CN109853494A - 岔洞与调压室一体式结构及其施工方法 - Google Patents
岔洞与调压室一体式结构及其施工方法 Download PDFInfo
- Publication number
- CN109853494A CN109853494A CN201910182810.6A CN201910182810A CN109853494A CN 109853494 A CN109853494 A CN 109853494A CN 201910182810 A CN201910182810 A CN 201910182810A CN 109853494 A CN109853494 A CN 109853494A
- Authority
- CN
- China
- Prior art keywords
- hole
- chamber
- surge
- cha
- throttled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种岔洞与调压室一体式结构及其施工方法,包括第一支洞(1)、第二支洞(2)、主洞(3)、岔洞(4)、阻抗式调压室(5),第一、二支洞与主洞相交于岔洞,所述阻抗式调压室位于所述岔洞正上方,所述岔洞的顶拱衬砌(6)与所述阻抗式调压室的底板(7)合二为一,且所述阻抗式调压室的底板上开设有阻抗孔(8)。本发明结构布置紧凑,使调压室可以尽量靠近主厂房,对输水发电系统调节保证有利,同时可避免岔洞顶拱开挖引起的围岩稳定问题,总体工程量也较少。
Description
技术领域
本发明属于地下水电工程输水系统,具体涉及一种岔洞与调压室一体式结构及其施工方法。
背景技术
目前的地下水电工程输水系统设计中,采用联合供水方式时设置有岔洞,当引水隧洞或尾水隧洞较长时,往往需要设置阻抗式调压室以满足输水发电系统调节保证要求。工程实际应用中阻抗式调压室一般布置在主洞上,通过连接管与主洞相通,岔洞与阻抗式调压室是两个完全独立的结构,这样造成阻抗式调压室往往离主厂房较远,对机组的调节保证性能不利。而岔洞体型较复杂,开挖跨度一般较大,其顶拱围岩稳定问题突出。
因此工程中需要将阻抗式调压室尽量靠近主厂房布置,以及解决岔洞开挖时顶拱围岩稳定的问题。
发明内容
本发明所要解决的技术问题是,针对现有技术不足,提供一种阻抗式调压室位置离主厂房更近,有利于改善机组调节保证性能,同时大幅减少了岔洞顶拱开挖范围,以避免岔洞顶拱围岩稳定问题的岔洞与阻抗式调压室一体式布置结构及其施工方法。
为解决上述技术问题,本发明提供了一种岔洞与调压室一体式结构,包括第一支洞、第二支洞、主洞、岔洞、阻抗式调压室,第一、二支洞与主洞相交于岔洞,阻抗式调压室位于岔洞正上方,所述岔洞的顶拱衬砌与所述阻抗式调压室的底板合二为一,所述阻抗式调压室的底板上开设阻抗孔。
上述方案的进一步改进为,所述阻抗孔的中心与所述阻抗式调压室的中心重合或不重合。
上述方案的进一步改进为,同一个水力单元中所述岔洞有多个时,所述阻抗式调压室布置在离主厂房最远的所述岔洞正上方,以对主厂房与阻抗式调压室之间的压力进行调节。
相应的,本发明还提供一种岔洞与调压室一体式结构施工方法,其包括如下步骤:
(a)从第一支洞向主洞方向开挖,要求挖过阻抗式调压室的中心,并做好初期支护;
(b)从阻抗式调压室的顶部采用钻机开挖形成溜渣井,然后从上到下开挖阻抗式调压室,石渣通过溜渣井滑到下部先期开挖好的第一支洞内,采用运输车运走,直至开挖到底,并做好初期支护;
(c)开挖第二支洞、岔洞和主洞,并做好初期支护;
(d)先施工第一支洞、第二支洞、岔洞和主洞的衬砌结构,然后从下至上施工阻抗式调压室的衬砌结构。
相应的,本发明还提供了另一种岔洞与调压室一体式结构施工方法,其包括如下步骤:
(a)采用正井法从上到下开挖阻抗式调压室,并做好初期支护,开挖的石渣通过吊装设备提升到顶部,再采用运输车通过上部运输通道运走;
(b)依次开挖第一支洞、第二支洞、岔洞和主洞,并做好初期支护;
(c)先施工第一支洞、第二支洞、岔洞和主洞的衬砌结构,然后从下至上施工阻抗式调压室的衬砌结构。
本发明设计的岔洞与调压室一体式结构中,阻抗式调压室位于岔洞正上方,岔洞的顶拱衬砌与阻抗式调压室的底板合二为一,使得阻抗式调压室位置离主厂房更近,有利于改善机组调节保证性能,同时大幅减少了岔洞顶拱的开挖范围,避免了岔洞顶拱围岩稳定问题,另外这种一体式布置还可减少总体工程量。
附图说明
下面结合附图对本发明作进一步说明。
图1为岔洞与调压室一体式结构平面布置示意图。
图2为岔洞与调压室一体式结构纵剖面示意图。
图中:1-第一支洞,2-第二支洞,3-主洞,4-岔洞,5-阻抗式调压室,6-顶拱衬砌,7-底板,8-阻抗孔。
具体实施方式
如图1~2所示,本发明一种岔洞与调压室一体式结构包括第一支洞1、第二支洞2、主洞3、岔洞4与阻抗式调压室5。
阻抗式调压室5位于岔洞4正上方,其底板7与岔洞顶拱衬砌6合二为一。
调压室底板7(岔洞顶拱衬砌6)上开设阻抗孔8。
同一个水力单元中岔洞4可以有多个,此时阻抗式调压室5应布置在离主厂房最远的岔洞4正上方。
相应的,本发明岔洞与调压室一体式结构施工方法包括如下步骤:
(a)从第一支洞1向主洞3方向开挖,要求挖过阻抗式调压室5中心,并做好初期支护;
(b)从阻抗式调压室5的顶部采用钻机开挖形成溜渣井,然后从上到下开挖阻抗式调压室5,石渣通过溜渣井滑到下部先期开挖好的第一支洞1内,采用运输车运走,直至开挖到底,并做好初期支护;
(c)然后开挖第二支洞2、岔洞4和主洞3,并做好初期支护;
(d)先施工第一支洞1、第二支洞2、岔洞4和主洞3的衬砌结构,然后从下至上施工阻抗式调压室5的衬砌结构。
进一步的,如果阻抗式调压室5采用正井法开挖,不需要开挖溜渣井从下部出渣,则施工步骤为:
(a)从上到下开挖阻抗式调压室5,并做好初期支护。开挖的石渣通过吊装设备提升到顶部,采用运输车通过上部运输通道运走;
(b)然后依次开挖第一支洞1、第二支洞2、岔洞4和主洞3,并做好初期支护;
(c)先施工第一支洞1、第二支洞2、岔洞4和主洞3的衬砌结构,然后从下至上施工阻抗式调压室5的衬砌结构。
Claims (5)
1.一种岔洞与调压室一体式结构,包括第一支洞(1)、第二支洞(2)、主洞(3)、岔洞(4)、阻抗式调压室(5),第一、二支洞与主洞相交于岔洞,其特征在于:所述阻抗式调压室位于所述岔洞正上方,所述岔洞的顶拱衬砌(6)与所述阻抗式调压室的底板(7)合二为一,且所述阻抗式调压室的底板上开设有阻抗孔(8)。
2.根据权利要求1所述的岔洞与调压室一体式结构,其特征在于:所述阻抗孔的中心与所述阻抗式调压室的中心重合或不重合。
3.根据权利要求1或2所述的岔洞与调压室一体式结构,其特征在于:同一个水力单元中所述岔洞有多个时,所述阻抗式调压室布置在离主厂房最远的所述岔洞正上方。
4.一种权利要求1-3中任一项所述的岔洞与调压室一体式结构施工方法,其特征在于包括如下步骤:
(a)从第一支洞向主洞方向开挖,要求挖过阻抗式调压室的中心,并做好初期支护;
(b)从阻抗式调压室的顶部采用钻机开挖形成溜渣井,然后从上到下开挖阻抗式调压室,石渣通过溜渣井滑到下部先期开挖好的第一支洞内,采用运输车运走,直至开挖到底,并做好初期支护;
(c)开挖第二支洞、岔洞和主洞,并做好初期支护;
(d)先施工第一支洞、第二支洞、岔洞和主洞的衬砌结构,然后从下至上施工阻抗式调压室的衬砌结构。
5.一种权利要求1-3中任一项所述的岔洞与调压室一体式结构施工方法,其特征在于包括如下步骤:
(a)采用正井法从上到下开挖阻抗式调压室,并做好初期支护,开挖的石渣通过吊装设备提升到顶部,再采用运输车通过上部运输通道运走;
(b)依次开挖第一支洞、第二支洞、岔洞和主洞,并做好初期支护;
(c)先施工第一支洞、第二支洞、岔洞和主洞的衬砌结构,然后从下至上施工阻抗式调压室的衬砌结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910182810.6A CN109853494A (zh) | 2019-03-12 | 2019-03-12 | 岔洞与调压室一体式结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910182810.6A CN109853494A (zh) | 2019-03-12 | 2019-03-12 | 岔洞与调压室一体式结构及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109853494A true CN109853494A (zh) | 2019-06-07 |
Family
ID=66900539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910182810.6A Pending CN109853494A (zh) | 2019-03-12 | 2019-03-12 | 岔洞与调压室一体式结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109853494A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219288A (zh) * | 2019-07-12 | 2019-09-10 | 河南郑大水利科技有限公司 | 一种双阻抗式调压室 |
CN111395281A (zh) * | 2020-03-20 | 2020-07-10 | 南方电网调峰调频发电有限公司 | 一种水电工程双机共用调压井的阻抗孔连接结构 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0673997A (ja) * | 1992-08-25 | 1994-03-15 | Shimizu Corp | 導水路トンネルの施工方法 |
JP2012077448A (ja) * | 2010-09-30 | 2012-04-19 | Nippon Steel Corp | トンネル接続構造およびトンネル施工方法 |
CN203768883U (zh) * | 2014-02-14 | 2014-08-13 | 中国水电顾问集团华东勘测设计研究院有限公司 | 一种洞群差动式调压室系统 |
CN105317028A (zh) * | 2015-04-14 | 2016-02-10 | 贵州省水利水电勘测设计研究院 | 一种适用于长距离有压引水隧洞的调压室结构及施工方法 |
CN207092036U (zh) * | 2017-08-25 | 2018-03-13 | 中国电建集团中南勘测设计研究院有限公司 | 一种水电站引水系统布置型式 |
CN207161119U (zh) * | 2017-08-30 | 2018-03-30 | 中国电建集团中南勘测设计研究院有限公司 | 一种对称岔洞支护结构 |
CN108755622A (zh) * | 2018-07-25 | 2018-11-06 | 中国水利水电第十四工程局有限公司 | 一种大直径圆筒式尾水调压室的开挖方法 |
CN209703451U (zh) * | 2019-03-12 | 2019-11-29 | 中国电建集团中南勘测设计研究院有限公司 | 岔洞与调压室一体式结构 |
-
2019
- 2019-03-12 CN CN201910182810.6A patent/CN109853494A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0673997A (ja) * | 1992-08-25 | 1994-03-15 | Shimizu Corp | 導水路トンネルの施工方法 |
JP2012077448A (ja) * | 2010-09-30 | 2012-04-19 | Nippon Steel Corp | トンネル接続構造およびトンネル施工方法 |
CN203768883U (zh) * | 2014-02-14 | 2014-08-13 | 中国水电顾问集团华东勘测设计研究院有限公司 | 一种洞群差动式调压室系统 |
CN105317028A (zh) * | 2015-04-14 | 2016-02-10 | 贵州省水利水电勘测设计研究院 | 一种适用于长距离有压引水隧洞的调压室结构及施工方法 |
CN207092036U (zh) * | 2017-08-25 | 2018-03-13 | 中国电建集团中南勘测设计研究院有限公司 | 一种水电站引水系统布置型式 |
CN207161119U (zh) * | 2017-08-30 | 2018-03-30 | 中国电建集团中南勘测设计研究院有限公司 | 一种对称岔洞支护结构 |
CN108755622A (zh) * | 2018-07-25 | 2018-11-06 | 中国水利水电第十四工程局有限公司 | 一种大直径圆筒式尾水调压室的开挖方法 |
CN209703451U (zh) * | 2019-03-12 | 2019-11-29 | 中国电建集团中南勘测设计研究院有限公司 | 岔洞与调压室一体式结构 |
Non-Patent Citations (1)
Title |
---|
胡香伟;段汝健;: "阻抗式调压室下部五岔口开挖支护施工", 水利水电施工, no. 03 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219288A (zh) * | 2019-07-12 | 2019-09-10 | 河南郑大水利科技有限公司 | 一种双阻抗式调压室 |
CN110219288B (zh) * | 2019-07-12 | 2023-12-12 | 河南郑大水利科技有限公司 | 一种双阻抗式调压室 |
CN111395281A (zh) * | 2020-03-20 | 2020-07-10 | 南方电网调峰调频发电有限公司 | 一种水电工程双机共用调压井的阻抗孔连接结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102392677A (zh) | 煤层气储盖层立体缝网改造增透技术 | |
CN102587959A (zh) | 一种抽采煤层瓦斯的方法 | |
CN102913249B (zh) | 斜井横向贯通正洞单喇叭挑高施工方法 | |
CN110387884A (zh) | 用于超深基坑防突涌的施工方法 | |
CN109372527B (zh) | 双螺旋盾构机在富水上软下硬地层中掘进系统及方法 | |
CN111441718A (zh) | 大断面陡坡长斜井高精度导井开挖施工方法、系统及应用 | |
CN209703451U (zh) | 岔洞与调压室一体式结构 | |
CN109026133A (zh) | 一种超长工作面采空离层区卸压瓦斯的抽采方法 | |
CN109853494A (zh) | 岔洞与调压室一体式结构及其施工方法 | |
CN103422813A (zh) | 单井眼煤层气多分支水平井系统及钻井方法 | |
CN105804084B (zh) | 一种临近已开挖深基坑的小基坑开挖施工方法 | |
CN111425664A (zh) | 一种大口径混凝土管道顶管施工方法 | |
CN217267334U (zh) | 引水隧洞检修洞布置结构 | |
CN111322086A (zh) | 一种泄水洞与正线隧道的连接构造 | |
CN113530565B (zh) | 暗挖车站主体导洞内向车站附属暗挖段施工超前支护方法 | |
CN109973100A (zh) | 一种实现矿山法隧道小半径转弯的支护形式及施工方法 | |
CN202108030U (zh) | 一种窑洞式拱坝坝肩槽结构 | |
CN104612699A (zh) | 大断面尾水隧洞带帽开挖方法 | |
CN205894100U (zh) | 一种地下输送通道 | |
CN204851296U (zh) | 一种基于狭小地下通道侧向扩建大跨洞室的施工结构 | |
CN205742111U (zh) | 一种尾调通气洞与通风兼安全洞结合布置结构 | |
CN111677512B (zh) | 一种竖井式引水隧道开挖方法 | |
CN211924173U (zh) | 一种泄水洞与正线隧道的连接构造 | |
CN111472839B (zh) | 基于综合渗控的富水隧洞施工排水量定量计算方法 | |
CN204608736U (zh) | 一种布置在溶洞内的发电厂房 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |