CN109838336A - A kind of intelligence water power electricity generation system - Google Patents

A kind of intelligence water power electricity generation system Download PDF

Info

Publication number
CN109838336A
CN109838336A CN201910023904.9A CN201910023904A CN109838336A CN 109838336 A CN109838336 A CN 109838336A CN 201910023904 A CN201910023904 A CN 201910023904A CN 109838336 A CN109838336 A CN 109838336A
Authority
CN
China
Prior art keywords
input terminal
output end
module
connect
central control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910023904.9A
Other languages
Chinese (zh)
Inventor
李承忠
杨金荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiwu Jilong Technology Co Ltd
Original Assignee
Yiwu Jilong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yiwu Jilong Technology Co Ltd filed Critical Yiwu Jilong Technology Co Ltd
Priority to CN201910023904.9A priority Critical patent/CN109838336A/en
Publication of CN109838336A publication Critical patent/CN109838336A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The invention discloses a kind of intelligent water power electricity generation systems, including central control system, sensing module and comparing unit, the output end of the sensing module and the input terminal of comparing unit connect, and the output end of comparing unit and the input terminal of feedback module connect, the output end of the feedback module and the input terminal of central control system connect, and the output end of central control system and the input terminal of comparing unit connect, and the present invention relates to electricity generation system technical fields.The intelligence water power electricity generation system, it is connected by the output end of sensing module and the input terminal of comparing unit, the auto-alarm function that the data that sensor can be detected upload after analyzing, while having, it is more intelligent, it works along both lines, with being widely popularized property, includes water level monitor and load sensor by sensing module, facilitate timely supervision and management, the safety that electricity generation system uses is improved, the safety of personnel is also ensured.

Description

A kind of intelligence water power electricity generation system
Technical field
The present invention relates to electricity generation system technical field, specially a kind of intelligent water power electricity generation system.
Background technique
Power generation refers to water energy, the thermal energy of fossil fuel (coal, oil, natural gas), nuclear energy etc. using dynamic power device Prime energy be converted to the production process of electric energy, to supply the need of each department of national economy Yu people's lives, generate electricity now It the use of fossil fuel is still main forms of electricity generation, but the resource of fossil fuel is few, increasingly exhausted, the mankind are gradually more Begin to use the energy such as solar energy, wind energy, geothermal energy, ocean energy to generate electricity, hydroelectric basic principle is using water level Drop, cooperation hydrogenerator generates electric power, that is, can switch to the mechanical energy of water wheels using the position of water, then push with mechanical energy Generator, and electric power is obtained, scientists are effective to utilize stream power engineering and mechanical-physical with the natural endowment of this height of water Deng meticulous to arrange in pairs or groups to reach highest generated energy, for people to use cheap and free of contamination electric power.
Currently, automatic Monitoring System of Hydro-power Plants is most basic component part in hydroelectric power plant's information management system, monitoring System investment synchronous with power plant generating equipment can achieve the requirement of few man on duty after building up, but power plant is with region point The features such as cloth is wider, running equipment is more, nobody supervises, and safety substantially reduces.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of intelligent water power electricity generation system, security performance friendship is solved Low problem.
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of intelligence water power electricity generation system, packet Central control system, sensing module and comparing unit are included, the output end of the sensing module and the input terminal of comparing unit connect, And the output end of comparing unit and the input terminal of feedback module connect, the output end and central control system of the feedback module Input terminal connection, and the input terminal of the output end of central control system and comparing unit connects, and central control system It realizes and is bi-directionally connected with control centre, the input terminal of the central control system and the output end of power module are electrically connected, and And the output end of power module and the input terminal of sensing module connect, the output end of the power module and the input of control switch End is electrically connected, and the output end of control switch and the input terminal of central control system connect.
Preferably, the sensing module includes water level monitor and load sensor, and comparing unit includes the first number According to comparator and the second data comparator.
Preferably, the input terminal connection of the output end and display screen of the central control system, and central control system Output end and alarm input terminal connect.
Preferably, the central control system is bi-directionally connected with wireless signal transmitting module realization, and wireless signal is sent out It penetrates module to be bi-directionally connected with reception of wireless signals module realization, the reception of wireless signals module and intelligent terminal realize two-way company It connects.
Preferably, the output end connection of the input terminal and sending module of the central control system, and sending module The connection of the output end of input terminal and video camera.
Preferably, the control centre includes controller, and the output end of the input terminal of controller and receiving module connects It connects, the output end of the controller and the input terminal of lifting motor connect, and the input of the output end and generator of controller End connection.
Preferably, the generator includes shaft and rotating vane, the output end of the generator and electric energy output device Input terminal connection, and the input terminal of the output end of electric energy output device and power grid connects.
Beneficial effect
The present invention provides a kind of intelligent water power electricity generation systems.Have compared with prior art it is following the utility model has the advantages that
(1), the intelligence water power electricity generation system is connected by the output end of sensing module and the input terminal of comparing unit, and And the output end of comparing unit and the input terminal of feedback module connect, the output end of feedback module and the input of central control system End connection, and the input terminal of the output end of central control system and comparing unit connects, and central control system and control Realize and be bi-directionally connected that the input terminal of central control system and the output end of power module are electrically connected, and power module in center Output end and the input terminal of sensing module connect, the input terminal of the output end of power module and control switch is electrically connected, and And the output end of control switch and the input terminal of central control system connect, when staff finds by experience abnormal omen When, it can be alarmed by button, will solve, and prevent trouble before it happens in rudiment extremely, the sensor module of setting can be by sensor The data detected upload after analyzing, while the auto-alarm function having, more intelligent, work along both lines, and have extensive Generalization.
(2), the intelligence water power electricity generation system, includes water level monitor and load sensor by sensing module, and compare Include the first data comparator and the second data comparator, the output end of central control system and the input terminal of display screen compared with unit Connection, and the input terminal of the output end of central control system and alarm connects, and central control system and wireless signal emit Module realization is bi-directionally connected, and wireless signal transmitting module is bi-directionally connected with reception of wireless signals module realization, wireless signal Receiving module is bi-directionally connected with intelligent terminal realization, and the input terminal of central control system and the output end of sending module connect, and And the input terminal of sending module and the output end of video camera connect, control centre includes controller, and the input terminal of controller It is connect with the output end of receiving module, the output end of controller and the input terminal of lifting motor connect, and the output of controller End is connect with the input terminal of generator, and generator includes shaft and rotating vane, the output end of generator and electric energy output device Input terminal connection, and the input terminal of the output end of electric energy output device and power grid connects, and camera chain is arranged, it in real time will acquisition Information upload, facilitate timely supervision and management, improve the safety that electricity generation system uses, the safety of personnel is also protected Barrier.
Detailed description of the invention
Fig. 1 is the structural principle block diagram of present system;
Fig. 2 is the structural schematic diagram of sensing module of the present invention;
Fig. 3 is the structural schematic diagram of comparing unit of the present invention;
Fig. 4 is the structural schematic diagram of control centre of the present invention.
In figure: 1 central control system, 2 sensing modules, 21 water level monitors, 22 load sensors, 3 comparing units, 31 One data comparator, 32 second data comparators, 4 feedback modules, 5 control centres, 51 controllers, 52 receiving modules, 53 liftings Motor, 54 generators, 541 shafts, 542 rotating vanes, 55 electric energy output devices, 56 power grids, 6 power modules, 7 control switches, 8 are shown Display screen, 9 alarms, 10 wireless signal transmitting modules, 11 reception of wireless signals module, 12 intelligent terminals, 13 sending modules, 14 are taken the photograph Camera.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, the present invention provides a kind of technical solution: a kind of intelligence water power electricity generation system, including center control System 1, sensing module 2 and comparing unit 3 can be alarmed when staff finds by experience abnormal omen by button, will It is abnormal to be solved in rudiment, it prevents trouble before it happens, the sensor module of setting can be by data that sensor detects after analyzing It uploads, while the auto-alarm function having, it is more intelligent, it works along both lines, there is being widely popularized property, sensing module 2 includes Water level monitor 21 and load sensor 22, and comparing unit 3 includes the first data comparator 31 and the second data comparator 32, the output end of central control system 1 is connect with the input terminal of display screen 8, and the output end of central control system 1 and alarm The input terminal of device 9 connects, and central control system 1 is bi-directionally connected with the realization of wireless signal transmitting module 10, and wireless signal is sent out It penetrates module 10 to be bi-directionally connected with the realization of reception of wireless signals module 11, reception of wireless signals module 11 is realized double with intelligent terminal 12 To connection, the input terminal of central control system 1 is connect with the output end of sending module 13, and the input terminal of sending module 13 with The output end of video camera 14 connects, and 14 system of video camera is arranged, and in real time uploads the information of acquisition, convenient supervision in time and pipe Reason, improves the safety that electricity generation system uses, the safety of personnel is also ensured that the output end of sensing module 2 is compared with The input terminal of unit 3 connects, and the output end of comparing unit 3 is connect with the input terminal of feedback module 4, feedback module 4 it is defeated Outlet is connect with the input terminal of central control system 1, and the input terminal of the output end of central control system 1 and comparing unit 3 Connection, and central control system 1 realizes with control centre 5 and is bi-directionally connected that control centre 5 includes controller 51, and is controlled The input terminal of device 51 is connect with the output end of receiving module 52, and the output end of controller 51 and the input terminal of lifting motor 53 connect It connects, and the output end of controller 51 is connect with the input terminal of generator 54, generator 54 includes shaft 541 and rotating vane 542, the output end of generator 54 is connect with the input terminal of electric energy output device 55, and the output end and power grid of electric energy output device 55 56 input terminal connection, the input terminal of central control system 1 and the output end of power module 6 are electrically connected, and power module 6 Output end connect with the input terminal of sensing module 2, the input terminal of the output end of power module 6 and control switch 7 is electrically connected, And the output end of control switch 7 is connect with the input terminal of central control system 1.
Compare in use, collected signal is transmitted in the second data comparator 32 by load sensor 22 in real time Compared with the comparison data in the second data comparator 32 are set in advance, and when data are normal, data are shown on display screen 8 Show, when data exception, central control system 1 is abnormal by 9 prompt system of alarm, and sends data on display screen 8 It is shown, video camera 14 shoots the case where surrounding, and the photo of shooting is sent to center by sending module 13 Control system 1 can press button nearby, button module is by position when staff has found somewhere by abnormal conditions omen Information is transmitted to main control module, and main control module controls alarm 9 and alarms, while specific location is shown on display screen 8, it is convenient and When find the problem and solve, prevent trouble before it happens, normal water level value when first determining to need to input power generation, substandard water level value Then to input low-water alarm threshold values in the first data comparator 31 to the alert threshold values of low water level, as comparing data, water level Monitor 21 can detect water level, the data transfer that then will test to the first data comparator 31, in the first data ratio It is compared compared with the water level value that will test in device 31 with low-water alarm threshold values, the first data comparator 31 will arrive the alert valve of low water level Value feeds back to central control system 1 through feedback module 4, if it exceeds low water level value, central control system 1 will be controlled in control The heart 5 is operated, and controller 51 controls generator 54 and operated, and water flow directly impacts rotating vane 542, drives rotating vane 542 rotations, rotating vane 542 drives rotary shaft 541, generator 54 to rotate again, so that the speed of river water be enable to be directly changed into Electric energy, controller 51 can control lifting motor 53, and the electric energy that electric energy output device 55 issues generator 53 accesses power grid 56, supply Electricity consumption user uses.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of intelligence water power electricity generation system, including central control system (1), sensing module (2) and comparing unit (3), described The output end of sensing module (2) is connect with the input terminal of comparing unit (3), and the output end of comparing unit (3) and feedback mould The input terminal of block (4) connects, it is characterised in that: the output end of the feedback module (4) and the input terminal of central control system (1) Connection, and the output end of central control system (1) is connect with the input terminal of comparing unit (3), and central control system (1) It realizes and is bi-directionally connected with control centre (5), the input terminal of the central control system (1) and the output end electricity of power module (6) Property connection, and the output end of power module (6) is connect with the input terminal of sensing module (2), the output of the power module (6) End is electrically connected with the input terminal of control switch (7), and the output end of control switch (7) and central control system (1) is defeated Enter end connection.
2. a kind of intelligent water power electricity generation system according to claim 1, it is characterised in that: the sensing module (2) includes Water level monitor (21) and load sensor (22), and comparing unit (3) includes the first data comparator (31) and the second number According to comparator (32).
3. a kind of intelligent water power electricity generation system according to claim 1, it is characterised in that: the central control system (1) Output end connect with the input terminal of display screen (8), and the input of the output end of central control system (1) and alarm (9) End connection.
4. a kind of intelligent water power electricity generation system according to claim 1, it is characterised in that: the central control system (1) It realizes and is bi-directionally connected with wireless signal transmitting module (10), and wireless signal transmitting module (10) and reception of wireless signals module (11) it realizes and is bi-directionally connected, the reception of wireless signals module (11) is realized with intelligent terminal (12) and is bi-directionally connected.
5. a kind of intelligent water power electricity generation system according to claim 1, it is characterised in that: the central control system (1) Input terminal connect with the output end of sending module (13), and the output of the input terminal of sending module (13) and video camera (14) End connection.
6. a kind of intelligent water power electricity generation system according to claim 1, it is characterised in that: the control centre (5) includes Controller (51), and the input terminal of controller (51) is connect with the output end of receiving module (52), the controller (51) Output end is connect with the input terminal of lifting motor (53), and the output end of controller (51) and the input terminal of generator (54) connect It connects.
7. a kind of intelligent water power electricity generation system according to claim 6, it is characterised in that: the generator (54) includes turning The output end of axis (541) and rotating vane (542), the generator (54) is connect with the input terminal of electric energy output device (55), and And the output end of electric energy output device (55) is connect with the input terminal of power grid (56).
CN201910023904.9A 2019-01-10 2019-01-10 A kind of intelligence water power electricity generation system Pending CN109838336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910023904.9A CN109838336A (en) 2019-01-10 2019-01-10 A kind of intelligence water power electricity generation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910023904.9A CN109838336A (en) 2019-01-10 2019-01-10 A kind of intelligence water power electricity generation system

Publications (1)

Publication Number Publication Date
CN109838336A true CN109838336A (en) 2019-06-04

Family

ID=66883744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910023904.9A Pending CN109838336A (en) 2019-01-10 2019-01-10 A kind of intelligence water power electricity generation system

Country Status (1)

Country Link
CN (1) CN109838336A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112530151A (en) * 2020-11-25 2021-03-19 重庆中节能悦来能源管理有限公司 Energy supply system capable of carrying out wireless monitoring
CN114265389A (en) * 2021-12-21 2022-04-01 北京华电云博科技有限公司 Method for detecting compliance safety of hydraulic power plant
CN114962130A (en) * 2022-04-13 2022-08-30 长沙光润电气科技有限公司 Method for automatically controlling generator set to work through water level in hydropower station

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0617741A (en) * 1992-07-03 1994-01-25 Toshiba Corp Automatic control protection device for hydraulic turbine
CN104935228A (en) * 2015-07-17 2015-09-23 李红 Hydropower intelligent control system and control method
US20160009347A1 (en) * 2010-09-13 2016-01-14 Incube Labs, Llc Self-propelled buoy for monitoring underwater objects
CN105865523A (en) * 2016-04-20 2016-08-17 杭州万禾电力科技有限公司 Substation operating environment monitoring device and anomaly detection method thereof
CN108725727A (en) * 2018-07-03 2018-11-02 中国船舶重工集团公司第七〇九研究所 A kind of marine ship fuel management systems
CN108765842A (en) * 2018-04-24 2018-11-06 范志杰 A kind of transmission line forest fire monitoring and warning system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0617741A (en) * 1992-07-03 1994-01-25 Toshiba Corp Automatic control protection device for hydraulic turbine
US20160009347A1 (en) * 2010-09-13 2016-01-14 Incube Labs, Llc Self-propelled buoy for monitoring underwater objects
CN104935228A (en) * 2015-07-17 2015-09-23 李红 Hydropower intelligent control system and control method
CN105865523A (en) * 2016-04-20 2016-08-17 杭州万禾电力科技有限公司 Substation operating environment monitoring device and anomaly detection method thereof
CN108765842A (en) * 2018-04-24 2018-11-06 范志杰 A kind of transmission line forest fire monitoring and warning system
CN108725727A (en) * 2018-07-03 2018-11-02 中国船舶重工集团公司第七〇九研究所 A kind of marine ship fuel management systems

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112530151A (en) * 2020-11-25 2021-03-19 重庆中节能悦来能源管理有限公司 Energy supply system capable of carrying out wireless monitoring
CN114265389A (en) * 2021-12-21 2022-04-01 北京华电云博科技有限公司 Method for detecting compliance safety of hydraulic power plant
CN114962130A (en) * 2022-04-13 2022-08-30 长沙光润电气科技有限公司 Method for automatically controlling generator set to work through water level in hydropower station
CN114962130B (en) * 2022-04-13 2024-03-08 长沙光润电气科技有限公司 Method for automatically controlling operation of generator set through water level in hydropower station

Similar Documents

Publication Publication Date Title
CN109838336A (en) A kind of intelligence water power electricity generation system
CN203532160U (en) Wind power generation remote monitoring system based on internet of things
CN102288856B (en) Photovoltaic polar plate fault damage detection device based on wireless communication and method of same
CN104514683A (en) Remote wind power generation monitoring system based on Internet of Things
CN105785925A (en) Remote monitoring system for offshore wind turbine generator
CN107769388A (en) Photovoltaic generating system
CN105182880A (en) Automatic control system for water conservancy
CN207180768U (en) Wind power plant intelligent monitor system
CN108696249A (en) Photovoltaic module Fault Quick Diagnosis method
CN113654587A (en) Wind-powered electricity generation field environmental data monitoring devices
CN204886791U (en) Scene heat complementary intelligent power generation system in three sources
CN204331438U (en) A kind of offshore wind farm set remote monitoring system
CN105373087A (en) Monitoring method of solar photovoltaic power station
CN204596125U (en) A kind of dam safety monitoring terminal
CN111555460A (en) Intelligent diagnosis system and judgment method for electrical performance health degree of photovoltaic power station
CN207964765U (en) A kind of gas monitor
CN114337505B (en) Energy-saving control system of photovoltaic power station
CN204082446U (en) Based on the offshore wind farm unit comprehensive monitoring system of 6LoWPAN radio sensing network
CN207008368U (en) Photovoltaic combiner box long-distance monitorng device
CN105697245A (en) Novel wind-driven power generation device with real-time temperature monitoring function
CN105785926A (en) CAN bus-based offshore wind turbine generator monitoring system
CN207366013U (en) A kind of intelligent monitor system for water conservancy
KR20160074919A (en) System for operation of small wind power complex
CN205690904U (en) A kind of Boiler Monitoring System
CN109812369A (en) A kind of fair current intelligent power generation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190604

RJ01 Rejection of invention patent application after publication