CN109853907A - Skyscraper layer-stepping flue and its apply method - Google Patents

Skyscraper layer-stepping flue and its apply method Download PDF

Info

Publication number
CN109853907A
CN109853907A CN201910088852.3A CN201910088852A CN109853907A CN 109853907 A CN109853907 A CN 109853907A CN 201910088852 A CN201910088852 A CN 201910088852A CN 109853907 A CN109853907 A CN 109853907A
Authority
CN
China
Prior art keywords
layer
flue
tongue
square tube
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910088852.3A
Other languages
Chinese (zh)
Inventor
徐震
徐凯锋
焦苗苗
崔源
杨芳
郭佳慧
殷佳鑫
李英霞
平原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi Sanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Co Ltd filed Critical Shanxi Sanjian Group Co Ltd
Priority to CN201910088852.3A priority Critical patent/CN109853907A/en
Publication of CN109853907A publication Critical patent/CN109853907A/en
Pending legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The invention discloses a kind of skyscraper layer-stepping flue and its method is applied, solves the problems, such as that the kitchen position flue poor sealing performance of existing skyscraper is easy leakage flue gas.Build floor (1) and upper layer concreting floor (2) are poured including this layer concrete, the corner that this layer concrete pours build floor (1) is provided with this layer of flue reserved opening (3), the corner of upper layer concreting floor (2) is provided with upper layer flue reserved opening (4), this layer concrete on the outside of this layer of flue reserved opening (3), which pours, has poured the anti-bank step (6) of the outer tongue and groove of L-type on build floor (1), be provided with this layer of square tube flue (5) between the anti-bank step (6) of tongue and groove outside L-type and the bottom surface of upper layer concreting floor (2).Solves the problem of traditional closure hole piece imprecision, flue gas easy to form is flow backwards.

Description

Skyscraper layer-stepping flue and its apply method
Technical field
The present invention relates to a kind of flue of skyscraper kitchen and toilet, in particular to a kind of high level with good seal performance It builds layer-stepping flue and its applies method.
Background technique
With the development of society and the continuous improvement of urban life level, requirement of the people to indoor living environment is also increasingly It improves;It especially to the requirement of kitchen and toilet, does not require nothing more than visually beautiful and generous, but also requires the good of surrounding air. The flue structure of existing skyscraper is such that be reserved with rectangular in the corner of every layer of drainage pipe through floor of skyscraper The floss hole of floss hole, each layer is vertically correspondingly arranged, and is provided with upper lower flue envelope on the floor on the inside of flue splicing mouth The spacer bar of closure plate, the flue of skyscraper is the square pipe of Prefabricated, by upper one layer prefabricated square pipe bottom End is placed on spacer bar, and the prefabricated square pipe apical grafting of lower layer forms up and down vertical on spacer bar Body flue, flue are formed with L shape gap after the installation is completed, between flue and floor plates, and the prior art is by concrete to L shape Gap is blocked.Due to whole square pipe flue splicing when be inevitably present connection gap, when on floor to L shape stitch When crack occurs in the concrete that gap is blocked, it will enter from the distress in concrete of closure from the flue gas leaked out in splicing seams Room air is polluted in interior.
Summary of the invention
The present invention provides a kind of skyscraper layer-stepping flue and its method is applied, solves the kitchen of existing skyscraper Position flue poor sealing performance is easy the technical issues of leakage flue gas.
The present invention is to solve the above technical problem by the following technical programs:
The present general inventive concept is: the anti-bank step of tongue and groove outside the outside Prefabricated L-shaped of the flue reserved opening of every floor plate, in L The outer anti-bank step of tongue and groove of type and this layer are hugged and install this layer of square tube flue between top plate, and each layer layering flue is formed through the vertical of perforation Body flue.
A kind of skyscraper layer-stepping flue, including this layer concrete pour build floor and upper layer concreting floor, The corner that this layer concrete pours build floor is provided with this layer of flue reserved opening, sets in the corner of upper layer concreting floor It is equipped with upper layer flue reserved opening, this layer concrete on the outside of this layer of flue reserved opening, which pours, has poured tongue and groove outside L-type on build floor Anti- bank step is provided with this layer of square tube cigarette between the anti-bank step of tongue and groove outside L-type and the bottom surface of upper layer concreting floor Road, the front side wall lower end of this layer of square tube flue are arranged on the front side step of the anti-bank step of tongue and groove outside L-type, this layer of square tube flue Right side wall lower end is arranged on the right side step of the anti-bank step of tongue and groove outside L-type, the left side wall of this layer of square tube flue and this layer of kitchen position Left side shear wall be abutted against together, the rear wall of this layer of square tube flue and the rear side shear wall of this layer of kitchen position are abutted against together, The top end face of this layer of square tube flue is together with the bottom surface apical grafting of upper layer concreting floor.
Reinforced mesh is provided in the anti-bank step of tongue and groove outside L-type.
A kind of skyscraper layer-stepping flue applies method, comprising the following steps:
The first step carries out this layer concrete and pours the concreting of build floor, and forms this layer of flue reserved opening;
Second step installs lifting template at this layer of flue reserved opening and reinforced mesh is arranged inside template, when this layer of coagulation When soil pours the concrete initial set of build floor, hanging after this layer of flue reserved opening installs pours pea gravel concreten in mould, forms L The anti-bank step of the outer tongue and groove of type, can smoothly demould when being demoulding, should be brushed on the inside of mould with ingot stripper to hanging before pouring;
Third step, after the anti-bank stepped of tongue and groove outside L-type, the rubbish such as floating ash on the anti-bank step of tongue and groove outside L-type are cleared up dry Only, seat slurry is carried out with waterproof polymer mortar, sits slurry with a thickness of 1 centimetre;
4th step the front side wall lower end of this layer of square tube flue is arranged on the front side step of the anti-bank step of tongue and groove outside L-type, this layer The right side wall lower end of square tube flue is arranged on the right side step of the anti-bank step of tongue and groove outside L-type, the left side wall of this layer of square tube flue It is abutted against together with the left side shear wall of this layer of kitchen position, the rear wall of this layer of square tube flue and the rear side shear wall of this layer of kitchen position lean on It is connected together, the top end face of this layer of square tube flue is together with the bottom surface apical grafting of upper layer concreting floor.
The anti-bank structure of outer tongue and groove shape provided by the invention is suitable for the construction of kitchen and toilet flue reserved opening, the outer tongue and groove of L-type Anti- bank step one-piece casting solves the problem of traditional closure hole piece imprecision, flue gas easy to form is flow backwards, and guarantees The verticality of flue, improves construction quality.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of the anti-bank step 6 of the outer tongue and groove of L-type of the invention.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
A kind of skyscraper layer-stepping flue, including this layer concrete pour build floor 1 and upper layer concreting floor 2, at this The corner that layer concrete pours build floor 1 is provided with this layer of flue reserved opening 3, in the corner of upper layer concreting floor 2 It is provided with upper layer flue reserved opening 4, this layer concrete in this layer of 3 outside of flue reserved opening pours have been poured outside L-type on build floor 1 The anti-bank step 6 of tongue and groove is provided with this layer between the anti-bank step 6 of tongue and groove outside L-type and the bottom surface of upper layer concreting floor 2 Square tube flue 5, the front side wall lower end of this layer of square tube flue 5 are arranged on the front side step of the anti-bank step 6 of tongue and groove outside L-type, this layer The right side wall lower end of square tube flue 5 is arranged on the right side step of the anti-bank step 6 of tongue and groove outside L-type, the left side of this layer of square tube flue 5 Wall and the left side shear wall 7 of this layer of kitchen position are abutted against together, and the rear wall of this layer of square tube flue 5 and the rear side of this layer of kitchen position shear Wall 8 is abutted against together, and the top end face of this layer of square tube flue 5 makes together with the bottom surface apical grafting of upper layer concreting floor 2 The combination of square flue and upper sub-floor plates fits together perfectly.
It is provided with reinforced mesh in the anti-bank step 6 of tongue and groove outside L-type, to guarantee that the anti-bank step of tongue and groove is not opened outside L-type Split phenomenon.
A kind of skyscraper layer-stepping flue applies method, comprising the following steps:
The first step carries out this layer concrete and pours the concreting of build floor 1, and forms this layer of flue reserved opening 3;
Second step installs lifting template at this layer of flue reserved opening 3 and reinforced mesh is arranged inside template, when this layer of coagulation When soil pours the concrete initial set of build floor 1, hanging after this layer of flue reserved opening 3 installs pours pea gravel concreten in mould, shape The anti-bank step 6 of the outer tongue and groove of l-shaped, can smoothly demould when being demoulding, should be brushed on the inside of mould with ingot stripper to hanging before pouring;
Third step, after the anti-bank step 6 of tongue and groove forms outside L-type, the rubbish such as floating ash on the anti-bank step 6 of tongue and groove outside L-type are cleared up Completely, seat slurry is carried out with waterproof polymer mortar, sits slurry with a thickness of 1 centimetre;
The front side wall lower end of this layer of square tube flue 5 is arranged on the front side step of the anti-bank step 6 of tongue and groove outside L-type 4th step, this The right side wall lower end of layer square tube flue 5 is arranged on the right side step of the anti-bank step 6 of tongue and groove outside L-type, a left side for this layer of square tube flue 5 Side wall and the left side shear wall 7 of this layer of kitchen position are abutted against together, and the rear wall of this layer of square tube flue 5 and the rear side of this layer of kitchen position are cut Power wall 8 is abutted against together, and the top end face of this layer of square tube flue 5 is together with the bottom surface apical grafting of upper layer concreting floor 2.

Claims (3)

1. a kind of skyscraper layer-stepping flue, including this layer concrete pour build floor (1) and upper layer concreting floor (2), the corner that this layer concrete pours build floor (1) is provided with this layer of flue reserved opening (3), in upper layer concreting building The corner of plate (2) is provided with upper layer flue reserved opening (4), which is characterized in that this layer on the outside of this layer of flue reserved opening (3) The anti-bank step (6) of the outer tongue and groove of L-type is poured on concreting floor (1), the anti-bank step (6) of tongue and groove and upper layer are mixed outside L-type Solidifying soil pours and is provided with this layer of square tube flue (5), the front side wall lower end of this layer of square tube flue (5) between the bottom surfaces of build floor (2) It is arranged outside L-type on the front side step of the anti-bank step (6) of tongue and groove, the right side wall lower end of this layer of square tube flue (5) is arranged outside L-type On the right side step of the anti-bank step (6) of tongue and groove, the left side shear wall (7) of the left side wall of this layer of square tube flue (5) and this layer of kitchen position It is abutted against together, the rear wall of this layer of square tube flue (5) and the rear side shear wall (8) of this layer of kitchen position are abutted against together, this layer of side The top end face of pipe flue (5) is together with the bottom surface apical grafting of upper layer concreting floor (2).
2. a kind of skyscraper layer-stepping flue according to claim 1, which is characterized in that the anti-Kan Tai of tongue and groove outside L-type Rank is provided with reinforced mesh in (6).
3. a kind of skyscraper layer-stepping flue applies method, comprising the following steps:
The first step carries out this layer concrete and pours the concreting of build floor (1), and forms this layer of flue reserved opening (3);
Second step installs lifting template at this layer of flue reserved opening (3) and reinforced mesh is arranged inside template, when this layer is mixed When solidifying soil pours the concrete initial set of build floor (1), hanging after this layer of flue reserved opening (3) installs pours microlith coagulation in mould Soil forms the anti-bank step (6) of the outer tongue and groove of L-type, can smoothly demould when being demoulding, should be carried out on the inside of mould with ingot stripper to hanging before pouring It brushes;
Third step, after tongue and groove anti-bank step (6) molding outside L-type, by rubbish such as floating ashes on the anti-bank step (6) of tongue and groove outside L-type It cleans out, carries out seat slurry with waterproof polymer mortar, sit slurry with a thickness of 1 centimetre;
4th step, the front side step that the front side wall lower end of this layer of square tube flue (5) is arranged outside L-type to the anti-bank step (6) of tongue and groove On, the right side wall lower end of this layer of square tube flue (5) is arranged outside L-type on the right side step of the anti-bank step (6) of tongue and groove, this layer of square tube The left side wall of flue (5) and the left side shear wall (7) of this layer of kitchen position are abutted against together, the rear wall of this layer of square tube flue (5) with The rear side shear wall (8) of this layer of kitchen position is abutted against together, the top end face and upper layer concreting floor of this layer of square tube flue (5) (2) bottom surface apical grafting is together.
CN201910088852.3A 2019-01-30 2019-01-30 Skyscraper layer-stepping flue and its apply method Pending CN109853907A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910088852.3A CN109853907A (en) 2019-01-30 2019-01-30 Skyscraper layer-stepping flue and its apply method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910088852.3A CN109853907A (en) 2019-01-30 2019-01-30 Skyscraper layer-stepping flue and its apply method

Publications (1)

Publication Number Publication Date
CN109853907A true CN109853907A (en) 2019-06-07

Family

ID=66896995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910088852.3A Pending CN109853907A (en) 2019-01-30 2019-01-30 Skyscraper layer-stepping flue and its apply method

Country Status (1)

Country Link
CN (1) CN109853907A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512831A (en) * 2019-09-02 2019-11-29 李良发 A kind of construction method of the public ventilation shaft of civil building
CN110984512A (en) * 2019-10-23 2020-04-10 千瑞机电科技(丹阳)有限公司 Flue casting and mounting integrated forming method
CN111335630A (en) * 2020-03-24 2020-06-26 中国五冶集团有限公司 Cast-in-place flue mould of house
CN111794468A (en) * 2020-07-09 2020-10-20 深圳市宏源建设工程有限公司 L-shaped prefabricated light component pipeline enclosing structure assembling construction technology
CN111958857A (en) * 2020-07-16 2020-11-20 安徽同济建设集团有限责任公司 Construction method for reverse ridge of toilet
CN113668854A (en) * 2021-08-27 2021-11-19 中国建筑第七工程局有限公司 Construction process and mold for prefabricated cup mouth with concrete reversed ridge embedded in concrete shear wall
CN114704048A (en) * 2022-05-01 2022-07-05 山西三建集团有限公司 Method for constructing smoke exhaust flue in main structure of high-rise building

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202008004073U1 (en) * 2008-03-25 2008-07-03 F. Willich Isoliersysteme Gmbh + Co. Chimney element for chimneys for the discharge of flue gases
CN201099975Y (en) * 2007-08-17 2008-08-13 张晓强 Building smoke-discharging pipeline
CN201141196Y (en) * 2007-12-24 2008-10-29 张晓强 Smoke discharging pipe of storied house
CN101787801A (en) * 2010-04-02 2010-07-28 王启定 Installation structure of building exhaust pipes and construction method thereof
CN202202545U (en) * 2011-06-23 2012-04-25 徐仁春 Outer sleeve type exhaust pipeline connecting device
CN203583842U (en) * 2013-08-27 2014-05-07 谢利哲 Multi-proof combined type flue gas discharge pipeline
CN103967258A (en) * 2014-05-15 2014-08-06 张家口市宝通建筑配套制品厂 Combined exhaust passage independently installed in layered mode
CN203755610U (en) * 2014-03-24 2014-08-06 王淑丽 Smoke discharge and air change pipeline prefabricated member of building
CN104947921A (en) * 2015-07-14 2015-09-30 成都市第八建筑工程公司 Flue structure and mounting construction method thereof
CN206667680U (en) * 2017-04-21 2017-11-24 云南建投第六建设有限公司 A kind of residential construction gas flue structure
CN207597816U (en) * 2017-11-04 2018-07-10 广州金辉建设集团有限公司 A kind of flue structure
CN209907850U (en) * 2019-01-30 2020-01-07 山西三建集团有限公司 Layered flue for high-rise building

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201099975Y (en) * 2007-08-17 2008-08-13 张晓强 Building smoke-discharging pipeline
CN201141196Y (en) * 2007-12-24 2008-10-29 张晓强 Smoke discharging pipe of storied house
DE202008004073U1 (en) * 2008-03-25 2008-07-03 F. Willich Isoliersysteme Gmbh + Co. Chimney element for chimneys for the discharge of flue gases
CN101787801A (en) * 2010-04-02 2010-07-28 王启定 Installation structure of building exhaust pipes and construction method thereof
CN202202545U (en) * 2011-06-23 2012-04-25 徐仁春 Outer sleeve type exhaust pipeline connecting device
CN203583842U (en) * 2013-08-27 2014-05-07 谢利哲 Multi-proof combined type flue gas discharge pipeline
CN203755610U (en) * 2014-03-24 2014-08-06 王淑丽 Smoke discharge and air change pipeline prefabricated member of building
CN103967258A (en) * 2014-05-15 2014-08-06 张家口市宝通建筑配套制品厂 Combined exhaust passage independently installed in layered mode
CN104947921A (en) * 2015-07-14 2015-09-30 成都市第八建筑工程公司 Flue structure and mounting construction method thereof
CN206667680U (en) * 2017-04-21 2017-11-24 云南建投第六建设有限公司 A kind of residential construction gas flue structure
CN207597816U (en) * 2017-11-04 2018-07-10 广州金辉建设集团有限公司 A kind of flue structure
CN209907850U (en) * 2019-01-30 2020-01-07 山西三建集团有限公司 Layered flue for high-rise building

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512831A (en) * 2019-09-02 2019-11-29 李良发 A kind of construction method of the public ventilation shaft of civil building
CN110512831B (en) * 2019-09-02 2021-03-23 李良发 Construction method of public ventilation pipeline of civil building
CN110984512A (en) * 2019-10-23 2020-04-10 千瑞机电科技(丹阳)有限公司 Flue casting and mounting integrated forming method
CN111335630A (en) * 2020-03-24 2020-06-26 中国五冶集团有限公司 Cast-in-place flue mould of house
CN111794468A (en) * 2020-07-09 2020-10-20 深圳市宏源建设工程有限公司 L-shaped prefabricated light component pipeline enclosing structure assembling construction technology
CN111958857A (en) * 2020-07-16 2020-11-20 安徽同济建设集团有限责任公司 Construction method for reverse ridge of toilet
CN113668854A (en) * 2021-08-27 2021-11-19 中国建筑第七工程局有限公司 Construction process and mold for prefabricated cup mouth with concrete reversed ridge embedded in concrete shear wall
CN114704048A (en) * 2022-05-01 2022-07-05 山西三建集团有限公司 Method for constructing smoke exhaust flue in main structure of high-rise building

Similar Documents

Publication Publication Date Title
CN109853907A (en) Skyscraper layer-stepping flue and its apply method
CN104947921B (en) Flue structure and its construction method of installation
CN208167956U (en) A kind of basement inwall using reverse construction
CN103015721A (en) Leakage prevention construction method of reserved holes in kitchen and toilet
CN207919780U (en) The plugging system of toilet bath room floor sewer pipe preformed hole
CN213296440U (en) Water stop structure for post-cast strip of underground chamber bottom plate
CN105587938A (en) Toilet pipe root blocking structure and construction process thereof
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN112112295A (en) Reinforcing construction method for post-cast strip of post-sealed outer wall
CN209907850U (en) Layered flue for high-rise building
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN212926756U (en) Waterproof joint structure of flue root
CN206667305U (en) Basement seepage point gradually leak stopping structure
CN107989205A (en) The plugging system of toilet bath room floor sewer pipe preformed hole
CN109518769A (en) A kind of method and structure using PVC waterstop joint installation sewer pipe
CN210658405U (en) Wall-separated drainage structure
CN212561820U (en) Secondary floor drain connecting structure of sinking type toilet
CN100370088C (en) Constructing method for preventing toilet and kitchen from leakage
CN209244008U (en) A kind of water-tight exterior wall structure
CN209211892U (en) One kind can be used for overhanging the molding light instrument in i-beam structure hole
CN209066442U (en) A kind of inverse construction joint structure for building construction of deep basal pit
CN209397671U (en) A kind of structure using PVC waterstop joint installation sewer pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190607