural gas vaporization between the heat medium and liquefied natural gas by primary heater heating.

Description

The system and method for supplying fuel gas for ship
Technical field
The present invention relates to the heats for the cooling water for using the engine for ship, and fuel gas is supplied to the hair The system and method for motivation.
Background technique
Liquefied natural gas (liquefied natural gas, LNG) is the natural gas liquid by making mainly to be made of methane Change the colorless and transparent liquid obtained to about -163 DEG C with liquefied natural gas, and volume is about the 1/600 of natural gas volume.Cause This, extremely effective transport is realized in the liquefaction of natural gas.Generally, the liquefied natural gas obtained via the liquefaction of natural gas It is stored in holding tank and by Shipping.
Can by the example of the marine engine of natural gas supply fuel include gas engine, such as DFDE engine, ME-GI engine and X-DF engine.There are four strokes for generating electricity and having in each circulation for DFDE engine.Utilize Otto (Otto cycle) is recycled to operate DFDE engine, there will be the natural of about 6.5 bars of (bar) relatively low pressures in Otto cycle Gas is injected into combustion chamber, then pushes piston with compressed gas.ME-GI engine is for promoting and having two in each circulation A stroke.ME-GI engine is operated using diesel cycle (diesel cycle), will be had about in diesel cycle In the combustion chamber for the near top dead center that the natural gas of 300 Bagao pressures is directly injected into piston.X-DF engine for promote and There are two strokes for each circulation tool.The natural gas with about 16 bar pressures is used to operate X-DF as fuel utilization Otto cycle Engine.
It is usually that the liquefaction being stored in holding tank is natural in order to use natural gas to supply fuel to engine as fuel Gas is vaporized to be supplied to engine, and the vaporization of liquefied natural gas needs heat source.It has been developed that in this field and is pressed from both sides using engine Water (engine jacket water) is covered as the technology for making the heat source of liquefied natural gas vaporization.
Summary of the invention
Technical problem
In general, after cooling engine, cooling water is through being adjusted to steady temperature.For example, in cooling It can be the temperature with about 85 DEG C by cooling water control after ME-GI engine.
However, because higher engine load generates more heats, cooling water is needed to cool down more heats, And because lower engine load generates less heat, cooling water is needed to cool down less heat.In addition, because hair Motivation is not cooled to prevent the low-temperature corrosion of engine lower than predetermined temperature, makes so reducing engine load from cooling The heat that water obtains is reduced.
The embodiment of the present invention provides the side of the heat of the cooling water changed for appropriate basic of distribution engine load Method, and the heat for suitably distributing cooling water equipment effective arrangement.
Technical solution
According to an aspect of the present invention, the system for supplying fuel gas for ship includes: vaporizer makes liquefied natural gas Vaporization is to be supplied to engine for liquefied natural gas;Primary heater, via what is be discharged after cooling engine from engine Heat exchange between cooling water and heat medium carrys out the fluid as heat medium in heated vaporizer;And fresh water generates Device, by with from engine discharge after passed through primary heater cooling water heat source some or all heating seawaters come Fresh water is generated, wherein vaporizer is made by the heat exchange between the heat medium heated by primary heater and liquefied natural gas Liquefied natural gas vaporization.
System can also include expansion slot, and the expansion slot absorbs the volume as caused by the expansion or shrinkage of cooling water and becomes Change.
Engine can be placed in enging cabin, and expansion slot can be placed in 20 meters to 25 meters distances above enging cabin Place.
Primary heater can be placed at position more higher than expansion slot.
System can also include secondary heater, secondary heater heating be discharged from fresh water generator to be supplied to hair The cooling water of motivation.
The cooling water being discharged from engine can be divided into two bursts of water flows, so that some in cooling water are supplied to primary heater And remaining cooling water bypasses primary heater, and system can also include the first triple valve, first triple valve be placed in around The cooling water for crossing primary heater merges place with the cooling water for having passed through primary heater.
First triple valve can be placed at position more lower than expansion slot.
System can also include cooler, and the cooler makes to have passed through primary heater and fresh water after being discharged from engine The cooling water of generator is cooling.
System can also include third temperature-control sensor, and the third temperature-control sensor is placed in will be from cooler On pipeline along the chilled(cooling) water supply (CWS) to engine of discharge and the temperature of cooling water is adjusted, wherein third temperature-control sensor Preset value with engine load increase and reduce.
The heat source obtained in cooling engine by cooling water can be used by primary heater and secondly by fresh water production first Raw device uses, and can be cooled down using cooler by heat remaining after fresh water generator use.
System can also include holding tank, and holding tank storage is not transported to the among the cooling water for cooling down engine The remaining cooling water of one heater.
System can also include the first compression unit, and first compression unit is placed in the cooling water that will be discharged from holding tank It is supplied on the pipeline along expansion slot, wherein when the liquid level of holding tank reaches predetermined value or is greater than predetermined value or in expansion slot Liquid level reach predetermined value or less than predetermined value when operates the first compression unit.
System can also include the second compression unit, and second compression unit compresses the cooling water being discharged from fresh water generator With the chilled(cooling) water supply (CWS) that will compress to engine.
System can also include the first valve, and first valve prevents from being supplied to from engine when the second compression unit stops The cooling water of one heater flows back.
Vaporizer, primary heater, fresh water generator and the second compression unit can be serially connected to allow to cool down Water is only recycled by the second compression unit.
System can also include third compression unit, and the third compression unit is placed in the cooling water that will be discharged from engine It is supplied on the pipeline along primary heater.
Fresh water generator can have the load being expressed by the following equation: B=(y-x) A/z, and wherein A indicates the negative of engine Lotus, x indicate the maximum heat for being transferred to the fluid as the heat medium in vaporizer, and B indicates the load of fresh water generator, y Indicate the maximum heat obtained in cooling engine by cooling water, and z instruction is 100% when institute in the load of fresh water generator The heat needed.
System can also include: at least one of first temperature-control sensor, be placed in cold by what is be discharged from engine But water is supplied on the pipeline along primary heater so that cooling water maintains at a constant temperature;And second temperature is adjusted and is passed Sensor, the temperature of cooling water will be adjusted by being placed on the pipeline along the chilled(cooling) water supply (CWS) to engine being discharged from fresh water generator Degree, the preset value that wherein second temperature adjusts sensor reduce as the load of engine increases.
System can also include air separator, and the air separator, which is placed in, will be discharged from engine and passed through first On pipeline along the chilled(cooling) water supply (CWS) to fresh water generator of heater, to remove air from cooling water.
Can slot also be discharged comprising air in system, and the air discharge slot discharge is transported to the cold of engine from fresh water generator But the air in water.
Insulation process can be carried out to part or all for the pipeline that cooling water flows through.
According to another aspect of the present invention, the method for supplying fuel gas for ship includes: 1) being passed through using primary heater Heat medium is heated by the heat exchange after cooling engine between the cooling water being discharged from engine and heat medium;2) Make liquefied natural gas via the heat exchange between the heat medium and liquefied natural gas heated by the heat exchange in step 1) Vaporization;It 3) will be in the middle natural gas supply vaporized of step 2) to engine;And 4) using fresh water generator by using by with Some or all heating seawaters of the heat source that the cooling water of the heat exchange of heat medium in step 1) obtains generate fresh water.
Method can also include: 5) heating cooling water used in fresh water generator in step 4).
In step 5), when not operating engine, cooling water can be heated to that the low-temperature corrosion of engine can be prevented Temperature or be greater than the temperature.
In step 5), it is reduced in the temperature for determining the cooling water after 100% operation fresh water generator in step 4) Lower than the low-temperature corrosion that can prevent engine temperature when, 100% operation fresh water generator after cooling water can be heated To the temperature for the low-temperature corrosion that can prevent engine or greater than the temperature.
Method can also include: 5) compressing the cooling water being discharged from fresh water generator using the second compression unit, will compress Chilled(cooling) water supply (CWS) to engine.
The cooling water being discharged from engine can be divided into two bursts of water flows, so that some in cooling water are supplied to primary heater And remaining cooling water bypasses primary heater, and the first triple valve can be placed in and bypass the cooling water of primary heater and wear The cooling water for crossing primary heater merges place.
When the second compression unit stops, the valve portion of the guiding primary heater of the first triple valve can be closed, and it is surplus Remaining valve portion can keep in open state.
Algorithm can be established to allow the valve portion of the guiding primary heater of the first triple valve to stop in the second compression unit When automatically turned off by control panel.
According to another aspect of the present invention, a kind of method for arranging is provided, wherein engine is placed in enging cabin, adjustment At buffering because cooling water expansion or shrinkage caused by the expansion slot of volume change be placed in above enging cabin 20 meters to 25 At rice distance, heat medium is heated so that the primary heater of liquefied natural gas vaporization is placed in position more higher than expansion slot Place, and the first triple valve is placed in and has bypassed the cooling water of primary heater and merge it with the cooling water for having passed through primary heater It sentences and is placed at position more lower than expansion slot.
According to another aspect of the invention, a kind of method is provided, the method is in cooling engine according to following equation By the heat distribution obtained by cooling water to vaporizer and fresh water generator: Ax+Bz=Ay, wherein A indicates the load of engine, X indicates the maximum heat for being transferred to the fluid as the heat medium in vaporizer, and B indicates the load of fresh water generator, y instruction The maximum heat obtained in cooling engine by cooling water, and z instruction is required when the load of fresh water generator is 100% Heat.
Favourable effect
According to an embodiment of the invention, can be via according between the load of load and fresh water generator for indicating engine The equation of relationship adjust the load of fresh water generator and will suitably be divided in cooling engine by the heat that cooling water obtains It is fitted on vaporizer and fresh water generator.
According to an embodiment of the invention, system include primary heater and vaporizer, thus reduce cooler capacity and Energy for operating cooler.
According to an embodiment of the invention, being stored it in holding tank before reusing superfluous cooling water, thus make The consumption of pending chemically treated cooling water minimizes.
According to an embodiment of the invention, the device along cooling water-circulation pipe placement is serially connected, wherein in uneasiness In the case where filling additional compression component, cooling water can be recycled only by the pressure of the second compression unit.
According to an embodiment of the invention, even if can be generated in 100% operation fresh water when engine has compared with underload Cooling water is heated by secondary heater after device, is achieved in the more effective operation of system.
According to an embodiment of the invention, system and method can while stopping (specifically, the second compression unit) be the One heater is placed in the structure above expansion slot and prepares.
According to an embodiment of the invention, system and method can efficiently control each device via control panel, and have Saying to body can automatically prepare when the second compression unit breaks down.
Detailed description of the invention
Fig. 1 is according to the first embodiment of the present invention be ship supply fuel gas system schematic diagram.
Fig. 2 is according to the second embodiment of the present invention be ship supply fuel gas system schematic diagram.
Specific embodiment
Hereinafter with reference to attached drawing detailed description of the present invention exemplary embodiment.It should be understood that following embodiment can be various Mode is modified and is not limit the scope of the invention.
Fig. 1 is according to the first embodiment of the present invention be ship supply fuel gas system schematic diagram.
It include primary heater (110), vaporizer according to the fuel gas supply system of this embodiment referring to Fig. 1 (180) and fresh water generator (120).
By according to the fuel gas supply system of this embodiment supply fuel engine (E) example may include using Natural gas is as the ME-GI engine of fuel, X-DF engine, DF engine and similar engine, and according to this implementation Example fuel gas supply system can be applied to the other burners for using natural gas as fuel, such as combustion gas turbine with And the like.Herein, it is preferably applied to be used as mainly propulsion according to the fuel gas supply system of this embodiment to start The ME-GI engine of machine.According to this embodiment, engine (E) is placed in enging cabin.
According to this embodiment, primary heater (110) is discharged after cooling engine (E) from engine (E) cold But heat is exchanged between water (pipeline L10) and the fluid (pipeline L3) for the heat medium being used as in vaporizer (180).Namely It says, some be supplied in the heat obtained in cooling engine (E) by cooling water is used as vaporization by primary heater (110) The fluid (pipeline L3) of heat medium in device (180), so that heating is used as the fluid of the heat medium in vaporizer (180) (pipeline L3).
Cooling water is being supplied on the pipeline (L10) along primary heater (110) from engine (E), can be disposed One temperature-control sensor (210) is to adjust from engine (E) cooling water to be supplied to primary heater (110) being discharged Temperature.According to this embodiment, the first temperature-control sensor (210) can will be from the temperature of engine (E) cooling water being discharged Adjust about 85 DEG C.
According to this embodiment, because adjusting the temperature for the cooling water being discharged from engine (E) to about 85 DEG C and by sending out The heat that motivation (E) generates increases as the load of engine (E) increases, so be supplied to the cooling water of engine (E) Temperature changes according to the load of engine (E).That is, the low-temperature corrosion of engine (E) in order to prevent, is supplied to and starts The temperature of the cooling water of machine (E) is increased as the load of engine (E) reduces.
According to this embodiment, vaporizer (180) is via the heat medium (pipeline L4) heated with primary heater (110) Heat exchange between liquefied natural gas makes liquefied natural gas vaporization.That is, vaporizer (180) use is started in cooling Some in the heat obtained when machine (E) by cooling water make liquefied natural gas vaporization via heat medium.It will be by vaporizer (180) engine (E) is supplied to for use as fuel via the natural gas (pipeline L1) that the vaporization of liquefied natural gas obtains.As vapour The fluid for changing the heat medium in device (180) can be ethylene glycol water (glycol water).
According to this embodiment, fresh water generator (120) adds by using by first is discharged and passed through from engine (E) Some or all heating seawaters of the heat that the cooling water (pipeline L20) of hot device (110) obtains generate fresh water.
Because the heat that can be obtained by cooling water in cooling engine (E) it is proportional to the load of engine (E) and to The amount of the fuel of consumption increases as the load of engine (E) increases, so the liquefaction to be vaporized by vaporizer (180) is natural The amount of gas increases also with the load of engine (E) and is increased.Therefore, to be transferred to from primary heater (110) by vaporizer (180) heat of the fluid as heat medium is also proportional to the load of engine (E).
Therefore, in the load of A instruction engine (E), x instruction is transferred to as the heat medium in vaporizer (180) The maximum heat of fluid, B indicate the load of fresh water generator (120), and y instruction is obtained in cooling engine (E) by cooling water Maximum heat, and z instruction, when the load of fresh water generator (120) is 100% when required heat, following equation is set up.
Ax+Bz=Ay
Therefore, the load of fresh water generator is expressed by the following equation: B=(y-x) A/z, and can be by according to this equation The load for adjusting fresh water generator (120) will be appropriately distributed in cooling engine (E) by the heat that cooling water obtains Vaporizer (180) and fresh water generator (120).
According to this embodiment, the heat obtained in cooling engine (E) by cooling water is first by primary heater (110) it uses, and after-heat is used by fresh water generator (120).
The cooling water (pipeline L10) being discharged from engine (E) can be divided into two bursts of water flows, so that in cooling water (pipeline L10) Some primary heaters (110) and remaining cooling water (pipeline L12) of being transported to around primary heater (110).Bypass The cooling water (pipeline L12) of one heater (110) can merge with the cooling water (pipeline L20) for having passed through primary heater (110) To be transported to fresh water generator (120), and the first triple valve (810) can be placed in the cooling for having bypassed primary heater (110) Water (pipeline L12) merges place with the cooling water (pipeline L20) for having passed through primary heater (110).It, can according to this embodiment The amount of the cooling water to be delivered to primary heater (110) is adjusted by adjusting the opening degree of the first triple valve (810), by This can adjust the heat that primary heater (110) are transferred to from cooling water.
Heat medium is being transported on the pipeline (L4) along vaporizer (180) from primary heater (110), can disposed Temperature sensor (not shown) is to allow to adjust the unlatching journey of the first triple valve (810) according to the temperature thus detected Degree.Because the temperature for the heat medium supplied along pipeline L4 increases with the amount of the liquefied natural gas to be vaporized by vaporizer (180) Add and increase, so can be adjusted by adjusting the temperature along the pipeline L4 heat medium supplied to be vaporized by vaporizer (180) Liquefied natural gas amount, and the cooling water of primary heater (110) can be transported to by being adjusted by the first triple valve (810) It measures to adjust the temperature of the heat medium along pipeline L4 supply.
In addition, can be operated according to the fuel gas supply system of this embodiment so that the heating along pipeline L4 flowing is situated between Matter maintains at a constant temperature.Because the temperature for the fluid (pipeline L3) being discharged from vaporizer (180) is being used as vaporizing Make to reduce after the heat medium of liquefied natural gas vaporization in device (180), so adjusting the opening degree of the first triple valve (810) To allow thus to heat the fluid for being supplied to primary heater along pipeline L3.
Flow rate and the second valve (720) of opening degree for adjusting fluid can be placed in pipeline (L4), heat Medium is transported to vaporizer (180) from primary heater (110) along the pipeline (L4).
It can include also air separator (330) according to the fuel gas supply system of this embodiment, be placed in pipeline (L20) on, be discharged from engine (E) and passed through the cooling water of primary heater (110) be transported to along the pipeline (L20) it is light Water generator (120).Fresh water production is transported to from from primary heater (110) according to the air separator (330) of this embodiment Air is removed in the cooling water of raw device (120), is thus prevented various in the fuel gas supply system according to this embodiment Failure of apparatus.
On the other hand, it is discharged from engine (E) and the cooling water (pipeline L20) for having passed through primary heater (110) can divide For two bursts of water flows, so that some in cooling water (pipeline L20) are transported to fresh water generator (120), and remaining cooling water (pipeline L22 fresh water generator (120)) are bypassed.Bypassed fresh water generator (120) cooling water (pipeline L22) can with passed through fresh water The cooling water (pipeline L30) of generator (120) merges to be transported to engine (E), and the second triple valve (820) can be placed in Around the cooling water (pipeline L22) of fresh water generator (120) with passed through the cooling water (pipeline L30) of fresh water generator (120) Merge place.According to this embodiment, can be adjusted by adjusting the opening degree of the second triple valve (820) to be delivered to fresh water The amount of the cooling water of generator (120), thus, it is possible to adjust the heat that fresh water generator (120) are transferred to from cooling water.
The cooling water being discharged from fresh water generator (120) is being transported on the pipeline (L30) along engine (E), it can Placement second temperature adjusts sensor (220) to adjust the temperature of cooling water.According to this embodiment, second temperature adjusts sensing The preset value of device (220) reduces as the load of engine (E) increases.
It can also include cooler (130) according to the fuel gas supply system of this embodiment, reduce from engine (E) It is discharged and has passed through the temperature of the cooling water of primary heater (110) and fresh water generator (120).Even if when in cooling engine (E) some in heat are supplied to after primary heater (110) and fresh water generator (120) by the cooling water that heat is obtained when When the temperature of cooling water does not reduce sufficiently yet, the temperature of cooling water is reduced according to the cooler (130) of this embodiment to permit Perhaps engine (E) is cooled to the predetermined temperature for engine (E) by cooling water.
In the structure for including cooler (130) according to the fuel gas supply system of this embodiment, generated from fresh water The cooling water (pipeline L30) of device (120) discharge can be divided into two bursts of water flows, so that some in cooling water (pipeline L30) are transported to Cooler (130) and remaining cooling water (pipeline L32) is around subcooler (130).Around the cooling water (pipe of subcooler (130) Line L32) it can merge with the cooling water (L40) for having passed through cooler (130) to be transported to engine (E), and third triple valve (830) it can be placed in around the cooling water (pipeline L32) of subcooler (130) and the cooling water (pipe for having passed through cooler (130) Line L40) merge place.It, can be to be conveyed to adjust by adjusting the opening degree of third triple valve (830) according to this embodiment To the amount of the cooling water of cooler (130), thus, it is possible to adjust by the degree of cooler (130) cooling cooling water.
Conventional system allows by chilled(cooling) water supply (CWS) to engine (E) after cooling cooler (130), rather than uses cold But the heat of water carrys out heats liquefied natural gas, however includes primary heater according to the fuel gas supply system of this embodiment (110) and vaporizer (180), to allow after the heat using cooling water carrys out heats liquefied natural gas only when needed by cold But the cooling cooling water of device (130) thus reduces the capacity of cooler (130) and is used for the energy of operating cooler (130).
In the structure for including cooler (130) according to the fuel gas supply system of this embodiment, start in cooling The heat obtained when machine (E) by cooling water is used by primary heater (110) first and is secondly made by fresh water generator (120) With, and cooled down using cooler (130) by remaining heat after fresh water generator (120) use.
In the structure for including cooler (130) according to the fuel gas supply system of this embodiment, third temperature tune Section sensor (230) can be placed on pipeline (L40) temperature for adjusting cooling water, the cooling water being discharged from cooler (130) Engine (E) is transported to along the pipeline (L40).According to this embodiment, the preset value of third temperature-control sensor (230) As the load of engine (E) increases and reduce.
It can also include holding tank (160), expansion slot (170) and sky according to the fuel gas supply system of this embodiment At least one of slot (140) are discharged in gas.
It is stored according to the holding tank (160) of this embodiment and is not transported among the cooling water for cooling down engine (E) The cooling water of primary heater (110), and some in the cooling water being stored in holding tank (160) can transport expansion slot (170) (pipeline L50).According to this embodiment, because superfluous cooling water is stored in holding tank (160) to make again With so fuel gas supply system can be such that the consumption of pending chemically treated cooling water minimizes.
According to this embodiment, expansion slot (170) is to body caused by by absorbing the expansion or shrinkage because of cooling water Product changes to improve the stability of system, and to apply pressure for the circulation of cooling water.Expansion slot (170) is received from holding tank (160) cooling water supplied and the air being discharged from air discharge slot (140).It is excessively risen in the internal pressure of expansion slot (170) Gao Shi, gas can be discharged along gas discharge pipe line (L2) from expansion slot (170).
According to this embodiment, expansion slot (170) is mountable at about 20 meters to 25 meters distances, to be started above enging cabin Machine (E) is placed in the enging cabin.If the mounting distance of the expansion slot (170) above enging cabin is more than 25 meters, that The pressure for being supplied to the cooling water of engine (E) is more than predetermined pressure.The mounting distance of expansion slot (170) can be according to engine (E) temperature of the cooling water needed for and change.Because the pressure reduction of cooling water can cause, bubble is generated and bubble generates pressure Changed according to the temperature of cooling water, so determining expansion slot (170) according to the temperature of cooling water needed for engine (E) Mounting distance is to prevent the bubble in cooling water from generating.
According to this embodiment, air discharge slot (140) will be transported to engine (E) from from fresh water generator (120) The air obtained in cooling water is discharged to expansion slot (170), and to mitigate the temperature change because of fluid caused by quick body The influence of product variation.The cooling water that engine (E) is transported to from fresh water generator (120) can be temporarily stored in air row Engine (E) is transported to later in slot (140) out.
It can include also the first compression unit (410) according to the fuel gas supply system of this embodiment, be placed in pipe On line (L50), the cooling water being discharged from holding tank (160) is supplied to expansion slot (170) along the pipeline (L50).
It can be with the of the water level for being adapted to adjust holding tank (160) according to the first compression unit (410) of this embodiment One level adjuster (310) and the second level adjuster (320) for being adapted to adjust the water level of expansion slot (170) are grasped in association Make.That is, the first compression unit (410) reaches pre- through operating with the water level in holding tank (160) according to this embodiment Definite value or when being greater than predetermined value or when the water level of expansion slot (170) reaches predetermined value or is less than predetermined value by holding tank (160) Cooling water be transported to expansion slot (170).
It can also include at least one of the following: the second compression unit according to the fuel gas supply system of this embodiment (420), the cooling water that is discharged from fresh water generator (120) of compression is with the chilled(cooling) water supply (CWS) that will compress to engine (E);And First valve (710) is placed on pipeline (L10), and cooling water is supplied to first from engine (E) along the pipeline (L10) and adds Hot device (110) is to prevent cooling water from flowing back.
According to this embodiment, it is possible to provide multiple second compression units (420) are to be connected in parallel, and second compression is single First (420) can compress cooling water under about 3 bars of pressure.According to this embodiment, the second compression unit (420) compressible cooling Water with meet the circulation for cooling water pressure and engine (E) needed for pressure.
In the structure for including the second compression unit (420) according to the fuel gas supply system of this embodiment, in accordance with It is desirable that being placed in the device that will be supplied to again on the pipeline along engine (E) from the cooling water that engine (E) is discharged It is serially connected, to allow cooling water in the case where not installing additional compression component merely with from the second compression unit (420) pressure and recycle.
According to this embodiment, the first valve (710) prevent because when the second compression unit (420) stop from engine (E) It is supplied to the pressure reduction of the cooling water of primary heater (110) and cooling water is caused to flow back.
It can also include secondary heater (150) according to the fuel gas supply system of this embodiment, heat from fresh water The cooling water to be supplied to engine (E) of generator (120) discharge.According to this embodiment, secondary heater (150) via Cooling water is heated in heat exchange between steam and cooling water.Third valve (730) can be placed on the pipeline along supply steam, And the amount of steam can be adjusted by adjusting the opening degree of third valve (730), thus, it is possible to adjust the degree of heating cooling water.
According to this embodiment, secondary heater (150) is to be heated to predetermined temperature for cooling water or be greater than predetermined temperature Degree, so that can prevent the chilled(cooling) water supply (CWS) of heating to engine (E) when not operating engine (E) during ship anchorage The only low-temperature corrosion of engine (E).In general, it according to this embodiment, is not grasped during the operation of secondary heater (150) Make cooler (130).
In the structure for including secondary heater (150) according to the fuel gas supply system of this embodiment, even if Cooling water ready for use can also 100% operation fresh water generator when the load of engine (E) is lower to have more low in calories (120).Routinely, when engine (E) has compared with underload, because 100% operation fresh water generator (120) to be supplied to The temperature of the cooling water of engine (E) is too low to prevent the corrosion low temperature of engine (E), thus can not 100% operation it is light Water generator (120).However, according to the present invention, even if still operating fresh water 100% when engine (E) has compared with underload Cooling water is heated to by secondary heater (150) temperature of the low-temperature corrosion of engine (E) can be prevented after generator (120) Degree, can more effectively operate fuel gas supply system.
In the structure for including secondary heater (150) according to the fuel gas supply system of this embodiment, from fresh water The cooling water of generator (120) discharge can be divided into two bursts of water flows so that some in cooling water (pipeline L60) be transported to second plus Hot device (150) and remaining cooling water (pipeline L62) bypasses secondary heater (150).The cooling of secondary heater (150) is bypassed Water (pipeline L62) can merge with the cooling water (L60) for having passed through secondary heater (150) to be transported to engine (E), and the 4th Valve (740) can be placed on pipeline (L62), and the cooling water for having bypassed secondary heater (150) is flowed along the pipeline (L62). According to this embodiment, can be adjusted by adjusting the opening degree of the 4th valve (740) to be delivered to secondary heater (150) The amount of cooling water, thus, it is possible to adjust by the degree of secondary heater (150) heating cooling water.
It is including cooler (130), air discharge slot (140), the according to the fuel gas supply system of this embodiment In whole structures in two compression units (420) and secondary heater (150), cooler (130) can be placed in fresh water production The downstream of raw device (120), air discharge slot (140) can be placed in the downstream of cooler (130), and the second compression unit (420) can It is placed in the downstream of air discharge slot (140), secondary heater (150) can be placed in the downstream of the second compression unit (420), and Engine (E) can be placed in the downstream of secondary heater (150).
It also include the first triple valve (810), the second triple valve (820), third triple valve in fuel gas supply system (830), third valve (730), the first temperature-control sensor (210), second temperature adjust sensor (220) and third temperature In the embodiment for adjusting at least one of sensor (230), the first triple valve (810), second can be controlled by control panel (C) Triple valve (820), third triple valve (830), third valve (730), the first temperature-control sensor (210), second temperature are adjusted The operation of each of sensor (220) and third temperature-control sensor (230).
According to this embodiment, control panel (C) is obtained via based on each of the device by being connected to control panel (C) Information and each of device state and to the operational circumstances of system carry out global analysis come it is every in control device One.
It, can be to the pipeline that cooling water flows through (by double in Fig. 1 in the fuel gas supply system according to this embodiment Dotted line instruction) insulation process is carried out, to use the heat from engine (E) cooling water being discharged without losing as much as possible Heat.
Fig. 2 is according to the second embodiment of the present invention be ship supply fuel gas system schematic diagram.
Implement shown in fuel gas supply system according to the second embodiment and Fig. 1 shown in Fig. 2 according to first The fuel gas supply system of example is the difference is that fuel gas supply system according to the second embodiment includes to be placed in Primary heater (110) above expansion slot (170), and include also third compression unit (190), and be described below and will focus on The different characteristic of fuel gas supply system according to the second embodiment.It will omit and be supplied with fuel gas according to first embodiment Answer the detailed description of the identical component of the component of system.
It include primary heater (110), vaporizer according to the fuel gas supply system of this embodiment referring to Fig. 2 (180) and fresh water generator (120), with first embodiment.
With first embodiment, by the engine for supplying fuel according to the fuel gas supply system of this embodiment (E) example may include using natural gas as the ME-GI engine of fuel, X-DF engine, DF engine and similar hair Motivation, and can be applied to that natural gas is used to fill as other burnings of fuel according to the fuel gas supply system of this embodiment It sets, such as combustion gas turbine and the like.With first embodiment, system is supplied according to the fuel gas of this embodiment System is preferably applied to the ME-GI engine as main propelling motor.According to this embodiment, engine (E) is placed in In enging cabin, with first embodiment.
With first embodiment, it is being discharged according to the primary heater (110) of this embodiment from engine (E) Heat is exchanged between cooling water (pipeline L10) and the fluid (pipeline L3) for the heat medium being used as in vaporizer (180).Namely It says, it, will be in cooling engine (E) Shi Youleng according to the primary heater (110) of this embodiment with first embodiment But water obtain heat in it is some be supplied to the fluid (pipeline L3) as the heat medium in vaporizer (180), thus plus Heat is used as the fluid (pipeline L3) of the heat medium in vaporizer (180).
Cooling water is being supplied on the pipeline (L10) along primary heater (110) from engine (E), can be disposed One temperature-control sensor (210) is to adjust from engine (E) cooling water to be supplied to primary heater (110) being discharged Temperature such as, with first embodiment.According to this embodiment, the first temperature-control sensor (210) can will be from engine (E) temperature for the cooling water being discharged is adjusted to about 85 DEG C, with first embodiment.
It according to this embodiment, will adjust from the temperature of engine (E) cooling water being discharged to about 85 DEG C, and be supplied to hair The temperature of the cooling water of motivation (E) changes according to the load of engine (E), with first embodiment.That is, being It prevents engine (E) from low-temperature corrosion occur as engine (E) load reduces, is supplied to the cooling water of engine (E) Temperature increases.
According to this embodiment, vaporizer (180) is via the heat medium (pipeline L4) heated with primary heater (110) Heat exchange between liquefied natural gas makes liquefied natural gas vaporization, with first embodiment.That is, vaporizer (180) using some natural to make to liquefy via heat medium in the heat obtained in cooling engine (E) by cooling water Gas vaporization, with first embodiment.Natural gas (the pipe that will be obtained by vaporizer (180) via the vaporization of liquefied natural gas Line L1) engine (E) is supplied to for use as in fuel, with first embodiment.As the heat medium in vaporizer (180) Fluid can be ethylene glycol water, with first embodiment.
According to this embodiment, fresh water generator (120) adds by using by first is discharged and passed through from engine (E) Some or all heating seawaters for the heat that the cooling water (pipeline L20) of hot device (110) obtains generate fresh water, implement with first It is the same in example.
With first embodiment, in the load of A instruction engine (E), x instruction is transferred to as vaporizer (180) In heat medium fluid maximum heat, B indicates the load of fresh water generator (120), and y instruction is at cooling engine (E) When the maximum heat that is obtained by cooling water, and z instruction is when the load of fresh water generator (120) is 100% when required heat, Following equation is set up.
Ax+Bz=Ay
Therefore, the load of fresh water generator is expressed by the following equation: B=(y-x) A/z, and can be by according to this equation The load for adjusting fresh water generator (120) will be appropriately distributed in cooling engine (E) by the heat that cooling water obtains Vaporizer (180) and fresh water generator (120).
According to this embodiment, the heat obtained in cooling engine (E) by cooling water is first by primary heater (110) it uses, and after-heat is used by fresh water generator (120), with first embodiment.
With first embodiment, the cooling water (pipeline L10) being discharged from engine (E) can be divided into two bursts of water flows, make Some in cooling water (pipeline L10) be transported to primary heater (110) and remaining cooling water (pipeline L12) around first plus Hot device (110).Bypassed primary heater (110) cooling water (pipeline L12) can with passed through the cold of primary heater (110) But water (pipeline L20) merges to be transported to fresh water generator (120), and the first triple valve (810) can be placed in and bypass first The cooling water (pipeline L12) of heater (110) merges place with the cooling water (pipeline L20) for having passed through primary heater (110), With first embodiment.According to this embodiment, can be adjusted by adjusting the opening degree of the first triple valve (810) to It is transported to the amount of the cooling water of primary heater (110), thus, it is possible to adjust from cooling water to be transferred to primary heater (110) In heat, with first embodiment.
Heat medium is being transported on the pipeline (L4) along vaporizer (180) from primary heater (110), can disposed Temperature sensor (not shown) is to allow to adjust the unlatching journey of the first triple valve (810) according to the temperature thus detected Degree, with first embodiment.
In addition, can be operated according to the fuel gas supply system of this embodiment so that the heating along pipeline L4 flowing is situated between Matter maintains at a constant temperature, with first embodiment.
Flow rate and the second valve (720) of opening degree for adjusting fluid can be placed in pipeline (L4), heat Medium is transported to vaporizer (180) from primary heater (110) along the pipeline (L4), with first embodiment.
It can include also air separator (330) according to the fuel gas supply system of this embodiment, be placed in pipeline (L20) on, be discharged from engine (E) and passed through the cooling water of primary heater (110) be transported to along the pipeline (L20) it is light Water generator (120), with first embodiment.It is heated according to the air separator (330) of this embodiment from from first Device (110) is transported in the cooling water of fresh water generator (120) and removes air, thus prevents in the system according to this embodiment The various failure of apparatus for including, with first embodiment.
With first embodiment, the cooling water (pipe of primary heater (110) is discharged and passed through from engine (E) Line L20) two bursts of water flows can be divided into, so that some in cooling water (pipeline L20) are transported to fresh water generator (120), and remaining Cooling water (pipeline L22) bypasses fresh water generator (120).With first embodiment, fresh water generator (120) has been bypassed Cooling water (pipeline L22) can merge with the cooling water (pipeline L30) for having passed through fresh water generator (120) to be transported to engine (E), and the second triple valve (820) can be placed in bypassed the cooling water (pipeline L22) of fresh water generator (120) with passed through it is light The cooling water (pipeline L30) of water generator (120) merges place.It, can be by adjusting the second triple valve according to this embodiment (820) opening degree adjusts the amount of the cooling water to be delivered to fresh water generator (120), and thus, it is possible to adjust from cooling water It is transferred to the heat of fresh water generator (120), with first embodiment.
The cooling water being discharged from fresh water generator (120) is being transported on the pipeline (L30) along engine (E), it can Placement second temperature adjusts sensor (220) to adjust the temperature of cooling water, with first embodiment.According to this implementation Example, the preset value that second temperature adjusts sensor (220) reduces as the load of engine (E) increases, with first embodiment In it is the same.
It can also include cooler (130) according to the fuel gas supply system of this embodiment, reduce from engine (E) It is discharged and has passed through the temperature of the cooling water of primary heater (110) and fresh water generator (120), in first embodiment one Sample.Even if some in heat are supplied to primary heater (110) when obtaining the cooling water of heat in cooling engine (E) When not reduced sufficiently yet with the temperature of cooling water after fresh water generator (120), dropped according to the cooler (130) of this embodiment The temperature of low cooling water is to allow cooling water that engine (E) is cooled to predetermined temperature, with first embodiment.
In the structure for including cooler (130) according to the fuel gas supply system of this embodiment, generated from fresh water The cooling water (pipeline L30) of device (120) discharge can be divided into two bursts of water flows, so that some in cooling water (pipeline L30) are transported to Cooler (130) and remaining cooling water (pipeline L32) is around subcooler (130), with first embodiment.Around supercooling The cooling water (pipeline L32) of device (130) can merge with the cooling water (pipeline L40) for having passed through cooler (130) to be transported to hair Motivation (E), and third triple valve (830) can be placed in around the cooling water (pipeline L32) of subcooler (130) with passed through it is cold But the cooling water (pipeline L40) of device (130) merges place, with first embodiment.According to this embodiment, tune can be passed through The opening degree of third triple valve (830) is saved to adjust the amount of the cooling water to be delivered to cooler (130), thus, it is possible to adjust By the degree of cooler (130) cooling cooling water, with first embodiment.
The capacity of cooler (130) can be reduced according to the fuel gas supply system of this embodiment and for operating cooling The energy of device (130), with first embodiment.
In the structure for including cooler (130) according to the fuel gas supply system of this embodiment, start in cooling The heat obtained when machine (E) by cooling water is used by primary heater (110) first and is secondly made by fresh water generator (120) With, and cooled down by remaining heat after fresh water generator (120) use, in first embodiment using cooler (130) Equally.
In the structure for including cooler (130) according to the fuel gas supply system of this embodiment, third temperature tune Section sensor (230) can be placed on pipeline (L40) temperature for adjusting cooling water, the cooling water being discharged from cooler (130) It is transported to engine (E) along the pipeline (L40), with first embodiment.According to this embodiment, third temperature is adjusted The preset value of sensor (230) reduces as the load of engine (E) increases, with first embodiment.
It can also include holding tank (160), expansion slot (170) and sky according to the fuel gas supply system of this embodiment At least one of slot (140) are discharged in gas.
It is stored according to the holding tank (160) of this embodiment and is not transported among the cooling water for cooling down engine (E) The cooling water of primary heater (110), and some in the cooling water being stored in holding tank (160) can transport expansion slot (170) in (pipeline L50), with first embodiment.According to this embodiment, fuel gas supply system can make pendingization The consumption for learning the cooling water of processing minimizes, with first embodiment.
According to this embodiment, expansion slot (170) is to body caused by by absorbing the expansion or shrinkage because of cooling water Product variation improves the stability of system, and in circulation the application pressure, with first embodiment for cooling water.Expansion The air that slot (170) receives the cooling water supplied from holding tank (160) and is discharged from air discharge slot (140) is implemented with first It is the same in example.When the internal pressure of expansion slot (170) excessively increases, gas can be along gas discharge pipe line (L2) from expansion slot (170) it is discharged, with first embodiment.
According to this embodiment, expansion slot (170) is mountable at about 20 meters to 25 meters distances, to be started above enging cabin Machine (E) is placed in the enging cabin, with first embodiment.
It can also include third compression unit according to the fuel gas supply system of this embodiment different from first embodiment (190), being placed in will be on the pipeline along from the chilled(cooling) water supply (CWS) that engine (E) is discharged to primary heater (110).According to The third compression unit (190) of this embodiment provides to wherein primary heater (110) that be mounted on obstruction effective by cooling water Ground is supplied to the structure at the high height of primary heater (110), specifically, providing to wherein the second compression unit (420) it provides and is not enough to the structure of the pressure of chilled(cooling) water supply (CWS) to primary heater (110).
Slot (140), which will be discharged, according to the air of this embodiment to be transported to engine (E) from from fresh water generator (120) The air obtained in cooling water is discharged to expansion slot (170), and to mitigate the temperature change because of fluid caused by quick body The influence of product variation, with first embodiment.The cooling water of engine (E) can will be transported to from fresh water generator (120) It is transported to engine (E) after being temporarily stored in air discharge slot (140), with first embodiment.
It can include also the first compression unit (410) according to the fuel gas supply system of this embodiment, be placed in pipe On line (L50), the cooling water being discharged from holding tank (160) is supplied to expansion slot (170) along the pipeline (L50), real with first It applies the same in example.
It can be with the of the water level for being adapted to adjust holding tank (160) according to the first compression unit (410) of this embodiment One level adjuster (310) and the second level adjuster (320) for being adapted to adjust the water level of expansion slot (170) are grasped in association Make, with first embodiment.That is, the first compression unit (410) is operated to store according to this embodiment When the water level of slot (160) reaches predetermined value or is greater than predetermined value or reaches predetermined value in the water level of expansion slot (170) or be less than pre- The cooling water of holding tank (160) is transported to expansion slot (170) when definite value, with first embodiment.
It can also include at least one of the following: the second compression unit according to the fuel gas supply system of this embodiment (420), the cooling water that is discharged from fresh water generator (120) of compression is with the chilled(cooling) water supply (CWS) that will compress to engine (E);And First valve (710) is placed on pipeline (L10), and cooling water is supplied to first from engine (E) along the pipeline (L10) and adds Hot device (110) is to prevent cooling water from flowing back, with first embodiment.
According to this embodiment, it is possible to provide multiple second compression units (420) are to be connected in parallel, and second compression is single First (420) can compress cooling water under about 3 bars of pressure, with first embodiment.According to this embodiment, the second compression Unit (420) compressible cooling water with meet the circulation for cooling water pressure and engine (E) needed for pressure, with It is the same in one embodiment.
In the structure for including the second compression unit (420) according to the fuel gas supply system of this embodiment, in accordance with It is desirable that being placed in the device that will be supplied to again on the pipeline along engine (E) from the cooling water that engine (E) is discharged It is serially connected, to allow cooling water in the case where not installing additional compression component merely with from the second compression unit (420) pressure and recycle, with first embodiment.
According to this embodiment, the first valve (710) prevent because when the second compression unit (420) stop from engine (E) It is supplied to the pressure reduction of the cooling water of primary heater (110) and cooling water is caused to flow back, with first embodiment.
It can also include secondary heater (150) according to the fuel gas supply system of this embodiment, heat from fresh water The cooling water to be supplied to engine (E) of generator (120) discharge, with first embodiment.According to this embodiment, Secondary heater (150) heats cooling water via the heat exchange between steam and cooling water, with first embodiment.The Three valves (730) can be placed on the pipeline along supply steam, and can be adjusted by adjusting the opening degree of third valve (730) The amount of steam, thus, it is possible to adjust the degree of heating cooling water, with first embodiment.
According to this embodiment, secondary heater (150) is to be heated to predetermined temperature for cooling water or be greater than predetermined temperature Degree, so that can prevent the chilled(cooling) water supply (CWS) of heating to engine (E) when not operating engine (E) during ship anchorage The only low-temperature corrosion of engine (E), with first embodiment.In general, according to this embodiment, in secondary heater (150) not operating cooler (130) during operation.
In the structure for including secondary heater (150) according to the fuel gas supply system of this embodiment, even if Cooling water ready for use can also 100% operation fresh water generator when the load of engine (E) is lower to have more low in calories (120), in first embodiment.According to the present invention, even if when engine (E) has compared with underload, still in 100% behaviour Make to be heated to cooling water by secondary heater (150) the low temperature corruption of engine (E) can be prevented after fresh water generator (120) The temperature of erosion, can more effectively operate in fuel gas supply system, with first embodiment.
In the structure for including secondary heater (150) according to the fuel gas supply system of this embodiment, from fresh water The cooling water of generator (120) discharge can be divided into two bursts of water flows so that some in cooling water (pipeline L60) be transported to second plus Hot device (150) and remaining cooling water (pipeline L62) bypasses secondary heater (150), with first embodiment.Bypass The cooling water (pipeline L62) of two heaters (150) can merge with the cooling water (pipeline L60) for having passed through secondary heater (150) To be transported to engine (E), and the 4th valve (740) can be placed on pipeline (L62), bypass the cold of secondary heater (150) But water is flowed along the pipeline (L62), with first embodiment.It, can be by adjusting the 4th valve according to this embodiment (740) opening degree adjusts the amount of the cooling water to be delivered to secondary heater (150), thus, it is possible to adjusting by second plus The degree of hot device (150) heating cooling water, with first embodiment.
It is including expansion slot (170) according to the fuel gas supply system of this embodiment different from first embodiment In structure, primary heater (110) is mounted at position more higher than expansion slot (170).In general, in ship according to this reality In the actual arrangement for applying the component of the fuel gas supply system of example, it is difficult to which primary heater (110) is mounted on enging cabin In, and primary heater must be placed at position more higher than expansion slot (170).
In addition, including expansion slot (170) and the first triple valve according to the fuel gas supply system of this embodiment (810) in structure, the first triple valve (810) be can be placed at position more lower than expansion slot (170).
According to this embodiment, when the second compression unit (420) stop, the guiding first of the first triple valve (810) adds The valve portion (the upper side valve portion in Fig. 2) of hot device (110) can close, and the guiding pipeline L12 of the first triple valve (810) and The valve portion (left side valve portion and lower side valve portion in Fig. 2) of fresh water generator (120) can be kept it turning on.
According to this embodiment, in the valve portion (in Fig. 2 of the guiding primary heater (110) of the first triple valve (810) Upper side valve portion) close when, even if the circulation for cooling water pressure because make the second compression unit (420) stopping due to dropping When low, it is possible to the first triple valve for preventing primary heater (110) and being placed at position more lower than expansion slot (170) (810) cooling water and the pressure loss in pipeline (pipeline L20) between.
In addition, in the guiding pipeline L12 of the first triple valve (810) and the valve portion of fresh water generator (120) (in Fig. 2 Left side valve portion and lower side valve portion) when keeping it turning on, even if stopping the second compression unit (420) to allow from engine (E) when being supplied to the cooling water reflux of primary heater (110), the first valve (710) is prevented from cooling water and flows back into engine (E) it (in the structure for including third compression unit (190) according to the fuel gas supply system of this embodiment, also prevents cold But water flows back towards third compression unit (190)) it will be from primary heater (110) via pipeline L12 and the first triple valve (810) The cooling water of reflux is transported to fresh water generator (120).
If the first triple valve (810) is placed at position more higher than expansion slot (170), even when in the first threeway When the valve portion (the upper side valve portion in Fig. 2) of the guiding primary heater (110) of valve (810) is closed, the second compression unit (420) failure can still cause pressure reduction to be to cause in cooling water close to steam pressure and because generating vacuum in pipeline Bubble is generated, thus the hardness of pipeline is had adverse effect.In addition, the pressure or flow rate of cooling water can promptly drop It is low, thereby increases and it is possible to generate water hammer (Water Hammering) phenomenon.
If primary heater (110) can be arranged as lower than expansion slot (170), even when in the second compression unit (420) it when failing, also needs not worry about in the pipeline (pipeline L20) between primary heater (110) and the first triple valve (810) Generate vacuum.However, primary heater is inevitably placed in the structure above expansion slot in ship, the first triple valve (810) it is arranged as lower than expansion slot to prevent primary heater (110) and the first threeway when the second compression unit (420) fail Vacuum is generated in pipeline (pipeline L20) between valve (810).
Therefore, water hammer (Water Hammering) phenomenon can be prevented according to the fuel gas supply system of this embodiment With failure of apparatus caused by the reflux because of cooling water.
It is including cooler (130), air discharge slot (140), the according to the fuel gas supply system of this embodiment In whole structures in two compression units (420) and secondary heater (150), cooler (130) can be placed in fresh water production The downstream of raw device (120), air discharge slot (140) can be placed in the downstream of cooler (130), and the second compression unit (420) can It is placed in the downstream of air discharge slot (140), secondary heater (150) can be placed in the downstream of the second compression unit (420), and Engine (E) can be placed in the downstream of secondary heater (150), with first embodiment.
It also include the first triple valve (810), the second triple valve (820), third triple valve in fuel gas supply system (830), third valve (730), the first temperature-control sensor (210), second temperature adjust sensor (220) and third temperature In the embodiment for adjusting at least one of sensor (230), the first triple valve (810), second can be controlled by control panel (C) Triple valve (820), third triple valve (830), third valve (730), the first temperature-control sensor (210), second temperature are adjusted The operation of each of sensor (220) and third temperature-control sensor (230), with first embodiment.
According to this embodiment, control panel (C) is obtained via based on each of the device by being connected to control panel (C) Information and each of device state and to the operational circumstances of system carry out global analysis come it is every in control device One, with first embodiment.
Specifically, establishing the algorithm of fuel gas supply system in the second compression unit according to this embodiment (420) valve portion (the upper side valve portion in Fig. 2 of the guiding primary heater (110) of the first triple valve (810) is closed when stopping Point), thus, it is possible to cope with the failure etc. of the second compression unit (420) automatically via control panel (C).
It, can be to the pipeline that cooling water flows through (by double in Fig. 1 in the fuel gas supply system according to this embodiment Dotted line instruction) insulation process is carried out, to use the heat from engine (E) cooling water being discharged without losing as much as possible Heat.
It will be apparent to those skilled in the art that the present invention is not limited to embodiments described above and can not take off It carry out various modifications, change in the case where from the spirit and scope of the present invention, changing and equivalent embodiment.

Claims (31)

1. a kind of system for supplying fuel gas for ship, comprising:
Vaporizer makes liquefied natural gas vaporization so that the liquefied natural gas is supplied to engine;
Primary heater, via after the cooling engine from the engine be discharged cooling water and heat medium between Heat exchange heat the fluid as the heat medium in the vaporizer;And
Fresh water generator passes through the heat with the cooling water for having passed through the primary heater after engine discharge Some or all heating seawaters in source generate fresh water,
Wherein the vaporizer passes through between the heat medium heated by the primary heater and the liquefied natural gas Heat exchange make the liquefied natural gas vaporization.
2. the system according to claim 1 for supplying fuel gas for ship, further includes: expansion slot is absorbed by described cold But volume change caused by the expansion or shrinkage of water.
3. the system according to claim 2 for supplying fuel gas for ship, wherein the engine is placed in engine In cabin, and the expansion slot is placed in above the enging cabin at 20 meters to 25 meters distances.
4. the system according to claim 2 for supplying fuel gas for ship, wherein the primary heater is placed in ratio At the higher position of expansion slot.
5. the system according to claim 1 for supplying fuel gas for ship, further includes: secondary heater is heated from institute State the cooling water to be supplied to the engine of fresh water generator discharge.
6. the system according to claim 2 for supplying fuel gas for ship, wherein from described in engine discharge Cooling water is divided into two bursts of water flows, so that some in the cooling water are supplied to the primary heater and the remaining cooling Water bypasses the primary heater,
The system also includes:
First triple valve is placed in the cooling water for having bypassed the primary heater and has passed through the primary heater The cooling water merges place.
7. the system according to claim 6 for supplying fuel gas for ship, wherein first triple valve is placed in ratio At the lower position of expansion slot.
8. the system according to claim 1 for supplying fuel gas for ship, further includes: cooler makes to start from described The cooling water that the primary heater and the fresh water generator have been passed through after machine discharge is cooling.
9. the system according to claim 8 for supplying fuel gas for ship, further includes:
Third temperature-control sensor, being placed in will be from the chilled(cooling) water supply (CWS) that the cooler is discharged to engine institute On the pipeline on edge, so that the temperature of the cooling water is adjusted,
Wherein the preset value of the third temperature-control sensor reduces as the load of the engine increases.
10. the system according to claim 8 for supplying fuel gas for ship, wherein in the cooling engine by institute The heat source for stating cooling water acquisition is used by the primary heater first and is secondly used by the fresh water generator, and benefit It is cooled down with the cooler by remaining heat after the fresh water generator use.
11. the system according to claim 2 for supplying fuel gas for ship, further includes: holding tank is stored for cooling down The remaining cooling water of the primary heater is not transported among the cooling water of the engine.
12. the system according to claim 11 for supplying fuel gas for ship, further includes:
First compression unit is placed in the pipe along the chilled(cooling) water supply (CWS) to the expansion slot that will be discharged from the holding tank On line,
Reach or be less than predetermined value when the liquid level of the holding tank reaches or surpasses predetermined value or in the liquid level of the expansion slot When operate first compression unit.
13. it is according to claim 1 for ship supply fuel gas system, further includes: the second compression unit, compression from The cooling water of fresh water generator discharge is with the chilled(cooling) water supply (CWS) that will compress to the engine.
14. the system according to claim 13 for supplying fuel gas for ship, further includes: the first valve, described second Compression unit prevents the cooling water reflux that the primary heater is supplied to from the engine when stopping.
15. it is according to claim 13 for ship supply fuel gas system, wherein the vaporizer, described first plus Hot device, the fresh water generator and second compression unit are serially connected to allow the cooling water only by described Two compression units circulation.
16. also being wrapped to the system for described in any one of claim 15 being ship supply fuel gas according to claim 1 Include: third compression unit is placed in along the chilled(cooling) water supply (CWS) to the primary heater that will be discharged from the engine Pipeline on.
17. according to claim 1 to the system for described in any one of claim 15 being ship supply fuel gas, wherein institute Stating fresh water generator has the load being expressed by the following equation: B=(y-x) A/z, wherein A indicates the load of the engine, x Indicate the maximum heat for being transferred to the fluid as the heat medium in the vaporizer, B indicates the fresh water production The load of raw device, y indicates the maximum heat obtained in the cooling engine by the cooling water, and z instruction is described light The load of water generator heat required when being 100%.
18. also being wrapped to the system for described in any one of claim 15 being ship supply fuel gas according to claim 1 It includes:
At least one first temperature-control sensor, being placed in will be from the chilled(cooling) water supply (CWS) that the engine is discharged to described So that the cooling water maintains at a constant temperature on pipeline along primary heater;And second temperature adjusts sensor, Be placed in by from the pipeline along the chilled(cooling) water supply (CWS) to the engine that the fresh water generator is discharged to adjust The temperature of cooling water is stated,
The preset value that wherein second temperature adjusts sensor reduces as the load of the engine increases.
19. also being wrapped to the system for described in any one of claim 15 being ship supply fuel gas according to claim 1 Include: air separator, the chilled(cooling) water supply (CWS) of the primary heater will be discharged from the engine and has passed through by being placed in Onto the pipeline along the fresh water generator, to remove air from the cooling water.
20. also being wrapped to the system for described in any one of claim 15 being ship supply fuel gas according to claim 1 Include: slot is discharged in air, and the air from the cooling water that the fresh water generator is transported to the engine is discharged.
21. according to claim 1 to the system for described in any one of claim 15 being ship supply fuel gas, wherein right Part or all for the pipeline that cooling water flows through carries out insulation process.
22. a kind of method for supplying fuel gas for ship, comprising:
1) using primary heater via the cooling water and heat medium being discharged after cooling engine from the engine it Between heat exchange heat the heat medium;
2) make via the heat exchange between the heat medium and liquefied natural gas heated by the heat exchange in step 1) The liquefied natural gas vaporization;
It 3) will be in the middle natural gas supply vaporized of step 2) to the engine;And
4) utilize fresh water generator by using the cooling water by the heat exchange for the heat medium in step 1) Some or all heating seawaters of the heat source of acquisition generate fresh water.
23. the method according to claim 22 for supplying fuel gas for ship, further includes: 5) heating institute in step 4) State the cooling water used in fresh water generator.
24. the method according to claim 23 for supplying fuel gas for ship, wherein in step 5), do not operating When the engine, cooling water heating is reached or surpassed to the temperature for the low-temperature corrosion that can prevent the engine.
25. the method according to claim 23 for supplying fuel gas for ship, wherein in step 5), determining The temperature of the cooling water falls below and can prevent described start after the 100% operation fresh water generator in step 4) When the temperature of the low-temperature corrosion of machine, cooling water heating is reached or surpassed after the 100% operation fresh water generator It can prevent the temperature of the low-temperature corrosion of the engine.
26. the method according to claim 22 for supplying fuel gas for ship, further includes: 5) utilize the second compression unit The cooling water being discharged from the fresh water generator is compressed, by the chilled(cooling) water supply (CWS) of the compression to the engine.
27. the method according to claim 26 for supplying fuel gas for ship, wherein the institute being discharged from the engine It states cooling water and is divided into two bursts of water flows, so that some in the cooling water are supplied to the primary heater and remaining described cold But water bypasses the primary heater, and the first triple valve can be placed in the cooling water for having bypassed the primary heater Merge place with the cooling water for having passed through the primary heater.
28. the method according to claim 27 for supplying fuel gas for ship, wherein stop in second compression unit When only, the valve portion of the guiding primary heater of first triple valve is closed, and its remaining valve portion keeps being in open Open state.
29. the method according to claim 28 for supplying fuel gas for ship, wherein establishing algorithm to allow described the The valve portion of the guiding primary heater of one triple valve is automatic by control panel when second compression unit stops Ground is closed.
30. a kind of method for arranging, wherein engine is placed in enging cabin, is adapted to buffer the expansion or shrinkage because of cooling water Caused by the expansion slot of volume change be placed in above the enging cabin at 20 meters to 25 meters distances, heat heat medium with It is placed in the primary heater of liquefied natural gas vaporization at position more higher than the expansion slot, and the first triple valve is placed in What the cooling water for having bypassed the primary heater merged with the cooling water for having passed through the primary heater sentences It is placed at position more lower than the expansion slot.
31. a kind of method, the method in cooling engine according to following equation by the heat distribution obtained by cooling water to Vaporizer and fresh water generator: Ax+Bz=Ay, wherein A indicates the load of the engine, and x instruction is transferred to as the vapour Change the maximum heat of the fluid of the heat medium in device, B indicates that the load of the fresh water generator, y are indicated in the cooling hair The maximum heat obtained when motivation by the cooling water, and z instruction is 100% when institute in the load of the fresh water generator The heat needed.
CN201780061379.9A 2016-10-05 2017-09-26 System and method for supplying fuel gas to ship Active CN109863081B (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
KR1020160128368A KR101876973B1 (en) 2016-10-05 2016-10-05 Fuel Gas Supply System and Method for Vessel
KR10-2016-0128367 2016-10-05
KR1020160128367A KR101876972B1 (en) 2016-10-05 2016-10-05 Fuel Gas Supply System and Method for Vessel
KR10-2016-0128368 2016-10-05
PCT/KR2017/010597 WO2018066860A1 (en) 2016-10-05 2017-09-26 System and method for supplying fuel gas for ship

Publications (2)

Publication Number Publication Date
CN109863081A true CN109863081A (en) 2019-06-07
CN109863081B CN109863081B (en) 2021-11-23

Family

ID=61832184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201780061379.9A Active CN109863081B (en) 2016-10-05 2017-09-26 System and method for supplying fuel gas to ship

Country Status (4)

Country Link
JP (1) JP7048589B2 (en)
CN (1) CN109863081B (en)
SG (1) SG11201902807UA (en)
WO (1) WO2018066860A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114651148A (en) * 2019-11-26 2022-06-21 三菱重工船用机械株式会社 Cold energy recovery system, ship provided with cold energy recovery system, and cold energy recovery method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748439B (en) * 2019-10-16 2022-01-11 大连船舶重工集团有限公司 Low-pressure gas supply system capable of efficiently utilizing cold energy of LNG (liquefied natural gas) fuel
JP2023015869A (en) 2021-07-20 2023-02-01 三菱造船株式会社 Ammonia fuel supply facility, and ammonia fuel supply method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0979036A (en) * 1995-09-08 1997-03-25 Hitachi Zosen Corp Cooling operation method and cooling equipment in marine vessel
JP2004082866A (en) * 2002-08-27 2004-03-18 Mitsubishi Heavy Ind Ltd Cooling water circulating device
US6733352B1 (en) * 2003-05-09 2004-05-11 Brunswick Corporation Electronically controlled cooling system for a marine propulsion engine
CN101918749A (en) * 2007-11-30 2010-12-15 瓦锡兰芬兰有限公司 Floating LNG storage and re-gasification unit and method for re-gasification of LNG on said unit
JP2013180625A (en) * 2012-02-29 2013-09-12 Mitsubishi Heavy Ind Ltd Exhaust heat recovery type ship propulsion device, and operation method therefor
KR20130123967A (en) * 2012-05-04 2013-11-13 대우조선해양 주식회사 Generator engine preheating system for a ship
CN103511127A (en) * 2012-06-25 2014-01-15 U&S株式会社 Liquefied natural gas fuel supply system for ship engines
KR20150005344A (en) * 2013-07-05 2015-01-14 현대중공업 주식회사 Cooling water system of engine
KR20150115232A (en) * 2014-04-03 2015-10-14 대우조선해양 주식회사 System and method for supplying fuel gas using a waste heat of engine cooling water

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6544929B2 (en) * 2015-01-09 2019-07-17 大阪瓦斯株式会社 LNG fueled ship

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0979036A (en) * 1995-09-08 1997-03-25 Hitachi Zosen Corp Cooling operation method and cooling equipment in marine vessel
JP2004082866A (en) * 2002-08-27 2004-03-18 Mitsubishi Heavy Ind Ltd Cooling water circulating device
US6733352B1 (en) * 2003-05-09 2004-05-11 Brunswick Corporation Electronically controlled cooling system for a marine propulsion engine
CN101918749A (en) * 2007-11-30 2010-12-15 瓦锡兰芬兰有限公司 Floating LNG storage and re-gasification unit and method for re-gasification of LNG on said unit
JP2013180625A (en) * 2012-02-29 2013-09-12 Mitsubishi Heavy Ind Ltd Exhaust heat recovery type ship propulsion device, and operation method therefor
KR20130123967A (en) * 2012-05-04 2013-11-13 대우조선해양 주식회사 Generator engine preheating system for a ship
CN103511127A (en) * 2012-06-25 2014-01-15 U&S株式会社 Liquefied natural gas fuel supply system for ship engines
KR20150005344A (en) * 2013-07-05 2015-01-14 현대중공업 주식회사 Cooling water system of engine
KR20150115232A (en) * 2014-04-03 2015-10-14 대우조선해양 주식회사 System and method for supplying fuel gas using a waste heat of engine cooling water

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114651148A (en) * 2019-11-26 2022-06-21 三菱重工船用机械株式会社 Cold energy recovery system, ship provided with cold energy recovery system, and cold energy recovery method
CN114651148B (en) * 2019-11-26 2023-12-01 三菱重工船用机械株式会社 Cold energy recovery system, ship provided with same, and cold energy recovery method

Also Published As

Publication number Publication date
JP7048589B2 (en) 2022-04-05
CN109863081B (en) 2021-11-23
WO2018066860A1 (en) 2018-04-12
JP2019531966A (en) 2019-11-07
SG11201902807UA (en) 2019-05-30

Similar Documents

Publication Publication Date Title
EP2851547B1 (en) System and method for processing liquefied gas
EP2832972B1 (en) Ship, fuel gas supply apparatus, and fuel gas supply method
JP5538234B2 (en) Natural gas supply method and apparatus
US7497180B2 (en) Gas supply arrangement of a marine vessel and method of providing gas in a gas supply arrangement of a marine vessel
JP5248607B2 (en) Filling tank with pressurized gas
KR101009920B1 (en) Apparatus and method for supplying fuel gas in ships, floating vessels or floating facilities
CN109863081A (en) The system and method for supplying fuel gas for ship
KR102370604B1 (en) Fuel gas supply system and method for vessel
KR20120123783A (en) Lng fuel supply system for vessel engine
CN108730759A (en) Air-cooled carbon dioxide carburetion system and its vaporization constant temperature pressure regulation method
KR101280185B1 (en) Fuel gas supply system of the direct heat exchange form using boiler steam
CN110167837B (en) Fuel gas supply system
KR101876973B1 (en) Fuel Gas Supply System and Method for Vessel
KR101960607B1 (en) Regasification System of liquefied Gas and Ship Having the Same
US20180172209A1 (en) Apparatus and Method for the Regasification of Liquefied Natural Gas
KR20190124000A (en) Regasification System of liquefied Gas and Ship Having the Same
KR101280216B1 (en) Fuel gas supply system of the direct heat exchange form using boiler steam
KR101876972B1 (en) Fuel Gas Supply System and Method for Vessel
KR20190031079A (en) Regasification System of liquefied Gas and Ship Having the Same
KR20220039985A (en) Regasification System of liquefied Gas and Ship Having the Same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3370 Juti Road, Juji City, Gyeongsangnam do, South Korea

Patentee after: Hanhua Ocean Co.,Ltd.

Address before: 3370 Juti Road, Juji City, Gyeongsangnam do, South Korea (postal code 53302)

Patentee before: DAEWOO SHIPBUILDING & MARINE ENGINEERING Co.,Ltd.