CN109842522A - Communicate the configuration method and system of route resource - Google Patents

Communicate the configuration method and system of route resource Download PDF

Info

Publication number
CN109842522A
CN109842522A CN201910101988.3A CN201910101988A CN109842522A CN 109842522 A CN109842522 A CN 109842522A CN 201910101988 A CN201910101988 A CN 201910101988A CN 109842522 A CN109842522 A CN 109842522A
Authority
CN
China
Prior art keywords
business
routing
router
level topology
route resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910101988.3A
Other languages
Chinese (zh)
Other versions
CN109842522B (en
Inventor
陈拽霞
王颖
刘军
张书林
王乔木
姜辉
李君婷
刘冬梅
高菲璠
樊秀娟
闫龙川
唐佳
赵永利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Information And Communication Branch Of Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Beijing University of Posts and Telecommunications
Original Assignee
Information And Communication Branch Of Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Beijing University of Posts and Telecommunications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Information And Communication Branch Of Jiangsu Electric Power Co Ltd, State Grid Corp of China SGCC, State Grid Information and Telecommunication Co Ltd, Beijing University of Posts and Telecommunications filed Critical Information And Communication Branch Of Jiangsu Electric Power Co Ltd
Priority to CN201910101988.3A priority Critical patent/CN109842522B/en
Publication of CN109842522A publication Critical patent/CN109842522A/en
Application granted granted Critical
Publication of CN109842522B publication Critical patent/CN109842522B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of configuration system and methods for communicating route resource, which includes: router-level topology trigger module, meet routing trigger condition for judging whether, when meeting the routing trigger condition, generate the application of business router-level topology;Business demand analysis module, for determining router-level topology requirement according to business feature, and determine router-level topology precondition when receiving the business router-level topology application;Routing calculation module for requiring according to current business routing configuration information and the router-level topology, and determines business route resource allocation result under the constraint of the business router-level topology precondition;Routing configuration module can also include fail-safe analysis module, for carrying out fail-safe analysis to business route resource allocation result for carrying out the configuration of business route resource according to the business route resource allocation result.The present invention can take into account the reliability and robustness of network while meeting business transmission demand.

Description

Communicate the configuration method and system of route resource
Technical field
The present invention relates to powerline network fields, particularly relate to a kind of configuration method and system for communicating route resource.
Background technique
In recent years, electric power backbone communication network is increasingly sophisticated, while to protect novel power grid production industry of the private network as representative Business continuously emerges, and power telecom network equipment and the electric power services carried are increased with annual 10% or more speed.Ensure The safe and reliable operation of electric power services is the core of power telecom network operation and maintenance.Powerline network has structure The features such as complication, multi-business diversification generally rely on O&M people in traditional electric power services communications resource allocation Member carries out the distribution of business transmission route manually, thus cannot achieve the optimum arrangements of global business transmission route.
Summary of the invention
In view of this, it is an object of the invention to propose a kind of configuration method and system for communicating route resource.
Based on a kind of above-mentioned purpose configuration system for communicating route resource provided by the invention, comprising:
Router-level topology trigger module meets routing trigger condition for judging whether, is meeting the routing trigger condition When, it generates the application of business router-level topology and is sent to business demand analysis module;
The business demand analysis module is connect with the router-level topology trigger module, for receiving the business When router-level topology application, router-level topology requirement is determined according to business feature, and determine router-level topology precondition;
Routing calculation module is connect with the business demand analysis module, for according to current business routing configuration information It is required with the router-level topology, and determines business route resource distribution knot under the constraint of the business router-level topology precondition Fruit;
Routing configuration module is connect with the routing calculation module, for according to the business route resource allocation result The configuration of carry out business route resource.
In one embodiment, the system also includes:
Fail-safe analysis module is connect with the routing calculation module, in the business route resource allocation result When including multiple schemes, the reliability of multiple schemes is analyzed respectively, and optimal side is determined according to fail-safe analysis result Case;When the business route resource allocation result includes a scheme, one scheme is determined as optimal case.
In one embodiment, network performance data after the fail-safe analysis module is also used to based on resource distribution into Row reliability assessment, and determine whether that triggering the router-level topology trigger module judges whether to meet the road according to assessment result By trigger condition.
In one embodiment, the system also includes:
Routing configuration obtains module, does not meet the current business routing configuration letter when routing trigger condition for obtaining Breath.
In one embodiment, the routing trigger condition includes: the emergency detour Shen of Added Business application, interrupting service Please or business batch optimization is applied.
Based on above-mentioned purpose the present invention also provides a kind of communication route resource configuration method, be applied to above-mentioned communication lines By in the configuration system of resource, this method comprises:
Judge whether to meet routing trigger condition;
When meeting the routing trigger condition, router-level topology requirement is determined according to business feature, and determine router-level topology Precondition;
According to current business routing configuration information and router-level topology requirement, and in the router-level topology precondition Constraint is lower to determine business route resource allocation result;
The configuration of business route resource is carried out according to the business route resource allocation result.
In one embodiment, the method also includes:
When the business route resource allocation result includes multiple schemes, the reliability of multiple schemes is divided respectively Analysis, and according to fail-safe analysis result optimum scheme comparison;When the business route resource allocation result includes a scheme, One scheme is determined as optimal case.
In one embodiment, the method also includes:
Reliability assessment is carried out based on the network performance data after resource distribution, and determines whether to touch according to assessment result Hair judges whether to meet the routing trigger condition.
In one embodiment, the method also includes:
Obtain current business routing configuration information when not meeting the routing trigger condition.
In one embodiment, the routing trigger condition includes: the emergency detour Shen of Added Business application, interrupting service Please or business batch optimization is applied.
From the above it can be seen that the configuration method and system of communication route resource provided by the invention, not only general Property it is strong and effectively towards electric power services, the system is in Added Business demand, the emergency detour of interrupting service and batch When optimization, business router-level topology can be carried out automatically according to business feature, and filter out according to fail-safe analysis result Optimal path, to realize the reliability and robustness of taking into account network while meeting business transmission demand.
Detailed description of the invention
Fig. 1 is a kind of flow chart of configuration method for communicating route resource provided by one embodiment of the present invention;
Fig. 2 is the exemplary diagram of determining business route resource allocation result provided by one embodiment of the present invention;
Fig. 3 is a kind of flow chart of the configuration method for communication route resource that another embodiment of the present invention provides;
Fig. 4 is a kind of structural schematic diagram of configuration system for communicating route resource provided by one embodiment of the present invention;
Fig. 5 is a kind of structural schematic diagram of the configuration system for communication route resource that another embodiment of the present invention provides.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference Attached drawing, the present invention is described in more detail.
It should be noted that all statements for using " first " and " second " are for differentiation two in the embodiment of the present invention The non-equal entity of a same names or non-equal parameter, it is seen that " first " " second " only for the convenience of statement, does not answer It is interpreted as the restriction to the embodiment of the present invention, subsequent embodiment no longer illustrates this one by one.
Fig. 1 is the flow chart of the configuration method of communication route resource provided in an embodiment of the present invention, as shown in Figure 1, the party Method may comprise steps of:
Step S201, router-level topology trigger module judges whether to meet routing trigger condition, routes trigger condition meeting When, it generates the application of business router-level topology and is sent to business demand analysis module.
In one embodiment, router-level topology trigger module judges whether to start router-level topology according to routing trigger condition, when When meeting routing trigger condition, router-level topology can be started by being judged as, the purpose of router-level topology is carried out to communication route resource It reconfigures, then router-level topology trigger module generates the application of business router-level topology and is sent to business demand analysis module.
In one embodiment, routing trigger condition may include: the emergency detour Shen of Added Business application, interrupting service Please or business batch optimization is applied.Wherein the emergency detour of interrupting service may include that equipment fault, interruption of optical cables, performance are bad Situations such as situations such as change, business batch optimization may include network topology change.
For Added Business application, by needing to apply the service unit of communication route resource in TMS system Apply for newly-increased industry in (Telecommunication Management System, communications management system) in a manner of initiation Business or change operation flow, such as the channel opening link of extra-high voltage project operation preparatory phase, need to initiate Added Business Shen Please.
Emergency detour application for interrupting service when generation important service is offline, is led in actual operation The escape truck for crossing operation maintenance personnel formulation initiates the emergency detour application of interrupting service, to promote operational reliability.
For business batch optimization application, refer to causes network topology that big rule occur due to maintenance, capital construction or technological transformation etc. When mould changes, there is optimization space in the method for operation of original electric power services, and the reliability of network routing reduces, and will trigger net The batch Optimization Work of bearer service in network.
In one embodiment, the emergency for receiving Added Business application or interrupting service when router-level topology trigger module is circuitous When returning application or business batch optimization, it is judged as satisfaction routing trigger condition, sends business routing to business demand analysis module Calculate application.
Step S202, business demand analysis module receives business router-level topology application, is determined and is routed according to business feature It calculates and requires, and determine router-level topology precondition, and router-level topology is required to be sent to routing with router-level topology precondition Computing module.
In one embodiment, business demand analysis module can in conjunction with network service feature analysis business start node, The requirement of the router-level topologies such as end node, service bandwidth demand, and determine calculation constraint condition in conjunction with practical condition, that is, it routes Calculate precondition.
Specifically, in one embodiment, business demand analysis module can be based on being carried on what equipment was connected with optical cable Service logic topological diagram carries out route need analysis, obtain include: the source node of business, destination node, Dominator, must be without The requirement of the router-level topologies such as node, service bandwidth demand.
In one embodiment, business demand analysis module is according to different production types of service, to be determined for compliance with power communication The conditions such as the constraint condition, such as time delay, independence, consistency that practical O&M requires are netted, and are counted constraint condition as routing Calculate the router-level topology precondition of module.For example, router-level topology requirement is communication channel list for relay protection type of service 10ms should be not more than to propagation delay time, pilot wire relays optical-fibre channel should be ensured that two-way routing is consistent, to reach double To delay inequality minimum.
Wherein, business may include: protection, peace control, dispatch data net, integrated data network, dispatching exchange and administrative friendship It changes etc. one or more.
Step S203, routing calculation module is required according to current business routing configuration information, router-level topology, and on business road By carrying out the calculating of idle route resource under the constraint of calculating precondition, business route resource allocation result is obtained.
Wherein, business route resource may include the resources such as routing, port, time slot.
In one embodiment, module is obtained by routing configuration and transfers network foundation data from network foundation data platform, And current business routing configuration information is determined based on network foundation data.
Specifically, network foundation data platform includes transmission device profession network management system, Integrated Network Management System and TMS System.In network foundation data platform, it is stored with communication network basic resource data and possession resource data.
The acquisition of communication network basic resource data mainly includes following two parts:
1) TMS system and Integrated Network Management System are interconnected by northbound interface and each professional network management, acquire transmission device The information such as communication networks the basic resource data, such as optical port, time slot such as warning information, Network resource allocation, to realize the whole network The acquisition of logical message and integrated;
2) higher level TMS system realizes possession resource data and net by the cascade with unit TMS systems in possession at different levels The association of network logical message, wherein possession resource data may include the physical message of optical cable, fibre core etc., such as OPGW optical cable (Optical Fiber Composite Overhead GroundWire, optical fiber composite overhead ground wire), ADSS optical cable (All Dielectric Self-SupportingAerial Optical Cable, All Dielectric self-support), the optical cables class such as general cable Type, the total core number of cable length, optical cable, occupied core number, vacant core number.
Routing configuration obtains module based on the communication network basic resource data and possession resource data got, determines Current business routing configuration information.
Routing calculation module is the core work module of entire route resource management.In one embodiment, as shown in Fig. 2, For the exemplary diagram of determining business route resource allocation result provided by one embodiment of the present invention, protection business is important electric power Production business needs to configure mutually independent host-standby communication channel for it.It is calculated by routing calculation module, constraint condition To need vacant power port, optical port in website A and C equipment, vacant optical port, OPGW optical cable are needed in website B and D equipment With sky remaining fibre core pair has been required on general cable.Router-level topology requirement are as follows: the high reliablity of primary communication channel is logical in spare communication Road, and primary communication channel and alternate communication channels are independent mutually.
In this example, routing calculation module is according to initial routing configuration information and router-level topology requirement, in router-level topology The constraint of precondition gets off to calculate idle route resource, i.e. business route resource allocation result, comprising: OPGW optical cable and general Cable.
Step S204, routing configuration module carries out the configuration of business route resource according to business route resource allocation result.
In the present embodiment, by determining router-level topology requirement and router-level topology premise item when meeting routing trigger condition Part, and based on initial routing configuration information and router-level topology requirement, computation-free provides under the constraint of router-level topology precondition Source can carry out the configuration of communication route resource automatically according to business transmission demand, simultaneous while meeting business transmission demand Care for the reliability and robustness of network.
Fig. 3 is the flow chart of the configuration method of another communication route resource provided in an embodiment of the present invention;Such as Fig. 3 institute Show, the difference of the embodiment and embodiment illustrated in fig. 1 is: further comprising the steps of after step S203:
Business route resource allocation result is sent to fail-safe analysis module by step S204 ', routing calculation module.
Step S205 ', fail-safe analysis module carry out reliability assessment to business route resource allocation result, and according to commenting Estimate result optimum scheme comparison.
In one embodiment, when business route resource allocation result is unique, fail-safe analysis module determines the result For optimal routing;When business route resource allocation result is not unique, includes multiple allocation plans, fail-safe analysis module is to more A result carries out reliability assessment, filters out optimal routing.
For example, as shown in the example of figure 2, router-level topology result, that is, business route resource allocation result includes that available resources are OPGW optical cable and general cable, by the analysis of fail-safe analysis module: OPGW optical cable is in cable strength, laying position, O&M Aspect is superior to general cable, therefore assessment result is the high reliablity of OPGW optical cable in general cable, and fail-safe analysis module is by OPGW optical cable It is determined as optimal routing, thus OPGW optical cable is used for bearer service channel, general cable is for carrying protection channel.
Step S206 ', routing configuration module carry out the distribution of route resource according to routing optimal distributing scheme.
Network performance data after step S207 ', fail-safe analysis module real-time monitoring resource distribution, and it is based on network Performance data determines whether to trigger router-level topology trigger module executes the judgement for whether meeting routing trigger condition.
In one embodiment, fail-safe analysis module is based on network performance data and carries out reliability assessment, when determining business When the reliability of routing reduces, such as less than a certain empirical value when, whether retriggered router-level topology trigger module executes full The judgement of foot routing trigger condition.Wherein reliability assessment should comprehensively consider equipment operation condition, bandwidth utilization rate, carrying optical cable The many factors such as operating condition.
As shown in figure 4, the structural schematic diagram of the configuration system for communication route resource provided by one embodiment of the present invention, The system includes: router-level topology trigger module 10, business demand analysis module 20, routing calculation module 30 and routing configuration mould Block 40.
Wherein, router-level topology trigger module 10 meets routing trigger condition for judging whether, routes triggering item meeting When part, generates the application of business router-level topology and be sent to business demand analysis module 20;
Business demand analysis module 20 is connect with router-level topology trigger module 10, for receiving business router-level topology When application, router-level topology requirement is determined according to business feature, and determine router-level topology precondition;
Routing calculation module 30 is connect with business demand analysis module 20, for according to current business routing configuration information It is required with router-level topology, and determines business route resource allocation result under the constraint of business router-level topology precondition;
Routing configuration module 40 is connect with routing calculation module 30, for being carried out according to business route resource allocation result The configuration of business route resource.
As shown in figure 5, being the structural representation of the configuration system for the communication route resource that another embodiment of the present invention provides Scheme, the difference of the embodiment and embodiment illustrated in fig. 4 is, the embodiment further include: fail-safe analysis module 50.
Fail-safe analysis module 50 is connect with routing calculation module 30, receives the business road that routing calculation module 30 determines By resource allocation result, for dividing the reliability of multiple schemes when business route resource allocation result includes multiple schemes It is not analyzed, and according to fail-safe analysis result optimum scheme comparison;It include a side in business route resource allocation result When case, a scheme is determined as optimal case, and identified optimal case is sent to routing configuration module 40 and is provided Source configuration.
Network performance data after fail-safe analysis module 50 is also used to based on resource distribution carries out reliability assessment, and Determine whether that triggering router-level topology trigger module 10 judges whether to meet routing trigger condition according to assessment result.
When assessment result is that reliability is lower than given threshold, fail-safe analysis module 50 triggers router-level topology trigger module 10 judge whether to meet routing trigger condition, and execute the configuration of the communication route resource of a new round.
The embodiment can also include: that routing configuration obtains module 60, not meet when routing trigger condition for obtaining Current business routing configuration information, and current business routing configuration information is sent to routing calculation module 30.
The function of the modules of the system can refer to the description of Fig. 1-2 illustrated embodiment, and details are not described herein.
The configuration system and method for communication route resource provided in this embodiment, it is not only versatile and effectively towards electricity Power produces business, which, can be certainly when Added Business demand, the emergency detour of interrupting service and batch optimize It is dynamic to carry out business router-level topology according to business feature, and optimal path is filtered out according to fail-safe analysis result, to realize full The reliability and robustness of network are taken into account while sufficient business transmission demand.
It should be understood by those ordinary skilled in the art that: the discussion of any of the above embodiment is exemplary only, not It is intended to imply that the scope of the present disclosure (including claim) is limited to these examples;Under thinking of the invention, above embodiments Or can also be combined between the technical characteristic in different embodiments, step can be realized with random order, and be existed such as Many other variations of the upper different aspect of the invention, for simplicity, they are not provided in details.
In addition, to simplify explanation and discussing, and in order not to obscure the invention, it can in provided attached drawing It is connect with showing or can not show with the well known power ground of integrated circuit (IC) chip and other components.Furthermore, it is possible to Device is shown in block diagram form, to avoid obscuring the invention, and this has also contemplated following facts, i.e., about this The details of the embodiment of a little block diagram arrangements be height depend on will implementing platform of the invention (that is, these details should It is completely within the scope of the understanding of those skilled in the art).Elaborating that detail (for example, circuit) is of the invention to describe In the case where exemplary embodiment, it will be apparent to those skilled in the art that can be in these no details In the case where or implement the present invention in the case that these details change.Therefore, these descriptions should be considered as explanation Property rather than it is restrictive.
Although having been incorporated with specific embodiments of the present invention, invention has been described, according to retouching for front It states, many replacements of these embodiments, modifications and variations will be apparent for those of ordinary skills.Example Such as, discussed embodiment can be used in other memory architectures (for example, dynamic ram (DRAM)).
The embodiment of the present invention be intended to cover fall into all such replacements within the broad range of appended claims, Modifications and variations.Therefore, all within the spirits and principles of the present invention, any omission, modification, equivalent replacement, the improvement made Deng should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of configuration system for communicating route resource characterized by comprising
Router-level topology trigger module meets routing trigger condition for judging whether, raw when meeting the routing trigger condition Business demand analysis module is sent at business router-level topology application;
The business demand analysis module is connect with the router-level topology trigger module, for receiving the business routing When calculating application, router-level topology requirement is determined according to business feature, and determine router-level topology precondition;
Routing calculation module is connect with the business demand analysis module, for according to current business routing configuration information and institute Router-level topology requirement is stated, and determines business route resource allocation result under the constraint of the business router-level topology precondition;
Routing configuration module is connect with the routing calculation module, for being carried out according to the business route resource allocation result The configuration of business route resource.
2. system according to claim 1, which is characterized in that the system also includes:
Fail-safe analysis module is connect with the routing calculation module, for including in the business route resource allocation result When multiple schemes, the reliability of multiple schemes is analyzed respectively, and according to fail-safe analysis result optimum scheme comparison;? When the business route resource allocation result includes a scheme, one scheme is determined as optimal case.
3. system according to claim 2, which is characterized in that the fail-safe analysis module is also used to based on resource distribution Network performance data later carries out reliability assessment, and is determined whether to trigger the router-level topology trigger mode according to assessment result Block judges whether to meet the routing trigger condition.
4. system according to claim 1, which is characterized in that the system also includes:
Routing configuration obtains module, does not meet the current business routing configuration information when routing trigger condition for obtaining.
5. system according to claim 1, which is characterized in that the routing trigger condition include: Added Business application, in The application of emergency detour or business batch optimization application of disconnected business.
6. a kind of configuration method for communicating route resource, which is characterized in that be applied to the described in any item systems of claim 1-5 In, which comprises
Judge whether to meet routing trigger condition;
When meeting the routing trigger condition, router-level topology requirement is determined according to business feature, and determine router-level topology premise Condition;
According to current business routing configuration information and router-level topology requirement, and in the constraint of the router-level topology precondition Lower determining business route resource allocation result;
The configuration of business route resource is carried out according to the business route resource allocation result.
7. according to the method described in claim 6, it is characterized in that, the method also includes:
When the business route resource allocation result includes multiple schemes, the reliability of multiple schemes is analyzed respectively, And according to fail-safe analysis result optimum scheme comparison;It, will when the business route resource allocation result includes a scheme One scheme is determined as optimal case.
8. the method according to the description of claim 7 is characterized in that the method also includes:
Reliability assessment is carried out based on the network performance data after resource distribution, and determines whether that triggering is sentenced according to assessment result It is disconnected whether to meet the routing trigger condition.
9. according to the method described in claim 6, it is characterized in that, the method also includes:
Obtain current business routing configuration information when not meeting the routing trigger condition.
10. according to the method described in claim 6, it is characterized in that, the routing trigger condition include: Added Business application, The emergency detour application of interrupting service or business batch optimization application.
CN201910101988.3A 2019-02-01 2019-02-01 Method and system for configuring communication routing resources Active CN109842522B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910101988.3A CN109842522B (en) 2019-02-01 2019-02-01 Method and system for configuring communication routing resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910101988.3A CN109842522B (en) 2019-02-01 2019-02-01 Method and system for configuring communication routing resources

Publications (2)

Publication Number Publication Date
CN109842522A true CN109842522A (en) 2019-06-04
CN109842522B CN109842522B (en) 2022-03-11

Family

ID=66884380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910101988.3A Active CN109842522B (en) 2019-02-01 2019-02-01 Method and system for configuring communication routing resources

Country Status (1)

Country Link
CN (1) CN109842522B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112054957A (en) * 2020-08-11 2020-12-08 烽火通信科技股份有限公司 Resource scheduling method, device, equipment and storage medium
WO2022127608A1 (en) * 2020-12-17 2022-06-23 微网优联科技(成都)有限公司 Routing resource allocation method and apparatus for wifi 6 router

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020144143A1 (en) * 2000-12-15 2002-10-03 International Business Machines Corporation Method and system for network management capable of restricting consumption of resources along endpoint-to-endpoint routes throughout a network
CN101478705A (en) * 2009-01-21 2009-07-08 电子科技大学 Survivable service flow conducting method based on interlayer message routing
CN102231647A (en) * 2011-06-21 2011-11-02 中国电力科学研究院 Fiber communication network service route configuration method used in electric power
CN108011907A (en) * 2016-10-31 2018-05-08 华为技术有限公司 The resource allocation methods and device of adapted telecommunication net

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020144143A1 (en) * 2000-12-15 2002-10-03 International Business Machines Corporation Method and system for network management capable of restricting consumption of resources along endpoint-to-endpoint routes throughout a network
CN101478705A (en) * 2009-01-21 2009-07-08 电子科技大学 Survivable service flow conducting method based on interlayer message routing
CN102231647A (en) * 2011-06-21 2011-11-02 中国电力科学研究院 Fiber communication network service route configuration method used in electric power
CN108011907A (en) * 2016-10-31 2018-05-08 华为技术有限公司 The resource allocation methods and device of adapted telecommunication net

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112054957A (en) * 2020-08-11 2020-12-08 烽火通信科技股份有限公司 Resource scheduling method, device, equipment and storage medium
CN112054957B (en) * 2020-08-11 2022-04-29 烽火通信科技股份有限公司 Resource scheduling method, device, equipment and storage medium
WO2022127608A1 (en) * 2020-12-17 2022-06-23 微网优联科技(成都)有限公司 Routing resource allocation method and apparatus for wifi 6 router

Also Published As

Publication number Publication date
CN109842522B (en) 2022-03-11

Similar Documents

Publication Publication Date Title
CN107070724B (en) Method for monitoring end-to-end service communication state of power communication network
CN104486194B (en) A kind of more reliability step virtual network controls system and method
CN108809828B (en) Power communication network routing method for joint balance of load flow and business risk
CN104579965B (en) Support two layers of path calculation method of photoelectricity and system of a variety of constraints policies
CN108183813B (en) Group's barrier processing method and processing device
CN107689918B (en) Automatic searching method for service channel path of power communication network
CN105703973B (en) A kind of power communication fiber optic network reliability consideration method based on composite measure
CN105007220B (en) Inter-domain routing manages system, method, field adapter and transmission network
CN107292598A (en) One kind pays method for routing and pays route middleware
CN114025264A (en) Routing planning method for power communication SDH optical transmission network
Liu et al. DL-assisted cross-layer orchestration in software-defined IP-over-EONs: From algorithm design to system prototype
CN107800624A (en) A kind of optimal circuitous path selection new method of regional protection key message
CN109842522A (en) Communicate the configuration method and system of route resource
Reyes et al. Adaptive and state-dependent online resource allocation in dynamic optical networks
Jereb Network reliability: models, measures and analysis
CN112887207B (en) Service route distribution method and device for power IP-optical communication network
CN102868624B (en) The control device of electro-optical composite network node, control system and control method
CN105530133B (en) A kind of Electric control business intelligence restoration methods
CN107483141B (en) Ethernet link method for building up and controller
Li et al. P-cycle based protection scheme with cycle multiplexing and capacity balance for multicast service in substation communication network
CN101742366B (en) QOS-assuring parameterized label forwarding method for optical packet network
CN115277578B (en) Service arrangement method, device and storage medium
CN206100015U (en) Railway data net network resource management platform
CN115604607A (en) Power optical network computation circuit control method based on time delay strategy
CN113068083B (en) Method, device and equipment for establishing connection and computer readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant