CN109826072A - Court chinampa and its application method - Google Patents

Court chinampa and its application method Download PDF

Info

Publication number
CN109826072A
CN109826072A CN201910258646.2A CN201910258646A CN109826072A CN 109826072 A CN109826072 A CN 109826072A CN 201910258646 A CN201910258646 A CN 201910258646A CN 109826072 A CN109826072 A CN 109826072A
Authority
CN
China
Prior art keywords
buffer layer
chinampa
court
bolster
clamping portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910258646.2A
Other languages
Chinese (zh)
Inventor
谢平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yizhibo Industrial Co Ltd
Original Assignee
Jiangsu Yizhibo Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yizhibo Industrial Co Ltd filed Critical Jiangsu Yizhibo Industrial Co Ltd
Priority to CN201910258646.2A priority Critical patent/CN109826072A/en
Publication of CN109826072A publication Critical patent/CN109826072A/en
Pending legal-status Critical Current

Links

Landscapes

  • Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)

Abstract

The present invention relates to a kind of court chinampa and its application methods, wherein this court chinampa and its application method, comprising: base, the buffer layer being arranged in base, the casing of the bolster being arranged in buffer layer and setting on the buffer layer;Wherein the buffer layer has elastic force, and the buffer layer is suitable for grafting bolster;The bolster is inwardly gathered to form a section as trapezoidal buffer cavity, protects sportsman in all directions, it is injured to reduce sportsman;The inner wall of described sleeve pipe is relatively set with clamping portion;Careless silk insertion casing and tufting on the buffer layer after, the clamping portion is closed up to clamp grass silk by arc clamping head, is avoided careless silk from being pulled out by clamping force, is improved the installation fastness of chinampa.

Description

Court chinampa and its application method
Technical field
The present invention relates to a kind of court chinampa and its application methods.
Background technique
Existing chinampa has the following problems:
The case where 1. sportsman on the field falls down or when sliding tackle, inadequate for the protectiveness of sportsman, be easy to cause tumble injury or sprain the ankle;
2. careless silk installation will appear loosening to be easier the case where extracting from casing after sportsman runs for a long time.
To solve the above-mentioned problems, the present invention needs to design a kind of new court chinampa.
Summary of the invention
The object of the present invention is to provide a kind of court chinampa and its application methods.
In order to solve the above-mentioned technical problems, the present invention provides a kind of court chinampas, comprising:
Base, the buffer layer being arranged in base, the casing of the bolster being arranged in buffer layer and setting on the buffer layer;Its In
The buffer layer has elastic force, and the buffer layer is suitable for grafting bolster;
The bolster is inwardly gathered to form a section as trapezoidal buffer cavity;
The inner wall of described sleeve pipe is relatively set with clamping portion;
Careless silk insertion casing and tufting on the buffer layer after, the clamping portion is closed up to clamp grass silk by arc clamping head.
Further, the rotation slot of described sleeve pipe offered inside and outside connection casing;
The clamping portion is rotationally connected in rotation slot by bolt;
The scroll spring for being suitable for that clamping portion is driven to close up is equipped between the clamping portion and bolt.
In the present embodiment, the wedging position offers in the side of outside of sleeve and struts slot;
The slot that struts is suitable for that clamping portion is driven to strut outward so that careless silk passes through.
In the present embodiment, the lateral wall of described sleeve pipe, which is located at, is provided with support column with the perpendicular direction in clamping portion;
The support column is suitable for propping up casing.
Further, the cross sectional shape of described sleeve pipe is ellipse, in order to quickly spring back after casing bending.
Further, the bolster includes: plate and the support plate around the plate;Wherein
The plate is suitable for compression support plate and struts downwards to buffer the vertical impact forces above buffer layer;
The support plate favours plate setting, and the support plate is suitable for inwardly collapsing compression with oblique above buffer layer To impact force.
Further, any side of the buffer layer offers slot, to be inserted into bolster.
Further, the opening of the slot is provided with check device, skids off outward to avoid bolster;
The check device includes: the baffle for being hinged on slot opening, and
Torsional spring between baffle and slot inner wall is set, to drive baffle rebound to block bolster.
On the other hand, the present invention also provides a kind of application method of court chinampa,
The court chinampa includes: casing and buffer layer;Wherein
Bolster is internally provided with positioned at buffer layer;
The inner wall of described sleeve pipe is relatively set with clamping portion;
Careless silk insertion casing and tufting on the buffer layer after, the clamping portion is closed up to clamp grass silk by arc clamping head;
The bolster is suitable for buffering oblique above the vertical impact forces and/or buffer layer above buffer layer Impact force.
Further, the application method uses court chinampa as described above to realize the careless silk of clamping and buffer Vertical impact forces and/or oblique impact force.
The invention has the advantages that court chinampa of the invention, the buffer layer has elastic force, and passes through institute State buffer layer grafting bolster;The bolster is inwardly gathered to form a section as trapezoidal buffer cavity, and then in all directions Protection of the sportsman, reduces player injuries probability, and careless silk insertion casing and tufting on the buffer layer after, the clamping portion is simultaneously Hold together to clamp careless silk by arc clamping head, avoids careless silk from being pulled out by clamping force, improve the installation fastness of chinampa.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of structural schematic diagram of the preferred embodiment of court chinampa of the invention;
Fig. 2 is the partial enlarged view schematic diagram of part A in Fig. 1;
Fig. 3 is the partial enlarged view schematic diagram of part B in Fig. 1;
Fig. 4 is the partial enlarged view schematic diagram of C portion in Fig. 3;
Fig. 5 is the top view illustration of casing.
In figure: 100- base, the first base cloth layer of 110-, the second base cloth layer of 120-, 130- glue layer, 200- buffer layer, 300- bolster, 310- plate, 320- support plate, 400- check device, 410- baffle, 420- torsional spring, 500- casing, 510- card Socket part, 511- arc clamping head, 512- strut slot, 520- rotation slot, 530- bolt, 540- scroll spring, 550- support column, 600- Careless silk, 700- concrete layer.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with Illustration illustrates basic structure of the invention, therefore it only shows the composition relevant to the invention.
Embodiment 1
Fig. 1 is a kind of structural schematic diagram of the preferred embodiment of court chinampa of the invention;
Fig. 3 is the partial enlarged view schematic diagram of part B in Fig. 1.
As shown in figures 1 and 3, the court chinampa of the present embodiment, comprising:
Base 100, the buffer layer 200 being arranged in base 100, the bolster 300 being arranged in buffer layer 200 and setting are slow Rush the casing 500 on layer 200;Wherein the buffer layer 200 has elastic force, and the buffer layer 200 is suitable for grafting bolster 300;The bolster 300 is inwardly gathered to form a section as trapezoidal buffer cavity, and then Protection of the sportsman in all directions, subtracts Few player injuries probability;Careless silk 600 be inserted into casing 500 and tufting on buffer layer 200 after, the clamping portion 510 close up with Careless silk 600 is clamped by arc clamping head 511, avoids careless silk 600 from being pulled out by clamping force, improves the installation jail of chinampa Solidity.
Fig. 4 is the partial enlarged view schematic diagram of C portion in Fig. 3.
As shown in figure 4, in the present embodiment, the rotation slot 520 of described sleeve pipe 500 offered inside and outside connection casing 500; The clamping portion 510 is rotationally connected in rotation slot 520 by bolt 530;It is equipped between the clamping portion 510 and bolt 530 Suitable for the scroll spring 540 for driving clamping portion 510 to close up.
In the present embodiment, the side that the clamping portion 510 is located at 500 outside of casing, which offers, struts slot 512;The support 512 are slotted suitable for driving clamping portion 510 to strut outward so that careless silk 600 passes through, release clamping portion 510 passes through scroll spring 540 Rebound clamps careless silk 600 so that clamping portion 510 closes up and passes through arc clamping head 511, and then careless silk 600 is avoided to be pulled out, and improves The installation fastness of chinampa.
Fig. 5 is the top view illustration of casing.
As shown in figure 5, in the present embodiment, the lateral wall of described sleeve pipe 500 is located to be set with the perpendicular direction in clamping portion 510 It is equipped with support column 550;The support column 550 is suitable for propping up casing 500, and then improves the orthostatic of casing 500.
In the present embodiment, the cross sectional shape of described sleeve pipe 500 is ellipse, is quickly returned after bending in order to casing 500 Bullet when casing 500 is squeezed in chinampa motion process, bends, can be returned quickly compared with traditional semi-circular structure Bullet restores to original state, ensure that the orthostatic and elastic recovery of chinampa, and comfort is more preferable when use.
In the present embodiment, the bolster 300 includes: plate 310 and the support plate 320 around the plate 310;Its Described in plate 310 be suitable for compression support plate 320 and strut downwards to buffer vertical impact forces above buffer layer 200;Institute It states support plate 320 and favours the setting of plate 310, and the support plate 320 is suitable for inwardly collapsing compression on buffer layer 200 The oblique impact force of side.
In the present embodiment, any side of the buffer layer 200 offers slot 210, to be inserted into bolster 300.
Fig. 2 is the partial enlarged view schematic diagram of part A in Fig. 1;
As shown in Fig. 2, in the present embodiment, the opening of the slot 210 is provided with check device 400, to avoid bolster 300 skid off outward, and then ensure that the buffering effect of bolster 300;The check device 400 includes: to be hinged on slot 210 to open Baffle 410 at mouthful, and the torsional spring 420 being arranged between 210 inner wall of baffle 410 and slot, to drive the rebound gear of baffle 410 Firmly bolster 300 can exit bolster after inwardly pushing baffle 410 that baffle 410 is flushed with the bottom of bolster 300 300, and then convenient for removing replacement bolster 300.
A kind of optional embodiment as the base 100 is comprising: the first base cloth layer 110,120 and of the second base cloth layer Glue layer 130;Wherein first base cloth layer 110 is suitable for by the equidistant tufting grass silk 600 of row;First base cloth layer, 110 He Second base cloth layer 120 is bonded integral structure by glue layer 130.
In the present embodiment, the bottom end of second base cloth layer 120 is equipped with concrete layer 700, with smooth second base cloth layer 120, and then guarantee the whole planarization of base 100.
Embodiment 2
On the basis of embodiment 1, the present embodiment 2 provides a kind of application method of court chinampa, and the court is used Chinampa includes buffer layer 200, is internally provided with bolster 300 positioned at buffer layer 200;The bolster 300 is suitable for Buffer the oblique impact force above the vertical impact forces and/or buffer layer 200 above buffer layer 200;Further include: Casing 500, the inner wall of described sleeve pipe 500 are relatively set with clamping portion 510;Careless silk 600 is inserted into casing 500 and tufting in base After on 100, the clamping portion 510 is closed up to clamp careless silk 600 by arc clamping head 511.
In the present embodiment, the application method uses court chinampa as described above to realize and clamp careless silk simultaneously Cushions vertical impact forces and/or oblique impact force, and clamping portion 510 is closed up to clamp careless silk 600 by arc clamping head 511.
About the specific structure and working principle of court chinampa, the associated description of detailed in Example 1, herein not It repeats again.
In conclusion the court chinampa and its application method of the present embodiment, are especially suitable for football pitch and are laid with, i.e., it is logical 310 compression support plate 320 of plate is crossed to strut downwards to buffer the vertical impact forces above buffer layer 200, and then buffering ball Impact force when member falls down inwardly collapses the oblique impact force compressed with above buffer layer 200 by support plate 320, into And the impact force of ankle carries out protection in all directions, reduction ball to sportsman to protect sportsman's ankle part when buffering sportsman's sliding tackle Member is injured;And by strut clamping portion 510 outward so that careless silk 600 pass through casing 500 after tufting on buffer layer 200, pine Clamping portion 510 is opened, clamping portion 510 is driven by the rebound of scroll spring 540 mutually closes up to clamp careless silk 600, passes through clamping Try hard to avoid and exempt from careless silk 600 and be pulled out, improves the installation fastness of chinampa.
Taking the above-mentioned ideal embodiment according to the present invention as inspiration, through the above description, relevant staff is complete Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property range is not limited to the contents of the specification, it is necessary to which the technical scope thereof is determined according to the scope of the claim.

Claims (10)

1. a kind of court chinampa characterized by comprising
Base, the buffer layer being arranged in base, the casing of the bolster being arranged in buffer layer and setting on the buffer layer;Its In
The buffer layer has elastic force, and the buffer layer is suitable for grafting bolster;
The bolster is inwardly gathered to form a section as trapezoidal buffer cavity;
The inner wall of described sleeve pipe is relatively set with clamping portion;
Careless silk insertion casing and tufting on the buffer layer after, the clamping portion is closed up to clamp grass silk by arc clamping head.
2. court chinampa as described in claim 1, which is characterized in that
The rotation slot of described sleeve pipe offered inside and outside connection casing;
The clamping portion is rotationally connected in rotation slot by bolt;
The scroll spring for being suitable for that clamping portion is driven to close up is equipped between the clamping portion and bolt.
3. court chinampa as claimed in claim 2, which is characterized in that
The wedging position offers in the side of outside of sleeve and struts slot;
The slot that struts is suitable for that clamping portion is driven to strut outward so that careless silk passes through.
4. court chinampa as described in claim 1, which is characterized in that
The lateral wall of described sleeve pipe, which is located at, is provided with support column with the perpendicular direction in clamping portion;
The support column is suitable for propping up casing.
5. court chinampa as described in claim 1, which is characterized in that
The cross sectional shape of described sleeve pipe is ellipse, in order to quickly spring back after casing bending.
6. court chinampa as described in claim 1, which is characterized in that
The bolster includes: plate and the support plate around the plate;Wherein
The plate is suitable for compression support plate and struts downwards to buffer the vertical impact forces above buffer layer;
The support plate favours plate setting, and the support plate is suitable for inwardly collapsing compression with oblique above buffer layer To impact force.
7. court chinampa as described in claim 1, which is characterized in that
Any side of the buffer layer offers slot, to be inserted into bolster.
8. court chinampa as claimed in claim 7, which is characterized in that
The opening of the slot is provided with check device, skids off outward to avoid bolster;
The check device includes: the baffle for being hinged on slot opening, and
Torsional spring between baffle and slot inner wall is set, to drive baffle rebound to block bolster.
9. a kind of application method of court chinampa, which is characterized in that
The court chinampa includes: casing and buffer layer;Wherein
Bolster is internally provided with positioned at buffer layer;
The inner wall of described sleeve pipe is relatively set with clamping portion;
Careless silk insertion casing and tufting on the buffer layer after, the clamping portion is closed up to clamp grass silk by arc clamping head;
The bolster is suitable for buffering oblique above the vertical impact forces and/or buffer layer above buffer layer Impact force.
10. application method as claimed in claim 9, which is characterized in that
The application method is used such as the described in any item court chinampas of claim 1-9 to realize the careless silk of clamping and delay Rush vertical impact forces and/or oblique impact force.
CN201910258646.2A 2019-04-01 2019-04-01 Court chinampa and its application method Pending CN109826072A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910258646.2A CN109826072A (en) 2019-04-01 2019-04-01 Court chinampa and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910258646.2A CN109826072A (en) 2019-04-01 2019-04-01 Court chinampa and its application method

Publications (1)

Publication Number Publication Date
CN109826072A true CN109826072A (en) 2019-05-31

Family

ID=66873953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910258646.2A Pending CN109826072A (en) 2019-04-01 2019-04-01 Court chinampa and its application method

Country Status (1)

Country Link
CN (1) CN109826072A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013096102A (en) * 2011-10-31 2013-05-20 Sekisui Jushi Co Ltd Laying structure for artificial lawn and renewal method for artificial lawn
CN204985457U (en) * 2015-07-13 2016-01-20 常州光洋轴承股份有限公司 Novel wave spring
CN205516158U (en) * 2016-01-22 2016-08-31 江汉大学 Mat for sports
CN107587407A (en) * 2016-07-08 2018-01-16 江苏万源人造草坪有限公司 Chinampa with hollow structure
CN207699992U (en) * 2017-12-16 2018-08-07 深圳市创先实业有限公司 A kind of chinampa
CN207878218U (en) * 2018-01-18 2018-09-18 扬州绿宝人造草坪有限公司 A kind of chinampa convenient for splicing
CN108755361A (en) * 2018-07-26 2018-11-06 北京天仁科技发展有限公司 A kind of grass-trap pipe device and its planting machine based on mixed lawn planting machine
CN109024155A (en) * 2018-07-16 2018-12-18 广州庆合体育设施工程有限责任公司 A kind of artificial turf restorative procedure
CN208346583U (en) * 2018-01-20 2019-01-08 扬州市其乐纤维科技有限公司 A kind of chinampa that wear-resisting property is good
CN208346584U (en) * 2018-05-25 2019-01-08 北京华体创研工程设计咨询有限公司 Pedaline football pitch
CN208533313U (en) * 2018-05-26 2019-02-22 青岛海晶体育产业有限公司 Chinampa resilient cushion
CN209975306U (en) * 2019-04-01 2020-01-21 江苏亿之博实业有限公司 Artificial lawn for court

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013096102A (en) * 2011-10-31 2013-05-20 Sekisui Jushi Co Ltd Laying structure for artificial lawn and renewal method for artificial lawn
CN204985457U (en) * 2015-07-13 2016-01-20 常州光洋轴承股份有限公司 Novel wave spring
CN205516158U (en) * 2016-01-22 2016-08-31 江汉大学 Mat for sports
CN107587407A (en) * 2016-07-08 2018-01-16 江苏万源人造草坪有限公司 Chinampa with hollow structure
CN207699992U (en) * 2017-12-16 2018-08-07 深圳市创先实业有限公司 A kind of chinampa
CN207878218U (en) * 2018-01-18 2018-09-18 扬州绿宝人造草坪有限公司 A kind of chinampa convenient for splicing
CN208346583U (en) * 2018-01-20 2019-01-08 扬州市其乐纤维科技有限公司 A kind of chinampa that wear-resisting property is good
CN208346584U (en) * 2018-05-25 2019-01-08 北京华体创研工程设计咨询有限公司 Pedaline football pitch
CN208533313U (en) * 2018-05-26 2019-02-22 青岛海晶体育产业有限公司 Chinampa resilient cushion
CN109024155A (en) * 2018-07-16 2018-12-18 广州庆合体育设施工程有限责任公司 A kind of artificial turf restorative procedure
CN108755361A (en) * 2018-07-26 2018-11-06 北京天仁科技发展有限公司 A kind of grass-trap pipe device and its planting machine based on mixed lawn planting machine
CN209975306U (en) * 2019-04-01 2020-01-21 江苏亿之博实业有限公司 Artificial lawn for court

Similar Documents

Publication Publication Date Title
US7081069B2 (en) Jogging machine having a platform folding structure
CN208919502U (en) A kind of steel pipe connection joint being easily installed
CN208209135U (en) Power supply adaptor
CN109826072A (en) Court chinampa and its application method
CN109759993B (en) A kind of nailing gun that interior decoration uses
CN109588158B (en) Inserting rod ware is planted to beans
CN105480356B (en) A kind of anti-jamming folding device
CN208715767U (en) A kind of camera doubly telecentric lens packing box damping device
CN207568532U (en) Trouble of lost tool in hole fishing device
CN216840485U (en) Folding ladder that shock resistance is strong
CN2303079Y (en) Anchoring means for oil pipe
JP3183561U (en) Elastic folding structure of automatic folding umbrella
CN105951935B (en) A kind of drawing device with auto-lock function
CN207220353U (en) A kind of opposite direction umbrella of adjustable handle of umbrella length
CN104353233A (en) Portable golf ball picking device
CN209975306U (en) Artificial lawn for court
KR101868080B1 (en) umbrella with cane
CN207190849U (en) A kind of anti-retraction structure of extending type
CN208669790U (en) A kind of stealthy diamond shape iron nail of fastening
CN101953555B (en) Damping device for automatic folding-unfolding umbrella with bracing wire structure
CN206956725U (en) A kind of improved floral tube hammer
CN104296476B (en) Refrigerator doors opening device and the refrigerator including it
CN205917739U (en) Well ware is driven in combination
CN107669383A (en) A kind of medical uprisal-assist of leg disease patient
CN208363074U (en) A kind of ramming machine with damping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190531