CN109826157A - A kind of cut-pff wall convenient for construction - Google Patents
A kind of cut-pff wall convenient for construction Download PDFInfo
- Publication number
- CN109826157A CN109826157A CN201910140655.1A CN201910140655A CN109826157A CN 109826157 A CN109826157 A CN 109826157A CN 201910140655 A CN201910140655 A CN 201910140655A CN 109826157 A CN109826157 A CN 109826157A
- Authority
- CN
- China
- Prior art keywords
- hydro
- expansive rubber
- rubber
- expansive
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
Abstract
The present invention relates to a kind of cut-pff walls convenient for construction.Its technical solution is: including concrete wall, hydro-expansive rubber plate, top protection rubber sleeve, the concrete wall be externally provided with multiple hydro-expansive rubber board groups at water barrier, and concrete wall top be equipped with top protection rubber sleeve, the section of the concrete wall is that lower part uses trapezium structure, top uses rectangular parallelepiped structure, the hydro-expansive rubber plate gradually thinning structure from lower to upper.Beneficial effect is: based on the present invention utilizes armored concrete, carrying out antiseepage, damp proof using hydro-expansive rubber plate, the top protection of concrete wall is done using top protection rubber sleeve, achieve the purpose that protect armored concrete;The present invention frame structure can be tied by the reinforcing bar of armored concrete and hydro-expansive rubber plate built-in connection carries out gun iron link, is connected as one its protection with basis, and construction simplifies, and extends the service life of concrete dykes and dams significantly.
Description
Technical field
The present invention relates to a kind of cut-pff wall and method convenient for construction, in particular to a kind of concrete cuts.
Background technique
Cut-pff wall is that one kind is built in the ground diaphragm wall for playing antiseepage in loose pervious bed or earth and rockfill dam (weir), is answered extensively
For dykes and dams, building aspect, bottom is embedded in certain depth in basement rock or opposite impervious stratum, can be truncated or reduce ground
In infiltration water flow, to guarantee ground seepage stability and gate dam safety.Antiseepage wall technology is because its structure is reliable, anti-seepage effect
Well, the advantages that all kinds of formation conditions, easy construction is adapted to, " stream soil ", " piping " are isotonic especially behind processing leakage of dam foundation, dam
It works well on deformation potential problem, is at home and abroad widely used thoroughly.China's water conservancy and hydropower coating and native stone enclose
There is a generally preferred cut-pff wall of the Anti-seeping technology of anti-consolidation pressure on weir etc., present cut-pff wall generally comprise normal concrete cut-pff wall,
Armored concrete cut-pff wall, Clay-concrete cut-pff wall, plastic concrete cut-off wall and mortar cut-pff wall.Its there are the problem of
It is: high stress problem of the concrete cut because of wall caused by high elastic modulus, plastic concrete cut-off wall intensity and impermeability
It is lower, and durability is poor;Wall is generally partially thick, improves cost;Scene laying in construction site is excessive, the construction period is inclined
It is long, larger to the disturbance of former dam body etc.;In addition, belonging to inorganic mineral material by the concrete of cement setting, the stability of itself is very
It is good.But concrete/reinforced concrete structure of practical engineering application be in the natural environment, will necessarily meet with many destructions because
Element, such as winter can endure cold, and coastal cut-pff wall can (chlorine, which can penetrate into concrete, in seawater causes reinforcing bar to become rusty by sea water intrusion
Erosion), in some Soils In The Regions containing sulfate or have acid rain can corrosion concrete, the service life of concrete can also be greatly reduced.
Moreover, concrete structure it is naturally occurring have many subtle capillary channels, subtle crack (being invisible to the naked eye) and
Hole.Along with work progress is manual operation, there can be non-uniform situation of vibrating, will lead to honeycomb and hole formation.This
The channel that a little hidden danger have just given water to enter concrete structure, water slowly leak via these capillary channels, crack, hole.
It destroys reinforcing bar, destroy concrete.Water is most fearful to the corrosion of armored concrete.It is seeped by capillary channel, crack, hole
Enter in concrete structure, the reinforcing bar in concrete structure is corroded, causes steel bar corrosion to expand and then destroy concrete knot
Structure, and then generate bigger crack.Crack increases, and water increases, and corrodes peace that is also just more severe, and then destroying cut-pff wall entirety
Quan Xing causes cut-pff wall to scrap or occur serious safety accident.
Chinese patent literature Publication No. 105951857B, patent name are the " composite anti-penetrating for water conservancy project coffering
Wall and its construction method ", it is fast which provides a kind of speed of application, good seepage-proof property, construction cost it is relatively low be used for water
The compound impervious wall of work coffering.Compound impervious wall includes concrete cut ontology, soft organic barrier film and antiseepage
Connection structure, the concrete cut ontology in cubic metre of earth and stone basis with it is described soft in the body of landfill cofferdam weir
The connection that organic barrier film passes through the anti-seepage linkage antiseepage is an entirety.The construction method first pours coagulation
Native guide groove, concrete cut pour, soft organic antiseepage transition film, the arrangement for determining support frame and rear pouring concrete
Cover pouring of emitting.Itself the problem is that: since water directly contacts cut-pff wall, although design have soft organic antiseepage thin
Film, but still effect is less desirable, causes the reduced service life of cut-pff wall.
Chinese patent literature Publication No. 104746633A, patent name are " a kind of waterproof, seepage control metope ", comprising: first
Brick wall body and the second brick wall body, first brick wall body are arranged in parallel in the side of the second brick wall body, and described first
It is provided with gap between brick wall body and the second brick wall body, is filled with concrete structure, the concrete knot in the gap
A waterproof layer is provided in structure, the waterproof layer is made of water-proof concrete and non-woven fabric net, and the non-woven fabric net dipping is solid
Change among water-proof concrete, the non-woven fabric net is parallel with the first brick wall body.By the above-mentioned means, of the present invention
Waterproof, seepage control metope, water-proof concrete are arranged in centre, strengthen the connection between the first brick wall body and the second brick wall body,
Structure is stronger, and double-faced waterproofing, relative inexpensiveness, but its waterproof effect and not satisfactory.
Chinese patent literature Publication No. 103088786B, patent name are " cut-pff wall and its construction method ", the present invention
It is flexibly connected by more piece barrier sheet, the barrier sheet is anti-rot plastic plate, and barrier sheet is by mainboard and set on mainboard two sides
Connection flanging and connection folding ear are provided with a machine template in mainboard bottom and mount slot, and the barrier sheet flexible connection refers to adjacent
Two section barrier sheets are wedging connections, i.e. the connection flanging of later section barrier sheet is plugged in the connection folding ear of previous section barrier sheet.
Antiseepage wall construction of the present invention is simple, easy for construction, cheap, using the poles such as polyethylene or polypropylene anticorrosive material, service life
It is extremely long and strong due to using being flexibly connected, adapting to resistance to shear of soil deformability between each section barrier sheet, it will not cracked thing
Therefore cost performance is very high.It is suitble to the sub-bottom changes of rivers,lakes and seas reservoir, is also suitble to the Anti-seeping technology of soil property building.Existing for it
Problem is: still there may be the hidden danger of leak for anti-rot plastic plate, moreover, the interface of multiple anti-rot plastic plates is inevitably
The case where leaking, time have grown the lost of life for still resulting in concrete wall.
Summary of the invention
The purpose of the present invention is to drawbacks described above of the existing technology, provide a kind of cut-pff wall convenient for construction,
It is combined together using hydro-expansive rubber plate with concrete, and hydro-expansive rubber plate is made according to the needs of cut-pff wall and is convenient for
The structure of connection forms waterproof layer, and use special preparation side so that the external and internal wall of cut-pff wall be protected
Method, manufactured hydro-expansive rubber plate is convenient for construction, and waterproof effect is good.
A kind of cut-pff wall convenient for construction that the present invention mentions, technical solution is: including concrete wall (1), meeting water
Expanded rubber plate (2), top protection rubber sleeve (3) are externally provided with multiple hydro-expansive rubber plates in the concrete wall (1)
(2) form water barrier, and concrete wall (1) top be equipped with top protection rubber sleeve (3), the concrete walls
The section of body (1) is that lower part uses trapezium structure, and top uses rectangular parallelepiped structure, and the hydro-expansive rubber plate (2) is under
Up gradually thinning structure.
Preferably, hydro-expansive rubber plate (2) are equipped on the outside of the trapezium structure of the lower part of concrete wall (1), upper
Top protection rubber sleeve (3) are cased with outside the rectangular parallelepiped structure in portion.
Preferably, the downside of above-mentioned proof rubber set (3) is pyramidal structure, inner wall and hydro-expansive rubber plate (2)
Top contact, outside is covered on the outer wall of hydro-expansive rubber plate (2).
Preferably, above-mentioned hydro-expansive rubber plate (2) includes mainboard (2.1), built-in connection (2.2), upper notch
(2.3), connecting hole (2.4), lower notch (2.5), lower sieve tray (2.6), sieve line (2.7), upper sieve tray (2.8) are preset, in master
The top side of plate (2.1) is equipped with upper notch (2.3), and the lower part other side is equipped with lower notch (2.5), at upper notch (2.3)
Built-in connection (2.2) are equipped in mainboard, and the inner end protrusion of built-in connection (2.2), and are connect admittedly with upper sieve tray (2.8)
Fixed, outer end reaches outside mainboard;It is equipped in mainboard at the lower notch (2.5) default connecting hole (2.4), passes through lower sieve tray
(2.6);It is connect between the lower sieve tray (2.6) and upper sieve tray (2.8) by more sieve lines (2.7).
Preferably, above-mentioned lower sieve tray (2.6) and upper sieve tray (2.8) are rectangular shaped, and multiple through having above
Sieve pore and macropore.
Preferably, set on the upside of the mainboard (2.1) of each group of hydro-expansive rubber plate (2) there are three or three or more pre-buried
Connector (2.2), set on the downside of the mainboard (2.1) there are three or three or more default connecting holes (2.4), two groups of water-swellable rubbers
When offset plate (2) is connected, the built-in connection (2.2) of one group of hydro-expansive rubber plate (2) and another group of default connecting hole
(2.4) it connects.
Preferably, above-mentioned hydro-expansive rubber plate (2) is by the way that hydro-expansive rubber sulphur is added in hydro-expansive rubber piece
Change mold, then vulcanizes on vulcanizer and be made, the hydro-expansive rubber sulfurizing mould includes positioning pin (a1), cope plate
(a2), lower template (a3), open die bush item (a4), lower rubber compensation item (a5), compensation axis (a6), connecting pin (a9), upper rubber mend
Repay item (a10), by lower rubber compensation item (a5) and compensation axis (a6) pass through connecting pin (a9) be fixed together, and with open die bush item
(a4) it is installed along with the side of lower template (a3), and inserts bottom hydro-expansive rubber piece, then in the another of lower template (a3)
Built-in connection (2.2) and upper sieve tray (2.8) are installed in side, continue to insert middle layer hydro-expansive rubber piece, then by upper rubber
Compensation item (a10) covers on the upside of built-in connection (2.2), is further continued for filling middle layer hydro-expansive rubber piece, and in lower template
(a3) lower sieve tray (2.6) are installed in downside, and more sieves are equipped between lower sieve tray (2.6) and upper sieve tray (2.8)
Line (2.7);Set on the lower sieve tray (2.6) there are three or three or more macropores, install compensation axis respectively at macropore
(a6), filling outer layer hydro-expansive rubber piece is then proceeded to, then cope plate (a2) is mounted on lower template (a3), stationary positioned
It sells (a1).
Preferably, the top of above-mentioned lower template (a3), which is equipped with, runs glue groove (a12), run glue groove (a12) and bolster it
Between gap, open the gap area between die bush item (a4) and cope plate.
Preferably, above-mentioned cope plate (a2) opens mould screw hole (a7) equipped with multiple, and opens mould screw hole (a7) and run glue groove
(a12) corresponding.
Preferably, the bottom of above-mentioned lower template (a3) is equipped with multiple open and serves as a contrast a screw hole (a11), and opens lining screw hole
(a11) with lower template (a3) in install open die bush item (a4) it is corresponding, and install open lining bolts.
The beneficial effects of the present invention are: the present invention is using based on armored concrete, using hydro-expansive rubber plate into
It is row antiseepage, damp proof, the top protection of concrete wall is done using top protection rubber sleeve, to protect hydro-expansive rubber plate, is made
Hydro-expansive rubber is unlikely to expand and influence the purpose of its anti-seepage and anti-wet by top, to reach guarantor in rainy days
Protect the purpose of armored concrete;The present invention can tie frame structure by the reinforcing bar of armored concrete and hydro-expansive rubber plate is pre-buried
Connector carries out gun iron link, is connected as one its protection with basis, and the whole lower part that presents is trapezium structure, and top is
Rectangular parallelepiped structure, in this way the temperature change requirement to adapt to dykes and dams;
In addition, the hydro-expansive rubber plate that the present invention uses be also especially made of, pass through dedicated hydro-expansive rubber plate sulphur
Change mold and dedicated hydro-expansive rubber plate is made, and in the production process, is gradually to add from inside to outside to make water absorbing force
Strong special hydro-expansive rubber needs to select different water absorbing forces in the cavity between bolster when vulcanizing production
Hydro-expansive rubber, specifically bottom hydro-expansive rubber piece, middle layer hydro-expansive rubber piece and outer layer hydro-expansive rubber piece,
Layering forms together with built-in connection and sieve line and upper and lower sieve tray, and is sulfided into the special hydro-expansive rubber of monoblock type
Plate, the connection between the hydro-expansive rubber plate are the mechanical forces by built-in connection and default connecting hole, make to match upper and lower
Notch is combined closely, therefore there is no leakage problems between special hydro-expansive rubber plate;
In addition, the present invention is equipped in the concrete wall and closes to solve the problems, such as that the concrete of the dam construction expands with heat and contract with cold
The swollen eye of heat that removing the work is set, and in the swollen intraocular placement rubber bar of heat, utilize the elasticity of rubber, so that it may very good solution concrete wall
Anti-seepage and anti-wet and temperature change contradiction, easy construction of the present invention, and good water-proof effect in a word, make cut-pff wall use the longevity
Life greatly improves.
Detailed description of the invention
Attached drawing 1 is side view of the invention;
Attached drawing 2 is positive structure schematic of the invention;
Attached drawing 3 is the sectional view of hydro-expansive rubber plate;
Attached drawing 4 is the outline drawing of hydro-expansive rubber plate;
Attached drawing 5 is the top view of hydro-expansive rubber sulfurizing mould;
Attached drawing 6 is the Section A-A figure of hydro-expansive rubber sulfurizing mould;
Attached drawing 7 is the section B-B figure of hydro-expansive rubber sulfurizing mould;
Attached drawing 8 is the side cross-sectional, view of multiple hydro-expansive rubber plates;
Attached drawing 9 is construction schematic diagram when hydro-expansive rubber plate is connect with reinforcing bar;
In upper figure: concrete wall 1, hydro-expansive rubber plate 2, top protection rubber sleeve 3, connector 4, lightning rod 5, reinforcing bar 6,
Mainboard (2.1), built-in connection (2.2), upper notch (2.3), default connecting hole (2.4), lower notch (2.5), lower sieve tray
(2.6), line (2.7), upper sieve tray (2.8) are sieved;Positioning pin a1, cope plate a2, lower template a3, die bush a4, lower rubber benefit are opened
Repay an a5, compensation axis a6, open mould screw hole a7, die sinking hole a8, connecting pin a9, upper rubber compensation a10, open lining screw hole (a11),
It runs glue groove (a12).
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Referring to attached Fig. 1 and 2, a kind of cut-pff wall (concrete cut) convenient for construction that the present invention mentions, technical side
Case is: including concrete wall (1), hydro-expansive rubber plate (2), top protection rubber sleeve (3), in the concrete wall
(1) be externally provided with the water barrier of multiple hydro-expansive rubber plates (2) composition, and the top of concrete wall (1) be equipped with top
Proof rubber set (3), the section of the concrete wall (1) are that lower part uses trapezium structure, and top uses rectangular parallelepiped structure,
The hydro-expansive rubber plate (2) gradually thinning structure from lower to upper.
Hydro-expansive rubber plate (2) are equipped on the outside of the trapezium structure of the lower part of concrete wall (1), in the rectangular of top
Top protection rubber sleeve (3) are cased with outside body structure;The downside of proof rubber set (3) is pyramidal structure, inner wall and water-swellable rubber
The top of offset plate (2) contacts, and outside is covered on the outer wall of hydro-expansive rubber plate (2).
Referring to attached drawing 3 and 4, the hydro-expansive rubber plate (2) that the present invention mentions includes mainboard (2.1), built-in connection
(2.2), upper notch (2.3), default connecting hole (2.4), lower notch (2.5), lower sieve tray (2.6), sieve line (2.7), upper sieve pore
Plate (2.8) is equipped with upper notch (2.3) in the top side of mainboard (2.1), and the lower part other side is equipped with lower notch (2.5), lacks upper
Be equipped with built-in connection (2.2) in mainboard at mouthful (2.3), and the inner end protrusion of built-in connection (2.2), and with upper sieve tray
(2.8) it is connected and fixed, outer end reaches outside mainboard;It is equipped in mainboard at the lower notch (2.5) default connecting hole (2.4),
Across lower sieve tray (2.6);It is connect between the lower sieve tray (2.6) and upper sieve tray (2.8) by more sieve lines (2.7).
Wherein, lower sieve tray (2.6) and upper sieve tray (2.8) are rectangular shaped, and above through there is multiple sieve pores and big
Hole, multiple sieve pores can make the more preferable of sieve tray and concrete coagulation, and macropore is then for manufacturing default connecting hole (2.4)
's.
In addition, set on the upside of the mainboard (2.1) of each group of hydro-expansive rubber plate (2) there are three or three or more pre-buried companies
Fitting (2.2), set on the downside of the mainboard (2.1) there are three or three or more default connecting holes (2.4), two groups of hydro-expansive rubbers
When plate (2) is connected, the built-in connection (2.2) of one group of hydro-expansive rubber plate (2) and another group of default connecting hole (2.4)
Connection.
Referring to attached drawing 5-7, the hydro-expansive rubber plate (2) that the present invention mentions is met by the way that hydro-expansive rubber piece to be added
Then water-expansible rubber sulfurizing mould vulcanizes on vulcanizer and is made, the hydro-expansive rubber sulfurizing mould includes positioning pin
(a1), cope plate (a2), lower template (a3), open die bush item (a4), lower rubber compensation item (a5), compensation axis (a6), connecting pin
(a9), lower rubber compensation item (a5) and compensation axis (a6) are fixed on one by connecting pin (a9) by upper rubber compensation item (a10)
It rises, and is installed along with the side of lower template (a3) with die bush item (a4) is opened, and insert bottom hydro-expansive rubber piece, then under
Other side installation built-in connection (2.2) of template (a3) and upper sieve tray (2.8) continue to insert middle layer hydro-expansive rubber
Then piece covers upper rubber compensation item (a10) on the upside of built-in connection (2.2), be further continued for filling middle layer hydro-expansive rubber
Piece, and install lower sieve tray (2.6) in the downside of lower template (a3), and lower sieve tray (2.6) and upper sieve tray (2.8) it
Between be equipped with more sieve lines (2.7);Set on the lower sieve tray (2.6) there are three or three or more macropores, distinguish at macropore
Compensation axis (a6) is installed, then proceedes to filling outer layer hydro-expansive rubber piece, then cope plate (a2) is mounted on lower template (a3)
On, fixed locating stud (a1).
Wherein, the top of lower template (a3), which is equipped with, runs glue groove (a12), runs the gap between glue groove (a12) and bolster,
The gap area between die bush item (a4) and cope plate is opened, in this way, in vulcanization, when glue groove is run in discovery rubber spilling, into
Row heat preservation, pressure maintaining when the time reaches 45 minutes or more, just complete the vulcanization process of rubber.
In addition, above-mentioned cope plate (a2) opens mould screw hole (a7) equipped with multiple, and opens mould screw hole (a7) and run glue groove (a12)
It is corresponding, it opens mould screw hole and bolt cooperates, can play and cope plate and lower template are forced into the effect separated, this is mainly four
When the die sinking hole in week cannot separate bolster, bolster separation is realized with this method.
Die sinking hole (a8) is equipped at outer ledge between the lower template (a3) and cope plate (a2).
In addition, the bottom of lower template (a3) of the invention, which is equipped with multiple open, serves as a contrast a screw hole (a11), and open lining screw hole
(a11) with lower template (a3) in install open die bush item (a4) it is corresponding, and install open lining bolts, this be also vulcanization complete
After when needing to dismantle, rectangular configuration is opened into die bush item (a4) from lower template after opening cope plate, then by opening lining bolts
Ejection, consequently facilitating easier dismantle the hydro-expansive rubber plate vulcanizated.It should be understood that opening die bush item (a4) is square
Shape structure, and the section on top is the structure of right-angled trapezium, outside is inclined-plane, its effect is to be installed to lower template in cope plate
When, guiding role is played, cope plate is more easily installed in lower template.
In addition, the production method for the hydro-expansive rubber plate that the present invention mentions, comprising the following steps:
1), according to the needs of the coefficient of expansion, rubber is kneaded respectively, bottom hydro-expansive rubber piece is made, water is met in middle layer
Expanded rubber piece and outer layer hydro-expansive rubber piece;
2), by lower rubber compensation item (a5) and compensation axis (a6) pass through connecting pin (a9) be fixed together, and with open die bush item
(a4) it is formed together an entirety A;
3) whole A, is mounted on the side in lower template (a3),;
4), by bottom hydro-expansive rubber piece, the coefficient of expansion is five times after water suction, by the bottom shape of lower template (a3), is used
Wallpaper knife is cut into corresponding shape, and puts it into lower template (a3).
5) it, is further filled with middle layer hydro-expansive rubber piece, the coefficient of expansion is twice after water suction, needs to be cut into fragment, then
Upper rubber compensation item (a10) is covered on the upside of the built-in connection (2.2), is further continued for filling middle layer hydro-expansive rubber piece, and
Lower sieve tray (2.6) are installed in the downside of lower template (a3), and are equipped between lower sieve tray (2.6) and upper sieve tray (2.8)
More sieve lines (2.7);Set on the lower sieve tray (2.6) there are three or three or more macropores, install benefit respectively at macropore
Repay axis (a6);
6) outer layer hydro-expansive rubber piece, then, is inserted, the coefficient of expansion is one times after water suction, according to mold shape, is cut into
Corresponding shape filling, after the height of outer layer hydro-expansive rubber piece, which is higher by, opens die bush item (a4) 5 ~ 6mm, then by cope plate
(a2) it is mounted on lower template (a3), and positioning pin (a1) is installed, form hydro-expansive rubber sulfurizing mould;
7) heating mechanism for, opening vulcanizer, preheats the sheet rubber of each layer in hydro-expansive rubber sulfurizing mould, when
When temperature reaches 120 DEG C ~ 150 DEG C, start to pressurize, sees run in glue groove (a12) whether have rubber spilling, when discovery has rubber
It when spilling, is kept the temperature, pressure maintaining, when the time reaching 45 minutes or more, just completes the vulcanization process of rubber.
8) after the vulcanization process for, completing rubber, entire hydro-expansive rubber sulfurizing mould is hung out and is cooled down, temperature is worked as
When spending suitable, it can be opened;
9), when opening mold, firstly, positioning pin (a1) is opened, then by the die sinking hole (a8) on cope plate (a2), by cope plate
(a2) it is come out from lower template (a3), if cope plate cannot be acted open by being opened hole (a8), opens mould spiral shell in cope plate (a2)
Bolt is installed at hole (a7), cope plate (a2) and lower template (a3) are separated by force, and cope plate (a2) is hung away;
Second step is exactly integrally to invert lower template (a3), is rotated using lining bolts are opened along lining screw hole (a11) is opened, thus
Die bush item (a4) taking-up will be opened, then, overturns lower template (a3), takes compensation axis (a6) and upper rubber compensation item (a10) away;
Third step, then lower template (a3) is overturn, it takes out connecting pin (a9), then can take out hydro-expansive rubber plate (2), then
Lower rubber compensation item (a5) is taken out, the production of one group of hydro-expansive rubber plate (2) is completed.
Since the downside of concrete wall (1) is trapezium structure, it can be kept full according to replacement cope plate and lower template is required
The inclined requirement of foot, is finally made the multiple groups hydro-expansive rubber plate (2) for meeting concrete wall (1) requirement.
Referring to attached drawing 8 and 9, the construction method for the cut-pff wall convenient for construction that the present invention mentions, comprising the following steps:
It 1, is needs according to engineering first, the hydro-expansive rubber plate (2) that production matches with concrete wall (1), and by
Under up, the wall thickness of hydro-expansive rubber plate is more and more thinner, and the water-swellable of the produced in lengths respective numbers according to dam body
Rubber slab (2);
2, second, first reinforcing bar 6 is tied up on the basis of former dam body, then, hydro-expansive rubber plate (2) is sequentially connected,
It is connected and fixed by the built-in connection of one group of hydro-expansive rubber plate (2) and another group of default connecting hole (2.4), is successively arranged
Column fix, and outermost end again with reinforcing bar bundle frame structure be connected and fixed or directly by connector 4 and the chance water of the other side it is swollen
The built-in connection of swollen rubber slab is fixedly connected, and after making its later period casting concrete, can be connected as one with concrete wall,
And entirety is set to be rendered as the concrete exterior sheathing of trapezium structure, and the swollen pipe of a lot of heat is installed;Then, wooden outer in top installation
Template forms the cavity of rectangular shape;
3, third, after reaching dam designs requirement, to the exterior sheathing luminal perfusion coagulation of hydro-expansive rubber plate (2) composition
Soil, since inside is equipped with multiple swollen pipes of heat, and the swollen pipe close of heat has corrosion-resistant ageing-resistant rubber bar, can form multiple install
The swollen eye of heat of rubber bar, moreover, because built-in connection is equipped in hydro-expansive rubber plate (2), it can be by hydro-expansive rubber
Plate (2) is closely linked with concrete wall, and this construction does not need the exterior sheathing for dismantling lower part again yet, only disassembly top
Rectangular shape on the outside of wooden exterior sheathing, reduce working procedure;
4, finally, rectangular parallelepiped structure outer wall at the top of the concrete wall solidified, puts on the top of Ageing-resistant corrosion-resistant
Proof rubber set 3, protects the upper position of the hydro-expansive rubber plate (2) of lower part, avoids rainy or natural ring
To the destruction of hydro-expansive rubber plate (2) under border, the service life of entire dykes and dams is extended, to complete entire concrete anti-seepage
The production of wall.
Furthermore it is possible to lightning rod 5 is installed in dykes and dams as needed, in addition, needing in prolonged use to dike
Dam is conserved, such as replacement top protection rubber sleeve 3, can extend the service life of hydro-expansive rubber plate;It is also in need
What is illustrated is bottom hydro-expansive rubber piece, middle layer hydro-expansive rubber piece and outer layer hydro-expansive rubber piece using existing
The hydro-expansive rubber of technology, water-swellable coefficient is different, can meet the requirements, and corrosion-resistant ageing-resistant;Its basic principle
It is when cut-pff wall encounters water, hydro-expansive rubber plate can obstruct erosion of the water to concrete, to extend concrete wall
Service life.
In addition, the formula for the hydro-expansive rubber that the present invention uses is existing conventional techniques.It is of course also possible to use following
Formula is made: the formula of bottom hydro-expansive rubber is using as follows: nitrile rubber 13kg, water-absorbing resin 10kg, stearic acid SA
0.13kg, di-iron trioxide 0.26kg, anti-aging agent RD (2,2,4- trimethyl -1,2- dihyaroquinoline condensate) 0.26kg, rush
Into agent CZ(chemical name N- cyclohexyl -2-[4-morpholinodithio sulfenamide) 0.16kg, rubber accelerator DM (chemical name: 2,
2'- dithio-bis-benzothiazole) 0.26kg, activating agent zinc oxide 0.65kg, desiccant calcium oxide 0.65kg, reinforcing agent titanium dioxide
Silicon 2.6kg, plasticizer DOP (dioctyl phthalate) 1.95k, pre-dispersed medicine glue S-80 0.04kg of sulphur, vulcanization crosslinking agent
DCP 0.26kg, peg4000 1.3kg, methyl diphenylene diisocyanate MDI 0.08kg, silica 1kg.Wherein, water suction tree
Rouge can be using the commercial product BS-3 Hydroxylated acrylic resin of Nanjing match regular senior middle school's molecular material Co., Ltd, and peg4000 is ring
Oxidative ethane condensation product, the product produced such as Jiangsu Hai'an petrochemical plant.The expansion multiple of the hydro-expansive rubber is 5 times.
The formula of middle layer hydro-expansive rubber is using as follows: nitrile rubber 13kg, water-absorbing resin 6kg, stearic acid SA
0.12kg, di-iron trioxide 0.21kg, anti-aging agent RD (2,2,4- trimethyl -1,2- dihyaroquinoline condensate) 0.22kg, rush
Into agent CZ(chemical name N- cyclohexyl -2-[4-morpholinodithio sulfenamide) 0.15kg, rubber accelerator DM (chemical name: 2,
2'- dithio-bis-benzothiazole) 0.26kg, activating agent zinc oxide 0.6kg, desiccant calcium oxide 0.6kg, reinforcing agent silica
2.2kg, plasticizer DOP (dioctyl phthalate) 1.9k, pre-dispersed medicine glue S-80 0.04kg of sulphur, vulcanization crosslinking agent DCP
0.26kg, peg4000 1.2kg, methyl diphenylene diisocyanate MDI 0.08kg, silica 0.9kg.Wherein, water-absorbing resin
Can be using the commercial product BS-3 Hydroxylated acrylic resin of Nanjing match regular senior middle school's molecular material Co., Ltd, peg4000 is epoxy
Oxide condensate, the product produced such as Jiangsu Hai'an petrochemical plant.The expansion multiple of the hydro-expansive rubber is 2 times.
The formula of outer layer hydro-expansive rubber is using as follows: nitrile rubber 13kg, water-absorbing resin 3kg, stearic acid SA
0.13kg, di-iron trioxide 0.24kg, anti-aging agent RD (2,2,4- trimethyl -1,2- dihyaroquinoline condensate) 0.25kg, rush
Into agent CZ(chemical name N- cyclohexyl -2-[4-morpholinodithio sulfenamide) 0.13kg, rubber accelerator DM (chemical name: 2,
2'- dithio-bis-benzothiazole) 0.23kg, activating agent zinc oxide 0.6kg, desiccant calcium oxide 0.6kg, reinforcing agent silica
2.1kg, plasticizer DOP (dioctyl phthalate) 1.9k, pre-dispersed medicine glue S-80 0.04kg of sulphur, vulcanization crosslinking agent DCP
0.26kg, peg4000 1.3kg, methyl diphenylene diisocyanate MDI 0.08kg, silica 0.8kg.Wherein, water-absorbing resin
Can be using the commercial product BS-3 Hydroxylated acrylic resin of Nanjing match regular senior middle school's molecular material Co., Ltd, peg4000 is epoxy
Oxide condensate, the product produced such as Jiangsu Hai'an petrochemical plant.The expansion multiple of the hydro-expansive rubber is 1 times.
The above, is only part preferred embodiment of the invention, and anyone skilled in the art may benefit
Equivalent technical solution is modified or is revised as with the technical solution of above-mentioned elaboration.Therefore, technology according to the present invention
Any simple modification or substitute equivalents that scheme is carried out, belong to the greatest extent the scope of protection of present invention.
Claims (7)
1. a kind of cut-pff wall convenient for construction, it is characterized in that: including concrete wall (1), hydro-expansive rubber plate (2), top
Proof rubber set (3) is externally provided with the water barrier of multiple hydro-expansive rubber plate (2) compositions in the concrete wall (1), and
The top of concrete wall (1) be equipped with top protection rubber sleeve (3), the section of the concrete wall (1) is lower part
Using trapezium structure, top uses rectangular parallelepiped structure, the hydro-expansive rubber plate (2) gradually thinning knot from lower to upper
Structure;
The hydro-expansive rubber plate (2) includes mainboard (2.1), built-in connection (2.2), upper notch (2.3), default connection
Hole (2.4), lower notch (2.5), lower sieve tray (2.6), sieve line (2.7), upper sieve tray (2.8), on the top one of mainboard (2.1)
Side is equipped with upper notch (2.3), and the lower part other side is equipped with lower notch (2.5), and pre-buried company is equipped in the mainboard at upper notch (2.3)
Fitting (2.2), and the inner end protrusion of built-in connection (2.2), and be connected and fixed with upper sieve tray (2.8), outer end reaches master
Outside plate;It is equipped with default connecting hole (2.4), passes through lower sieve tray (2.6) in mainboard at the lower notch (2.5);The lower sieve
It is connect between orifice plate (2.6) and upper sieve tray (2.8) by more sieve lines (2.7);
The lower sieve tray (2.6) and upper sieve tray (2.8) are rectangular shaped, and above through having multiple sieve pores and macropore;
Set on the upside of the mainboard (2.1) of each group of hydro-expansive rubber plate (2) there are three or three or more built-in connections
(2.2), set on the downside of the mainboard (2.1) there are three or three or more default connecting holes (2.4), two groups of hydro-expansive rubber plates
(2) when being connected, the built-in connection (2.2) of one group of hydro-expansive rubber plate (2) and another group of default connecting hole (2.4) are even
It connects.
2. the cut-pff wall according to claim 1 convenient for construction, it is characterized in that: the ladder in the lower part of concrete wall (1)
Hydro-expansive rubber plate (2) are equipped on the outside of shape structure, top protection rubber sleeve (3) are cased with outside the rectangular parallelepiped structure on top.
3. the cut-pff wall according to claim 1 convenient for construction, it is characterized in that: the downside of the proof rubber set (3)
For pyramidal structure, inner wall is contacted with the top of hydro-expansive rubber plate (2), and outside is covered on the outer of hydro-expansive rubber plate (2)
Wall.
4. the cut-pff wall according to claim 1 convenient for construction, it is characterized in that: the hydro-expansive rubber plate (2) is logical
It crosses and hydro-expansive rubber sulfurizing mould is added in hydro-expansive rubber piece, then vulcanize on vulcanizer and be made, the chance water is swollen
Swollen vulcanization of rubber mold includes positioning pin (a1), cope plate (a2), lower template (a3), opens die bush item (a4), lower rubber compensation item
(a5), axis (a6), connecting pin (a9), upper rubber compensation item (a10) are compensated, lower rubber compensation item (a5) and compensation axis (a6) is logical
It crosses connecting pin (a9) to be fixed together, and be installed along with the side of lower template (a3) with die bush item (a4) is opened, and inserts bottom
Hydro-expansive rubber piece, then built-in connection (2.2) and upper sieve tray (2.8) are installed in the other side of lower template (a3), continue
Middle layer hydro-expansive rubber piece is inserted, then upper rubber compensation item (a10) is covered on the upside of built-in connection (2.2), is further continued for
Middle layer hydro-expansive rubber piece, and the sieve tray (2.6) under the installation of the downside of lower template (a3) are inserted, and in lower sieve tray
(2.6) more sieve lines (2.7) are equipped between upper sieve tray (2.8);Set on the lower sieve tray (2.6) there are three or three with
On macropore, install compensation axis (a6) respectively at macropore, then proceed to filling outer layer hydro-expansive rubber piece, then by cope plate
(a2) it is mounted on lower template (a3), fixed locating stud (a1).
5. the cut-pff wall according to claim 4 convenient for construction, it is characterized in that: the top of the lower template (a3) is equipped with
It runs glue groove (a12), runs the gap between glue groove (a12) and bolster, the gap opened between die bush item (a4) and cope plate connects
It is logical.
6. the cut-pff wall according to claim 5 convenient for construction, it is characterized in that: the cope plate (a2) is equipped with multiple open
Mould screw hole (a7), and it is corresponding with glue groove (a12) is run to open mould screw hole (a7).
7. the cut-pff wall according to claim 5 convenient for construction, it is characterized in that: the bottom of the lower template (a3) is equipped with
It is multiple to open lining screw hole (a11), and it is corresponding to open the opening of installation in lining screw hole (a11) and lower template (a3) die bush item (a4),
And it installs and opens lining bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910140655.1A CN109826157B (en) | 2018-09-28 | 2018-09-28 | Cut-off wall convenient to construction |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811140749.0A CN109113024B (en) | 2018-09-28 | 2018-09-28 | A kind of concrete cut |
CN201910140655.1A CN109826157B (en) | 2018-09-28 | 2018-09-28 | Cut-off wall convenient to construction |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811140749.0A Division CN109113024B (en) | 2018-09-28 | 2018-09-28 | A kind of concrete cut |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109826157A true CN109826157A (en) | 2019-05-31 |
CN109826157B CN109826157B (en) | 2020-09-08 |
Family
ID=64857106
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811140749.0A Active CN109113024B (en) | 2018-09-28 | 2018-09-28 | A kind of concrete cut |
CN201910140655.1A Active CN109826157B (en) | 2018-09-28 | 2018-09-28 | Cut-off wall convenient to construction |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811140749.0A Active CN109113024B (en) | 2018-09-28 | 2018-09-28 | A kind of concrete cut |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN109113024B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965521A (en) * | 2019-07-22 | 2020-04-07 | 张谦 | Membrane structure protective wall for dam erosion protection and application method thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110044339B (en) * | 2019-04-09 | 2020-10-20 | 李敬文 | Device and method for comprehensively monitoring and utilizing barrier-free river channel |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2712998Y (en) * | 2004-06-10 | 2005-07-27 | 衡水丰泽工程橡胶科技开发有限公司 | Slowly water-swellable rubber waterstop strip |
CN102011412A (en) * | 2010-12-31 | 2011-04-13 | 中国水电顾问集团中南勘测设计研究院 | Concrete anti-seepage wall joint |
CN102041800A (en) * | 2010-12-08 | 2011-05-04 | 四川路航建设工程有限责任公司 | Method for constructing PVC (polyvinyl chloride) composite geomembrane watertight core of earth-rockfill dam |
US9034454B1 (en) * | 2011-09-30 | 2015-05-19 | Southern Rubber Company, Inc. | Composite joint filler seal material for joints in precast concrete structures |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1145131A (en) * | 1980-04-05 | 1983-04-26 | Hajime Yamaji | Aqueously-swelling water stopper and a process of stopping water thereby |
CN101451360A (en) * | 2007-11-30 | 2009-06-10 | 上海久隆电力(集团)有限公司 | Antiseep installation technique of cable working well |
CN204645097U (en) * | 2015-05-11 | 2015-09-16 | 青岛一建集团有限公司 | A kind of hydro-expansive rubber repairs deformation joint structure |
CN206956669U (en) * | 2017-03-31 | 2018-02-02 | 中国电建集团华东勘测设计研究院有限公司 | A kind of attachment structure of cut-pff wall and concrete cover |
CN207484405U (en) * | 2017-04-26 | 2018-06-12 | 中国电建集团西北勘测设计研究院有限公司 | A kind of concrete cut |
CN207159937U (en) * | 2017-06-26 | 2018-03-30 | 党文文 | A kind of concrete watertight wall joint |
CN207553031U (en) * | 2017-09-08 | 2018-06-29 | 马乐军 | A kind of impervious water conservancy structure of flood bank |
CN107740380A (en) * | 2017-09-18 | 2018-02-27 | 杭州国电大坝安全工程有限公司 | Concrete deformation seam resistant abrasion leakage preventing structure and its construction method |
CN207376572U (en) * | 2017-10-30 | 2018-05-18 | 武汉江韵勘测工程集团有限公司 | A kind of underwater bridge matrix of antiseep |
-
2018
- 2018-09-28 CN CN201811140749.0A patent/CN109113024B/en active Active
- 2018-09-28 CN CN201910140655.1A patent/CN109826157B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2712998Y (en) * | 2004-06-10 | 2005-07-27 | 衡水丰泽工程橡胶科技开发有限公司 | Slowly water-swellable rubber waterstop strip |
CN102041800A (en) * | 2010-12-08 | 2011-05-04 | 四川路航建设工程有限责任公司 | Method for constructing PVC (polyvinyl chloride) composite geomembrane watertight core of earth-rockfill dam |
CN102011412A (en) * | 2010-12-31 | 2011-04-13 | 中国水电顾问集团中南勘测设计研究院 | Concrete anti-seepage wall joint |
US9034454B1 (en) * | 2011-09-30 | 2015-05-19 | Southern Rubber Company, Inc. | Composite joint filler seal material for joints in precast concrete structures |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965521A (en) * | 2019-07-22 | 2020-04-07 | 张谦 | Membrane structure protective wall for dam erosion protection and application method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109113024A (en) | 2019-01-01 |
CN109826157B (en) | 2020-09-08 |
CN109113024B (en) | 2019-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109113024B (en) | A kind of concrete cut | |
CN106149764A (en) | A kind of precast assembly pipe gallery bell and spigot waterproof construction | |
CN109356162A (en) | A kind of OPT interlocking pile slip casting around pile water-stopping method and slip casting pipe device | |
US20130309013A1 (en) | Reinforcement system for increased lateral stability of flood wall | |
CN105926617A (en) | Structure capable of proving protection for anti-floating anchor rod and construction method thereof | |
CN109338995A (en) | A kind of cut-pff wall hydro-expansive rubber plate | |
CN109291473A (en) | A kind of cut-pff wall hydro-expansive rubber plate and production method | |
JP4535902B2 (en) | Seismic joint for concrete structure and its construction method | |
CN201826306U (en) | Bladder-type anticorrosive device with pile shoe and anticorrosive pile using same | |
KR100676416B1 (en) | Method and structure for bridge pier mould construction using concrete water barrier | |
CN215562332U (en) | Hydraulic engineering dykes and dams prevention of seepage ecological protection structure | |
CN115573302A (en) | Anti-seepage and anti-impact flood bank for hydraulic engineering and anti-seepage method thereof | |
CN105464226B (en) | The flexible waterstop of integrated component formula and its application in building deformation joint waterproof | |
CN115045342A (en) | Water-swelling plugging ring for pile-first packer and using method thereof | |
CN110397088B (en) | Advanced water-stop post-pouring strip structure of river beach working condition basement and construction method | |
CN210768806U (en) | Can carry out prefabricated tunnel lining structure that accurate was corrected to deformation section line type | |
CN209891239U (en) | Piston type foundation support structure | |
CN210597321U (en) | From waterproof fender pile and from waterproof supporting system | |
CN209243728U (en) | A kind of OPT interlocking pile slip casting around pile pipe device | |
CN208563267U (en) | A kind of earth and rockfill dam pressure slope body discharge structure | |
CN105089060A (en) | Foundation pit support system using atmospheric pressure as support force | |
CN106382123B (en) | A kind of macromolecule tunnel waterproofing layer and its construction technology | |
CN204644979U (en) | Reinforced earth arch dam discharge structure system | |
CN220248101U (en) | Novel tunnel impervious structure | |
JP2019157619A (en) | Composite segment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200814 Address after: Room 1109-1120, No.9 Haibo Xingdu, No.1 Guanghui street, high tech Zone, Hengyang City, Hunan Province Applicant after: Hunan Yihui Construction Co., Ltd Address before: 257000 Shandong city of Dongying province Lijin County Jin Road No. 638 two Applicant before: Li Jingwen |
|
GR01 | Patent grant | ||
GR01 | Patent grant |