CN109812977A - A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange - Google Patents

A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange Download PDF

Info

Publication number
CN109812977A
CN109812977A CN201910192787.9A CN201910192787A CN109812977A CN 109812977 A CN109812977 A CN 109812977A CN 201910192787 A CN201910192787 A CN 201910192787A CN 109812977 A CN109812977 A CN 109812977A
Authority
CN
China
Prior art keywords
tube body
flue gas
gas chamber
heat exchange
burning zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910192787.9A
Other languages
Chinese (zh)
Inventor
何英志
胡纳江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910192787.9A priority Critical patent/CN109812977A/en
Publication of CN109812977A publication Critical patent/CN109812977A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Air Supply (AREA)

Abstract

The present invention relates to a kind of burnt gas wall hanging furnace of good effect of heat exchange and boilers, including heating compartment, heating compartment is equipped with burner and fortune water pipe, transporting water pipe includes the burning zone tube body that inside is arranged in, the time condensation section tube body of condensation segment tube body and setting on the outside, water body passes sequentially through time condensation section tube body, condensation segment tube body and burning zone tube body, the top and bottom of heating compartment are respectively equipped with flue gas chamber and lower flue gas chamber, it is connected to by several with being coiled in the fume pipe on the outside of time condensation section tube body between upper flue gas chamber and lower flue gas chamber, the flue gas of burner discharge successively passes through lower flue gas chamber, fume pipe and upper flue gas chamber, transport the setting of the multi-segment structure cooperation fume pipe of water pipe, the high-temperature flue gas for generating burner fully carries out multisection type heat exchange with the water body in fortune water pipe, to more increase The heat in flue gas is utilized to effect, promotes efficiency of the invention.

Description

A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange
Technical field
The present invention relates to a kind of burnt gas wall hanging furnace of good effect of heat exchange and boilers.
Background technique
Burnt gas wall hanging furnace is a kind of equipment by fuel gas buring heating for the heating of Indoor environment environment, existing combustion gas Wall-hung boiler heats water pipe generally by the flue gas that burner generates, and still, the utilization rate of the heat in flue gas is relatively low, Most of heat can be discharged with flue gas, cause the efficiency of wall-hung boiler relatively low.
Therefore, it is necessary to be further improved.
Summary of the invention
It is an object of the invention to overcome above-mentioned the shortcomings of the prior art, and provide a kind of combustion gas of good effect of heat exchange Wall-hung boiler and boiler, it is intended to solve one of above-mentioned technical problem in the prior art at least to a certain extent.
The object of the present invention is achieved like this:
A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange, including heating compartment, heating compartment are equipped with burner and fortune water Pipe, fortune water pipe include the burning zone tube body that inside is arranged in, the time condensation section of a condensation segment tube body and setting on the outside The nearside of burner is arranged in tube body, burning zone tube body, and the distal side of burner is arranged in a condensation segment tube body, and water body successively leads to Time condensation section tube body, a condensation segment tube body and burning zone tube body are crossed, the top and bottom of heating compartment are respectively equipped with Upper flue gas chamber and lower flue gas chamber, by several with being coiled on the outside of time condensation section tube body between upper flue gas chamber and lower flue gas chamber Fume pipe connection, burner discharge flue gas successively pass through lower flue gas chamber, fume pipe and upper flue gas chamber.
Sealed wall is equipped between the time condensation section tube body and a condensation segment tube body and burning zone tube body.
It is connected between the time condensation section tube body and a condensation segment tube body by connecting tube, connecting tube is set to lower cigarette In air cavity.
The upper flue gas chamber is equipped with smoke exhaust pipe, and the inlet end of smoke exhaust pipe is in arc-shaped, and area of section is passed from the bottom to top Increase.
The inlet end of the burner is equipped with blower motor.
Between condensation segment tube body and burning zone tube body be equipped with thermal insulation board, thermal insulation board make a condensation segment tube body with Burning zone tube body forms layered structure up and down.
The thermal insulation board is equipped with several positioning bending parts, and positioning bending part passes through a condensation segment tube body and burning zone Bending structure is formed behind gap between tube body, is fixed on thermal insulation board between condensation segment tube body and burning zone tube body.
The beneficial effects of the present invention are:
Transport water pipe multi-segment structure cooperation fume pipe setting, allow burner generate high-temperature flue gas fully with fortune water Water body in pipe carries out multisection type heat exchange and promotes efficiency of the invention so that the heat in flue gas more efficiently be utilized.
Additional aspect and advantage of the invention will become obviously in following description section, or practice through the invention Recognize.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure of the embodiment of the present invention.
Fig. 2 is the perspective view of the embodiment of the present invention.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and embodiments.
Referring to Fig. 1, Fig. 2, (wherein long arrow is water body trend, short arrow for the burnt gas wall hanging furnace and boiler of this good effect of heat exchange Head is that flue gas moves towards), including heating compartment 1, heating compartment 1 is equipped with burner 2 and fortune water pipe, and fortune water pipe is including setting The burning zone tube body 31 of side, the time condensation section tube body 33 of a condensation segment tube body 32 and setting on the outside, burning zone tube body 31 are arranged in the nearside of burner 2, and the distal side of burner 2 is arranged in a condensation segment tube body 32, and water body passes sequentially through secondary cold Solidifying 33, condensation segment tube bodies 32 of section tube body and burning zone tube body 31, the top and bottom of heating compartment 1 are respectively equipped with Flue gas chamber 11 and lower flue gas chamber 12, by several with being coiled in time condensation section pipe between upper flue gas chamber 11 and lower flue gas chamber 12 The fume pipe 4 in 33 outside of body is connected to, and the flue gas that burner 2 is discharged successively passes through lower flue gas chamber 12, fume pipe 4 and upper flue gas chamber 11, transport water pipe multi-segment structure cooperation fume pipe 4 setting, allow burner 2 generate high-temperature flue gas fully with fortune Water body in water pipe carries out multisection type heat exchange and promotes efficiency of the invention so that the heat in flue gas more efficiently be utilized;
Working principle of the invention is such that the high-temperature flue gas that burner 2 generates is burning zone tube body 31 and primary In condensation segment tube body 32 water body heat exchange after, enter back into lower flue gas chamber 12, by when fume pipe 4 with time condensation section tube body 33 in water Body exchanges heat, and cold water initially enters time condensation section tube body 33 and receives preheating, water temperature when by a condensation segment tube body 32 Continue to rise, finally enter after burning zone tube body 31 again by after fast heating at high temperature, from the water outlet being connect with burning zone tube body 31 Mouth discharge, whole process are greatly improved to the heat utilization ratio of flue gas.
Further, it is equipped between time condensation section tube body 33 and a condensation segment tube body 32 and burning zone tube body 31 close Seal wall 5, burner 2 generate high-temperature flue gas sufficiently flowed in the inner cavity of sealed wall 5 first, can with high-temperature flue gas fully with Water body in burning zone tube body 31 and a condensation segment tube body 32 sufficiently exchanges heat, and enters lower flue gas chamber with making fume centralized 12。
Further, it is connected, is connected by connecting tube 34 between time condensation section tube body 33 and a condensation segment tube body 32 Pipe 34 is set in lower flue gas chamber 12, improves the utilization rate in space in lower flue gas chamber 12.
Further, upper flue gas chamber 11 is equipped with smoke exhaust pipe 6, and the inlet end of smoke exhaust pipe 6 is in arc-shaped, area of section by Under it is supreme be incremented by, allow the inlet end of smoke exhaust pipe 6 that more flue gases to be allowed to pass through, and under narrow wide 6 inlet end of smoke exhaust pipe Structure, which can be reduced, there is gas backflow phenomenon, improves smoke exhaust efficiency.
Further, the inlet end of burner 2 is equipped with blower motor 7, keeps the burning of burner 2 more abundant, will not produce Raw pernicious gas.
Further, thermal insulation board 8 is equipped between a condensation segment tube body 32 and burning zone tube body 31, thermal insulation board 8 makes once Condensation segment tube body 32 and burning zone tube body 31 form layered structure up and down, the high-temperature flue gas that thermal insulation board 8 can be such that burner 2 generates It is longer with the water body heat-exchange time in burning zone tube body 31, promote heating efficiency.
Further, thermal insulation board 8 is equipped with several positioning bending parts 81, and positioning bending part 81 passes through a condensation segment pipe Form bending structure behind gap between body 32 and burning zone tube body 31, make thermal insulation board 8 be fixed on a condensation segment tube body 32 with Between burning zone tube body 31, thermal insulation board 8 is not necessarily to that stationary positioned can be realized by techniques such as welding, avoids a condensation segment tube body 32 there is the case where installation damage with burning zone tube body 31.
Above-described embodiment is preferred embodiment of the invention, and the present invention can also have other embodiments.The technology of this field Personnel can also make equivalent deformation or replacement on the premise of without prejudice to spirit of the invention, these equivalent variation or replacement are wrapped It is contained in range set by the claim of this application.

Claims (7)

1. the burnt gas wall hanging furnace and boiler of a kind of good effect of heat exchange, including heating compartment (1), the heating compartment (1) is equipped with combustion Burner (2) and fortune water pipe, which is characterized in that the fortune water pipe includes the burning zone tube body (31) that inside is arranged in, primary cold The time condensation section tube body (33) of solidifying Duan Guanti (32) and setting on the outside, the burning zone tube body (31) are arranged in burner (2) nearside, a condensation segment tube body (32) are arranged in the distal side of burner (2), and water body passes sequentially through time condensation section Tube body (33), a condensation segment tube body (32) and burning zone tube body (31), the top and bottom of heating compartment (1) are set respectively There are upper flue gas chamber (11) and lower flue gas chamber (12), by several with disk between the upper flue gas chamber (11) and lower flue gas chamber (12) Fume pipe (4) connection being wound on the outside of time condensation section tube body (33), the flue gas of burner (2) discharge successively pass through lower flue gas chamber (12), fume pipe (4) and upper flue gas chamber (11).
2. the burnt gas wall hanging furnace and boiler of good effect of heat exchange according to claim 1, it is characterised in that: the time condensation section Sealed wall (5) are equipped between tube body (33) and a condensation segment tube body (32) and burning zone tube body (31).
3. the burnt gas wall hanging furnace and boiler of good effect of heat exchange according to claim 1, it is characterised in that: the time condensation section It is connect between tube body (33) and a condensation segment tube body (32) by connecting tube (34), the connecting tube (34) is set to lower flue gas In chamber (12).
4. the burnt gas wall hanging furnace and boiler of good effect of heat exchange according to claim 1, it is characterised in that: the upper flue gas chamber (11) smoke exhaust pipe (6) are equipped with, the inlet end of the smoke exhaust pipe (6) is in arc-shaped, and area of section is incremented by from the bottom to top.
5. the burnt gas wall hanging furnace and boiler of good effect of heat exchange according to claim 1, it is characterised in that: the burner (2) Inlet end be equipped with blower motor (7).
6. the burnt gas wall hanging furnace and boiler of any one of -5 good effect of heat exchange according to claim 1, it is characterised in that: described one Thermal insulation board (8) are equipped between secondary condensation segment tube body (32) and burning zone tube body (31), the thermal insulation board (8) makes a condensation segment pipe Body (32) and burning zone tube body (31) form layered structure up and down.
7. the burnt gas wall hanging furnace and boiler of good effect of heat exchange according to claim 6, it is characterised in that: the thermal insulation board (8) Several positioning bending part (81) are equipped with, the positioning bending part (81) passes through a condensation segment tube body (32) and burning zone pipe Bending structure is formed behind gap between body (31), thermal insulation board (8) is made to be fixed on a condensation segment tube body (32) and burning zone pipe Between body (31).
CN201910192787.9A 2019-03-14 2019-03-14 A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange Withdrawn CN109812977A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910192787.9A CN109812977A (en) 2019-03-14 2019-03-14 A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910192787.9A CN109812977A (en) 2019-03-14 2019-03-14 A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange

Publications (1)

Publication Number Publication Date
CN109812977A true CN109812977A (en) 2019-05-28

Family

ID=66609002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910192787.9A Withdrawn CN109812977A (en) 2019-03-14 2019-03-14 A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange

Country Status (1)

Country Link
CN (1) CN109812977A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520903A (en) * 2020-05-19 2020-08-11 杭州中荷智慧城市科技有限公司 Waste heat recovery type household wall-mounted furnace
CN113375140A (en) * 2021-06-18 2021-09-10 广东念智节能科技有限公司 Superconductive vortex heat exchange device and steam generator thereof
US11761677B2 (en) 2019-12-04 2023-09-19 A. O. Smith Corporation Water heater having highly efficient and compact heat exchanger

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11761677B2 (en) 2019-12-04 2023-09-19 A. O. Smith Corporation Water heater having highly efficient and compact heat exchanger
CN111520903A (en) * 2020-05-19 2020-08-11 杭州中荷智慧城市科技有限公司 Waste heat recovery type household wall-mounted furnace
CN111520903B (en) * 2020-05-19 2021-12-03 江苏苏通兴源科技发展有限公司 Waste heat recovery type household wall-mounted furnace
CN113375140A (en) * 2021-06-18 2021-09-10 广东念智节能科技有限公司 Superconductive vortex heat exchange device and steam generator thereof

Similar Documents

Publication Publication Date Title
CN109812977A (en) A kind of burnt gas wall hanging furnace and boiler of good effect of heat exchange
CN105042557B (en) Multi-return-stroke gas-steam boiler
CN205717142U (en) Biomass double furnace thorax gas-steam boiler and combustion system thereof
CN208735618U (en) A kind of novel segmentation low nitrogen combustion apparatus
JPH064171Y2 (en) Radiant chives
CN209131150U (en) A kind of more backhaul plates of S type expansion change formula liner
CN108050693A (en) fuel gas hot-blast stove
CN210014353U (en) Fire grate type gas boiler
CN109812976A (en) A kind of multiple condensation structure of burnt gas wall hanging furnace and boiler
CN106766172A (en) A kind of efficient energy-saving gas heating wall-hanging furnace
CN208998096U (en) Hot-blast stove
CN206958979U (en) A kind of energy-saving heating device
CN207394915U (en) A kind of energy saving and environment friendly Oil-burning range
CN207763252U (en) fuel gas hot-blast stove
CN106016724A (en) Horizontal energy-saving and environment-friendly hot water boiler
CN206861853U (en) A kind of high gas heater of thermal efficiency
CN206280959U (en) A kind of heat accumulating type multitubular bundles radiant tube combustion device
CN201285168Y (en) Pulse combustion heating stove
CN205842741U (en) A kind of energy-saving coal stove
CN205536514U (en) Two sections horizontal quick -witted enamelware pot stoves of burning
CN205579543U (en) Co -combustion boiler
CN2267421Y (en) Ambient pressure hot water and steam generating heater using oil as fuel
CN215809285U (en) High-efficient living beings boiler
CN106705042A (en) Regenerative type multi-tube-bundle radiation tube combustion device
CN217875821U (en) Heat carrier heating furnace for producing gas by burning biomass

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190528