CN109855699A - A kind of mine remnants water level isoplethes drawing method being conducive to unified standard format - Google Patents

A kind of mine remnants water level isoplethes drawing method being conducive to unified standard format Download PDF

Info

Publication number
CN109855699A
CN109855699A CN201910007668.1A CN201910007668A CN109855699A CN 109855699 A CN109855699 A CN 109855699A CN 201910007668 A CN201910007668 A CN 201910007668A CN 109855699 A CN109855699 A CN 109855699A
Authority
CN
China
Prior art keywords
data
mine
water level
working face
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910007668.1A
Other languages
Chinese (zh)
Other versions
CN109855699B (en
Inventor
赵小磊
张毅
杨佃杰
杜玉龙
魏明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Engineering Testing & Inspection Co Ltd
Original Assignee
Huaibei Engineering Testing & Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Engineering Testing & Inspection Co Ltd filed Critical Huaibei Engineering Testing & Inspection Co Ltd
Priority to CN201910007668.1A priority Critical patent/CN109855699B/en
Publication of CN109855699A publication Critical patent/CN109855699A/en
Application granted granted Critical
Publication of CN109855699B publication Critical patent/CN109855699B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention is suitable for coal mining geology water control technique field, provides a kind of mine remnants water level isoplethes drawing method for being conducive to unified standard format;The a large amount of anti-physical prospecting initial data of harnessing the river of acquisition, these initial data can analyze mine working face hydrogeologic condition in early period, determine working face rich water abnormal area;Drilling data can be combined in the later period, situation is administered to working face water enrichment area and carries out analysis verifying, to judge regulation effect this technology, make in terms of the data handling utility in later period towards prevention and treatment water conservancy project, the a large amount of anti-physical prospecting initial data of harnessing the river of acquisition, these initial data can analyze mine working face hydrogeologic condition in early period, determine working face rich water abnormal area;In the later period situation can be administered to working face water enrichment area and carry out analysis verifying in conjunction with drilling data, to judge regulation effect this technology, made in terms of the data handling utility in later period towards prevention and treatment water conservancy project.

Description

A kind of mine remnants water level isoplethes drawing method being conducive to unified standard format
Technical field
The invention belongs to coal mining geology water control technique field more particularly to a kind of mines for being conducive to unified standard format Remaining water level isoplethes drawing method.
Background technique
Mine water disaster is a kind of common major casualty of coal mining, once occur not only to will affect mine normal production, The dead group's wound of group is more seriously caused, is lost huge.Huaibei Mining Area is threatened by water damage deeply, a lot of water damage accidents occurs, so right Prevention and treatment water conservancy project is extremely paid attention to, and water control technique research is constantly carried out, and strengthens floods prevention.
Group company's level does not have the method for drafting of working face remnants water level isopleth profession, the software that each mine uses at present Multifarious, standard, format are different, ununified specification, and most of mines use manual drawing, and error-prone, modification is inconvenient, It cannot be guaranteed that the accuracy of interpolation isopleth, and remaining water level isoplethes drawing needs to refer to the borehole data closed on, and by hand Drafting cannot efficiently use adjacent drilling, and subjectivity is strong, easily causes the distortion of drawing achievement.
Summary of the invention
The present invention provides a kind of mine remnants water level isoplethes drawing method for being conducive to unified standard format, it is intended to solve Group company's level does not have the method for drafting of working face remnants water level isopleth profession at present, and the software five that each mine uses spends eight Door, standard, format are different, ununified specification, and most of mines use manual drawing, and error-prone, modification is inconvenient, Bu Nengbao The accuracy of interpolation isopleth is demonstrate,proved, and remaining water level isoplethes drawing needs to refer to the borehole data closed on, and manual drawing is not The problem of energy efficiently uses adjacent drilling, and subjectivity is strong, easily causes the distortion of drawing achievement.
The invention is realized in this way a kind of mine remnants water level isoplethes drawing side for being conducive to unified standard format Method, method and step are:
Step 1: underground site acquires data;To mine field experiment, related data is acquired;
Step 2: analysis judges;Theory analysis is carried out to the related data of live mine field experiment acquisition And judgement;
Step 3: computer programming;With computer programming, the correlation for being acquired the experiment of live mine by software Data information carries out typing;
Step 4: contrast of multiple-schemes;By the initial data of acquisition by Software Create data model scheme, with mine reality The related data for testing acquisition compares;
Step 5: interior business processing;Joint debugging test is carried out to the related data of acquisition;
Step 6: computer graphics;Joint debugging is successfully tested is drawn by computer software.
The present invention also provides preferred, original data collection step is in the contrast of multiple-schemes;
A multiple mines carry out nearly limestone water visits in advance, the advanced administration project of working face Sandstone Water, acquisition initial data, Analyze rich water abnormal area;
B determines the arrangement in drilling verification hole for abnormal area application theory analysis, collects verify data;
C tracks the improvement situation of rich water abnormal area, collects data;
D acquires remaining water level value after administering, realize mesh by module design, programming with computer programming Mark function.
The present invention also provides preferred, the contrast of multiple-schemes by the kinds of schemes that is formed in the initial data collected, It establishes model and mine experiment acquisition data forms scheme comparison.
The present invention also provides preferred, the interior business processing includes theory analysis, module design and detail programming, to adopting Collect data into progress joint debugging test.
The present invention also provides preferred, the computer drawing software is that the professional drawing established with initial data is soft Part.
Compared with prior art, the beneficial effects of the present invention are: a kind of mine for being conducive to unified standard format of the invention Well remnants water level isoplethes drawing method, acquires a large amount of anti-physical prospecting initial data of harnessing the river, these initial data can divide in early period Mine working face hydrogeologic condition is analysed, determines working face rich water abnormal area;It can be in conjunction with drilling data, to work in the later period Face water enrichment area administers situation and carries out analysis verifying, to judge regulation effect this technology, makees towards prevention and treatment water conservancy project in the later period In terms of data handling utility, it can accomplish:
(1) change anti-physical prospecting initial data of the harnessing the river phenomenon inadequate using depth, realize that the extension of initial data utilizes, pass through It wears prevention and treatment water conservancy project and makees overall process;
(2) phenomenon for changing working face remnants water level isopleth drafting standards, format confusion realizes drawing achievement standard system One, version is general;
(3) change the phenomenon that working face remnants water level isopleth drafting accuracy is low, data are unreliable, drafting subjectivity is big, It realizes based on initial data, adjacent area participation calculating, realizes high-precision drawing achievement;
(4) change each mine, each working face outcome data dispersion, be difficult to comprehensively utilize, the phenomenon that global analysis, realize collection Group company remnants water level isopleth drawing achievement can any mine, any drafting system carry out integration separation, delete supplement, It uses for reference and uses.
Detailed description of the invention
Fig. 1 is method structural schematic diagram of the invention;
Fig. 2 is technological means structural schematic diagram in the present invention;
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The present invention provides a kind of mine remnants water level isoplethes drawing for being conducive to unified standard format referring to FIG. 1-2, Method and technology scheme:
Embodiment one: when generating data model matching;
Step 1: underground site acquires data;To mine field experiment, related data is acquired;
Step 2: analysis judges;Theory analysis is carried out to the related data of live mine field experiment acquisition And judgement;
Step 3: computer programming;With computer programming, the correlation for being acquired the experiment of live mine by software Data information carries out typing, determines data model and basis of software platform;
Step 4: contrast of multiple-schemes;By the initial data of acquisition by Software Create data model scheme, with mine reality The related data for testing acquisition compares;
Source data collection step is;
A, which is utilized, carries out the opportunity of the anti-physical prospecting research of harnessing the river of geology in mining area, carries out in mines such as Yuan two, Zhu Xianzhuan, willows Nearly limestone water visits in advance, the advanced administration project of working face Sandstone Water, acquires initial data, analysis rich water abnormal area;
B determines the arrangement in drilling verification hole for abnormal area application theory analysis, collects verify data;
C tracks the improvement situation of rich water abnormal area, collects data;
D acquires remaining water level value after administering, realize mesh by module design, programming with computer programming Mark function.
Step 5: interior business processing;Joint debugging test is carried out to the related data of acquisition, is basic data by initial data Professional software carries out theory analysis to acquisition data, carries out module design, is programmed debugging, and joint debugging test is successfully tested Afterwards;
Step 6: computer graphics;Joint debugging is successfully tested is drawn by the computer software based on initial data.
The special project Software on Drawing method makees the data handling utility in the later period towards prevention and treatment water conservancy project, has efficient, accurate, mark Quasi- feature forms general format, unified reference format, different mines in group company's level by promoting to mining area The drawing of different working faces any mine can use for reference use, modification delete benefit, improve resource-sharing and data fusion;
(1) the specialized mapping software researched and developed, the subjectivity for solving people in drawing is random, makes mining area remnants water level isopleth Drawing drafting format is consistent, standard is unified;
(2) start with from the advanced project of detecting of underground coal mine, the overall process made through prevention and treatment water conservancy project helps to improve physical prospecting The level of research work.
(3) water level predictions such as artificial selected close region correlation drilling, by the comprehensive operation in software backstage, entirety considers, Improve the accuracy drawn.
(4) big fusion, the shared and exploitation of the geology prevention and treatment water number evidence in full mining area are realized.
Embodiment two;When generating data model mismatch;
Step 1: underground site acquires data;To mine field experiment, related data is acquired;
Step 2: analysis judges;Theory analysis is carried out to the related data of live mine field experiment acquisition And judgement;
Step 3: computer programming;With computer programming, the correlation for being acquired the experiment of live mine by software Data information carries out typing, determines data model and basis of software platform;
Step 4: contrast of multiple-schemes;By the initial data of acquisition by Software Create data model scheme, with mine reality The related data for testing acquisition compares;
Source data collection step is;
A, which is utilized, carries out the opportunity of the anti-physical prospecting research of harnessing the river of geology in mining area, carries out in mines such as Yuan two, Zhu Xianzhuan, willows Nearly limestone water visits in advance, the advanced administration project of working face Sandstone Water, acquires initial data, analysis rich water abnormal area;
B determines the arrangement in drilling verification hole for abnormal area application theory analysis, collects verify data;
C tracks the improvement situation of rich water abnormal area, collects data;
D acquires remaining water level value after administering, realize mesh by module design, programming with computer programming Mark function.
Step 5: interior business processing;Joint debugging test is carried out to the related data of acquisition, is basic data by initial data Professional software carries out theory analysis to acquisition data, carries out module design, is programmed debugging, joint debugging test, and test joint debugging is lost After losing, data model is redefined;
Step 6: contrast of multiple-schemes;By the initial data of acquisition by Software Create data model scheme, with mine reality The related data for testing acquisition produces new model scheme and compares;
Step 7: interior business processing;Joint debugging test is carried out to the related data of acquisition, is basic data by initial data Professional software carries out theory analysis to acquisition data, carries out module design, be programmed debugging, joint debugging test, test joint debugging at After function;
Step 8: computer graphics;Joint debugging is successfully tested is drawn by the computer software based on initial data.
The a large amount of anti-physical prospecting initial data of harnessing the river of acquisition, these initial data can analyze the mine working face hydrology in early period Geological conditions determines working face rich water abnormal area;Feelings can be administered to working face water enrichment area in conjunction with drilling data in the later period Condition carries out analysis verifying, to judge regulation effect this technology, makees in terms of the data handling utility in later period towards prevention and treatment water conservancy project;
(1) the specialized mapping software researched and developed, the subjectivity for solving people in drawing is random, makes mining area remnants water level isopleth Drawing drafting format is consistent, standard is unified;
(2) start with from the advanced project of detecting of underground coal mine, the overall process made through prevention and treatment water conservancy project helps to improve physical prospecting The level of research work.
(3) water level predictions such as artificial selected close region correlation drilling, by the comprehensive operation in software backstage, entirety considers, Improve the accuracy drawn.
(4) big fusion, the shared and exploitation of the geology prevention and treatment water number evidence in full mining area are realized.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (5)

1. a kind of mine remnants water level isoplethes drawing method for being conducive to unified standard format, method and step are:
Step 1: underground site acquires data;To mine field experiment, related data is acquired;
Step 2: analysis judges;Theory analysis is carried out to the related data of live mine field experiment acquisition and is sentenced It is disconnected;
Step 3: computer programming;With computer programming, the related data for being acquired the experiment of live mine by software Data carries out typing;
Step 4: contrast of multiple-schemes;By the initial data of acquisition by Software Create data model scheme, adopted with mine experiment The related data of collection compares;
Step 5: interior business processing;Joint debugging test is carried out to the related data of acquisition;
Step 6: computer graphics;Joint debugging is successfully tested is drawn by computer software.
2. a kind of mine remnants water level isoplethes drawing method for being conducive to unified standard format as described in claim 1, Be characterized in that: original data collection step is in the contrast of multiple-schemes;
A multiple mines carry out nearly limestone water visits in advance, the advanced administration project of working face Sandstone Water, acquire initial data, analyze Rich water abnormal area;
B determines the arrangement in drilling verification hole for abnormal area application theory analysis, collects verify data;
C tracks the improvement situation of rich water abnormal area, collects data;
D acquires remaining water level value after administering, realize target function by module design, programming with computer programming Energy.
3. a kind of mine remnants water level isoplethes drawing method for being conducive to unified standard format as claimed in claim 2, Be characterized in that: the kinds of schemes that the contrast of multiple-schemes is formed in the initial data by collection establishes model and mine is tested It acquires data and forms scheme comparison.
4. a kind of mine remnants water level isoplethes drawing method for being conducive to unified standard format as claimed in claim 3, Be characterized in that: the interior business processing includes theory analysis, module design and detail programming, to acquisition data into carrying out joint debugging survey Examination.
5. a kind of mine remnants water level isoplethes drawing method for being conducive to unified standard format as claimed in claim 4, Be characterized in that: the computer drawing software is the professional drawing software established with initial data.
CN201910007668.1A 2019-01-04 2019-01-04 Mine residual water level contour line drawing method beneficial to unifying standard formats Active CN109855699B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910007668.1A CN109855699B (en) 2019-01-04 2019-01-04 Mine residual water level contour line drawing method beneficial to unifying standard formats

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910007668.1A CN109855699B (en) 2019-01-04 2019-01-04 Mine residual water level contour line drawing method beneficial to unifying standard formats

Publications (2)

Publication Number Publication Date
CN109855699A true CN109855699A (en) 2019-06-07
CN109855699B CN109855699B (en) 2020-12-22

Family

ID=66893869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910007668.1A Active CN109855699B (en) 2019-01-04 2019-01-04 Mine residual water level contour line drawing method beneficial to unifying standard formats

Country Status (1)

Country Link
CN (1) CN109855699B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113029643A (en) * 2021-02-26 2021-06-25 山东丰源远航煤业有限公司北徐楼煤矿 Mine hydrogeological condition detector

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630464A (en) * 2009-09-04 2010-01-20 中国煤炭地质总局水文地质局 Making method of geologic and hydrogeologic map
CN102496187A (en) * 2011-10-21 2012-06-13 克拉玛依红有软件有限责任公司 Method for tracking contour line to boundary and fault based on triangular mesh
CN103617336A (en) * 2013-12-16 2014-03-05 中国民航大学 Method for drawing aircraft noise contour map
CN103742145A (en) * 2013-12-24 2014-04-23 山东新阳能源有限公司 Water control method for abnormal water-enriched region of coal mine
CN106918412A (en) * 2017-02-14 2017-07-04 北京铁路局天津工程项目管理部 A kind of monitoring method and system of frame core-tube system jacking construction
US10094417B2 (en) * 2015-01-28 2018-10-09 Kobe Steel, Ltd. Tilting pad journal bearing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630464A (en) * 2009-09-04 2010-01-20 中国煤炭地质总局水文地质局 Making method of geologic and hydrogeologic map
CN102496187A (en) * 2011-10-21 2012-06-13 克拉玛依红有软件有限责任公司 Method for tracking contour line to boundary and fault based on triangular mesh
CN103617336A (en) * 2013-12-16 2014-03-05 中国民航大学 Method for drawing aircraft noise contour map
CN103742145A (en) * 2013-12-24 2014-04-23 山东新阳能源有限公司 Water control method for abnormal water-enriched region of coal mine
US10094417B2 (en) * 2015-01-28 2018-10-09 Kobe Steel, Ltd. Tilting pad journal bearing
CN106918412A (en) * 2017-02-14 2017-07-04 北京铁路局天津工程项目管理部 A kind of monitoring method and system of frame core-tube system jacking construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王锋堂等: "地下水水位等值线数值的计算方法及其机助制图", 《首都师范大学学报(自然科学版)》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113029643A (en) * 2021-02-26 2021-06-25 山东丰源远航煤业有限公司北徐楼煤矿 Mine hydrogeological condition detector

Also Published As

Publication number Publication date
CN109855699B (en) 2020-12-22

Similar Documents

Publication Publication Date Title
WO2019042483A2 (en) Tbm boring rock state real-time sensing system and method
US10961826B2 (en) Subsurface modeler workflow and tool
Borsaru et al. Automated lithology prediction from PGNAA and other geophysical logs
CN105484735A (en) Method for evaluating coincidence rate of actual drilling borehole trajectory and design track
Wright The In Salah gas CO2 storage project
Zhao et al. Location and flux discrimination of water inrush using its spreading process in underground coal mine
Dudt et al. The “penalty factors” method for the prediction of TBM performances in changing grounds
CN109855699A (en) A kind of mine remnants water level isoplethes drawing method being conducive to unified standard format
CN109752064A (en) A kind of automation method for drafting for the mine remnants water level isopleth that accuracy is high
Glaser et al. New directions in rock mechanics—report on a forum sponsored by the American Rock Mechanics Association
Farndale et al. An Update on the United Downs Geothermal Power Project, Cornwall, UK
Liu et al. A high-resolution numerical well-test model for pressure transient analysis of multistage fractured horizontal wells in naturally fractured reservoirs
Zoccarato et al. Modeling fault activation due to fluid production: Bayesian update by seismic data
CN104268785A (en) Analysis method for deep well floor water inrush risk
CN110644975B (en) Fracture-cavity type oil reservoir tracer curve quantitative interpretation method
Parney et al. Fracture and production data integration using discrete fracture network models for carbonate reservoir management, South Oregon basin field, Wyoming
CN107013207A (en) A kind of method for obtaining Complex Fault Block Oil Reservoir sand body underground well location information
Zheng et al. Simulation of bench stepping and optimization of bolt parameters based on multiple geological information fusion
Kneafsey et al. The EGS Collab Project: Status and Accomplishments
Schwering The First EGS Collab Testbed at the Sanford Underground Research Facility? Discrete Fracture Network Characterization.
Mobarra et al. Application of artificial neural networks to the prediction of TBM penetration rate in TBM-driven golab water transfer tunnel
CN105891443B (en) A kind of tunnel rock Geological data collecting processing method and system
Zhao et al. Prediction Equipment and Water Damage Prevention Based on Microscopic Image and Mine Water Inflow.
Witherspoon et al. Hydrogeological testing to characterize a fractured granite.
CN110991081B (en) Method for determining gas extraction amount of adjacent layer based on gas extraction of ground drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant