CN109815342A - A kind of plan automatic generation method and intelligent terminal - Google Patents

A kind of plan automatic generation method and intelligent terminal Download PDF

Info

Publication number
CN109815342A
CN109815342A CN201910078747.1A CN201910078747A CN109815342A CN 109815342 A CN109815342 A CN 109815342A CN 201910078747 A CN201910078747 A CN 201910078747A CN 109815342 A CN109815342 A CN 109815342A
Authority
CN
China
Prior art keywords
plan
task
subordinate
topics
hierarchical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910078747.1A
Other languages
Chinese (zh)
Inventor
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Chuangshi Deyi Information Technology Co Ltd
Original Assignee
Nanjing Chuangshi Deyi Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Chuangshi Deyi Information Technology Co Ltd filed Critical Nanjing Chuangshi Deyi Information Technology Co Ltd
Priority to CN201910078747.1A priority Critical patent/CN109815342A/en
Publication of CN109815342A publication Critical patent/CN109815342A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of plan automatic generation method and intelligent terminal, method includes: detecting whether the addition instruction triggers of mind map;When detection there are the addition instruction triggers of the mind map, addition mind map is instructed according to the addition;The mind map includes N number of hierarchical topics;The N is positive integer;The mind map is generated into schedule view according to each hierarchical topics are corresponding, and the schedule view is shown.The mind map about plan that user adds can be automatically generated the efficiency for helping to improve user's completion plan for schedule view by the present invention.

Description

A kind of plan automatic generation method and intelligent terminal
Technical field
The present invention relates to planning management field, espespecially a kind of plan automatic generation method and intelligent terminal.
Background technique
Mind map, also known as mind map are a kind of tools of image-type thinking and a kind of think deeply backman using image-type Have to express the tool of thinking.It is using a central keyword or idea with radiate all representative words of linear connection, The graphic mode of idea, task or other associated items.As a kind of tool for being memonic or arranging complicated idea, thinking is led Figure is applied in many of individual, family, education and business environment, can be summarized as the following: being established frame, classification, is swashed Hair intention assisted learning, organizational information, is solved the problems, such as, is made a policy, establishes knowledge hierarchy, carries out career planing, team Brainstorming and interactive demonstration etc..It is either personal to formulate task list, work planning especially at aspect of making a plan, also It is enterprise's combing project planning, dismantling target, can preferably analyzes the endogenous development of event, a step by mind map Part planning is acted in one stepping.
User is when completing a target, it will usually form a preliminary idea in brain, form a preliminary think of Dimension lead figure, plan what each step should do, but these ideas how to land, how implementation and supervision progress and effect? with Family is usually required with other team collaboration or personal management software foundation plan, and idea one one after combing is included in In the works.This just considerably increases the planned costs and operating cost of user.
Based on this, the present invention provides a kind of plan automatic generation method and intelligent terminals.
Summary of the invention
The object of the present invention is to provide a kind of plan automatic generation method and intelligent terminal, the present invention can be added user The mind map about plan automatically generate the efficiency for helping to improve user's completion plan for schedule view.
Technical solution provided by the invention is as follows:
The present invention provides a kind of plan automatic generation methods, comprising steps of detecting whether that the addition of mind map refers to Enable triggering;When detection there are the addition instruction triggers of the mind map, addition mind map is instructed according to the addition;It is described Mind map includes N number of hierarchical topics;The N is positive integer;The mind map is generated according to each hierarchical topics are corresponding Schedule view, and the schedule view is shown.
In one embodiment, the addition instruction includes content addition instruction, insertion theme instruction at the same level, intron master Topic instruction;Described instructs addition mind map according to the addition, specifically includes: being added and instructed according to content, adds X layer The subject content of grade theme;According to theme instruction at the same level is inserted into, the theme at the same level of Y level is added;Referred to according to insertion sub-topics It enables, adds next hierarchical topics of Z level;Described X, Y, Z are the positive integer less than or equal to the N.
In one embodiment, the schedule view includes a plan;It is described by the mind map according to each layer Grade theme is corresponding to generate schedule view, specifically includes: by the corresponding plan generated in the schedule view of the first hierarchical topics.
In one embodiment, the schedule view includes a plan, and the plan includes at least one sub- plan, described Son plan includes at least a task items, and the task items include at least one task, and the task includes that at least one son is appointed Business.
In one embodiment, described that the mind map is corresponding according to each hierarchical topics as the N=1 Schedule view is generated, is specifically included: by the corresponding plan generated in the schedule view of the first hierarchical topics.
In one embodiment, described that the mind map is corresponding according to each hierarchical topics as the N=2 Schedule view is generated, is specifically included: by the corresponding plan generated in the schedule view of the first hierarchical topics;By the first layer Corresponding the generating the task items subordinate of the task of the second hierarchical topics of grade theme subordinate.
In one embodiment, described that the mind map is corresponding according to each hierarchical topics as the N=3 Schedule view is generated, is specifically included: by the corresponding plan generated in the schedule view of the first hierarchical topics;By the first layer The corresponding task items for generating the sub- plan subordinate of the second hierarchical topics of grade theme subordinate;By the second hierarchical topics subordinate Corresponding the generating the task items subordinate of the task of third hierarchical topics.
In one embodiment, described that the mind map is corresponding according to each hierarchical topics as the N=4 Schedule view is generated, is specifically included: by the corresponding plan generated in the schedule view of the first hierarchical topics;By the first layer The corresponding son plan for generating the plan subordinate of the second hierarchical topics of grade theme subordinate;By the second hierarchical topics subordinate's The corresponding task items for generating the sub- plan subordinate of third hierarchical topics;By the 4th level master of the third hierarchical topics subordinate Corresponding the generating the task items subordinate of the task of topic.
In one embodiment, described that the mind map is corresponding according to each hierarchical topics as the N=5 Schedule view is generated, specifically further include: by the corresponding plan generated in the schedule view of the first hierarchical topics;By described first The corresponding son plan for generating the plan subordinate of the second hierarchical topics of hierarchical topics subordinate;By the second hierarchical topics subordinate The corresponding task items for generating the sub- plan subordinate of third hierarchical topics;By the 4th level of the third hierarchical topics subordinate Corresponding the generating the task items subordinate of the task of theme;By the corresponding generation of the layer 5 grade theme of the 4th hierarchical topics subordinate The subtask of the task subordinate.
In one embodiment, described to be shown the schedule view, it specifically includes: the first of display interface Default column shows the plan, and/or shows the subordinate of the plan extremely in the second default column of the display interface A few son is planned, and/or shows the sub- plan subordinate at least one in the second default column in the display interface Task items, and/or at least one task of the task items subordinate is shown in the second default column in the display interface, And/or at least one subtask of the task subordinate is shown in the second default column in the display interface.
In one embodiment, this method further include: it receives to a son plan and/or a task items and/or a task, And/or one subtask attribute setting, by the subtask and/or the task items and/or the task and/or described Classify according to significance level and urgency level subtask;According to the subtask and/or the task items and/or institute The classification for stating task and/or the subtask, by the subtask and/or the task items and/or the task, and/or The subtask is shown in four-quadrant task view.
In one embodiment, the reception is to a son plan and/or a task items and/or a task and/or one The attribute of subtask is arranged, and the subtask and/or the task items and/or the task and/or the subtask are pressed Classify according to significance level and urgency level, specifically include: receiving to a son plan and/or a task items and/or one The setting of the attribute of task and/or a subtask, the task is classified as according to significance level and urgency level important and tight The one type of anxious, important but not urgent, urgent but inessential, inessential not urgent four seed type;The four-quadrant task view Figure includes: important and urgent, important but not urgent, urgent but inessential, inessential not urgent four quadrant areas;Described presses According to the classification of the subtask and/or the task items and/or the task and/or the subtask, the son is appointed Business and/or the task items and/or the task and/or the subtask are shown have in four-quadrant task view Body includes: the classification according to the subtask and/or the task items and/or the task and/or the subtask, will The subtask and/or the task items and/or the task and/or the subtask four-quadrant task view its In a quadrant area shown.
In one embodiment, the invention also includes one son plan of setting and/or a task items and/or a task, And/or one at the beginning of subtask and the deadline;In conjunction with current time, to the sub- plan and/or the task items, And/or the task and/or the subtask carry out time prompting.
In one embodiment, the invention also includes: when having detected report generation instruction, according to each sub- plan, And/or each task items and/or each task and/or the performance and each sub- plan of each subtask, and/or it is every The deadline of one task items and/or each task and/or each subtask generates debriefing.
In one embodiment, the debriefing includes that working portion, expired unfinished work part, task is completed Plan part, problematic portion, measure part;It is described according to each sub- plan and/or each task items and/or each The performance and each sub- plan and/or each task items of business and/or each subtask and/or each task, and/ Or the deadline of each subtask, generate debriefing, specifically include: when having detected report generation instruction, traversal is every One son plan and/or each task items and/or each task and/or the performance of each subtask, by completed son Working portion is completed to described in the editor of plan and/or task items and/or task and/or subtask, does not complete expired Son plan and/or task items and/or task and/or subtask edit to expired unfinished work part;By it is not out of date not Part editor is completed to task scheduling part;The problem of receiving user's input content and measure content, and will be in described problem Hold editor to described problem part, by the measure Edition Contains to the measure part.
The present invention also provides a kind of intelligent terminal, intelligent terminal includes storage medium and processor, and the storage is situated between Computer program is stored in matter, when the processor executes the computer program, executes a kind of plan described above Automatic generation method.
A kind of plan automatic generation method and intelligent terminal provided through the invention, can bring following at least one to have Beneficial effect:
Through the invention, user can add mind map on intelligent terminal, and mind map is then automatically generated meter View is drawn, is intended to be finely divided, allowing user to entire plan, control, help user clear plan thinking, improve plan Formulation and formation efficiency.
Detailed description of the invention
Below by clearly understandable mode, preferred embodiment is described with reference to the drawings, to a kind of plan side of automatically generating Above-mentioned characteristic, technical characteristic, advantage and its implementation of method and intelligent terminal are further described.
Fig. 1 is a kind of flow chart of the one embodiment for planning automatic generation method of the present invention;
Fig. 2 is a kind of schematic diagram of mind map in one embodiment of the invention;
Fig. 3 is another schematic diagram of mind map in one embodiment of the invention;
Fig. 4 is another schematic diagram of mind map in one embodiment of the invention;
Fig. 5 is a kind of schematic diagram of schedule view in one embodiment of the invention;
Fig. 6 is a kind of flow chart for another embodiment for planning automatic generation method of the present invention;
Fig. 7 is the four-quadrant task view in one embodiment of the invention;
Fig. 8 is the schematic diagram of the debriefing in one embodiment of the invention;
Fig. 9 is a kind of structural schematic diagram of one embodiment of intelligent terminal of the present invention.
Specific embodiment
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, Detailed description of the invention will be compareed below A specific embodiment of the invention.It should be evident that drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, and obtain other embodiments.
To make simplified form, part related to the present invention is only schematically shown in each figure, they are not represented Its practical structures as product.In addition, there is identical structure or function in some figures so that simplified form is easy to understand Component only symbolically depicts one of those, or has only marked one of those.Herein, "one" is not only indicated " only this ", can also indicate the situation of " more than one ".
The present invention provides a kind of one embodiment for planning automatic generation method, and the present embodiment can be by with operation The intelligent terminal of processing capacity realizes, such as smart phone, tablet computer, laptop, desktop computer, wearable sets Standby, vehicle intelligent equipment etc., as shown in Figure 1, this method comprises:
S101 detects whether the addition instruction triggers of mind map;
In the present embodiment, mind map addition window can be set on the display screen of intelligent terminal, user can pass through Mind map adds window and adds mind map.When user operates, it is corresponding with operation that intelligent terminal can trigger generation Addition instruction.
S102 instructs addition thinking to lead when detection has the addition instruction triggers of the mind map, according to the addition Figure;The mind map includes N number of hierarchical topics;The N is positive integer;
Intelligent terminal can generate corresponding mind map according to addition instruction.Preferably, the addition instruction includes content Peer's theme instruction, insertion sub-topics instruction are inserted into addition instruction;Described instructs addition mind map according to the addition, It specifically includes: being added and instructed according to content, add the subject content of X hierarchical topics;According to theme instruction at the same level is inserted into, add The theme at the same level of Y level;According to insertion sub-topics instruction, next hierarchical topics of Z level are added;Described X, Y, Z are small In or equal to the N positive integer.
As shown in Fig. 2, a central theme is had in mind map first, user can by touch-control central theme frame, or Person clicks central theme using mouse, selects corresponding option to trigger corresponding addition instruction.Such as double-click central theme can To trigger content addition instruction, user can add corresponding content, such as " Annual sales plan ".Click can for example be passed through again Right mouse button shows suspension windows as shown in Figure 3, is inserted into theme at the same level by selection " being inserted into theme at the same level " to trigger Instruction triggers insertion sub-topics instruction by selection " insertion sub-topics ".After selection insertion sub-topics, center master can be generated The sub-topics of subordinate are inscribed, the content addition instruction of sub-topics can be triggered by double-clicking sub-topics, adds the correlation of sub-topics Content.After theme at the same level is inserted into selection, theme at the same level therewith can be generated, likewise, can touch by double-clicking theme at the same level The content for sending out theme at the same level adds instruction.
For example, triggering content addition instruction in center can be double-clicked, central theme is revised as " Annual sales plan ", then It adds a sub-topics " first quarter marketing plan " of " Annual sales plan ", subsequently add " first quarter marketing plan " The other three peer theme: " second quarter marketing plan ", " third season marketing plan ", " fourth quarter marketing plan ". If user feels the not fine enough of mind map, it can still be improved and be thought by way of adding peer's theme, addition sub-topics Dimension leads figure.As shown in figure 4, can finally form the mind map of a tree structure.In practical application, user can will need to complete Thing recorded by way of this mind map, clear the thinking entirely planned, the efficiency that the plan of raising is completed.
S103 is when detecting planned view generation instruction triggers, by the mind map according to each hierarchical topics pair Schedule view should be generated, and the schedule view is shown.
Specifically, can be by the corresponding generation schedule view of each hierarchical topics of mind map.Preferably, schedule view can wrap Include plan, the plan may include at least one sub- plan, the sub- plan may include at least one task items, the task items It may include at least one task, the task may include at least one subtask.
Described generates schedule view according to each hierarchical topics are corresponding for the mind map, specifically includes:
If user is only provided with the theme, i.e. N=1 of a level, then only by the corresponding generation meter of the first hierarchical topics Draw the plan in view.
If when the user setting theme, i.e. N=2 of two rank, then generating the plan view for the first hierarchical topics are corresponding Plan in figure;The second hierarchical topics of the first hierarchical topics subordinate are corresponded to the generating the task items subordinate of the task, The content of the task items of son plan and son plan subordinate is defaulted as the content of the plan, and subtask is defaulted as sky.
If when the user setting theme, i.e. N=3 of three levels, then generating the plan view for the first hierarchical topics are corresponding Plan in figure;By corresponding the generating the sub- plan subordinate of the task of the second hierarchical topics of the first hierarchical topics subordinate ?;The third hierarchical topics of the second hierarchical topics subordinate are corresponded to the generating the task items subordinate of the task, sub- plan Content is defaulted as the content of the plan, and subtask is defaulted as sky.
If the user setting theme of four levels, by the corresponding meter generated in the schedule view of the first hierarchical topics It draws;By the corresponding son plan for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate;By described The corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of two hierarchical topics subordinaties;By the third hierarchical topics Corresponding the generating the task items subordinate of the task of the 4th hierarchical topics of subordinate, subtask is defaulted as sky.
If when the user setting theme, i.e. N=5 of five levels, then generating the plan view for the first hierarchical topics are corresponding Plan in figure;By the corresponding son plan for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate; By the corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of the second hierarchical topics subordinate;By the third Corresponding the generating the task items subordinate of the task of the 4th hierarchical topics of hierarchical topics subordinate;By the 4th hierarchical topics subordinate The corresponding subtask for generating the task subordinate of layer 5 grade theme.
If themes more than six levels of user setting, the theme correspondence of first five level is only generated to schedule view In, more than layer 6 it will be retained in mind map, is generated to schedule view without correspondence.
In another embodiment, described that the mind map is generated into plan view according to each hierarchical topics are corresponding Figure, specifically includes: by the corresponding plan generated in the schedule view of the first hierarchical topics;Or it will be under first hierarchical topics The corresponding son plan for generating the plan subordinate of the second hierarchical topics belonged to;Or by the third layer of the second hierarchical topics subordinate The corresponding task items for generating the sub- plan subordinate of grade theme;Or by the 4th hierarchical topics pair of the third hierarchical topics subordinate The task of the task items subordinate should be generated;Or it will be described in the corresponding generation of the layer 5 grade theme of the 4th hierarchical topics subordinate The subtask of task subordinate.If user is only provided with the theme of a level, only by the corresponding generation meter of the first hierarchical topics Draw the plan in view.If the user setting theme of two rank, the schedule view is generated by the first hierarchical topics are corresponding In plan, the corresponding son for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate is planned.If The user setting theme of three levels, then by the corresponding plan generated in the schedule view of the first hierarchical topics, by described the The corresponding son plan for generating the plan subordinate of the second hierarchical topics of one hierarchical topics subordinate, will be under second hierarchical topics The corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of category.It, will if the user setting theme of four levels The corresponding plan generated in the schedule view of first hierarchical topics, by the second hierarchical topics of the first hierarchical topics subordinate The son plan of the corresponding generation plan subordinate, will be described in the corresponding generation of the third hierarchical topics of the second hierarchical topics subordinate The task items of son plan subordinate, by the corresponding generation task items subordinate of the 4th hierarchical topics of the third hierarchical topics subordinate Task.If the user setting theme of five levels, by the corresponding plan generated in the schedule view of the first hierarchical topics, By the corresponding son plan for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate, by the second layer The corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of grade theme subordinate, by the third hierarchical topics subordinate Corresponding the generating the task items subordinate of the task of the 4th hierarchical topics, by the layer 5 grade master of the 4th hierarchical topics subordinate The corresponding subtask for generating the task subordinate of topic.If themes more than six levels of user setting, only by first five level Theme correspondence is generated in schedule view, more than layer 6 will be retained in mind map, is generated to schedule view without correspondence.
As shown in figure 5, the corresponding schedule view of mind map can be formed.By means of the invention it is possible to quickly by the meter of user It draws idea and is converted to a kind of intuitive schedule view, user is facilitated to clear plan according to schedule view, improve the completion effect of plan Rate.
The present invention provides a kind of one embodiment for planning automatic generation method, and the present embodiment can be by with operation The intelligent terminal of processing capacity realizes, such as smart phone, tablet computer, laptop, desktop computer, wearable sets Standby, vehicle intelligent equipment etc., as shown in fig. 6, this method comprises:
S201 detects whether the addition instruction triggers of mind map;
In the present embodiment, mind map addition window can be set on the display screen of intelligent terminal, user can pass through Mind map adds window and adds mind map.When user operates, it is corresponding with operation that intelligent terminal can trigger generation Addition instruction.
S202 is added according to content and is instructed when detection has the addition instruction triggers of the mind map, adds X level The subject content of theme;According to theme instruction at the same level is inserted into, the theme at the same level of Y level is added;It is instructed according to insertion sub-topics, Add next hierarchical topics of Z level;The mind map includes N number of hierarchical topics;The N is positive integer;Described X, Y, Z For the positive integer less than or equal to the N.
Intelligent terminal can generate corresponding mind map according to addition instruction.Preferably, the addition instruction includes content Peer's theme instruction, insertion sub-topics instruction are inserted into addition instruction;Described instructs addition mind map according to the addition, It specifically includes: being added and instructed according to content, add the subject content of X hierarchical topics;According to theme instruction at the same level is inserted into, add The theme at the same level of Y level;According to insertion sub-topics instruction, next hierarchical topics of Z level are added;Described X, Y, Z are small In or equal to the N positive integer.
As shown in Fig. 2, a central theme is had in mind map first, user can by touch-control central theme frame, or Person clicks central theme using mouse, selects corresponding option to trigger corresponding addition instruction.Such as double-click central theme can To trigger content addition instruction, user can add corresponding content, such as " Annual sales plan ".Click can for example be passed through again Right mouse button shows suspension windows as shown in Figure 3, is inserted into theme at the same level by selection " being inserted into theme at the same level " to trigger Instruction triggers insertion sub-topics instruction by selection " insertion sub-topics ".After selection insertion sub-topics, center master can be generated The sub-topics of subordinate are inscribed, the content addition instruction of sub-topics can be triggered by double-clicking sub-topics, adds the correlation of sub-topics Content.After theme at the same level is inserted into selection, theme at the same level therewith can be generated, likewise, can touch by double-clicking theme at the same level The content for sending out theme at the same level adds instruction.
For example, triggering content addition instruction in center can be double-clicked, central theme is revised as " Annual sales plan ", then It adds a sub-topics " first quarter marketing plan " of " Annual sales plan ", subsequently add " first quarter marketing plan " The other three peer theme: " second quarter marketing plan ", " third season marketing plan ", " fourth quarter marketing plan ". If user feels the not fine enough of mind map, it can still be improved and be thought by way of adding peer's theme, addition sub-topics Dimension leads figure.As shown in figure 4, can finally form the mind map of a tree structure.In practical application, user can will need to complete Thing recorded by way of this mind map, clear the thinking entirely planned, the efficiency that the plan of raising is completed.
First hierarchical topics are corresponded to the plan generated in the schedule view by S203;By the first hierarchical topics subordinate The corresponding son plan for generating the plan subordinate of the second hierarchical topics;By the third level master of the second hierarchical topics subordinate The corresponding task items for generating the sub- plan subordinate of topic;By the corresponding generation of the 4th hierarchical topics of the third hierarchical topics subordinate The task of the task items subordinate;By the corresponding generation task subordinate of the layer 5 grade theme of the 4th hierarchical topics subordinate Subtask.
S204 shows the plan in the first default column of display interface, in the second default column of the display interface Show at least one sub- plan of the subordinate of the plan and at least one task items of the sub- plan subordinate, described At least one task of item subordinate of being engaged in and at least one subtask of the task subordinate.
As shown in figure 5, the corresponding schedule view of mind map can be formed.By means of the invention it is possible to quickly by the meter of user It draws idea and is converted to a kind of intuitive schedule view, user is facilitated to clear plan according to schedule view, improve the completion effect of plan Rate.
This method further include: receive to a son plan and/or a task items and/or a task and/or a subtask Attribute setting, by the subtask and/or the task items and/or the task and/or the subtask according to important journey Degree and urgency level are classified;
It, will according to the classification of the subtask and/or the task items and/or the task and/or the subtask The subtask and/or the task items and/or the task and/or the subtask in four-quadrant task view into Row display.
Preferably, the present embodiment can receive to a son plan and/or a task items and/or a task and/or a son The attribute of task is arranged, and the task is classified as according to significance level and urgency level important and urgent, important but not tight The one type of anxious, urgent but inessential, inessential not urgent four seed type;The four-quadrant task view include: it is important and Promptly, important but not urgent, urgent but inessential, inessential not urgent four quadrant areas;According to the subtask, and/or The classification of the task items and/or the task and/or the subtask, by the subtask and/or the task items, And/or the task and/or the subtask are shown in one of quadrant area of four-quadrant task view.
Such as in Fig. 5, it is important but not urgent the attribute for selling population analysis this task items can be set to, sale is needed The attribute for analyzing this task items is asked to be set as urgent but inessential, then as shown in fig. 7, in four-quadrant task view, i.e., It can show its corresponding attribute.
Preferably, the invention also includes one son plans of setting and/or a task items and/or a task and/or a son to appoint At the beginning of business and the deadline;In conjunction with current time, to the sub- plan and/or the task items and/or described Business and/or the subtask carry out time prompting.
It completes at the beginning of this task of the sale population analysis of public institution to be in December, 2018 for example, can be set 29, the deadline was on January 3rd, 2019.In combination with current time, this task is prompted.Such as son plan, task Similarly time started and deadline can be set in item, subtask etc., and can carry out time alarm to it.In this manner, User can be helped to remember the time schedule of each task, efficiently complete to plan convenient for user, while being also prevented from user's forgetting Task scheduling.
Preferably, the invention also includes:
When having detected report generation instruction, according to each sub- plan and/or each task items and/or each The performance and each sub- plan and/or each task items of business and/or each subtask and/or each task, and/ Or the deadline of each subtask, generate debriefing.
Due to each sub- plan, each task items, each task, each subtask all it is settable it is corresponding at the beginning of and Deadline knows which sub- plan, task items times, the performance of subtask in combination with current time.When user needs When generating debriefing, relevant operation can be carried out on intelligent terminal, and intelligent terminal is made to generate corresponding report generation instruction, it is raw At debriefing.The debriefing can be divided into daily paper, weekly, monthly magazine etc. according to the time cycle, also can be according to the demand of user The self defined time period, such as two days, ten days etc..
Specifically, the debriefing includes that working portion, expired unfinished work part, task scheduling portion is completed Divide, problematic portion, measure part;
It is described according to each sub- plan and/or each task items and/or each task and/or each subtask When performance and each sub- plan and/or the completion of each task items and/or each task and/or each subtask Between, debriefing is generated, is specifically included:
When having detected report generation instruction, each sub- plan and/or each task items and/or each are traversed The performance of business and/or each subtask appoints completed sub- plan and/or task items and/or task, and/or son Working portion is completed to described in the editor of business, by expired unfinished son plan and/or task items and/or task, and/or It edits to expired unfinished work part subtask;By not out of date unfinished portion editor to task scheduling part;
The problem of receiving user's input content and measure content, and by described problem Edition Contains to described problem portion Point, by the measure Edition Contains to the measure part.
In the present embodiment, debriefing can be divided into fixed several modules, as shown in figure 8, by taking daily work report as an example, it can It is divided into and working portion, expired unfinished work part, task scheduling part, problematic portion, measure part is completed.Appoint generating When business report, there may be some tasks to complete, there are some tasks to have not been completed, the task dividable that do not complete is expired It does not complete and not out of date unfinished.Such as the task completion date (TCD) of setting is on December 1st, 2018, but the same day is 2018 11 The moon 30, then it represents that this task is not out of date do not complete;Such as the task completion date (TCD) of setting is on December 1st, 2018, still The same day is on December 2nd, 2018, then it represents that this task is expired do not complete.
The present invention also provides a kind of one embodiment of intelligent terminal, as shown in figure 9, being one kind of the embodiment of the present invention The structural schematic diagram of intelligent terminal, intelligent terminal include: storage device and processor;The intelligent terminal can be intelligent hand Machine, the tablet computer with call function or the wearable device with call function.These equipment can be carried out by charging interface Charging, and voice is acquired by microphone, realize call function.
The processor can be central processing unit (central processing unit, CPU).The processor is also It may further include hardware chip.Above-mentioned hardware chip can be specific integrated circuit (application-specific Integrated circuit, ASIC), programmable logic device (programmable logic device, PLD) etc..It is above-mentioned PLD can be field programmable gate array (field-programmable gate array, FPGA), and general array is patrolled Collect (generic array logic, GAL) etc..
The storage device 5 may include volatile memory (volatile memory), such as random access memory (random-access memory, RAM);Storage device 5 also may include nonvolatile memory (non-volatile Memory), such as flash memory (flash memory), solid state hard disk (solid-state drive, SSD) etc.;Storage dress Setting can also be including the combination of the memory of mentioned kind.
In one embodiment, program instruction is stored in the storage device, the processor calls described program to refer to It enables, performs the steps of
S101 detects whether the addition instruction triggers of mind map;
In the present embodiment, mind map addition window can be set on the display screen of intelligent terminal, user can pass through Mind map adds window and adds mind map.When user operates, it is corresponding with operation that intelligent terminal can trigger generation Addition instruction.
S102 instructs addition thinking to lead when detection has the addition instruction triggers of the mind map, according to the addition Figure;The mind map includes N number of hierarchical topics;The N is positive integer;
Intelligent terminal can generate corresponding mind map according to addition instruction.Preferably, the addition instruction includes content Peer's theme instruction, insertion sub-topics instruction are inserted into addition instruction;Described instructs addition mind map according to the addition, It specifically includes: being added and instructed according to content, add the subject content of X hierarchical topics;According to theme instruction at the same level is inserted into, add The theme at the same level of Y level;According to insertion sub-topics instruction, next hierarchical topics of Z level are added;Described X, Y, Z are small In or equal to the N positive integer.
As shown in Fig. 2, a central theme is had in mind map first, user can by touch-control central theme frame, or Person clicks central theme using mouse, selects corresponding option to trigger corresponding addition instruction.Such as double-click central theme can To trigger content addition instruction, user can add corresponding content, such as " Annual sales plan ".Click can for example be passed through again Right mouse button shows suspension windows as shown in Figure 3, is inserted into theme at the same level by selection " being inserted into theme at the same level " to trigger Instruction triggers insertion sub-topics instruction by selection " insertion sub-topics ".After selection insertion sub-topics, center master can be generated The sub-topics of subordinate are inscribed, the content addition instruction of sub-topics can be triggered by double-clicking sub-topics, adds the correlation of sub-topics Content.After theme at the same level is inserted into selection, theme at the same level therewith can be generated, likewise, can touch by double-clicking theme at the same level The content for sending out theme at the same level adds instruction.
For example, triggering content addition instruction in center can be double-clicked, central theme is revised as " Annual sales plan ", then It adds a sub-topics " first quarter marketing plan " of " Annual sales plan ", subsequently add " first quarter marketing plan " The other three peer theme: " second quarter marketing plan ", " third season marketing plan ", " fourth quarter marketing plan ". If user feels the not fine enough of mind map, it can still be improved and be thought by way of adding peer's theme, addition sub-topics Dimension leads figure.As shown in figure 4, can finally form the mind map of a tree structure.In practical application, user can will need to complete Thing recorded by way of this mind map, clear the thinking entirely planned, the efficiency that the plan of raising is completed.
The mind map is generated schedule view according to each hierarchical topics are corresponding by S103, and by the schedule view into Row is shown.
Specifically, can be by the corresponding generation schedule view of each hierarchical topics of mind map.Preferably, schedule view includes Plan, the plan include at least one task items including at least one sub- plan, the sub- plan, and the task items include extremely A few task, the task includes at least one subtask.
If user is only provided with the theme, i.e. N=1 of a level, then only by the corresponding generation meter of the first hierarchical topics Draw the plan in view.
If when the user setting theme, i.e. N=2 of two rank, then generating the plan view for the first hierarchical topics are corresponding Plan in figure;The second hierarchical topics of the first hierarchical topics subordinate are corresponded to the generating the task items subordinate of the task, The content of the task items of son plan and son plan subordinate is defaulted as the content of the plan, and subtask is defaulted as sky.
If when the user setting theme, i.e. N=3 of three levels, then generating the plan view for the first hierarchical topics are corresponding Plan in figure;By corresponding the generating the sub- plan subordinate of the task of the second hierarchical topics of the first hierarchical topics subordinate ?;The third hierarchical topics of the second hierarchical topics subordinate are corresponded to the generating the task items subordinate of the task, sub- plan Content is defaulted as the content of the plan, and subtask is defaulted as sky.
If the user setting theme of four levels, by the corresponding meter generated in the schedule view of the first hierarchical topics It draws;By the corresponding son plan for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate;By described The corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of two hierarchical topics subordinaties;By the third hierarchical topics Corresponding the generating the task items subordinate of the task of the 4th hierarchical topics of subordinate, subtask is defaulted as sky.
If when the user setting theme, i.e. N=5 of five levels, then generating the plan view for the first hierarchical topics are corresponding Plan in figure;By the corresponding son plan for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate; By the corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of the second hierarchical topics subordinate;By the third Corresponding the generating the task items subordinate of the task of the 4th hierarchical topics of hierarchical topics subordinate;By the 4th hierarchical topics subordinate The corresponding subtask for generating the task subordinate of layer 5 grade theme.
If themes more than six levels of user setting, the theme correspondence of first five level is only generated to schedule view In, more than layer 6 it will be retained in mind map, is generated to schedule view without correspondence.
In another embodiment, described that the mind map is generated into plan view according to each hierarchical topics are corresponding Figure, specifically includes: by the corresponding plan generated in the schedule view of the first hierarchical topics;Or it will be under first hierarchical topics The corresponding son plan for generating the plan subordinate of the second hierarchical topics belonged to;Or by the third layer of the second hierarchical topics subordinate The corresponding task items for generating the sub- plan subordinate of grade theme;Or by the 4th hierarchical topics pair of the third hierarchical topics subordinate The task of the task items subordinate should be generated;Or it will be described in the corresponding generation of the layer 5 grade theme of the 4th hierarchical topics subordinate The subtask of task subordinate.If user is only provided with the theme of a level, only by the corresponding generation meter of the first hierarchical topics Draw the plan in view.If the user setting theme of two rank, the schedule view is generated by the first hierarchical topics are corresponding In plan, the corresponding son for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate is planned.If The user setting theme of three levels, then by the corresponding plan generated in the schedule view of the first hierarchical topics, by described the The corresponding son plan for generating the plan subordinate of the second hierarchical topics of one hierarchical topics subordinate, will be under second hierarchical topics The corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of category.It, will if the user setting theme of four levels The corresponding plan generated in the schedule view of first hierarchical topics, by the second hierarchical topics of the first hierarchical topics subordinate The son plan of the corresponding generation plan subordinate, will be described in the corresponding generation of the third hierarchical topics of the second hierarchical topics subordinate The task items of son plan subordinate, by the corresponding generation task items subordinate of the 4th hierarchical topics of the third hierarchical topics subordinate Task.If the user setting theme of five levels, by the corresponding plan generated in the schedule view of the first hierarchical topics, By the corresponding son plan for generating the plan subordinate of the second hierarchical topics of the first hierarchical topics subordinate, by the second layer The corresponding task items for generating the sub- plan subordinate of the third hierarchical topics of grade theme subordinate, by the third hierarchical topics subordinate Corresponding the generating the task items subordinate of the task of the 4th hierarchical topics, by the layer 5 grade master of the 4th hierarchical topics subordinate The corresponding subtask for generating the task subordinate of topic.If themes more than six levels of user setting, only by first five level Theme correspondence is generated in schedule view, more than layer 6 will be retained in mind map, is generated to schedule view without correspondence.
As shown in figure 5, the corresponding schedule view of mind map can be formed.By means of the invention it is possible to quickly by the meter of user It draws idea and is converted to a kind of intuitive schedule view, user is facilitated to clear plan according to schedule view, improve the completion effect of plan Rate.
In one embodiment, program instruction is stored in the storage device, the processor calls described program to refer to It enables, can also be achieved following steps:
S201 detects whether the addition instruction triggers of mind map;
In the present embodiment, mind map addition window can be set on the display screen of intelligent terminal, user can pass through Mind map adds window and adds mind map.When user operates, it is corresponding with operation that intelligent terminal can trigger generation Addition instruction.
S202 is added according to content and is instructed when detection has the addition instruction triggers of the mind map, adds X level The subject content of theme;According to theme instruction at the same level is inserted into, the theme at the same level of Y level is added;It is instructed according to insertion sub-topics, Add next hierarchical topics of Z level;The mind map includes N number of hierarchical topics;The N is positive integer;Described X, Y, Z For the positive integer less than or equal to the N.
Intelligent terminal can generate corresponding mind map according to addition instruction.Preferably, the addition instruction includes content Peer's theme instruction, insertion sub-topics instruction are inserted into addition instruction;Described instructs addition mind map according to the addition, It specifically includes: being added and instructed according to content, add the subject content of X hierarchical topics;According to theme instruction at the same level is inserted into, add The theme at the same level of Y level;According to insertion sub-topics instruction, next hierarchical topics of Z level are added;Described X, Y, Z are small In or equal to the N positive integer.
As shown in Fig. 2, a central theme is had in mind map first, user can by touch-control central theme frame, or Person clicks central theme using mouse, selects corresponding option to trigger corresponding addition instruction.Such as double-click central theme can To trigger content addition instruction, user can add corresponding content, such as " Annual sales plan ".Click can for example be passed through again Right mouse button shows suspension windows as shown in Figure 3, is inserted into theme at the same level by selection " being inserted into theme at the same level " to trigger Instruction triggers insertion sub-topics instruction by selection " insertion sub-topics ".After selection insertion sub-topics, center master can be generated The sub-topics of subordinate are inscribed, the content addition instruction of sub-topics can be triggered by double-clicking sub-topics, adds the correlation of sub-topics Content.After theme at the same level is inserted into selection, theme at the same level therewith can be generated, likewise, can touch by double-clicking theme at the same level The content for sending out theme at the same level adds instruction.
For example, triggering content addition instruction in center can be double-clicked, central theme is revised as " Annual sales plan ", then It adds a sub-topics " first quarter marketing plan " of " Annual sales plan ", subsequently add " first quarter marketing plan " The other three peer theme: " second quarter marketing plan ", " third season marketing plan ", " fourth quarter marketing plan ". If user feels the not fine enough of mind map, it can still be improved and be thought by way of adding peer's theme, addition sub-topics Dimension leads figure.As shown in figure 4, can finally form the mind map of a tree structure.In practical application, user can will need to complete Thing recorded by way of this mind map, clear the thinking entirely planned, the efficiency that the plan of raising is completed.
First hierarchical topics are corresponded to the plan generated in the schedule view by S203;By the first hierarchical topics subordinate The corresponding son plan for generating the plan subordinate of the second hierarchical topics;By the third level master of the second hierarchical topics subordinate The corresponding task items for generating the sub- plan subordinate of topic;By the corresponding generation of the 4th hierarchical topics of the third hierarchical topics subordinate The task of the task items subordinate;By the corresponding generation task subordinate of the layer 5 grade theme of the 4th hierarchical topics subordinate Subtask.
S204 shows the plan in the first default column of display interface, in the second default column of the display interface Show at least one sub- plan of the subordinate of the plan and at least one task items of the sub- plan subordinate, described At least one task of item subordinate of being engaged in and at least one subtask of the task subordinate.
As shown in figure 5, the corresponding schedule view of mind map can be formed.By means of the invention it is possible to quickly by the meter of user It draws idea and is converted to a kind of intuitive schedule view, user is facilitated to clear plan according to schedule view, improve the completion effect of plan Rate.
This method further include: receive to a son plan and/or a task items and/or a task and/or a subtask Attribute setting, by the subtask and/or the task items and/or the task and/or the subtask according to important journey Degree and urgency level are classified;
It, will according to the classification of the subtask and/or the task items and/or the task and/or the subtask The subtask and/or the task items and/or the task and/or the subtask in four-quadrant task view into Row display.
Preferably, the present embodiment can receive to a son plan and/or a task items and/or a task and/or a son The attribute of task is arranged, and the task is classified as according to significance level and urgency level important and urgent, important but not tight The one type of anxious, urgent but inessential, inessential not urgent four seed type;The four-quadrant task view include: it is important and Promptly, important but not urgent, urgent but inessential, inessential not urgent four quadrant areas;According to the subtask, and/or The classification of the task items and/or the task and/or the subtask, by the subtask and/or the task items, And/or the task and/or the subtask are shown in one of quadrant area of four-quadrant task view.
Such as in Fig. 5, it is important but not urgent the attribute for selling population analysis this task items can be set to, sale is needed The attribute for analyzing this task items is asked to be set as urgent but inessential, then as shown in fig. 7, in four-quadrant task view, i.e., It can show its corresponding attribute.
Preferably, the invention also includes one son plans of setting and/or a task items and/or a task and/or a son to appoint At the beginning of business and the deadline;In conjunction with current time, to the sub- plan and/or the task items and/or described Business and/or the subtask carry out time prompting.
It completes at the beginning of this task of the sale population analysis of public institution to be in December, 2018 for example, can be set 29, the deadline was on January 3rd, 2019.In combination with current time, this task is prompted.Such as son plan, task Similarly time started and deadline can be set in item, subtask etc., and can carry out time alarm to it.In this manner, User can be helped to remember the time schedule of each task, efficiently complete to plan convenient for user.
Preferably, the invention also includes:
When having detected report generation instruction, according to each sub- plan and/or each task items and/or each The performance and each sub- plan and/or each task items of business and/or each subtask and/or each task, and/ Or the deadline of each subtask, generate debriefing.
Due to each sub- plan, each task items, each task, each subtask all it is settable it is corresponding at the beginning of and Deadline knows which sub- plan, task items times, the performance of subtask in combination with current time.When user needs When generating debriefing, relevant operation can be carried out on intelligent terminal, and intelligent terminal is made to generate corresponding report generation instruction, it is raw At debriefing.The debriefing can be divided into daily paper, weekly, monthly magazine etc. according to the time cycle, also can be according to the demand of user The self defined time period, such as two days, ten days etc..
Specifically, the debriefing includes that working portion, expired unfinished work part, task scheduling portion is completed Divide, problematic portion, measure part;
It is described according to each sub- plan and/or each task items and/or each task and/or each subtask When performance and each sub- plan and/or the completion of each task items and/or each task and/or each subtask Between, debriefing is generated, is specifically included:
When having detected report generation instruction, each sub- plan and/or each task items and/or each are traversed The performance of business and/or each subtask appoints completed sub- plan and/or task items and/or task, and/or son Working portion is completed to described in the editor of business, by expired unfinished son plan and/or task items and/or task, and/or It edits to expired unfinished work part subtask;By not out of date unfinished portion editor to task scheduling part;
The problem of receiving user's input content and measure content, and by described problem Edition Contains to described problem portion Point, by the measure Edition Contains to the measure part.
In the present embodiment, debriefing can be divided into fixed several modules, as shown in figure 8, by taking daily work report as an example, it can It is divided into and working portion, expired unfinished work part, task scheduling part, problematic portion, measure part is completed.Appoint generating When business report, there may be some tasks to complete, there are some tasks to have not been completed, the task dividable that do not complete is expired It does not complete and not out of date unfinished.Such as the task completion date (TCD) of setting is on December 1st, 2018, but the same day is 2018 11 The moon 30, then it represents that this task is not out of date do not complete;Such as the task completion date (TCD) of setting is on December 1st, 2018, still The same day is on December 2nd, 2018, then it represents that this task is expired do not complete.
It should be noted that above-described embodiment can be freely combined as needed.The above is only of the invention preferred Embodiment, it is noted that for those skilled in the art, in the premise for not departing from the principle of the invention Under, several improvements and modifications can also be made, these modifications and embellishments should also be considered as the scope of protection of the present invention.

Claims (12)

1. a kind of plan automatic generation method, which is characterized in that comprising steps of
Detect whether the addition instruction triggers of mind map;
When detection there are the addition instruction triggers of the mind map, addition mind map is instructed according to the addition;The think of It includes N number of hierarchical topics that dimension, which leads figure,;The N is positive integer;
The mind map is generated into schedule view according to each hierarchical topics are corresponding, and the schedule view is shown.
2. a kind of plan automatic generation method according to claim 1, which is characterized in that the addition instruction includes content Peer's theme instruction, insertion sub-topics instruction are inserted into addition instruction;
Described instructs addition mind map according to the addition, specifically includes:
It is added and is instructed according to the content, add the subject content of X hierarchical topics;
According to insertion theme instruction at the same level, the theme at the same level of Y level is added;
It is instructed according to the insertion sub-topics, adds next hierarchical topics of Z level;
Described X, Y, Z are the positive integer less than or equal to the N.
3. a kind of plan automatic generation method according to claim 1, which is characterized in that the schedule view includes a meter It draws, the plan includes at least one sub- plan, and the sub- plan includes at least a task items, and the task items include at least One task, the task include at least one subtask.
4. a kind of plan automatic generation method according to claim 3, it is characterised in that:
It is described that the mind map is generated into schedule view, specific packet according to each hierarchical topics are corresponding as the N=1 It includes:
By the corresponding plan generated in the schedule view of the first hierarchical topics.
5. a kind of plan automatic generation method according to claim 3, it is characterised in that:
It is described that the mind map is generated into schedule view, specific packet according to each hierarchical topics are corresponding as the N=2 It includes:
By the corresponding plan generated in the schedule view of the first hierarchical topics;By the second layer of the first hierarchical topics subordinate Corresponding the generating the task items subordinate of the task of grade theme.
6. a kind of plan automatic generation method according to claim 3, it is characterised in that:
It is described that the mind map is generated into schedule view, specific packet according to each hierarchical topics are corresponding as the N=3 It includes:
By the corresponding plan generated in the schedule view of the first hierarchical topics;By the second layer of the first hierarchical topics subordinate The corresponding task items for generating the sub- plan subordinate of grade theme;The third hierarchical topics of the second hierarchical topics subordinate are corresponding Generate the task of the task items subordinate.
7. a kind of plan automatic generation method according to claim 3, it is characterised in that:
It is described that the mind map is generated into schedule view, specific packet according to each hierarchical topics are corresponding as the N=4 It includes:
By the corresponding plan generated in the schedule view of the first hierarchical topics;By the second layer of the first hierarchical topics subordinate The corresponding son plan for generating the plan subordinate of grade theme;By the corresponding life of the third hierarchical topics of the second hierarchical topics subordinate At the task items of the sub- plan subordinate;By the corresponding generation task of the 4th hierarchical topics of the third hierarchical topics subordinate The task of item subordinate.
8. a kind of plan automatic generation method according to claim 3, it is characterised in that:
It is described that the mind map is generated into schedule view according to each hierarchical topics are corresponding as the N=5, specifically also Include:
By the corresponding plan generated in the schedule view of the first hierarchical topics;By the second layer of the first hierarchical topics subordinate The corresponding son plan for generating the plan subordinate of grade theme;By the corresponding life of the third hierarchical topics of the second hierarchical topics subordinate At the task items of the sub- plan subordinate;By the corresponding generation task of the 4th hierarchical topics of the third hierarchical topics subordinate The task of item subordinate;The corresponding son for generating the task subordinate of the layer 5 grade theme of the 4th hierarchical topics subordinate is appointed Business.
9. a kind of plan automatic generation method according to claim 3, which is characterized in that further include:
It receives and the attribute of a son plan and/or a task items and/or a task and/or a subtask is arranged, by the son Task and/or the task items and/or the task and/or the subtask according to significance level and urgency level into Row classification;
It, will be described according to the classification of the subtask and/or the task items and/or the task and/or the subtask Subtask and/or the task items and/or the task and/or the subtask are shown in four-quadrant task view Show.
10. a kind of plan automatic generation method according to claim 3, which is characterized in that further include:
Setting one son plan and/or a task items and/or a task and/or a subtask at the beginning of and the deadline;
In conjunction with current time, to the sub- plan and/or the task items and/or the task and/or the subtask into Row time prompting.
11. a kind of plan automatic generation method according to claim 3, which is characterized in that further include:
When having detected report generation instruction, according to each sub- plan and/or each task items and/or each task, and/ Or the performance and each sub- plan and/or each task items and/or each task and/or each of each subtask The deadline of subtask generates debriefing.
12. a kind of intelligent terminal, which is characterized in that intelligent terminal includes storage medium and processor, on the storage medium Computer program is stored, when the processor executes the computer program, is executed such as any one of claim 1-9 institute A kind of plan automatic generation method stated.
CN201910078747.1A 2019-01-28 2019-01-28 A kind of plan automatic generation method and intelligent terminal Pending CN109815342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910078747.1A CN109815342A (en) 2019-01-28 2019-01-28 A kind of plan automatic generation method and intelligent terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910078747.1A CN109815342A (en) 2019-01-28 2019-01-28 A kind of plan automatic generation method and intelligent terminal

Publications (1)

Publication Number Publication Date
CN109815342A true CN109815342A (en) 2019-05-28

Family

ID=66605323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910078747.1A Pending CN109815342A (en) 2019-01-28 2019-01-28 A kind of plan automatic generation method and intelligent terminal

Country Status (1)

Country Link
CN (1) CN109815342A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110825478A (en) * 2019-11-05 2020-02-21 广东优世联合控股集团股份有限公司 Main interface content adding method, device, medium and electronic equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130117060A1 (en) * 2011-11-08 2013-05-09 Matchware A/S System for Collaboration and Meeting Management
CN107092419A (en) * 2017-03-30 2017-08-25 国网山东省电力公司青岛市黄岛区供电公司 Mind map processing method and processing device
CN108595678A (en) * 2018-05-02 2018-09-28 网易(杭州)网络有限公司 Task data processing method and processing device, electronic equipment, storage medium

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130117060A1 (en) * 2011-11-08 2013-05-09 Matchware A/S System for Collaboration and Meeting Management
CN107092419A (en) * 2017-03-30 2017-08-25 国网山东省电力公司青岛市黄岛区供电公司 Mind map processing method and processing device
CN108595678A (en) * 2018-05-02 2018-09-28 网易(杭州)网络有限公司 Task data processing method and processing device, electronic equipment, storage medium

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
SAMEYY: "日事清:番茄钟+思维导图+档案", 《HTTPS://V.YOUKU.COM/V_SHOW/ID_XMZI2MJQZMZG0OA==.HTML?SPM=A2HBT.13141534.0.13141534》 *
一样SAME: "初识日事清", 《HTTPS://WWW.IQIYI.COM/W_19RWH3YPM9.HTML#CURID=10806319709_EEF3A137A022F2AAAEE8B13858EC2570》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110825478A (en) * 2019-11-05 2020-02-21 广东优世联合控股集团股份有限公司 Main interface content adding method, device, medium and electronic equipment

Similar Documents

Publication Publication Date Title
US10013676B2 (en) For-your-information events
Bozzon et al. Answering search queries with crowdsearcher
US9015604B2 (en) Calendaring between user profiles
US9164990B2 (en) Annotating contextual workspaces
CN109828708A (en) A kind of task management method and intelligent terminal
Murphy et al. API designers in the field: Design practices and challenges for creating usable APIs
US20060090071A1 (en) Systems and methods for project management
CN107730196A (en) Project scheduling management method and terminal device
US20150134386A1 (en) Collectively optimizing group schedules to minimize project completion time and cost
CN110310088A (en) Workflow configuration method and Related product
CN104662567A (en) System for accessing software functionality
US20120036209A1 (en) Hierarchical social network system
US9501462B2 (en) Form object having form representation and grid representation of form
CN109271208A (en) Parameter setting method, device, terminal and storage medium
CN109726987A (en) Event method for reporting, device, equipment and computer readable storage medium
CN109447851A (en) One kind prepares for a meal, vegetable providing method, device and equipment
US11449764B2 (en) AI-synthesized application for presenting activity-specific UI of activity-specific content
US11354581B2 (en) AI-driven human-computer interface for presenting activity-specific views of activity-specific content for multiple activities
US20180285791A1 (en) Space optimization solver using team collaboration patterns to guide team-to-floor allocation planning
US8839208B2 (en) Rating interestingness of profiling data subsets
CN109815342A (en) A kind of plan automatic generation method and intelligent terminal
US20160148148A1 (en) System and method for changing resource calendars by editing calendar views
CN109858804A (en) A kind of agenda managing method and intelligent terminal
CN113112244A (en) Method and device for creating backlog
CN113296656B (en) Information processing method, system, device and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190528

RJ01 Rejection of invention patent application after publication