CN109826327A - A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method - Google Patents

A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method Download PDF

Info

Publication number
CN109826327A
CN109826327A CN201711183273.4A CN201711183273A CN109826327A CN 109826327 A CN109826327 A CN 109826327A CN 201711183273 A CN201711183273 A CN 201711183273A CN 109826327 A CN109826327 A CN 109826327A
Authority
CN
China
Prior art keywords
pea gravel
gravel concreten
concrete floor
reinforced concrete
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711183273.4A
Other languages
Chinese (zh)
Inventor
郭峰钰
刘家铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201711183273.4A priority Critical patent/CN109826327A/en
Publication of CN109826327A publication Critical patent/CN109826327A/en
Pending legal-status Critical Current

Links

Abstract

A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method, soil stack passes perpendicularly through reinforced concrete floor face in pipe hole, characterized by the following steps: a, install reinforced concrete floor facial canal hole template, b, pea gravel concreten is poured into horn mouth, c, brushing polymer cement-base waterproof coating, d, pour microdilatancy pea gravel concreten, e, apply sealing agent on microdilatancy pea gravel concreten surface, e, apply sealing agent on microdilatancy pea gravel concreten surface, f, remaining hole filled with cement mortar closely knit, it smoothes out, g, close water experiment.It is simple with pipe hole horn mouth interstitital texture that kitchen and toilet of the invention wear reinforced concrete floor facial canal hole waterproof construction method, constructing operation is convenient, the advantages of effectively solution kitchen and toilet wear concrete floor facial canal hole waterproof problem, and waterproof performance is excellent, economical and practical and reduction waterproofing work cost.

Description

A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method
Technical field
The present invention relates to a kind of kitchen and toilet waterproof construction methods, specifically, being that a kind of kitchen and toilet wear reinforced concrete Tulou Plate face pipe hole waterproof construction method.
Background technique
It is found in practice in engineering, kitchen and toilet wear concrete floor facial canal hole and are easy to happen infiltration hidden danger, lead to lower part building The problems such as layer furred ceiling and metope pollute.More human and material resources are usually consumed to the secondary repairing of infiltration, and it is inconvenient to construct, directly Lead to housing construction quality problems.
Therefore known kitchen and toilet are worn reinforced concrete floor facial canal hole waterproof construction there is above-mentioned various inconvenience and are asked Topic.
Summary of the invention
The purpose of the present invention is to propose that a kind of safe and reliable kitchen and toilet are worn reinforced concrete floor facial canal hole waterproof and applied Work method.
To achieve the above object, the technical solution of the invention is as follows:
A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method, and it is mixed that Guan Dongzhong soil stack passes perpendicularly through reinforcing bar Solidifying Tulou plate face, it is characterised in that the following steps are included:
A, reinforced concrete floor facial canal hole template is installed
Reinforced concrete floor dimension of opening is chiseled according to construction drawing determination, by hole chisel at around the suitable for reading of soil stack The narrow bell shape of wide, lower mouth;Bell-mouthed top is in reinforced concrete floor surface, and bottom end is in armored concrete building Board bottom face;Two reinforcing bars are arranged in parallel in the hole two sides of horn mouth slab surfaces, are in mouth word on reinforcing bar with several 1st iron wires Shape is located by connecting securely, in bell-mouthed bottom end supporting module, makes template around soil stack, with several 2nd iron wires by template It is connected firmly with soil stack, the 1st iron wire is connect with the 2nd iron wire to form hole and hang mould;
B, pea gravel concreten is poured into horn mouth
First to the reinforced concrete floor brushing plain-water slurry of horn mouth bottom, pea gravel concreten is then poured, microlith coagulation is made The half for pouring height and being equal to loudspeaker open height of soil, the pea gravel concreten that vibrates is closely knit, after the completion of pouring within 24 hours Soil stack must not be touched, clear water conserves pea gravel concreten;
C, brushing polymer cement-base waterproof coating
In 24 hours pea gravel concreten external coating plain-water slurries after through conserving, scrub-brush brushing is used on plain-water slurry One of polymer cement-base waterproof coating, polymer cement-base waterproof coating thickness must not be lower than 2mm, polymer cement-based waterproof Coating should also be brushed on soil stack periphery, brush height and be not less than 10mm;
D, microdilatancy pea gravel concreten is poured
Microdilatancy pea gravel concreten pours that ensure to pour the time difference with pea gravel concreten be more than 24 hours, and pea gravel concreten cement It has consolidated;Emergencing copolymer cement-base waterproof coating external coating plain-water slurry, just looks at hole before microdilatancy pea gravel concreten pours Inside whether there is building sundries to fall into, if there is building sundries that should remove in time, microdilatancy pea gravel concreten pours height distance hole Apparent height should be not less than 20mm;
E, apply sealing agent on microdilatancy pea gravel concreten surface, comprising the following steps:
1) it must be consolidated until microdilatancy pea gravel concreten, and sealing agent construction can be carried out after having certain hardness;
2) match ratio of sealing agent is sealing agent: water=1:0.3, and when sealing agent mix should stir rapidly in container;
3) it is ensured that no-sundries in pipe hole, smearing range includes microdilatancy pea gravel concreten surface and its pipe before sealing agent is smeared Hole periphery;Sealing agent smearing thickness is not less than 10mm, and smearing height is 5mm-10mm;Pipe hole inner wall is smeared height and is not less than 10mm, thickness are not less than 5mm;
F, closely knit, floating is filled at remaining hole with cement mortar
To sealing agent it is stiff after, remaining pipe hole filled using cement mortar closely knit, and smoothes out, prevent sealing agent by broken It is bad;
G, water experiment is closed
Above-mentioned operation complete 7 days after do kitchen and toilet wear reinforced concrete floor facial canal hole close water experiment, through observation in 24 hours effect Fruit;It determines without after infiltration water leakage situation, completes kitchen and toilet and wear reinforced concrete floor facial canal hole waterproof construction.
Kitchen and toilet of the invention, which wear reinforced concrete floor facial canal hole waterproof construction method, can also use technology below Measure further realizes.
Method above-mentioned, wherein the bell-mouthed bottom end should ensure that standpipe diameter and hole diameter at least 10mm's is straight Diameter is poor.
Method above-mentioned, wherein the worm steel muscle of the bar diameter >=18mm.
Method above-mentioned, wherein the specification of the 1st iron wire, the 2nd iron wire is not less than No. 8 iron wires.
Method above-mentioned, wherein described pour before pea gravel concreten it is ensured that pipe hole surrounding and the watering of template bottom are wet, But there must not be bright water.
Method above-mentioned, wherein the microlith partial size 10mm-15mm of the pea gravel concreten complex;The weight of pea gravel concreten Amount match ratio is cement: sand: stone=1:1.52:3.23, sand in sand use;Pea gravel concreten strength grade is not less than building Plate concrete strength grade.
Method above-mentioned, wherein the additive amount of the swelling agent in the microdilatancy pea gravel concreten is 1%-2%, mixing time 2.5min must not be less than from feeding intake;Microdilatancy pea gravel concreten need to mix with.
Method above-mentioned, wherein the cement mortar must Site, with mix with;Cement mortar mixing ratio by weight is Cement: sand=1:5.93, strength of cement mortar must not be lower than M5.
Method above-mentioned, wherein the sealing agent is commercially available F or S type agent to rapidly block up leakage, mixing ratio by weight is sealing agent: Water=1:0.3.
After adopting the above technical scheme, kitchen and toilet of the invention wear reinforced concrete floor facial canal hole waterproof construction method tool It has the advantage that
1, pipe hole horn mouth interstitital texture is simple, and constructing operation is convenient;
2, kitchen and toilet are effectively solved and wears concrete floor facial canal hole waterproof problem, waterproof performance is excellent, work caused by preventing because of infiltration Journey is reprocessed, and more human and material resources, and the problem that construction is inconvenient are consumed;
3, economical and practical, reduce waterproofing work cost.
Detailed description of the invention
Fig. 1 is the horn mouth interstitital texture schematic diagram of the embodiment of the present invention;
Fig. 2 is the cross-sectional view of A-A in Fig. 1.
In figure: 1 reinforcing bar, 2 the 1st iron wires, 3PVC pipe, 4 the 2nd iron wires, 5 templates, 6 pea gravel concretens, 7 armored concrete, 8 is poly- Close object cement-base waterproof coating, 9 microdilatancy pea gravel concretens, 10 cement mortar, 11 sealing agents.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Kitchen and toilet of the invention wear reinforced concrete floor facial canal hole waterproof construction method, and Guan Dongzhong soil stack passes perpendicularly through steel Bar concrete floor face, comprising the following steps:
A, reinforced concrete floor facial canal hole template is installed
Reinforced concrete floor dimension of opening is chiseled according to construction drawing determination, by hole chisel at around the suitable for reading of soil stack The narrow bell shape of wide, lower mouth;Bell-mouthed top is in reinforced concrete floor surface, and bottom end is in armored concrete building Board bottom face.
It is the horn mouth interstitital texture schematic diagram of the embodiment of the present invention referring now to Fig. 1 and Fig. 2, Fig. 1, Fig. 2 is A- in Fig. 1 The cross-sectional view of A.Two reinforcing bars 1 are arranged in parallel in the hole two sides of horn mouth slab surfaces, with several 1st iron wires 2 on reinforcing bar It is located by connecting securely in square shape, in bell-mouthed bottom end supporting module 5, makes template around soil stack, with several 2nd iron wires 4 are connected firmly template and soil stack, and the 1st iron wire 2 is connect with the 2nd iron wire 4 to form hole and hang mould.The bell-mouthed bottom End should ensure that standpipe diameter and the hole diameter at least diameter difference of 10mm.The reinforcing bar 1 is the worm steel of diameter 18mm Muscle.1st iron wire 2, the 2nd iron wire 4 specification be No. 8 iron wires.
B, pea gravel concreten is poured into horn mouth
First to the reinforced concrete floor brushing plain-water slurry of horn mouth bottom, pea gravel concreten 6 is then poured, microlith coagulation is made The half for pouring height and being equal to loudspeaker open height of soil, the pea gravel concreten that vibrates is closely knit, after the completion of pouring within 24 hours Soil stack must not be touched, clear water conserves pea gravel concreten.The microlith partial size 10mm-15mm of the pea gravel concreten complex; The mixing ratio by weight of pea gravel concreten is cement: sand: stone=1:1.52:3.23, sand in sand use;Pea gravel concreten is strong It spends grade and is not less than floor concrete strength grade.It is described to pour before pea gravel concreten it is ensured that water-wet is poured in pipe hole surrounding and template bottom Profit, but must not have bright water.
C, brushing polymer cement-base waterproof coating
In 24 hours pea gravel concreten external coating plain-water slurries after through conserving, scrub-brush brushing is used on plain-water slurry One of polymer cement-base waterproof coating 6, polymer cement-base waterproof coating thickness must not be lower than 2mm, and polyalcohol cement basis is anti- Water paint should also be brushed on soil stack periphery, brush height and be not less than 10mm.
D, microdilatancy pea gravel concreten is poured
Microdilatancy pea gravel concreten 9 pours that ensure to pour the time difference with pea gravel concreten 6 be more than 24 hours, and pea gravel concreten water Mud has consolidated;Emergencing copolymer cement-base waterproof coating external coating plain-water slurry, just looks at hole before microdilatancy pea gravel concreten pours Whether there is building sundries to fall into mouthful, if there is building sundries that should remove in time, microdilatancy pea gravel concreten pours height distance hole Discharge surface height should be not less than 20mm.The additive amount of swelling agent in the microdilatancy pea gravel concreten is 1%-2%, mixing time 2.5min must not be less than from feeding intake;Microdilatancy pea gravel concreten need to mix with.
E, apply sealing agent on microdilatancy pea gravel concreten surface, comprising the following steps:
1) it must be consolidated until microdilatancy pea gravel concreten, and sealing agent construction can be carried out after having certain hardness;
2) match ratio of sealing agent is sealing agent: water=1:0.3, and when sealing agent mix should stir rapidly in container;
3) it is ensured that no-sundries in pipe hole, smearing range includes microdilatancy pea gravel concreten surface and its pipe before sealing agent is smeared Hole periphery;Sealing agent smearing thickness is not less than 10mm, and smearing height is 5mm-10mm;Pipe hole inner wall is smeared height and is not less than 10mm, thickness are not less than 5mm.The sealing agent is common commercially available F or S type agent to rapidly block up leakage, and mixing ratio by weight is sealing agent: Water=1:0.3.Sealing agent mix should rapidly, and with mixing with using finishing within Ying 10mim.
F, closely knit, floating is filled at remaining hole with cement mortar
To sealing agent it is stiff after, remaining pipe hole filled using cement mortar 10 closely knit, and smoothes out, prevent sealing agent by broken It is bad.The cement mortar must Site, with mix with;Cement mortar mixing ratio by weight is cement: sand=1:5.93, cement Mortar strength must not be lower than M5.
G, water experiment is closed
Above-mentioned operation complete 7 days after do kitchen and toilet wear reinforced concrete floor facial canal hole close water experiment, through observation in 24 hours effect Fruit;It determines without after infiltration water leakage situation, completes kitchen and toilet and wear reinforced concrete floor facial canal hole waterproof construction.
The present invention has substantive distinguishing features and significant technological progress, and kitchen and toilet of the invention wear reinforced concrete floor face Pipe hole waterproof construction method efficiently solves industry with civil buildings waterproofing work, and it is anti-that kitchen and toilet wear concrete floor facial canal hole Water problems.The present invention has many advantages, such as that good water-proof effect, construction production are simple, economical and practical.Engineering caused by solving because of infiltration It reprocesses, consumes the problem of more human and material resources and construction inconvenience.
Kitchen and toilet of the invention are worn reinforced concrete floor facial canal hole waterproof construction method and are built in Ruzhou City scientific and educational park It is used in engineering project, significant effect, does not find any leakage scenarios.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (9)

1. a kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method, Guan Dongzhong soil stack passes perpendicularly through reinforcing bar Concrete building plate face, it is characterised in that the following steps are included:
A, reinforced concrete floor facial canal hole template is installed
Reinforced concrete floor dimension of opening is chiseled according to construction drawing determination, by hole chisel at around the suitable for reading of soil stack The narrow bell shape of wide, lower mouth;Bell-mouthed top is in reinforced concrete floor surface, and bottom end is in armored concrete building Board bottom face;Two reinforcing bars (1) are arranged in parallel in the hole two sides of horn mouth slab surfaces, with several 1st iron wires (2) on reinforcing bar It is located by connecting securely in square shape, in bell-mouthed bottom end supporting module (5), makes template around soil stack, with several 2nd iron Template and soil stack are connected firmly by silk (4), and the 1st iron wire (2) is connect with the 2nd iron wire (4) to form hole and hang mould;
B, pea gravel concreten is poured into horn mouth
First to the reinforced concrete floor brushing plain-water slurry of horn mouth bottom, pea gravel concreten (6) are then poured, keep microlith mixed The half for pouring height and being equal to loudspeaker open height of solidifying soil, the pea gravel concreten that vibrates is closely knit, after the completion of pouring 24 hours with Interior to touch soil stack, clear water conserves pea gravel concreten;
C, brushing polymer cement-base waterproof coating
In 24 hours pea gravel concreten external coating plain-water slurries after through conserving, scrub-brush brushing is used on plain-water slurry One of polymer cement-base waterproof coating (6), polymer cement-base waterproof coating thickness must not be lower than 2mm, polyalcohol cement basis Water-repellent paint should also be brushed on soil stack periphery, brush height and be not less than 10mm;
D, microdilatancy pea gravel concreten is poured
Microdilatancy pea gravel concreten (9) pours that ensure to pour the time difference with pea gravel concreten (6) be more than 24 hours, and microlith coagulation Soil-cement has consolidated;Emergencing copolymer cement-base waterproof coating external coating plain-water slurry before microdilatancy pea gravel concreten pours, and See in hole whether have building sundries fall into, if having building sundries should remove in time, microdilatancy pea gravel concreten pour height away from 20mm should be not less than from hole apparent height;
E, apply sealing agent on microdilatancy pea gravel concreten surface, comprising the following steps:
1) it must be consolidated until microdilatancy pea gravel concreten, and sealing agent construction can be carried out after having certain hardness;
2) match ratio of sealing agent is sealing agent: water=1:0.3, and when sealing agent mix should stir rapidly in container;
3) it is ensured that no-sundries in pipe hole, smearing range includes microdilatancy pea gravel concreten surface and its pipe before sealing agent is smeared Hole periphery;Sealing agent smearing thickness is not less than 10mm, and smearing height is 5mm-10mm;Pipe hole inner wall is smeared height and is not less than 10mm, thickness are not less than 5mm;
F, closely knit, floating is filled at remaining hole with cement mortar
To sealing agent it is stiff after, remaining pipe hole filled using cement mortar (10) closely knit, and smoothed out, prevent sealing agent by It destroys;
G, water experiment is closed
Above-mentioned operation complete 7 days after do kitchen and toilet wear reinforced concrete floor facial canal hole close water experiment, through observation in 24 hours effect Fruit;It determines without after infiltration water leakage situation, completes kitchen and toilet and wear reinforced concrete floor facial canal hole waterproof construction.
2. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute Stating bell-mouthed bottom end should ensure that standpipe diameter and the hole diameter at least diameter difference of 10mm.
3. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute State the worm steel muscle of reinforcing bar (1) diameter >=18mm.
4. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute State the 1st iron wire (2), the specification of the 2nd iron wire (4) is not less than No. 8 iron wires.
5. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute It states before pouring pea gravel concreten it is ensured that pipe hole surrounding and the watering of template bottom are wet, but must not have bright water.
6. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute State the microlith partial size 10mm-15mm of pea gravel concreten complex;The mixing ratio by weight of pea gravel concreten is cement: sand: stone= 1:1.52:3.23, sand use in sand;Pea gravel concreten strength grade is not less than floor concrete strength grade.
7. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute The additive amount for stating the swelling agent in microdilatancy pea gravel concreten is 1%-2%, and mixing time must not be less than 2.5min from feeding intake;It is micro- Expansion pea gravel concreten need to mix with.
8. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute State cement mortar must Site, with mix with;Cement mortar mixing ratio by weight is cement: sand=1:5.93, cement mortar are strong Must not spend lower than M5.
9. kitchen and toilet as described in claim 1 wear reinforced concrete floor facial canal hole waterproof construction method, which is characterized in that institute Stating sealing agent is commercially available F or S type agent to rapidly block up leakage, and mixing ratio by weight is sealing agent: water=1:0.3.
CN201711183273.4A 2017-11-23 2017-11-23 A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method Pending CN109826327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711183273.4A CN109826327A (en) 2017-11-23 2017-11-23 A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711183273.4A CN109826327A (en) 2017-11-23 2017-11-23 A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method

Publications (1)

Publication Number Publication Date
CN109826327A true CN109826327A (en) 2019-05-31

Family

ID=66858933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711183273.4A Pending CN109826327A (en) 2017-11-23 2017-11-23 A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method

Country Status (1)

Country Link
CN (1) CN109826327A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677273A (en) * 2020-05-22 2020-09-18 浙江新中源建设有限公司 Anti-seepage structure for reserved hole in kitchen and toilet and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10225458A1 (en) * 2002-06-05 2003-12-18 Wasser Und Waerme Heizung Sani Seal for ceiling and floor penetrations consists of installation concrete made available by wetting of dry concrete with water without prior mixing, and consists of cement, aggregate and swelling components
CN101418641A (en) * 2008-10-17 2009-04-29 陕西省第三建筑工程公司 Obligate pore construction method for construction floor
CN102979303A (en) * 2012-12-07 2013-03-20 中国十七冶集团有限公司 Plugging and leakage-proof construction method of kitchen and toilet flue and water supply and drainage pipeline edge
CN103015721A (en) * 2012-12-20 2013-04-03 山东万鑫建设有限公司 Leakage prevention construction method of reserved holes in kitchen and toilet
CN105464224A (en) * 2015-12-31 2016-04-06 四川航天建筑工程有限公司 Anti-seepage structure of kitchen and bathroom reserved hole and construction method
CN206467802U (en) * 2016-12-27 2017-09-05 广东星艺装饰集团股份有限公司 Kitchen, toilet and balcony wear concrete building plate water pipe surrounding waterproof treatment structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10225458A1 (en) * 2002-06-05 2003-12-18 Wasser Und Waerme Heizung Sani Seal for ceiling and floor penetrations consists of installation concrete made available by wetting of dry concrete with water without prior mixing, and consists of cement, aggregate and swelling components
CN101418641A (en) * 2008-10-17 2009-04-29 陕西省第三建筑工程公司 Obligate pore construction method for construction floor
CN102979303A (en) * 2012-12-07 2013-03-20 中国十七冶集团有限公司 Plugging and leakage-proof construction method of kitchen and toilet flue and water supply and drainage pipeline edge
CN103015721A (en) * 2012-12-20 2013-04-03 山东万鑫建设有限公司 Leakage prevention construction method of reserved holes in kitchen and toilet
CN105464224A (en) * 2015-12-31 2016-04-06 四川航天建筑工程有限公司 Anti-seepage structure of kitchen and bathroom reserved hole and construction method
CN206467802U (en) * 2016-12-27 2017-09-05 广东星艺装饰集团股份有限公司 Kitchen, toilet and balcony wear concrete building plate water pipe surrounding waterproof treatment structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677273A (en) * 2020-05-22 2020-09-18 浙江新中源建设有限公司 Anti-seepage structure for reserved hole in kitchen and toilet and construction method

Similar Documents

Publication Publication Date Title
CN101016759B (en) Fiver cement board grouting wall and construction method therefor
CN100575642C (en) Special fine sand high-strength high-performance concrete ultra-high pumping construction method
CN103321257A (en) Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement
CN102979303A (en) Plugging and leakage-proof construction method of kitchen and toilet flue and water supply and drainage pipeline edge
CN106193624A (en) A kind of wall of aerated concrete block cracking-proof construction technology of improvement
CN105780976B (en) Compound concrete shear wall structure and its concreting method
CN107060340A (en) A kind of construction technology of Machine-made Sand clear-water concrete
CN108374566A (en) A kind of back side percolating water repairerment technique
CN102116092A (en) Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks
CN109056843A (en) A kind of FS101, FS102 underground rigid composite water-proof construction method
CN108049521B (en) A kind of assembled wall structure of the assembled light raw-soil and bionical soil RPC material
CN110629893B (en) Construction method of toilet waterproof engineering
CN105201101A (en) Light aggregate concrete small hollow block building masonry construction method
CN109826327A (en) A kind of kitchen and toilet wear reinforced concrete floor facial canal hole waterproof construction method
CN109137971A (en) The impervious construction technology of underground tank
CN106278065A (en) Imitative stone decoration element and production method thereof
CN109113068A (en) A kind of inverse construction joint structure for building construction of deep basal pit
CN110776293A (en) Oil-seepage-preventing concrete construction method for oil stain collecting tank
CN103590508A (en) Composite thermal insulating wall structure and construction method thereof
CN206844652U (en) Pipe hole need not hang the new template of mould
CN110284686A (en) Kitchen, toilet warterproof construction technology
CN106801482B (en) A kind of converter station firewall construction technology
CN206408762U (en) Split bolt hole water-impervious plugging mechanism on concrete cast-in-situ wall
CN102535493B (en) Method for constructing inverted type foundation beam
CN104452813B (en) A kind of underground power house gate shaft protected against the effects of immersion method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190531