CN109842522A - Communicate the configuration method and system of route resource - Google Patents
Communicate the configuration method and system of route resource Download PDFInfo
- Publication number
- CN109842522A CN109842522A CN201910101988.3A CN201910101988A CN109842522A CN 109842522 A CN109842522 A CN 109842522A CN 201910101988 A CN201910101988 A CN 201910101988A CN 109842522 A CN109842522 A CN 109842522A
- Authority
- CN
- China
- Prior art keywords
- business
- routing
- router
- level topology
- route resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000004458 analytical method Methods 0.000 claims abstract description 47
- 238000013468 resource allocation Methods 0.000 claims abstract description 35
- 238000004364 calculation method Methods 0.000 claims abstract description 19
- 238000005457 optimization Methods 0.000 claims description 11
- 238000009826 distribution Methods 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 abstract description 9
- 238000004891 communication Methods 0.000 description 28
- 230000003287 optical effect Effects 0.000 description 19
- 238000010586 diagram Methods 0.000 description 8
- 238000007726 management method Methods 0.000 description 7
- 230000008859 change Effects 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 239000013307 optical fiber Substances 0.000 description 3
- 239000002131 composite material Substances 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 102100020786 Adenylosuccinate synthetase isozyme 2 Human genes 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- KRTSDMXIXPKRQR-AATRIKPKSA-N monocrotophos Chemical compound CNC(=O)\C=C(/C)OP(=O)(OC)OC KRTSDMXIXPKRQR-AATRIKPKSA-N 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Abstract
The invention discloses a kind of configuration system and methods for communicating route resource, which includes: router-level topology trigger module, meet routing trigger condition for judging whether, when meeting the routing trigger condition, generate the application of business router-level topology;Business demand analysis module, for determining router-level topology requirement according to business feature, and determine router-level topology precondition when receiving the business router-level topology application;Routing calculation module for requiring according to current business routing configuration information and the router-level topology, and determines business route resource allocation result under the constraint of the business router-level topology precondition;Routing configuration module can also include fail-safe analysis module, for carrying out fail-safe analysis to business route resource allocation result for carrying out the configuration of business route resource according to the business route resource allocation result.The present invention can take into account the reliability and robustness of network while meeting business transmission demand.
Description
Technical field
The present invention relates to powerline network fields, particularly relate to a kind of configuration method and system for communicating route resource.
Background technique
In recent years, electric power backbone communication network is increasingly sophisticated, while to protect novel power grid production industry of the private network as representative
Business continuously emerges, and power telecom network equipment and the electric power services carried are increased with annual 10% or more speed.Ensure
The safe and reliable operation of electric power services is the core of power telecom network operation and maintenance.Powerline network has structure
The features such as complication, multi-business diversification generally rely on O&M people in traditional electric power services communications resource allocation
Member carries out the distribution of business transmission route manually, thus cannot achieve the optimum arrangements of global business transmission route.
Summary of the invention
In view of this, it is an object of the invention to propose a kind of configuration method and system for communicating route resource.
Based on a kind of above-mentioned purpose configuration system for communicating route resource provided by the invention, comprising:
Router-level topology trigger module meets routing trigger condition for judging whether, is meeting the routing trigger condition
When, it generates the application of business router-level topology and is sent to business demand analysis module;
The business demand analysis module is connect with the router-level topology trigger module, for receiving the business
When router-level topology application, router-level topology requirement is determined according to business feature, and determine router-level topology precondition;
Routing calculation module is connect with the business demand analysis module, for according to current business routing configuration information
It is required with the router-level topology, and determines business route resource distribution knot under the constraint of the business router-level topology precondition
Fruit;
Routing configuration module is connect with the routing calculation module, for according to the business route resource allocation result
The configuration of carry out business route resource.
In one embodiment, the system also includes:
Fail-safe analysis module is connect with the routing calculation module, in the business route resource allocation result
When including multiple schemes, the reliability of multiple schemes is analyzed respectively, and optimal side is determined according to fail-safe analysis result
Case;When the business route resource allocation result includes a scheme, one scheme is determined as optimal case.
In one embodiment, network performance data after the fail-safe analysis module is also used to based on resource distribution into
Row reliability assessment, and determine whether that triggering the router-level topology trigger module judges whether to meet the road according to assessment result
By trigger condition.
In one embodiment, the system also includes:
Routing configuration obtains module, does not meet the current business routing configuration letter when routing trigger condition for obtaining
Breath.
In one embodiment, the routing trigger condition includes: the emergency detour Shen of Added Business application, interrupting service
Please or business batch optimization is applied.
Based on above-mentioned purpose the present invention also provides a kind of communication route resource configuration method, be applied to above-mentioned communication lines
By in the configuration system of resource, this method comprises:
Judge whether to meet routing trigger condition;
When meeting the routing trigger condition, router-level topology requirement is determined according to business feature, and determine router-level topology
Precondition;
According to current business routing configuration information and router-level topology requirement, and in the router-level topology precondition
Constraint is lower to determine business route resource allocation result;
The configuration of business route resource is carried out according to the business route resource allocation result.
In one embodiment, the method also includes:
When the business route resource allocation result includes multiple schemes, the reliability of multiple schemes is divided respectively
Analysis, and according to fail-safe analysis result optimum scheme comparison;When the business route resource allocation result includes a scheme,
One scheme is determined as optimal case.
In one embodiment, the method also includes:
Reliability assessment is carried out based on the network performance data after resource distribution, and determines whether to touch according to assessment result
Hair judges whether to meet the routing trigger condition.
In one embodiment, the method also includes:
Obtain current business routing configuration information when not meeting the routing trigger condition.
In one embodiment, the routing trigger condition includes: the emergency detour Shen of Added Business application, interrupting service
Please or business batch optimization is applied.
From the above it can be seen that the configuration method and system of communication route resource provided by the invention, not only general
Property it is strong and effectively towards electric power services, the system is in Added Business demand, the emergency detour of interrupting service and batch
When optimization, business router-level topology can be carried out automatically according to business feature, and filter out according to fail-safe analysis result
Optimal path, to realize the reliability and robustness of taking into account network while meeting business transmission demand.
Detailed description of the invention
Fig. 1 is a kind of flow chart of configuration method for communicating route resource provided by one embodiment of the present invention;
Fig. 2 is the exemplary diagram of determining business route resource allocation result provided by one embodiment of the present invention;
Fig. 3 is a kind of flow chart of the configuration method for communication route resource that another embodiment of the present invention provides;
Fig. 4 is a kind of structural schematic diagram of configuration system for communicating route resource provided by one embodiment of the present invention;
Fig. 5 is a kind of structural schematic diagram of the configuration system for communication route resource that another embodiment of the present invention provides.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference
Attached drawing, the present invention is described in more detail.
It should be noted that all statements for using " first " and " second " are for differentiation two in the embodiment of the present invention
The non-equal entity of a same names or non-equal parameter, it is seen that " first " " second " only for the convenience of statement, does not answer
It is interpreted as the restriction to the embodiment of the present invention, subsequent embodiment no longer illustrates this one by one.
Fig. 1 is the flow chart of the configuration method of communication route resource provided in an embodiment of the present invention, as shown in Figure 1, the party
Method may comprise steps of:
Step S201, router-level topology trigger module judges whether to meet routing trigger condition, routes trigger condition meeting
When, it generates the application of business router-level topology and is sent to business demand analysis module.
In one embodiment, router-level topology trigger module judges whether to start router-level topology according to routing trigger condition, when
When meeting routing trigger condition, router-level topology can be started by being judged as, the purpose of router-level topology is carried out to communication route resource
It reconfigures, then router-level topology trigger module generates the application of business router-level topology and is sent to business demand analysis module.
In one embodiment, routing trigger condition may include: the emergency detour Shen of Added Business application, interrupting service
Please or business batch optimization is applied.Wherein the emergency detour of interrupting service may include that equipment fault, interruption of optical cables, performance are bad
Situations such as situations such as change, business batch optimization may include network topology change.
For Added Business application, by needing to apply the service unit of communication route resource in TMS system
Apply for newly-increased industry in (Telecommunication Management System, communications management system) in a manner of initiation
Business or change operation flow, such as the channel opening link of extra-high voltage project operation preparatory phase, need to initiate Added Business Shen
Please.
Emergency detour application for interrupting service when generation important service is offline, is led in actual operation
The escape truck for crossing operation maintenance personnel formulation initiates the emergency detour application of interrupting service, to promote operational reliability.
For business batch optimization application, refer to causes network topology that big rule occur due to maintenance, capital construction or technological transformation etc.
When mould changes, there is optimization space in the method for operation of original electric power services, and the reliability of network routing reduces, and will trigger net
The batch Optimization Work of bearer service in network.
In one embodiment, the emergency for receiving Added Business application or interrupting service when router-level topology trigger module is circuitous
When returning application or business batch optimization, it is judged as satisfaction routing trigger condition, sends business routing to business demand analysis module
Calculate application.
Step S202, business demand analysis module receives business router-level topology application, is determined and is routed according to business feature
It calculates and requires, and determine router-level topology precondition, and router-level topology is required to be sent to routing with router-level topology precondition
Computing module.
In one embodiment, business demand analysis module can in conjunction with network service feature analysis business start node,
The requirement of the router-level topologies such as end node, service bandwidth demand, and determine calculation constraint condition in conjunction with practical condition, that is, it routes
Calculate precondition.
Specifically, in one embodiment, business demand analysis module can be based on being carried on what equipment was connected with optical cable
Service logic topological diagram carries out route need analysis, obtain include: the source node of business, destination node, Dominator, must be without
The requirement of the router-level topologies such as node, service bandwidth demand.
In one embodiment, business demand analysis module is according to different production types of service, to be determined for compliance with power communication
The conditions such as the constraint condition, such as time delay, independence, consistency that practical O&M requires are netted, and are counted constraint condition as routing
Calculate the router-level topology precondition of module.For example, router-level topology requirement is communication channel list for relay protection type of service
10ms should be not more than to propagation delay time, pilot wire relays optical-fibre channel should be ensured that two-way routing is consistent, to reach double
To delay inequality minimum.
Wherein, business may include: protection, peace control, dispatch data net, integrated data network, dispatching exchange and administrative friendship
It changes etc. one or more.
Step S203, routing calculation module is required according to current business routing configuration information, router-level topology, and on business road
By carrying out the calculating of idle route resource under the constraint of calculating precondition, business route resource allocation result is obtained.
Wherein, business route resource may include the resources such as routing, port, time slot.
In one embodiment, module is obtained by routing configuration and transfers network foundation data from network foundation data platform,
And current business routing configuration information is determined based on network foundation data.
Specifically, network foundation data platform includes transmission device profession network management system, Integrated Network Management System and TMS
System.In network foundation data platform, it is stored with communication network basic resource data and possession resource data.
The acquisition of communication network basic resource data mainly includes following two parts:
1) TMS system and Integrated Network Management System are interconnected by northbound interface and each professional network management, acquire transmission device
The information such as communication networks the basic resource data, such as optical port, time slot such as warning information, Network resource allocation, to realize the whole network
The acquisition of logical message and integrated;
2) higher level TMS system realizes possession resource data and net by the cascade with unit TMS systems in possession at different levels
The association of network logical message, wherein possession resource data may include the physical message of optical cable, fibre core etc., such as OPGW optical cable
(Optical Fiber Composite Overhead GroundWire, optical fiber composite overhead ground wire), ADSS optical cable (All
Dielectric Self-SupportingAerial Optical Cable, All Dielectric self-support), the optical cables class such as general cable
Type, the total core number of cable length, optical cable, occupied core number, vacant core number.
Routing configuration obtains module based on the communication network basic resource data and possession resource data got, determines
Current business routing configuration information.
Routing calculation module is the core work module of entire route resource management.In one embodiment, as shown in Fig. 2,
For the exemplary diagram of determining business route resource allocation result provided by one embodiment of the present invention, protection business is important electric power
Production business needs to configure mutually independent host-standby communication channel for it.It is calculated by routing calculation module, constraint condition
To need vacant power port, optical port in website A and C equipment, vacant optical port, OPGW optical cable are needed in website B and D equipment
With sky remaining fibre core pair has been required on general cable.Router-level topology requirement are as follows: the high reliablity of primary communication channel is logical in spare communication
Road, and primary communication channel and alternate communication channels are independent mutually.
In this example, routing calculation module is according to initial routing configuration information and router-level topology requirement, in router-level topology
The constraint of precondition gets off to calculate idle route resource, i.e. business route resource allocation result, comprising: OPGW optical cable and general
Cable.
Step S204, routing configuration module carries out the configuration of business route resource according to business route resource allocation result.
In the present embodiment, by determining router-level topology requirement and router-level topology premise item when meeting routing trigger condition
Part, and based on initial routing configuration information and router-level topology requirement, computation-free provides under the constraint of router-level topology precondition
Source can carry out the configuration of communication route resource automatically according to business transmission demand, simultaneous while meeting business transmission demand
Care for the reliability and robustness of network.
Fig. 3 is the flow chart of the configuration method of another communication route resource provided in an embodiment of the present invention;Such as Fig. 3 institute
Show, the difference of the embodiment and embodiment illustrated in fig. 1 is: further comprising the steps of after step S203:
Business route resource allocation result is sent to fail-safe analysis module by step S204 ', routing calculation module.
Step S205 ', fail-safe analysis module carry out reliability assessment to business route resource allocation result, and according to commenting
Estimate result optimum scheme comparison.
In one embodiment, when business route resource allocation result is unique, fail-safe analysis module determines the result
For optimal routing;When business route resource allocation result is not unique, includes multiple allocation plans, fail-safe analysis module is to more
A result carries out reliability assessment, filters out optimal routing.
For example, as shown in the example of figure 2, router-level topology result, that is, business route resource allocation result includes that available resources are
OPGW optical cable and general cable, by the analysis of fail-safe analysis module: OPGW optical cable is in cable strength, laying position, O&M
Aspect is superior to general cable, therefore assessment result is the high reliablity of OPGW optical cable in general cable, and fail-safe analysis module is by OPGW optical cable
It is determined as optimal routing, thus OPGW optical cable is used for bearer service channel, general cable is for carrying protection channel.
Step S206 ', routing configuration module carry out the distribution of route resource according to routing optimal distributing scheme.
Network performance data after step S207 ', fail-safe analysis module real-time monitoring resource distribution, and it is based on network
Performance data determines whether to trigger router-level topology trigger module executes the judgement for whether meeting routing trigger condition.
In one embodiment, fail-safe analysis module is based on network performance data and carries out reliability assessment, when determining business
When the reliability of routing reduces, such as less than a certain empirical value when, whether retriggered router-level topology trigger module executes full
The judgement of foot routing trigger condition.Wherein reliability assessment should comprehensively consider equipment operation condition, bandwidth utilization rate, carrying optical cable
The many factors such as operating condition.
As shown in figure 4, the structural schematic diagram of the configuration system for communication route resource provided by one embodiment of the present invention,
The system includes: router-level topology trigger module 10, business demand analysis module 20, routing calculation module 30 and routing configuration mould
Block 40.
Wherein, router-level topology trigger module 10 meets routing trigger condition for judging whether, routes triggering item meeting
When part, generates the application of business router-level topology and be sent to business demand analysis module 20;
Business demand analysis module 20 is connect with router-level topology trigger module 10, for receiving business router-level topology
When application, router-level topology requirement is determined according to business feature, and determine router-level topology precondition;
Routing calculation module 30 is connect with business demand analysis module 20, for according to current business routing configuration information
It is required with router-level topology, and determines business route resource allocation result under the constraint of business router-level topology precondition;
Routing configuration module 40 is connect with routing calculation module 30, for being carried out according to business route resource allocation result
The configuration of business route resource.
As shown in figure 5, being the structural representation of the configuration system for the communication route resource that another embodiment of the present invention provides
Scheme, the difference of the embodiment and embodiment illustrated in fig. 4 is, the embodiment further include: fail-safe analysis module 50.
Fail-safe analysis module 50 is connect with routing calculation module 30, receives the business road that routing calculation module 30 determines
By resource allocation result, for dividing the reliability of multiple schemes when business route resource allocation result includes multiple schemes
It is not analyzed, and according to fail-safe analysis result optimum scheme comparison;It include a side in business route resource allocation result
When case, a scheme is determined as optimal case, and identified optimal case is sent to routing configuration module 40 and is provided
Source configuration.
Network performance data after fail-safe analysis module 50 is also used to based on resource distribution carries out reliability assessment, and
Determine whether that triggering router-level topology trigger module 10 judges whether to meet routing trigger condition according to assessment result.
When assessment result is that reliability is lower than given threshold, fail-safe analysis module 50 triggers router-level topology trigger module
10 judge whether to meet routing trigger condition, and execute the configuration of the communication route resource of a new round.
The embodiment can also include: that routing configuration obtains module 60, not meet when routing trigger condition for obtaining
Current business routing configuration information, and current business routing configuration information is sent to routing calculation module 30.
The function of the modules of the system can refer to the description of Fig. 1-2 illustrated embodiment, and details are not described herein.
The configuration system and method for communication route resource provided in this embodiment, it is not only versatile and effectively towards electricity
Power produces business, which, can be certainly when Added Business demand, the emergency detour of interrupting service and batch optimize
It is dynamic to carry out business router-level topology according to business feature, and optimal path is filtered out according to fail-safe analysis result, to realize full
The reliability and robustness of network are taken into account while sufficient business transmission demand.
It should be understood by those ordinary skilled in the art that: the discussion of any of the above embodiment is exemplary only, not
It is intended to imply that the scope of the present disclosure (including claim) is limited to these examples;Under thinking of the invention, above embodiments
Or can also be combined between the technical characteristic in different embodiments, step can be realized with random order, and be existed such as
Many other variations of the upper different aspect of the invention, for simplicity, they are not provided in details.
In addition, to simplify explanation and discussing, and in order not to obscure the invention, it can in provided attached drawing
It is connect with showing or can not show with the well known power ground of integrated circuit (IC) chip and other components.Furthermore, it is possible to
Device is shown in block diagram form, to avoid obscuring the invention, and this has also contemplated following facts, i.e., about this
The details of the embodiment of a little block diagram arrangements be height depend on will implementing platform of the invention (that is, these details should
It is completely within the scope of the understanding of those skilled in the art).Elaborating that detail (for example, circuit) is of the invention to describe
In the case where exemplary embodiment, it will be apparent to those skilled in the art that can be in these no details
In the case where or implement the present invention in the case that these details change.Therefore, these descriptions should be considered as explanation
Property rather than it is restrictive.
Although having been incorporated with specific embodiments of the present invention, invention has been described, according to retouching for front
It states, many replacements of these embodiments, modifications and variations will be apparent for those of ordinary skills.Example
Such as, discussed embodiment can be used in other memory architectures (for example, dynamic ram (DRAM)).
The embodiment of the present invention be intended to cover fall into all such replacements within the broad range of appended claims,
Modifications and variations.Therefore, all within the spirits and principles of the present invention, any omission, modification, equivalent replacement, the improvement made
Deng should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of configuration system for communicating route resource characterized by comprising
Router-level topology trigger module meets routing trigger condition for judging whether, raw when meeting the routing trigger condition
Business demand analysis module is sent at business router-level topology application;
The business demand analysis module is connect with the router-level topology trigger module, for receiving the business routing
When calculating application, router-level topology requirement is determined according to business feature, and determine router-level topology precondition;
Routing calculation module is connect with the business demand analysis module, for according to current business routing configuration information and institute
Router-level topology requirement is stated, and determines business route resource allocation result under the constraint of the business router-level topology precondition;
Routing configuration module is connect with the routing calculation module, for being carried out according to the business route resource allocation result
The configuration of business route resource.
2. system according to claim 1, which is characterized in that the system also includes:
Fail-safe analysis module is connect with the routing calculation module, for including in the business route resource allocation result
When multiple schemes, the reliability of multiple schemes is analyzed respectively, and according to fail-safe analysis result optimum scheme comparison;?
When the business route resource allocation result includes a scheme, one scheme is determined as optimal case.
3. system according to claim 2, which is characterized in that the fail-safe analysis module is also used to based on resource distribution
Network performance data later carries out reliability assessment, and is determined whether to trigger the router-level topology trigger mode according to assessment result
Block judges whether to meet the routing trigger condition.
4. system according to claim 1, which is characterized in that the system also includes:
Routing configuration obtains module, does not meet the current business routing configuration information when routing trigger condition for obtaining.
5. system according to claim 1, which is characterized in that the routing trigger condition include: Added Business application, in
The application of emergency detour or business batch optimization application of disconnected business.
6. a kind of configuration method for communicating route resource, which is characterized in that be applied to the described in any item systems of claim 1-5
In, which comprises
Judge whether to meet routing trigger condition;
When meeting the routing trigger condition, router-level topology requirement is determined according to business feature, and determine router-level topology premise
Condition;
According to current business routing configuration information and router-level topology requirement, and in the constraint of the router-level topology precondition
Lower determining business route resource allocation result;
The configuration of business route resource is carried out according to the business route resource allocation result.
7. according to the method described in claim 6, it is characterized in that, the method also includes:
When the business route resource allocation result includes multiple schemes, the reliability of multiple schemes is analyzed respectively,
And according to fail-safe analysis result optimum scheme comparison;It, will when the business route resource allocation result includes a scheme
One scheme is determined as optimal case.
8. the method according to the description of claim 7 is characterized in that the method also includes:
Reliability assessment is carried out based on the network performance data after resource distribution, and determines whether that triggering is sentenced according to assessment result
It is disconnected whether to meet the routing trigger condition.
9. according to the method described in claim 6, it is characterized in that, the method also includes:
Obtain current business routing configuration information when not meeting the routing trigger condition.
10. according to the method described in claim 6, it is characterized in that, the routing trigger condition include: Added Business application,
The emergency detour application of interrupting service or business batch optimization application.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910101988.3A CN109842522B (en) | 2019-02-01 | 2019-02-01 | Method and system for configuring communication routing resources |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910101988.3A CN109842522B (en) | 2019-02-01 | 2019-02-01 | Method and system for configuring communication routing resources |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109842522A true CN109842522A (en) | 2019-06-04 |
CN109842522B CN109842522B (en) | 2022-03-11 |
Family
ID=66884380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910101988.3A Active CN109842522B (en) | 2019-02-01 | 2019-02-01 | Method and system for configuring communication routing resources |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109842522B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112054957A (en) * | 2020-08-11 | 2020-12-08 | 烽火通信科技股份有限公司 | Resource scheduling method, device, equipment and storage medium |
WO2022127608A1 (en) * | 2020-12-17 | 2022-06-23 | 微网优联科技(成都)有限公司 | Routing resource allocation method and apparatus for wifi 6 router |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020144143A1 (en) * | 2000-12-15 | 2002-10-03 | International Business Machines Corporation | Method and system for network management capable of restricting consumption of resources along endpoint-to-endpoint routes throughout a network |
CN101478705A (en) * | 2009-01-21 | 2009-07-08 | 电子科技大学 | Survivable service flow conducting method based on interlayer message routing |
CN102231647A (en) * | 2011-06-21 | 2011-11-02 | 中国电力科学研究院 | Fiber communication network service route configuration method used in electric power |
CN108011907A (en) * | 2016-10-31 | 2018-05-08 | 华为技术有限公司 | The resource allocation methods and device of adapted telecommunication net |
-
2019
- 2019-02-01 CN CN201910101988.3A patent/CN109842522B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020144143A1 (en) * | 2000-12-15 | 2002-10-03 | International Business Machines Corporation | Method and system for network management capable of restricting consumption of resources along endpoint-to-endpoint routes throughout a network |
CN101478705A (en) * | 2009-01-21 | 2009-07-08 | 电子科技大学 | Survivable service flow conducting method based on interlayer message routing |
CN102231647A (en) * | 2011-06-21 | 2011-11-02 | 中国电力科学研究院 | Fiber communication network service route configuration method used in electric power |
CN108011907A (en) * | 2016-10-31 | 2018-05-08 | 华为技术有限公司 | The resource allocation methods and device of adapted telecommunication net |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112054957A (en) * | 2020-08-11 | 2020-12-08 | 烽火通信科技股份有限公司 | Resource scheduling method, device, equipment and storage medium |
CN112054957B (en) * | 2020-08-11 | 2022-04-29 | 烽火通信科技股份有限公司 | Resource scheduling method, device, equipment and storage medium |
WO2022127608A1 (en) * | 2020-12-17 | 2022-06-23 | 微网优联科技(成都)有限公司 | Routing resource allocation method and apparatus for wifi 6 router |
Also Published As
Publication number | Publication date |
---|---|
CN109842522B (en) | 2022-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107070724B (en) | Method for monitoring end-to-end service communication state of power communication network | |
CN104486194B (en) | A kind of more reliability step virtual network controls system and method | |
CN108809828B (en) | Power communication network routing method for joint balance of load flow and business risk | |
CN104579965B (en) | Support two layers of path calculation method of photoelectricity and system of a variety of constraints policies | |
CN108183813B (en) | Group's barrier processing method and processing device | |
CN107689918B (en) | Automatic searching method for service channel path of power communication network | |
CN105703973B (en) | A kind of power communication fiber optic network reliability consideration method based on composite measure | |
CN105007220B (en) | Inter-domain routing manages system, method, field adapter and transmission network | |
CN107292598A (en) | One kind pays method for routing and pays route middleware | |
CN114025264A (en) | Routing planning method for power communication SDH optical transmission network | |
Liu et al. | DL-assisted cross-layer orchestration in software-defined IP-over-EONs: From algorithm design to system prototype | |
CN107800624A (en) | A kind of optimal circuitous path selection new method of regional protection key message | |
CN109842522A (en) | Communicate the configuration method and system of route resource | |
Reyes et al. | Adaptive and state-dependent online resource allocation in dynamic optical networks | |
Jereb | Network reliability: models, measures and analysis | |
CN112887207B (en) | Service route distribution method and device for power IP-optical communication network | |
CN102868624B (en) | The control device of electro-optical composite network node, control system and control method | |
CN105530133B (en) | A kind of Electric control business intelligence restoration methods | |
CN107483141B (en) | Ethernet link method for building up and controller | |
Li et al. | P-cycle based protection scheme with cycle multiplexing and capacity balance for multicast service in substation communication network | |
CN101742366B (en) | QOS-assuring parameterized label forwarding method for optical packet network | |
CN115277578B (en) | Service arrangement method, device and storage medium | |
CN206100015U (en) | Railway data net network resource management platform | |
CN115604607A (en) | Power optical network computation circuit control method based on time delay strategy | |
CN113068083B (en) | Method, device and equipment for establishing connection and computer readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |