CN109837929A - A kind of surveying setting-out method applied to photovoltaic plant construction - Google Patents

A kind of surveying setting-out method applied to photovoltaic plant construction Download PDF

Info

Publication number
CN109837929A
CN109837929A CN201711225715.7A CN201711225715A CN109837929A CN 109837929 A CN109837929 A CN 109837929A CN 201711225715 A CN201711225715 A CN 201711225715A CN 109837929 A CN109837929 A CN 109837929A
Authority
CN
China
Prior art keywords
point
axis
campshed
timber
stake top
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711225715.7A
Other languages
Chinese (zh)
Inventor
朱义铁
宗进营
柴长坡
苏帅锋
张荣欣
韩世军
常欢欢
阙江波
韩艳斌
龚自艳
杨子轩
魏俊收
郑瑛瑛
苏军军
毛志恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingmei Shenma Construction and Engineering Group Co Ltd
Original Assignee
Pingmei Shenma Construction and Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingmei Shenma Construction and Engineering Group Co Ltd filed Critical Pingmei Shenma Construction and Engineering Group Co Ltd
Priority to CN201711225715.7A priority Critical patent/CN109837929A/en
Publication of CN109837929A publication Critical patent/CN109837929A/en
Pending legal-status Critical Current

Links

Abstract

A kind of surveying setting-out method applied to photovoltaic plant construction, step 1 sets up GPS Base Station, two axis points are set using the GPS surveying instrument survey on GPS Base Station, timber is nailed on respectively having surveyed at the two axis point positions set, then corresponding axis point is marked in the stake top of timber, the axis where the axis point is parallel with needing to measure the axis of multiple campsheds of stake top center position;Step 2, according to the designed elevation of campshed stake top on drawing, the elevation location point of campshed is measured with GPS surveying instrument, then timber is adjusted, after being in the elevation location point of axis point and campshed on timber in same level, the axis point on timber is drawstring anchor point;The both ends of cotton rope are separately fixed on drawstring anchor point by step 3, and cotton rope are tensed exceptionally straight;Step 4, according to the distance between campshed two neighboring in drawing, measured each campshed stake top center position to center position with ruler from cotton rope both ends and remembered with marking pen in cotton rope subscript.

Description

A kind of surveying setting-out method applied to photovoltaic plant construction
Technical field
The present invention relates to photovoltaic plant construction technical fields, and in particular to a kind of survey applied to photovoltaic plant construction Measure line-putting method.
Background technique
The pile foundation set in a row is known as campshed, and positioned at the campshed of same row, axis is arranged in parallel, and its stake top In approximately the same plane.At present photovoltaic plant project construction construction in, to large number of minor diameter independence pile foundation into Row surveying setting-out is one of key points and difficulties, and accuracy directly influences the positioning and installation of pile foundation, or even influences whole The construction quality of a photovoltaic plant.
During measuring unwrapping wire to pile foundation at present, the method generallyd use is by using total station along campshed Trend unwrapping wire successively is measured to each campshed, measurement accuracy is low, and cumulative errors are big.Due to this measuring tool of total station Operation and its complexity, special personnel must be configured in use process by prism conjunction measuring, therefore cause surveying setting-out work Make that speed is slow, seriously restricts the duration progress of entire engineering, and take prism conjunction measuring can be because of people by construction personnel Bigger error is brought for factor.
Summary of the invention
In order to solve the technical problem that measurement accuracy is low, cumulative errors are big, construction efficiency is low in campshed surveying setting-out, this The purpose of invention is to provide a kind of surveying setting-out method applied to photovoltaic plant construction.
The technical scheme adopted by the invention is that: a kind of surveying setting-out method applied to photovoltaic plant construction, including with Lower step:
Step 1 sets up GPS Base Station, sets two axis points using the GPS surveying instrument survey on GPS Base Station, is surveying two axis set Line point nails on timber at position respectively, and corresponding axis point is then marked in the stake top of timber, where the axis point Axis is parallel with needing to measure the axis of multiple campsheds of stake top center position;
Step 2, according to the designed elevation of campshed stake top on drawing, the elevation location point of campshed is measured with GPS surveying instrument, then Adjust timber, the axis point after being in the elevation location point of axis point and campshed on timber in same level, on timber As drawstring anchor point;
The both ends of cotton rope are separately fixed on drawstring anchor point by step 3, and cotton rope are tensed exceptionally straight;
Step 4, according to the distance between campshed two neighboring in drawing, measured often from cotton rope both ends to center position with ruler A campshed stake top center position is simultaneously remembered with marking pen in cotton rope subscript.
Further, the drawstring anchor point and with it is apart from nearest the distance between campshed stake top central point 200mm-300mm。
Further, the distance between described two drawstring anchor points are 150-200m.
Compared with prior art, the invention has the following advantages: it is of the present invention a kind of applied to photovoltaic plant The surveying setting-out method of construction realizes quick, large quantities of measurement operations, and each unwrapping wire length reaches as high as 200m, by cotton rope Portion measures thereto at both ends, reduces cumulative errors, improves measurement accuracy, using GPS surveying instrument to being set to multiple campsheds The timber of both side ends measures, so that elevation location and axis point position are more accurate, lays good basis for bracing wire rope, So that the campshed stake top center position of measurement is more accurate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that GPS Base Station is matched with timber;
Marked in the figure: 1, GPS Base Station, 2, GPS surveying instrument, 3, timber, 4, cotton rope, 5, campshed.
Specific embodiment
It elaborates in the following with reference to the drawings and specific embodiments to the present invention, the present embodiment is with technical solution of the present invention Premise, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to following implementation Example.
Embodiment 1
As shown, a kind of surveying setting-out method applied to photovoltaic plant construction, which comprises the following steps:
Step 1 sets up GPS Base Station 1, sets two axis points using the survey of GPS surveying instrument 2 on GPS Base Station 1, is surveying two set A axis point nails on timber 3 at position respectively, and corresponding axis point is then marked in the stake top of timber 3, the axis point The axis at place is parallel with needing to measure the axis of multiple campsheds 5 of stake top center position;
Step 2, according to the designed elevation of 5 stake top of campshed on drawing, the elevation location point of campshed 5 is measured with GPS surveying instrument 2, Then timber 3 is adjusted, after being in the elevation location point of axis point and campshed 5 on timber 3 in same level, on timber 3 Axis point be drawstring anchor point, the distance between described two drawstring anchor points be 150m;
The both ends of cotton rope 4 are separately fixed on drawstring anchor point by step 3, and cotton rope 4 are tensed exceptionally straight;
Step 4, according to the distance between campshed 5 two neighboring in drawing, measured from 4 both ends of cotton rope to center position with ruler Each 5 stake top center position of campshed is simultaneously marked on cotton rope 4 with marking pen, the drawstring anchor point and nearest with its distance The distance between 5 stake top central point of campshed is 200mm.
Embodiment 2
As shown, a kind of surveying setting-out method applied to photovoltaic plant construction, which comprises the following steps:
Step 1 sets up GPS Base Station 1, sets two axis points using the survey of GPS surveying instrument 2 on GPS Base Station 1, is surveying two set A axis point nails on timber 3 at position respectively, and corresponding axis point is then marked in the stake top of timber 3, the axis point The axis at place is parallel with needing to measure the axis of multiple campsheds 5 of stake top center position;
Step 2, according to the designed elevation of 5 stake top of campshed on drawing, the elevation location point of campshed 5 is measured with GPS surveying instrument 2, Then timber 3 is adjusted, after being in the elevation location point of axis point and campshed 5 on timber 3 in same level, on timber 3 Axis point be drawstring anchor point, the distance between described two drawstring anchor points be 175m;
The both ends of cotton rope 4 are separately fixed on drawstring anchor point by step 3, and cotton rope 4 are tensed exceptionally straight;
Step 4, according to the distance between campshed 5 two neighboring in drawing, measured from 4 both ends of cotton rope to center position with ruler Each 5 stake top center position of campshed is simultaneously marked on cotton rope 4 with marking pen, the drawstring anchor point and nearest with its distance The distance between 5 stake top central point of campshed is 250mm.
Embodiment 3
As shown, a kind of surveying setting-out method applied to photovoltaic plant construction, which comprises the following steps:
Step 1 sets up GPS Base Station 1, sets two axis points using the survey of GPS surveying instrument 2 on GPS Base Station 1, is surveying two set A axis point nails on timber 3 at position respectively, and corresponding axis point is then marked in the stake top of timber 3, the axis point The axis at place is parallel with needing to measure the axis of multiple campsheds 5 of stake top center position;
Step 2, according to the designed elevation of 5 stake top of campshed on drawing, the elevation location point of campshed 5 is measured with GPS surveying instrument 2, Then timber 3 is adjusted, after being in the elevation location point of axis point and campshed 5 on timber 3 in same level, on timber 3 Axis point be drawstring anchor point, the distance between described two drawstring anchor points be 200m;
The both ends of cotton rope 4 are separately fixed on drawstring anchor point by step 3, and cotton rope 4 are tensed exceptionally straight;
Step 4, according to the distance between campshed 5 two neighboring in drawing, measured from 4 both ends of cotton rope to center position with ruler Each 5 stake top center position of campshed is simultaneously marked on cotton rope 4 with marking pen, the drawstring anchor point and nearest with its distance The distance between 5 stake top central point of campshed is 300mm.

Claims (3)

1. a kind of surveying setting-out method applied to photovoltaic plant construction, which comprises the following steps:
Step 1 sets up GPS Base Station, sets two axis points using the GPS surveying instrument survey on GPS Base Station, is surveying two axis set Line point nails on timber at position respectively, and corresponding axis point is then marked in the stake top of timber, where the axis point Axis is parallel with needing to measure the axis of multiple campsheds of stake top center position;
Step 2, according to the designed elevation of campshed stake top on drawing, the elevation location point of campshed is measured with GPS surveying instrument, then Adjust timber, the axis point after being in the elevation location point of axis point and campshed on timber in same level, on timber As drawstring anchor point;
The both ends of cotton rope are separately fixed on drawstring anchor point by step 3, and cotton rope are tensed exceptionally straight;
Step 4, according to the distance between campshed two neighboring in drawing, measured often from cotton rope both ends to center position with ruler A campshed stake top center position is simultaneously remembered with marking pen in cotton rope subscript.
2. a kind of surveying setting-out method applied to photovoltaic plant construction as described in claim 1, which is characterized in that the drawing Restrict anchor point and with its apart from the distance between nearest campshed stake top central point be 200mm-300mm.
3. a kind of surveying setting-out method applied to photovoltaic plant construction as described in claim 1, which is characterized in that described two The distance between a drawstring anchor point is 150-200m.
CN201711225715.7A 2017-11-29 2017-11-29 A kind of surveying setting-out method applied to photovoltaic plant construction Pending CN109837929A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711225715.7A CN109837929A (en) 2017-11-29 2017-11-29 A kind of surveying setting-out method applied to photovoltaic plant construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711225715.7A CN109837929A (en) 2017-11-29 2017-11-29 A kind of surveying setting-out method applied to photovoltaic plant construction

Publications (1)

Publication Number Publication Date
CN109837929A true CN109837929A (en) 2019-06-04

Family

ID=66881912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711225715.7A Pending CN109837929A (en) 2017-11-29 2017-11-29 A kind of surveying setting-out method applied to photovoltaic plant construction

Country Status (1)

Country Link
CN (1) CN109837929A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006052A (en) * 2021-03-02 2021-06-22 江苏东交智控科技集团股份有限公司 Bridge cast-in-place pile lofting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011401A (en) * 2010-09-09 2011-04-13 平煤建工集团有限公司 High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer
CN102021916A (en) * 2010-11-02 2011-04-20 河南省电力公司洛阳供电公司 Foundation construction method of iron tower
CN102268871A (en) * 2010-06-03 2011-12-07 中国建筑第七工程局有限公司 Construction method of turnover platform for underwater pile foundation of bridge
CN102587425A (en) * 2012-03-29 2012-07-18 温州建设集团有限公司 Measurement positioning and construction method for foundation piles
CN105239574A (en) * 2014-06-17 2016-01-13 刘易 Construction method for static pressure prestressed pipe pile applied to sea-filling geology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102268871A (en) * 2010-06-03 2011-12-07 中国建筑第七工程局有限公司 Construction method of turnover platform for underwater pile foundation of bridge
CN102011401A (en) * 2010-09-09 2011-04-13 平煤建工集团有限公司 High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer
CN102021916A (en) * 2010-11-02 2011-04-20 河南省电力公司洛阳供电公司 Foundation construction method of iron tower
CN102587425A (en) * 2012-03-29 2012-07-18 温州建设集团有限公司 Measurement positioning and construction method for foundation piles
CN105239574A (en) * 2014-06-17 2016-01-13 刘易 Construction method for static pressure prestressed pipe pile applied to sea-filling geology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张峰等: "光伏电站圆柱形基础桩施工测量放样技巧", 《建筑技术开发》 *
王根虎: "《土木工程测量》", 28 February 2005, 黄河水利出版社 *
王永臣: "《放线工手册》", 30 July 1990, 中国建筑工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006052A (en) * 2021-03-02 2021-06-22 江苏东交智控科技集团股份有限公司 Bridge cast-in-place pile lofting method

Similar Documents

Publication Publication Date Title
CN105586994A (en) Monitoring device and monitoring method for horizontal displacement of pile tip of retaining pile for foundation pit
CN202853617U (en) Telescopic and convenient plumb bob scale
CN203464889U (en) Special-purpose building template verticality detection ruler
CN205957883U (en) Long and narrow space internal wall verticality measuring instrument and measuring device
CN113551641B (en) Horizontal displacement monitoring device, system and method suitable for subway tunnel in operation period
CN109837929A (en) A kind of surveying setting-out method applied to photovoltaic plant construction
CN207180575U (en) Construction engineering quality detector detection rule for verticality calibrating installation
CN204177379U (en) One can across obstacle formula horizontal range and vertical survey instrument
CN204142258U (en) A kind of wall column formwork testing apparatus for verticality
CN107764235B (en) Elevation vertical transmission measurement method for high-rise building construction
CN105258685A (en) Locating, measuring and clamping device of steel stand column
CN203148425U (en) Leveling device for track inspection
CN108592764A (en) A kind of practical straight line degree measurement fixture and application method
CN109405723B (en) Pipe straightness accuracy measurement detection device
CN112942129B (en) Rapid installation, measurement and positioning method for double prefabricated pier columns
CN204854573U (en) A multi -functional chi for piping installation
CN211552685U (en) Reinforcing cage butt joint installation accuracy detector
CN102023001B (en) Method for checking height difference between joints of cross arms for cross arms of dual-column pole tower
CN207215095U (en) A kind of mold plate verticality survey tool
CN213688383U (en) Pipeline inertial positioning instrument test comparison device
CN105064643A (en) Method for precisely installing R-shaped dry hanging stone plate hanging element
CN201269756Y (en) Measurement positioning apparatus
CN213632127U (en) Combined forced centering measurement mark applied to high-precision deformation monitoring
CN206113928U (en) Special detection instrument of template
CN213673800U (en) Pipeline inertial positioning instrument identification support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190604