Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910269544.0A
Other languages
Chinese (zh)
Other versions
CN109812020B (en
Inventor
丁建华
李新星
武帮成
皇甫定福
辛建宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201910269544.0A priority Critical patent/CN109812020B/en
Publication of CN109812020A publication Critical patent/CN109812020A/en
Application granted granted Critical
Publication of CN109812020B publication Critical patent/CN109812020B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of band-like Full-face pouring tube assembly and construction methods, it is related to technical field of building construction, technical solution is, including square steel group, square steel group includes the square steel of several inner hollows of horizontal alignment setting, and the side wall and upper wall of each square steel offer several through-holes, be fixedly connected between each square steel, and the through-hole connection between the side wall of two adjacent square steel, the lower wall of square steel are complete steel plate;The beneficial effects of the present invention are: the feature that this construction technology has grouting for water plugging effect good, easy to operate.Section is that the band-like Full-face pouring pipe of rectangle increases the chance of Grouting Pipe and the contact in concrete crack, greatly improves grouting for water plugging effect.Increase at construction joint with crack contact possibility, slip casting is abundant, and effect is good;It is pre-buried in advance, it is not influenced by small space between two layers of reinforcing bar, strong operability;Construction technology is simple, easily controllable;Material is common, cheap.

Description

A kind of band-like Full-face pouring tube assembly and construction method
Technical field
The present invention relates to technical field of building construction, in particular to a kind of band-like Full-face pouring tube assembly and construction party Method.
Background technique
Although existing circular tube shaped Full-face pouring pipe starts to apply, but also have the shortcomings that certain.First, traditional tunneling boring Grouting Pipe is usually that Grouting Pipe nails between two layers of reinforcing bar of wallboard two sides after the completion of old concrete pours, But the tools such as hammer or nailing gun are difficult to use in reality between two layers of reinforcing bar, operability is poor.Second, current construction application Full-face pouring pipe outside diameter mainly in 2cm or so, the contamination cracking that construction joint occurs is easy to around Grouting Pipe, so as to reach Effect is only leaked less than expected slip casting.Third, at present the Full-face pouring bore of construction application mainly in 0.8cm or so, Manual operation is improper or addition quick-set easily causes material plugging in slurries.
Summary of the invention
In view of the above technical problems, the present invention provides a kind of band-like Full-face pouring tube assembly and construction method.
Its technical solution is a kind of band-like Full-face pouring tube assembly, including square steel group, the square steel group include it is horizontal simultaneously The square steel of several inner hollows of setting is arranged, the side wall and upper wall of each square steel offer several through-holes, each described It is fixedly connected between square steel, and the through-hole connection between the side wall of two adjacent square steel, the lower wall of square steel are complete steel Plate;
Wing plate is symmetrical arranged on the outside of the square steel group long axis two;
The long axis both ends top of the square steel group opens up injected hole, and injected hole is fixedly connected with Grouting Pipe, and Grouting Pipe is hollow tube, Lumen constitutes the channel being connected to the inner cavity of the square steel group, and the axis of Grouting Pipe is vertical with the upper surface of the square steel group.
The square steel is DN15 coating steel pipe;The square steel length is 6100mm;In each square steel group described in two The axis spacing of injected hole is 6000mm;The Grouting Pipe is the seamless steel pipe of 30*2.5;
Annotation:
1, welding need to be fully welded between steel, if square steel welding combination can not be used by producing in enormous quantities, meet stability and slip casting Demand.This slip casting tube assembly may be designed as every 6.1m long as a monomer, and to its sealing two ends, each monomer both ends are each Equipped with slip casting entrance, and with internal thread, length can root tool board thickness design.
3, with the structure glue sealing for meeting intensity requirement between nylon wire and non-woven fabrics filter cloth and steel.
4, mounting ball valve at grouting port is installed at ball valve again and meets the filling adaptor that slip casting machine carries Grouting Pipe.
Preferably, the long axis of the square steel group every square steel is parallel to each other, and the square steel group every square steel Two end faces of long axis;
The long axis both ends of the square steel group are closed end, are fixedly connected with the steel plate of closing.
Preferably, the wing plate includes horizontal part and bending part, and the horizontal part is to fix with the square steel group lateral surface The level board of connection, the bending part is towards the separate square steel group side and tilts down;
The interior angle of the horizontal part and bending part is 135 °.
The plate thickness of the wing plate is the steel plate for sealing water of 3mm thickness.
Preferably, internal screw thread is arranged in the top of the Grouting Pipe, and Grouting Pipe top is threadedly coupled boring cover, the boring cover periphery The external screw thread on the corresponding Grouting Pipe top is set, and interior six side's shrinkage pools are arranged in the top of the boring cover.
Preferably, it is successively coated with non-woven fabrics filter layer of cloth and nylon mesh from the inside to the outside on the outside of the square steel group.
The construction method of band-like Full-face pouring tube assembly,
S1, pre-buried band-like Full-face pouring tube assembly;
Mold: being installed and is carried out concreting by S2, one-time-concreting concrete, by concreting to design height;It pours Grouting Pipe cannot be flung by building Concrete cloth material mouth, cause Grouting Pipe structure destruction and positional shift;After one-time-concreting, note Slurry pipe about half height it is exposed with pour after concrete surface on;
S3, demoulding: after the concrete setting for waiting S2 to pour, removing mold, should be carefully careful when demoulding, prevent from destroying Grouting Pipe; Dabbing is carried out after demoulding, dabbing carefully preferably should use dedicated dabbing tool, non-breakable Grouting Pipe, from reinforcing bar root 1cm range Inside not dabbing;
S4, the secondary casting concrete at exposed half Grouting Pipe;It pours and sneaks out solidifying native process cloth material mouth and cannot fling Grouting Pipe, Cause Grouting Pipe structure destruction and positional shift;It is secondary pour after, the upper surface of Grouting Pipe is flushed with concrete upper surface;
S5, it checks percolating water at construction joint: after the concrete setting for waiting S4 to pour, removing the rubbish and spot near construction joint, It examines and does percolating water situation record;
S6, it mixes and sets slurries: the strict control ratio of mud, it is ensured that grind slurries quality;
S7, carry out slip casting: the percolating water situation observed according to the S5 selects corresponding Grouting Pipe to carry out slip casting;
Ball valve is closed after the completion of S8, slip casting, injecting paste materials is waited to solidify, ball valve is removed, will be smoothed out at Grouting Pipe with quick hardening cement.
Preferably, the pre-buried band-like Full-face pouring tube assembly of the S1, specific method are to be applied according to layout design and scene Work requirement, in the pre-buried several band-like Full-face pouring tube assemblies in construction joint position, several band-like Full-face pouring tube assemblies are along long The adjacent linear array arrangement of axis direction, and band-like Full-face pouring tube assembly is weldingly fixed on the reinforcing bar of building structure;It pours It is checked comprehensively before concrete, it is ensured that band-like Full-face pouring tube assembly is normal without boring cover installation at breakage and Grouting Pipe, prevents It is only flowed into pipe when concreting, causes Grouting Pipe plugging;Appearance work progress is destroyed place should be in time to band-like tunneling boring Slip casting tube assembly is repaired.
Preferably, when the S7 carries out slip casting, back-out the boring cover first, each Grouting Pipe is all connected with ball valve, will Ball valve one end is connect with Grouting Pipe;
When slip casting, a ball valve in same band-like Full-face pouring tube assembly installation filling adaptor and with slip casting machine Discharge port connection, another ball valve are opened;
Grouting pressure when slip casting controls within the scope of 0.2MPa-0.4MPa;After slip casting starts, the ball of slip casting head is never installed Valve observe pulp situation, until emerge slurries with mix set slurries it is similar afterwards closing ball valve, 1 minute can be suspended when pressure is bigger than normal, Slip casting is carried out again, if pressure is still bigger than normal can to close ball valve, stops slip casting.
Technical solution provided in an embodiment of the present invention has the benefit that this construction technology has grouting for water plugging effect Good, easy to operate feature.
Section is that the band-like Full-face pouring pipe of rectangle increases the chance of Grouting Pipe and the contact in concrete crack, greatly improves note Starch plugging effect.Increase at construction joint with crack contact possibility, slip casting is abundant, and effect is good;It is pre-buried in advance, not by two layers of steel Small space influences between muscle, strong operability;Construction technology is simple, easily controllable;Material is common, cheap.
Using wallboard two sides, wherein a face reinforcing bar has bound and can weld pre-buried this band-like Full-face pouring pipe, does not need picture In traditional construction after first time concrete placings, installation is operated in a limited space with tool between two layers of reinforced mesh.
This band-like Full-face pouring pipe can be also served as in two injected holes of every 6 meters settings, one of injected hole Slurries peep hole closes slurries peep hole ball valve after water in discharge line and carries out slip casting closure, if occurring plugging among Grouting Pipe, It can peep hole grouting for water plugging again, it is ensured that grouting for water plugging effect.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the embodiment of the present invention.
Fig. 2 is the A partial enlarged view of Fig. 1.
Fig. 3 is the boring cover structural schematic diagram of the embodiment of the present invention.
Wherein, appended drawing reference are as follows: 1, square steel group;2, wing plate;3, Grouting Pipe;4, boring cover.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.Certainly, described herein specific examples are only used to explain the present invention, is not used to Limit the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the invention can To be combined with each other.
In the description of the invention, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description the invention and simplifies description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For the limitation to the invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result, Feature can explicitly or implicitly include one or more of the features.In the description of the invention, unless separately It is described, the meaning of " plurality " is two or more.
In the description of the invention, it should be noted that unless otherwise clearly defined and limited, term " peace Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition State concrete meaning of the term in the invention.
Embodiment 1
Referring to Fig. 1 to Fig. 3, the present invention provides a kind of band-like Full-face pouring tube assembly, including square steel group 1, and square steel group 1 includes water The square steel of the flat several inner hollows being set side by side, the side wall and upper wall of each square steel offer several through-holes, each square steel Between be fixedly connected, and the through-hole connection between the side wall of two adjacent square steel, the lower wall of square steel are complete steel plate;
Wing plate 2 is symmetrical arranged on the outside of 1 long axis two of square steel group;
The long axis both ends top of square steel group 1 opens up injected hole, and injected hole is fixedly connected with Grouting Pipe 3, and Grouting Pipe 3 is hollow tube, Lumen constitutes the channel being connected to the inner cavity of square steel group, and the axis of Grouting Pipe 3 is vertical with the upper surface of square steel group 1.
Square steel is DN15 coating steel pipe;Square steel length is 6100mm;The axis spacing of two injected holes in each square steel group For 6000mm;Grouting Pipe 3 is the seamless steel pipe of 30*2.5;
Annotation:
1, non-specified otherwise unit is in terms of mm.
2, between steel welding need to be fully welded, if produce in enormous quantities can not use square steel welding combination, meet stability and Slip casting demand.This slip casting tube assembly may be designed as every 6.1m long as a monomer, to its sealing two ends, each monomer two End is respectively provided with slip casting entrance, and with internal thread, length can root tool board thickness design.
3, with the structure glue sealing for meeting intensity requirement between nylon wire and non-woven fabrics filter cloth and steel.
4, mounting ball valve at grouting port is installed at ball valve again and meets the filling adaptor that slip casting machine carries Grouting Pipe.
The long axis of the every square steel of square steel group 1 is parallel to each other, and two end faces of the every square steel long axis of square steel group 1;
The long axis both ends of square steel group 1 are closed end, are fixedly connected with the steel plate of closing.
Wing plate 2 includes horizontal part and bending part, and horizontal part is the level board being fixedly connected with 1 lateral surface of square steel group, bending Portion is directed away from 1 side of square steel group and tilts down;
The interior angle of horizontal part and bending part is 135 °.
The plate thickness of wing plate 2 is the steel plate for sealing water of 3mm thickness.
Internal screw thread is arranged in the top of Grouting Pipe 3, and 3 top of Grouting Pipe is threadedly coupled boring cover 4, the corresponding note of 4 periphery of boring cover setting The external screw thread on 3 top of pipe is starched, interior six side's shrinkage pools are arranged in the top of boring cover 4.
1 outside of square steel group is successively coated with non-woven fabrics filter layer of cloth and nylon mesh from the inside to the outside.
Embodiment 2
On the basis of embodiment 1, the construction method of this band-like Full-face pouring tube assembly,
S1, pre-buried band-like Full-face pouring tube assembly;
Mold: being installed and is carried out concreting by S2, one-time-concreting concrete, by concreting to design height;It pours Grouting Pipe cannot be flung by building Concrete cloth material mouth, cause Grouting Pipe structure destruction and positional shift;After one-time-concreting, note Slurry pipe about half height it is exposed with pour after concrete surface on;
S3, demoulding: after the concrete setting for waiting S2 to pour, removing mold, should be carefully careful when demoulding, prevent from destroying Grouting Pipe; Dabbing is carried out after demoulding, dabbing should be careful, non-breakable Grouting Pipe;
S4, the secondary casting concrete at exposed half Grouting Pipe;It pours and sneaks out solidifying native process cloth material mouth and cannot fling Grouting Pipe, Cause Grouting Pipe structure destruction and positional shift;It is secondary pour after, the upper surface of Grouting Pipe is flushed with concrete upper surface;
S5, it checks percolating water at construction joint: after the concrete setting for waiting S4 to pour, removing the rubbish and spot near construction joint, It examines and does percolating water situation record;
S6, it mixes and sets slurries: the strict control ratio of mud, it is ensured that grind slurries quality;
S7, carry out slip casting: the percolating water situation observed according to S5 selects corresponding Grouting Pipe 3 to carry out slip casting;
Ball valve is closed after the completion of S8, slip casting, injecting paste materials is waited to solidify, removes ball valve, will be smoothed out at Grouting Pipe 3 with quick hardening cement.
The pre-buried band-like Full-face pouring tube assembly of S1, specific method are, according to layout design and site operation requirement, to apply Work stitches the pre-buried several band-like Full-face pouring tube assemblies in position, and several band-like Full-face pouring tube assemblies are along long axis direction adjacent straight Linear array arrangement, and band-like Full-face pouring tube assembly is weldingly fixed on the reinforcing bar of building structure;Before casting concrete comprehensively It checks, it is ensured that band-like Full-face pouring tube assembly is installed normally without boring cover 4 at breakage and Grouting Pipe 3, prevents concrete from pouring It is flowed into pipe when building, causes 3 plugging of Grouting Pipe;Appearance work progress is destroyed place should be in time to band-like Full-face pouring tube assembly It is repaired.
When S7 carries out slip casting, back-out boring cover 4 first, each Grouting Pipe 3 is all connected with ball valve, by ball valve one end and Grouting Pipe 3 Connection;
When slip casting, the ball valve installation filling adaptor in the same band-like Full-face pouring tube assembly and the discharging with slip casting machine Mouth connection, another ball valve are opened;
Grouting pressure when slip casting controls within the scope of 0.2MPa-0.4MPa;After slip casting starts, the ball of slip casting head is never installed Valve observe pulp situation, until emerge slurries with mix set slurries it is similar afterwards closing ball valve, 1 minute can be suspended when pressure is bigger than normal, Slip casting is carried out again, if pressure is still bigger than normal can to close ball valve, stops slip casting.
Since Grouting Pipe sectional area is relatively large in actual conditions, anti-plugging performance is relatively strong, can according to leakage scenarios To attempt to use other grouting serous fluids, guarantee that slip casting effect optimizes, such as single slurry (cement slurry), dual slurry (cement slurry and water Glass mixed liquor), Sai Baisi penetrant crystalline, epoxy resin etc..
Band-like Full-face pouring pipe non-woven fabrics filtering layer can be modified to and the elastic one-way hole that has used in mortar depositing construction The identical material of foamed strip is opened in the case where there is pressure to hole, can be with slip casting, after grouting pressure disappears, individual event bore closure, slurry Liquid can not flow.It can slip casting provides precondition again using flushing pipe as the later period after slip casting.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of band-like Full-face pouring tube assembly, which is characterized in that including square steel group (1), the square steel group (1) includes level The square steel for several inner hollows being set side by side, the side wall and upper wall of each square steel offer several through-holes, Mei Gesuo It states and is fixedly connected between square steel, and the through-hole connection between the side wall of two adjacent square steel, the lower wall of square steel is complete Steel plate;
Wing plate (2) are symmetrical arranged on the outside of square steel group (1) long axis two;
The long axis both ends top of the square steel group (1) opens up injected hole, and injected hole is fixedly connected Grouting Pipe (3), and Grouting Pipe (3) is Hollow tube, lumen constitute the channel being connected to, the axis of Grouting Pipe (3) and the square steel group (1) with the inner cavity of the square steel group Upper surface it is vertical.
2. band-like Full-face pouring tube assembly according to claim 1, which is characterized in that described every institute of square steel group (1) The long axis for stating square steel is parallel to each other, and two end faces of the square steel long axis of the square steel group (1) every;
The long axis both ends of the square steel group (1) are closed end, are fixedly connected with the steel plate of closing.
3. band-like Full-face pouring tube assembly according to claim 1, which is characterized in that the wing plate (2) includes level Portion and bending part, the horizontal part are the level board being fixedly connected with square steel group (1) lateral surface, and the bending part is towards institute It states far from square steel group (1) side and tilts down;
The interior angle of the horizontal part and bending part is 135 °.
4. band-like Full-face pouring tube assembly according to claim 3, which is characterized in that the top of the Grouting Pipe (3) Internal screw thread is set, and Grouting Pipe (3) top is threadedly coupled boring cover (4), the corresponding Grouting Pipe (3) of boring cover (4) periphery setting Interior six side's shrinkage pools are arranged in the external screw thread on top, the top of the boring cover (4).
5. band-like Full-face pouring tube assembly according to claim 1, which is characterized in that on the outside of the square steel group (1) by It is interior to being successively coated with non-woven fabrics filter layer of cloth and nylon mesh outside.
6. the construction method of band-like Full-face pouring tube assembly described in -5 according to claim 1, which is characterized in that
S1, pre-buried band-like Full-face pouring tube assembly;
Mold: being installed and is carried out concreting by S2, one-time-concreting concrete, by concreting to design height;One It is secondary pour after, Grouting Pipe about half highly expose on the concrete upper surface after pouring;
S3, demoulding: after the concrete setting for waiting S2 to pour, mold is removed, carries out dabbing after demoulding;
S4, the secondary casting concrete at exposed Grouting Pipe;It is secondary pour after, the upper surface and concrete upper surface of Grouting Pipe are neat It is flat;
S5, it checks percolating water at construction joint: after the concrete setting for waiting S4 to pour, removing the rubbish and spot near construction joint, It observes and does percolating water situation record;
S6, it mixes and sets slurries: the strict control ratio of mud, it is ensured that grind slurries quality;
S7, carry out slip casting: the percolating water situation observed according to the S5 selects corresponding Grouting Pipe (3) to carry out slip casting;
Ball valve is closed after the completion of S8, slip casting, injecting paste materials is waited to solidify, ball valve is removed, will be smeared at Grouting Pipe (3) with quick hardening cement It is flat.
7. the construction method based on band-like Full-face pouring tube assembly described in claim 1-6, which is characterized in that the S1 is pre- Buried strap shape Full-face pouring tube assembly, specific method are, pre-buried in construction joint position according to layout design and site operation requirement Several band-like Full-face pouring tube assemblies, several band-like Full-face pouring tube assemblies are arranged along the adjacent linear array of long axis direction, And band-like Full-face pouring tube assembly is weldingly fixed on the reinforcing bar of building structure;It is checked comprehensively before casting concrete, it is ensured that band Shape Full-face pouring tube assembly is normal without boring cover (4) installation at breakage and Grouting Pipe (3), inflow when preventing concreting In pipe, Grouting Pipe (3) plugging is caused.
8. the construction method based on band-like Full-face pouring tube assembly described in claim 1-7, which is characterized in that the S7 into When row slip casting, back-out first the boring cover (4), each Grouting Pipe (3) is all connected with ball valve, by ball valve one end and Grouting Pipe (3) it connects;
When slip casting, a ball valve in same band-like Full-face pouring tube assembly installation filling adaptor and with slip casting machine Discharge port connection, another ball valve are opened;
Grouting pressure when slip casting controls within the scope of 0.2MPa-0.4MPa;After slip casting starts, the ball of slip casting head is never installed Valve observe pulp situation, until emerge slurries with mix set slurries it is similar afterwards closing ball valve, 1 minute can be suspended when pressure is bigger than normal, Slip casting is carried out again, if pressure is still bigger than normal can to close ball valve, stops slip casting.
CN201910269544.0A 2019-04-04 2019-04-04 Strip-shaped full-section grouting pipe assembly and construction method Active CN109812020B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910269544.0A CN109812020B (en) 2019-04-04 2019-04-04 Strip-shaped full-section grouting pipe assembly and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910269544.0A CN109812020B (en) 2019-04-04 2019-04-04 Strip-shaped full-section grouting pipe assembly and construction method

Publications (2)

Publication Number Publication Date
CN109812020A true CN109812020A (en) 2019-05-28
CN109812020B CN109812020B (en) 2023-10-20

Family

ID=66611534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910269544.0A Active CN109812020B (en) 2019-04-04 2019-04-04 Strip-shaped full-section grouting pipe assembly and construction method

Country Status (1)

Country Link
CN (1) CN109812020B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110219673A (en) * 2019-06-25 2019-09-10 中建八局第一建设有限公司 A kind of Full-face pouring pipe device
CN110593142A (en) * 2019-09-21 2019-12-20 北京凯新浩达工程技术有限公司 Bridge repairing method
CN116538348A (en) * 2023-05-05 2023-08-04 北京泽通水务建设有限公司 Water diversion engineering jacking pipe internally-penetrating steel pipe and self-compacting concrete pouring construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2023210A (en) * 1978-06-01 1979-12-28 Tot Exploit Betonmortel Pinch valve nozzle for concrete dispenser
CN204780962U (en) * 2015-06-12 2015-11-18 杭州江润科技有限公司 Built -in anti sea anchor pole block structure of deep well precipitation well in soleplate
CN106223496A (en) * 2016-09-20 2016-12-14 中建八局第四建设有限公司 A kind of post-cast strip antiseepage grouting device
CN107460882A (en) * 2017-06-20 2017-12-12 中冶天工集团有限公司 A kind of retaining piles construction method of deep basal pit closing sealing
CN108412506A (en) * 2018-02-11 2018-08-17 中铁第勘察设计院集团有限公司 Ground fissure region tunnel lining structure based on shield tunnel and its construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2023210A (en) * 1978-06-01 1979-12-28 Tot Exploit Betonmortel Pinch valve nozzle for concrete dispenser
CN204780962U (en) * 2015-06-12 2015-11-18 杭州江润科技有限公司 Built -in anti sea anchor pole block structure of deep well precipitation well in soleplate
CN106223496A (en) * 2016-09-20 2016-12-14 中建八局第四建设有限公司 A kind of post-cast strip antiseepage grouting device
CN107460882A (en) * 2017-06-20 2017-12-12 中冶天工集团有限公司 A kind of retaining piles construction method of deep basal pit closing sealing
CN108412506A (en) * 2018-02-11 2018-08-17 中铁第勘察设计院集团有限公司 Ground fissure region tunnel lining structure based on shield tunnel and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110219673A (en) * 2019-06-25 2019-09-10 中建八局第一建设有限公司 A kind of Full-face pouring pipe device
CN110593142A (en) * 2019-09-21 2019-12-20 北京凯新浩达工程技术有限公司 Bridge repairing method
CN116538348A (en) * 2023-05-05 2023-08-04 北京泽通水务建设有限公司 Water diversion engineering jacking pipe internally-penetrating steel pipe and self-compacting concrete pouring construction method
CN116538348B (en) * 2023-05-05 2024-02-23 北京泽通水务建设有限公司 Water diversion engineering jacking pipe internally-penetrating steel pipe and self-compacting concrete pouring construction method

Also Published As

Publication number Publication date
CN109812020B (en) 2023-10-20

Similar Documents

Publication Publication Date Title
CN109812020A (en) A kind of band-like Full-face pouring tube assembly and construction method
KR102593218B1 (en) Pile bottom grouting device, cast-in-place pile body and method of construction thereof
JP4998198B2 (en) Mechanical joint grout filling method, PC member joining method, column beam joint construction method, column beam joint construction method, floor member and PC wall member joining method, PC member joining structure, column beam joining Structure, column beam joint structure, floor / wall joint structure
CN207527149U (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN109629845A (en) Concrete structure seam areas leakage treatment device and its construction method
WO2020024740A1 (en) Pile bottom grouting cavity and use method, and poured pile body and construction method of poured pile body
CN108951611A (en) Canal formula cuts assembled underground continuous wall and construction method
CN111119928B (en) Novel tunnel primary support structure and construction method
CN110500117B (en) Anti-seepage plugging method for grouting hole of shield segment
CN106522959B (en) A kind of borehole wall steel construction waterproof connecting plate and its construction technology
JP2003301526A (en) Connecting construction method for precast concrete vertical member
CN110593321A (en) Construction method of basement outer wall post-cast strip advanced sealing prefabricated clamping groove formwork-free system
CN212926718U (en) Prefabricated horizontal grouting sleeve connecting wall unit and wall
CN207062938U (en) Tubaeform mud jacking head and squeezing unit
CN111501510B (en) Microcrack repairing process for bridge deck
CN209557025U (en) Suitable for the locking angle ductule on steel bracket
CN105926650A (en) Concrete layer landslide prevention fixing device for slope building
CN217001019U (en) Integrated device for grouting and reinforcing concrete slab and reinforced and formed floor slab
CN205822204U (en) Domatic building concrete layer landslide-proofing fixing device
CN111734444B (en) Construction method of shield segment grouting reinforcement structure close to existing line
CN209837710U (en) Banded full-section slip casting pipe assembly
CN107724675A (en) A kind of reinforced concrete member post-cast strip shaped device
CN207647174U (en) A kind of reinforced concrete member post-cast strip molding machine
CN209760313U (en) Underground totally-enclosed pile head waterproof structure
CN114293810A (en) Method for reinforcing stone micro-pressure concrete filled structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant