CN109811631A - Traffic route conserves pretreated constructing device - Google Patents

Traffic route conserves pretreated constructing device Download PDF

Info

Publication number
CN109811631A
CN109811631A CN201910201193.XA CN201910201193A CN109811631A CN 109811631 A CN109811631 A CN 109811631A CN 201910201193 A CN201910201193 A CN 201910201193A CN 109811631 A CN109811631 A CN 109811631A
Authority
CN
China
Prior art keywords
trolley
belt pulley
belt
paint
conducting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910201193.XA
Other languages
Chinese (zh)
Other versions
CN109811631B (en
Inventor
孙晓玉
李传青
商联合
李建伟
屠大为
李冠军
田奇文
马金莲
翟俊峰
赵改静
张庆
赵杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910201193.XA priority Critical patent/CN109811631B/en
Publication of CN109811631A publication Critical patent/CN109811631A/en
Application granted granted Critical
Publication of CN109811631B publication Critical patent/CN109811631B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)

Abstract

The present invention relates to a kind of traffic routes to conserve pretreated constructing device, and the present invention efficiently solves the problems, such as that existing apparatus for striping of roads scratching process is relatively complicated and precision is not high;The technical solution of solution includes: that spray equipment is equipped on trolley, and spray equipment is just automatically stopped spraying after having drawn a roadmarking under control of the control system, after trolley moves forward set specific range, the spray equipment on trolley is set under the action of control system, road pavement is again started up to be sprayed, the trouble manually measured is eliminated, so that entire graticule spraying process is convenient, quick;Furthermore it is equipped with agitating device in coating cylinder, the coating being placed in paint can be effectively prevent to precipitate because placing the long period.

Description

Traffic route conserves pretreated constructing device
Technical field
The present invention relates to a kind of traffic construction equipment, specifically a kind of traffic route maintenance is filled with pretreated construction It sets.
Background technique
The means of transportation company of gradually attention with country to constructing road, China is in the ascendant, these means of transportation Company produces road line marker and other pavement construction machinery equipment mostly, and road line marker is for carrying out highway, road etc. The mapping of road surfaces Warning Mark is waited in road traffic safety sign such as zebra stripes, pavement, lane, and lines on road surface is road construction One important process in later period;And when the graticule drawn on road surface is longer because of spray time, due to by automotive wheel The destructions of extraneous factors such as roll and rub, it may appear that the phenomenon that part falls paint or fades will lead to the driver that passes by one's way and see not Graticule on clear road surface can have some potential safety problems in turn, need the road faded to these or part is destroyed at this time Face graticule is sprayed again;Existing road line marker is mainly by car body, the lineation device of wheel and installation on the car body Composition, when staff pushes car body, lineation device can cross along the travelling route of car body, the people in scratching process To control, but road line marker currently on the market still has certain defect when carrying out lines on road surface work, due to Lines on road surface is a duration process, therefore it is heavy because long-time placement can generate to be placed in the paint in paint tube It forms sediment, to cause the beauty of the second-rate influence road of the roadmarking drawn;Furthermore due to the graticule drawn on road The distance between be all to have (the distance between i.e. adjacent two pavement strips certain) centainly standardized, but practical at the scene draw When line, it is difficult to control the distance between adjacent two pavement strips and is allowed to constant gap, when paints a road marking Scribing line is started again at after pushing lineation device to move forward specific range after line, also needs manually to measure lineation device at this time The distance (namely the distance between two pavement strips are spaced) of forward movement, causes dashing work efficiency extremely low and artificial There is also biggish error, the time-consuming and laborious progress for being also unfavorable for entire roadmarking work for manual measurement, therefore we need A kind of traffic route maintenance roadmarking device is designed to be used to solve problem above.
Summary of the invention
For above situation, for the defect for overcoming the prior art, the present invention provides a kind of traffic route maintenance pretreatment Constructing device, the traffic route maintenance preferably resolve traditional roadmarking device in scribing line with pretreatment constructing device Existing more problem, for device itself after having drawn one of graticule, the spray equipment being set on trolley stops spraying, works as trolley After moving forward set specific range, the spray equipment being set on trolley is again started up road pavement and is sprayed, and saves The trouble manually measured, so that entire graticule spraying process is convenient, quick;Furthermore stirring dress is equipped in coating cylinder It sets, the coating being placed in paint can be effectively prevent to precipitate because placing the long period.
Specific technical solution is as follows:
Traffic route maintenance pretreated constructing device, including trolley, which is characterized in that the trolley equipped with paint can and Paint can is communicated with nozzle, connects between the paint can and nozzle through diaphragm pump, and longitudinal gap is set the cart base plate respectively There are the first belt pulley set and the second belt pulley set being laterally extended, is fixed with first on the first belt pulley set uplink belt and leads Electric block, cart base plate, which slides laterally to be connected on the first sliding block and the first sliding block, is fixed with spaced limited post, limited post On slide vertically the second conducting block for being combined with and matching with the first conducting block, second conducting block lower end both lateral sides difference It is arranged to inclined-plane and the first conducting block and the second conducting block matching part is likewise provided as inclined-plane, reset bullet being arranged on limited post Spring and reset spring one end are connected to the first sliding block other end and are connected to the second sliding block, the second belt pulley set and the first belt pulley set Between through with the first conducting block opposite position being fixed with driving lever on reversing arrangement connection and the second belt pulley set downlink belt, Driving lever lower end surface is set as inclined-plane, and the first conducting block and the second conducting block are series in the loop of voltage regulation being arranged on trolley and structure At the switch of diaphragm pump, trolley is equipped with speed regulation device and speed regulation device output end is connected to the second belt through third belt pulley set Wheel group, speed regulation device input terminal is connected with the first driving motor being set on trolley and the first driving motor be responsible for driving it is small Vehicle.
Preferably, first belt pulley set includes two first skins for being horizontally arranged at interval and being rotatablely installed in cart base plate Belt wheel is connected by the first belt between two first belt pulleys, the second belt pulley set include be horizontally arranged at interval and be rotatablely installed in Two second belt pulleys of cart base plate, are connected by the second belt between two second belt pulleys, and the reversing arrangement includes and is located at The first bevel gear and first bevel gear that first belt pulley of lateral one end rotates coaxially are engaged with rotational installation in cart base plate On second bevel gear, second bevel gear is engaged with the third hand tap gear rotated coaxially with the second belt pulley.
Preferably, the speed regulation device includes: that cart base plate upper surface is rotatably equipped with four groups and is horizontally arranged at interval and indulges To the rotating bar of extension, it is slidably connected jointly in mutually matched two groups of rotating bars there are two the plectane of longitudinal gap setting, is in It is concentric on two plectanes being diagonally arranged to be rotatably equipped with the first drive disk, concentric turn on another two diagonally positioned plectanes It is dynamic that second drive disk is installed, it is combined with driving belt jointly on four drive disks, the second drive disk positioned at longitudinal side is carried on the back Rotational installation is in axial sliding connection in the first axle on cart base plate from the first drive disk with matching side, is located at vertical Rotational installation has been in axial sliding connection in small away from the first drive disk with matching side to the second drive disk of the other side The second axis on car bottom plate, first axle is driven by the first driving motor and the first axle other end is connected with the 4th belt pulley set and warp 4th belt pulley set drives trolley, and the second axis other end is connect with third belt pulley set, and cart base plate is adjusted equipped with drive disk Transmission radius of the device for changing driving belt both ends, the effect adjusted the speed so as to realization.
Preferably, the drive disk regulating device includes: to be located at intermediate two rotating bars close to first driving motor one end point It does not cover and is engaged with driving gear between intrinsic driven gear and two driven gears jointly, driving gear is concentric to be rotatably equipped with snail It takes turns and turbine is combined with the worm screw being rotatably installed on trolley, the plectane corresponding positioned at intermediate two rotating bars matches position For be threadedly engaged and in same rotating bar two in oppositely arranged.
Preferably, trolley bottom longitudinal gap offers two the first slideway, the second slideways being laterally extended respectively, the One sliding block is slidably connected in the first slideway and the first sliding block is fixedly connected with through connecting rod close to the second slideway side and is slidably matched In the second sliding block in the second slideway, it is connected between the first slideway and the second slideway through rectangular opening and rod slide is matched with rectangle Hole is rotatably equipped in the second slideway on the first screw rod being laterally extended and the first screw rod and is slidably connected to by being threadedly engaged Baffle in second slideway, the first screw rod are spaced cooperation across the second sliding block and the second sliding block.
Preferably, the paint can upper end is equipped with internal gear disc and internal gear disc centre is equipped with rotational installation in paint can top The sun gear of wall, is engaged with several planetary gears between sun gear and internal gear disc and several planetary gear rotations are installed on and set The planet carrier at the top of paint can is set, the planet carrier upper end is installed on paint can roof, the sun gear through rotary drum By the second driving motor driving being set on paint can roof and sun gear lower end is fixed with the of coaxial heart rotation One agitating shaft, several planetary gear lower ends are respectively fixed with the second agitating shaft of co-axial heart rotation, the first agitating shaft, second Multiple flabellums are vertically fixed at intervals on agitating shaft, second driving motor output shaft is arranged with the coaxial heart septum of cylinder.
Preferably, the nozzle includes circular cylindrical cavity that is being laterally extended and connecting with diaphragm pump, circular cylindrical cavity bottom End offer several spray orifices and circular cylindrical cavity far from paint can one end by being threadedly engaged the second screw rod, the second screw rod is placed in One end is rotatably equipped with the plugging plate for sliding laterally and being connected in cylindrical cavity body in cylindrical cavity body.
Preferably, trolley bottom transverse ends, which are rotatably equipped with respectively in shaft and shaft, covers intrinsic wheel, described 4th belt pulley set includes the third belt pulley that set is fixed in first axle and third belt pulley is connected with through third belt and is fixed in The 4th belt pulley in shaft.
Preferably, the paint can upper end is equipped with feed inlet, passes through on the feed inlet and has been threadedly engaged capping.
Preferably, the trolley is equipped with handrail far from paint can one end.
Above-mentioned technical proposal beneficial effect is:
The present invention provides a kind of traffic route maintenance pretreatment constructing device, traffic route maintenance pretreatment constructing device It is relatively complicated and there are problems that error in scribing line to preferably resolve traditional roadmarking device, device itself is being drawn After one of pavement strip, the spray equipment being set on trolley stops spraying under control of the control system, when trolley is to Forward After moving set specific range, be set to spray equipment on trolley again under control of the control system starting road pavement into Row spraying, eliminates the trouble manually measured, relative to manually measuring, the program makes the accuracy of roadmarking It greatly improves, and makes entire graticule spraying process convenient, quick, improve the efficiency of roadmarking;Furthermore in coating cylinder It is interior to be equipped with agitating device, the coating being placed in paint can be effectively prevent to precipitate because placing the long period, so that marking Pavement strip it is more beautiful.
Detailed description of the invention
Fig. 1 is overall structure of the present invention;
Fig. 2 is overall structure schematic side view of the present invention;
Fig. 3 is overall structure oblique view of the present invention;
Fig. 4 is overall structure elevational schematic view of the present invention;
Fig. 5 is speed regulation device structure schematic top plan view inside inventive closure case;
Fig. 6 is another viewing angle constructions schematic diagram of speed regulation device inside inventive closure case;
Fig. 7 is that paint can longitudinal direction of the present invention one side wall leaves out rear schematic diagram of internal structure;
Fig. 8 is several planetary gears of the present invention and sun gear matching relationship schematic diagram;
Fig. 9 is that paint can roof of the present invention leaves out rear planet carrier, planetary gear, internal gear disc matching relationship schematic diagram;
Figure 10 is planet carrier of the present invention, planetary gear, sun gear, internal gear disc matching relationship schematic diagram;
Figure 11 is the first conducting block, the first belt pulley set, the second conducting block matching relationship schematic diagram of the invention;
Figure 12 is matching relationship schematic diagram when the first conducting block of the invention pushes the second conducting block to slide along cart base plate;
Figure 13 is matching relationship schematic diagram when driving lever of the present invention pushes the second conducting block to return;
Figure 14 is the first slideway, the first sliding block, the second conducting block and connecting rod matching relationship schematic diagram of the invention;
Figure 15 is the first slideway, the second slideway and the two internal sliding member matching relationship schematic diagram of the invention;
Positional diagram when Figure 16 is located at original state for the first conducting block of the invention, the second conducting block, driving lever three;
Figure 17 is internal structure schematic top plan view after nozzle section view of the present invention;
Figure 18 is another viewing angle constructions schematic diagram of nozzle interior structure of the present invention;
Figure 19 is schematic diagram after structure amplification at A of the present invention;
Figure 20 is present invention schematic diagram when carrying out dashing work.
1 in figure: trolley 1, paint can 2, nozzle 3, diaphragm pump 4, the first belt pulley set 5, the second belt pulley set 6, first leads Electric block 7, the first sliding block 8, limited post 9, the second conducting block 10, reset spring 11, driving lever 12, third belt pulley set 13, first drives Dynamic motor 14, the first belt pulley 15, the first belt 16, the second belt pulley 17, the second belt 18, first bevel gear 19, the second cone Gear 20, third hand tap gear 21, rotating bar 22, plectane 23, the first drive disk 24, the second drive disk 25, driving belt 26, first Axis 27, the second axis 28, the 4th belt pulley set 29, driven gear 30, driving gear 31, worm gear 32, worm screw 33, the first slideway 34, Second slideway 35, connecting rod 36, the second sliding block 37, rectangular opening 38, the first screw rod 39, baffle 40, internal gear disc 41, sun gear 42, Planetary gear 43, planet carrier 44, cylinder 45, the second driving motor 46, the first agitating shaft 47, the second agitating shaft 48, flabellum 49, circle Cylindrical chamber 50, spray orifice 51, the second screw rod 52, plugging plate 53, shaft 54, wheel 55, third belt pulley 56, the 4th belt pulley 57, feed inlet 58, capping 59, handrail 60, fully sheathed case 61, the first knob 62, the second knob 63, third knob 64, third skin Band 65, conduit 66.
Specific embodiment
For the present invention aforementioned and other technology contents, feature and effect, in following cooperation with reference to figures 1 through Figure 20 pairs In the detailed description of embodiment, can clearly it present.The structure content being previously mentioned in following embodiment is attached with specification Figure is reference.
Each exemplary embodiment of the invention is described below with reference to accompanying drawings.
Embodiment 1, traffic route conserve pretreated constructing device, including trolley 1, which is characterized in that the trolley 1 equipped with paint can 2 and paint can 2 is communicated with nozzle 3, connects between the paint can 2 and nozzle 3 through diaphragm pump 4, described small Longitudinal gap is equipped with the first belt pulley set 5 and the second belt pulley set 6 being laterally extended, first belt pulley to 1 bottom plate of vehicle respectively It is fixed with the first conducting block 7 on 5 uplink belts of group, 1 bottom plate of trolley, which slides laterally, to be connected on the first sliding block 8 and the first sliding block 8 It is fixed with spaced limited post 9, it is conductive that second for being combined with and matching with the first conducting block 7 is slid vertically on limited post 9 Block 10, the 10 lower end both lateral sides of the second conducting block are arranged respectively to inclined-plane and the first conducting block 7 is matched with the second conducting block 10 It closes position and is likewise provided as inclined-plane, reset spring 11 is arranged on limited post 9 and 11 one end of reset spring is connected to the first sliding block 8 The other end is connected to the second sliding block 37, through reversing arrangement connection and second between the second belt pulley set 6 and the first belt pulley set 5 Driving lever 12 is fixed on 6 downlink belt of belt pulley set with 7 opposite position of the first conducting block, 12 lower end surface of driving lever is set as oblique Face, the first conducting block 7 are series in the loop of voltage regulation being arranged on trolley 1 with the second conducting block 10 and constitute opening for diaphragm pump 4 It closes, trolley 1 is equipped with speed regulation device and speed regulation device output end is connected to the second belt pulley set 6 through third belt pulley set 13, adjusts Speed variator input terminal is connected with the first driving motor 14 being set on trolley 1 and the first driving motor 14 is responsible for driving trolley 1.
The traffic route maintenance preferably resolves traditional roadmarking device in scribing line with pretreatment constructing device Relatively complicated and there are problems that error, device itself is after having drawn a pavement strip, the spray equipment that is set on trolley 1 Stop spraying under control of the control system, after trolley 1 moves forward set specific range, is set on trolley 1 Spray equipment again under control of the control system starting road pavement sprayed, eliminate manually measure trouble (because It is constant for the distance between adjacent two pavement strips, manual measurement is also needed after having sprayed a pavement strip, to guarantee trolley 1 It is sprayed again after moving forward the specific distance);When in use, we are equipped on trolley 1 and apply the embodiment Charging basket 2 and paint can 2 are communicated with nozzle 3 through diaphragm pump 4, and when opening spraying, diaphragm pump 4 will deposit in the painting in paint can 2 Material sprays to ground through nozzle 3, and then realizes scribing line purpose, is how after having drawn a graticule to be automatically stopped spray about the device It applies and is again turned on being described in detail following for spraying after mobile set good specific range;
Specifically, we are respectively equipped with the first belt pulley set 5, the second belt pulley set 6, Wo Men in 1 bottom longitudinal gap of trolley The first conducting block 7(is fixed on first belt pulley set, 5 uplink belt referring to shown in attached drawing 12), 1 bottom plate of trolley and the first belt 5 opposite position of wheel group, which slides laterally, is connected with the first sliding block 8(referring to shown in attached drawing 14), it is fixed at intervals on the first sliding block 8 The second conducting block 10 matched with the first conducting block 7 is sliding combined on two limited posts 9 and two limited posts 9 jointly, first leads Electric block 7 and 10 contact site of the second conducting block are provided with conductive sheet (the first sliding block 8, limited post 9 are all made of insulating materials and are made) And the first conducting block 7 matches position with the second conducting block 10 and is set as inclined-plane, the first conducting block 7 and 10 phase of the second conducting block Mutually cooperate and (constitute diaphragm pump 4 to switch) and be connected on and be arranged on trolley 1 in loop of voltage regulation, diaphragm pump 4 is similarly series at Battery group is provided in the loop of voltage regulation and on trolley 1 for providing power supply to the loop of voltage regulation;When we set initial First conducting block 7, the second conducting block 10 are in state as shown in Fig. 12, and trolley 1 drives equipped with the first driving motor 14(first Dynamic motor 14 is connected with extraneous power supply through conducting wire) and the driving advance of trolley 1 of the first driving motor 14, trolley 1, which is equipped with, to be adjusted the speed Device and speed regulation device input terminal is connect with the first driving motor 14, speed regulation device output end is through third belt pulley set 13 and The connection of two belt pulley sets 6, therefore when staff starts the first driving motor 14 and starts to work, drive trolley 1 to move forward And the rotation of the second belt pulley set 6 is driven through third belt pulley set 13 by speed regulation device, due to the second belt pulley set 6 and first It is connected between belt pulley set 5 through reversing arrangement, therefore also synchronous backward is rotated the first belt pulley set 5 therewith;
We referring to shown in attached drawing 12, we set slide laterally the second conducting block 10 for being connected to 1 bottom plate of trolley can only be the One belt pulley set, 5 uplink belt is slided in the range of extending, and (i.e. 10 initial position of the second conducting block is located at the first belt Right above 5 one end of wheel group, the second conducting block 10 can farthest slide into that the first belt pulley set 5 is another along 1 bottom plate of trolley rectify on Side), it will be assumed that the second belt pulley set 6 is rotated in the counterclockwise direction under the drive of the first driving motor 14, then at this time First belt pulley set 5 is rotated along clockwise direction, and 7 upper end of the first conducting block contacts at 10 lower end of the second conducting block simultaneously at this time And the second conducting block 10 is pushed to be slid laterally along small size side bottom, the first conducting block 7 and the second conducting block 10 are mutual at this time Contact, therefore the loop of voltage regulation where diaphragm pump 4 is in an ON state, diaphragm pump 4 starts to work and will be in paint can 2 at this time Coating spray outward, the first conducting block 7 drives the first sliding block 8 and with the first belt pulley set 5 by the second conducting block 10 It rotates and is moved, so that second led at this time when the first conducting block 7 is moved to right above 5 other end of the first belt pulley set Electric block 10 cannot be further continued for along 1 bottom plate of trolley slide, the first conducting block 7 under the drive of the first belt pulley set 5 also after Continuous to be moved with the first belt pulley set 5, the first conducting block 7 and the second conducting block 10 pass through the mutual cooperation between inclined-plane at this time, Upward second conducting block 10 of first conducting block 7 makes the second conducting block 10 be slided and be compressed along limited post 9 upwards Reset spring 11, the first conducting block 7 crosses the second conducting block 10(movement of the second conducting block 10 stopping at this time and in the position at this time It sets, the first conducting block 7 and the second conducting block 10 are detached from this time, therefore loop of voltage regulation is in an off state and diaphragm pump 4 stops Work, spraying operation also stops therewith at this time), second conducting block 10 is multiple after the first conducting block 7 crosses the second conducting block 10 Restore again under the action of the spring 11 of position to original state, in the above process, the driving lever 12 being set in the second belt pulley set 6 Also it synchronizes therewith towards the movement of 6 other end of the second belt pulley set, when the first conducting block 7 crosses the second conducting block 10 and with first Belt pulley set 5 turns at 5 downlink belt position of the first belt pulley set, i.e., state as shown in Fig. 13 when, setting is the Driving lever 12 in two belt pulley sets 6 is moved at uplink belt position with the second belt pulley set 6, i.e., state as shown in Fig. 13 When, driving lever 12(driving lever 12 selects rubber material to be made at this time) upper surface just contacts at 10 lower end surface of the second conducting block, and Driving lever 12 pushes the second conducting block 10 along backtracking, the first conducting block 7 being now placed on 5 downlink belt of the first belt pulley set It is synchronous with driving lever 12 mobile towards the other end, when driving lever 12 pushes the second conducting block 10 to be moved to 5 other end of the first belt pulley set When surface, since the second conducting block 10 can be only moved to this, driving lever 12 is upward by the mutual cooperation between inclined-plane at this time Second conducting block 10 and make the second conducting block 10 upwards along limited post 9 slide so that driving lever 12 crosses the second conducting block 10 And as the second belt pulley set 6 continues to rotate, the first conducting block 7 is continued to rotate with the first belt pulley set 5 at this time, driving lever 12 It is continued to rotate also with the second belt pulley set 6, so that it is again at state as shown in Fig. 12 (the first conducting block 7 and the at this time Two conducting blocks 10 are contacted again, and the loop of voltage regulation being set on trolley 1 is again at on-state, and diaphragm pump 4 is also therewith at this time Start again at work and carry out spraying operation, that is, start next circulation), during this period, spraying operation is in stop working state, The distance that trolley 1 moves forward at this time is the spacing distance between the graticule of two road, then repeats above procedure again;
It is direct without selecting why we are provided with speed regulation device between the first driving motor 14 and the second belt pulley 17 It drives the second belt pulley set 6 to rotate the first driving motor 14, is because the rotation of the second belt pulley set 6 can be changed in the speed regulation device Speed and trolley 1 move forward the ratio of speed (if the second belt pulley set 6 is directly through the driving of the first driving motor 14, the second skin 6 velocity of rotation of belt wheel group is identical as 1 forward speed of trolley, also allows for the first conducting block 7 with the second conducting block 10 by being separated to Being contacted again this time is a definite value, and 6 length of the second belt pulley set is certain and 6 velocity of rotation one of the second belt pulley set It is fixed, thus the first conducting block 7 and the second conducting block 10 by be separated to be contacted again during time experienced also must be one Definite value, in this way, just the distance between unadjustable adjacent two roadmarking be spaced so that the applicability of the lineation device compared with It is narrow), so that the effect for adjusting distance between adjacent two roadmarking is realized, so that adjustable when the device is for different roadmarkings The distance between adjacent two roadmarking is saved, so that the device applicability is higher;
Embodiment 2, on the basis of embodiment 1, first belt pulley set 5 include being horizontally arranged at interval and being rotatablely installed in small Two first belt pulleys 15 of 1 bottom plate of vehicle are connected by the first belt 16 between two first belt pulleys 15, and the second belt pulley set 6 includes It is horizontally arranged at interval and is rotatablely installed two second belt pulleys 17 in 1 bottom plate of trolley, by the second skin between two second belt pulleys 17 Band 18 connects, the reversing arrangement include the first bevel gear 19 rotated coaxially with the first belt pulley 15 for being located at lateral one end and First bevel gear 19 is engaged with rotational installation in the second bevel gear 20 on 1 bottom plate of trolley, and second bevel gear 20 is engaged with and the The third hand tap gear 21 that two belt pulleys 17 rotate coaxially.
The embodiment is how to constitute and change about the first belt pulley set 5, the second belt pulley set 6 when in use It is how to work to be described in detail following to device;Referring to shown in attached drawing 13, the first belt pulley set 5 includes two and turns It moves the first belt pulley 15 being installed on 1 bottom plate of trolley and is connected between two first belt pulleys 15 by the first belt 16, the second skin Belt wheel group 6 includes being rotatablely installed between two second belt pulleys 17 on 1 bottom plate of trolley and two second belt pulleys 17 by the second skin Band 18 connects, and connects and is driven through reversing arrangement between the first belt pulley set 5 and the second belt pulley set 6, the first driving motor 14 warp Speed regulation device imparts power to third belt pulley set 13 and third belt pulley set 13 imparts power to the second belt pulley set 6, so that the second belt pulley set 6 is rotated, through reversing arrangement, (the second belt pulley 17 drives coaxially the second belt pulley set 6 The rotation of third hand tap gear 21 of rotation drives the rotate coaxially with the first belt pulley 15 first cone tooth through the commutation of second bevel gear 20 Wheel 19 is rotated in opposite direction) the first belt pulley set 5 is imparted power to, it drives the first belt pulley set 5 to rotate and makes The first belt pulley set 5 in opposite direction with the second belt pulley set 6 synchronize rotated, and then realize and be fixed on the first belt 16 On the first conducting block 7 that second conducting block 10 is pushed to the first belt pulley set 5 from original state (i.e. shown in attached drawing 12) is another (spraying operation, which is started to work, i.e. shown in attached drawing 13, during being somebody's turn to do carries out the spraying of graticule, and subsequent first leads after right above one end Electric block 7 is separated with the second conducting block 10, and spraying operation stops working), the driving lever 12 being fixed on the second belt 18 is led second Electric block 10 shifts initial position onto again and opens next circulation.
Embodiment 3, on the basis of embodiment 1, the speed regulation device include: that 1 bottom plate upper surface of trolley is rotatably equipped with Four groups of rotating bars 22 for being horizontally arranged at interval and longitudinally extending slidably connect two in mutually matched two groups of rotating bars 22 jointly The plectane 23 of a longitudinal gap setting, it is concentric on two diagonally positioned plectanes 23 to be rotatably equipped with the first drive disk 24, separately It is concentric on one two diagonally positioned plectanes 23 to be rotatably equipped with the second drive disk 25, it is combined with biography jointly on four drive disks Dynamic belt 26, the second drive disk 25 positioned at longitudinal side slide axially company away from 24 side of the first drive disk with matching Rotational installation is connected in the first axle 27 on 1 bottom plate of trolley, the second drive disk 25 positioned at longitudinal other side deviates to match therewith 24 side of the first drive disk closed is in axial sliding connection rotational installation in the second axis 28 on 1 bottom plate of trolley, first axle 27 by The driving of first driving motor 14 and 27 other end of first axle are connected with the 4th belt pulley set 29 and drive through the 4th belt pulley set 29 Trolley 1,28 other end of the second axis are connect with third belt pulley set 13, and 1 bottom plate of trolley is equipped with drive disk regulating device for changing The transmission radius for becoming 26 both ends of driving belt, so as to realizing the effect of speed regulation.
The embodiment is how to be adjusted the speed that detailed retouch will be done following about speed regulation device when in use It states;It is driven specifically, power is passed to be in axial sliding connection with first axle 27 second through first axle 27 by the first driving motor 14 Moving plate 25, second drive disk 25 and the first drive disk 24 with matching composition driving disc spacing pressing, another mutually matched second Drive disk 25 and the first drive disk 24 constitute driven disc, and driving disc spacing pressing imparts power to driven disc by driving belt 26, in turn Drive the second drive disk 25 being in axial sliding connection with the second axis 28 to rotate, and second drive disk 25 drive the second axis 28 into Row rotation, since 28 other end of the second axis is connected with third belt pulley set 13, and then power is transmitted through third belt pulley set 13 To the second belt pulley set 6 and the second belt pulley set 6 is driven to be rotated, due to being connected with the 4th belt pulley set in first axle 27 29, the first driving motor 14 also drives the 4th belt pulley set 29 to be rotated while driving first axle 27 to rotate, and then drives Dynamic trolley 1 moves forward;As shown in Fig. 5, the distance between mutually matched first drive disk 24 and the second drive disk 25 phase Deng (i.e. the transmission radius at 26 both ends of driving belt is identical), the velocity of rotation of the speed regulation device input terminal and output end turn at this time Dynamic speed is identical, preferably, the drive disk that we are equipped with for changing 26 transverse ends transmission radius of driving belt on trolley 1 Regulating device, i.e. change driving disc spacing pressing is (between the second drive disk 25 and the first drive disk 24 of 27 axial sliding fit of first axle Distance), change driven disc (i.e. between the second drive disk 25 of 28 axial sliding fit of the second axis and the first drive disk 24 Distance) so as to arbitrarily change the transmission radius ratio of 26 transverse ends of driving belt, and then realize and exported from the speed regulation device End exports different size of velocity of rotation, when trolley 1 drives in the first driving motor 14 and moves forward the certain situation of speed Under, we can be realized to obtain different second belt pulley sets 6, the first skin by the velocity of rotation of change speed regulation device output end (to separate this period be spraying operation work to the velocity of rotation of belt wheel group 5 from touching for the first conducting block 7 and the second conducting block 10 Make the duration, the first conducting block 7 and the second conducting block 10 are contacted again from being separated to, this period is spraying operation pause Time, the distance that trolley 1 moves forward are the distance between adjacent two road graticule interval because the first conducting block 7 with Second conducting block 10 is separated to that the location of to be contacted again all be in specific constant position therefore first from touching every time The different velocity of rotation correspondence of belt pulley 15 obtains the different working times and time out), so as to realize that control is adjacent The effect of distance interval between two roadmarkings.
Embodiment 4, on the basis of embodiment 3, the drive disk regulating device includes: to be located at intermediate two rotating bars 22 to lean on Nearly first driving motor, 14 one end covers respectively is engaged with driving gear between intrinsic driven gear 30 and two driven gears 30 jointly 31, driving gear 31 is concentric to be rotatably equipped with worm gear 32 and turbine is combined with the worm screw 33 being rotatably installed on trolley 1, is located at It is to be threadedly engaged and two in same rotating bar 22 in reversed that the corresponding plectane 23 of intermediate two rotating bars 22, which matches position, Setting.
The embodiment when in use, about about drive disk regulating device be how to work will it is following do in detail Description;We cover intrinsic driven gear 30 close to 14 one end of the first driving motor being located in the middle two rotating bars 22 respectively, Referring to shown in attached drawing 6, driving gear 31 is engaged between two driven gears 30 jointly and the concentric rotation of driving gear 31 is pacified Equipped with worm gear 32, worm gear 32 is combined with the worm screw 33 being rotatably installed on fully sheathed case 61 and worm screw 33 is placed in fully sheathed case 61 outer one End is fixed with the second knob 63, we drive worm gear 32 to rotate and then screwing the second knob 63, therefore drives actively Gear 31 is rotated, and driving gear 31 respectively drives to be rotated to two driven gears 30 of engagement in opposite direction therewith, We (are screw thread between plectane 23 and rotating bar 22 offering screw thread positioned at intermediate two rotating bars 22 and 23 matching part of plectane Cooperation) and same rotating bar 22 on two screw threads in oppositely arranged, screw thread therewith can be driven when rotating bar 22 rotates Two plectanes 23 of cooperation are close or separate simultaneously, since two rotating bars 22 are under driven gear 30 with matching cooperation, Rotation direction is rotated in the opposite sense, therefore two plectanes 23 in one of rotating bar 22 are mobile towards close direction When, in another rotating bar 22 two plectanes 23 must away from direction it is mobile, and then change and be rotatably installed on two plectanes 23 Drive disk between distance effect, to realize the different transmission radius ratio of 26 transverse ends of driving belt, and then adjust the speed dress Set the exportable different velocity of rotation of output end.
Embodiment 5, on the basis of embodiment 1, the 1 bottom longitudinal gap of trolley offer two respectively and are laterally extended First slideway 34, the second slideway 35, the first sliding block 8 is slidably connected in the first slideway 34 and the first sliding block 8 is close to the second slideway 35 sides are fixedly connected with the second sliding block 37 being snug fit in the second slideway 35 through connecting rod 36, and the first slideway 34 and second is sliding It is connected between road 35 through rectangular opening 38 and connecting rod 36 is snug fit at rectangular opening 38, be rotatably equipped in the second slideway 35 and laterally prolong Pass through on the first screw rod 39 and the first screw rod 39 stretched and is threadedly engaged the baffle 40 being slidably connected in the second slideway 35, first Screw rod 39 is spaced cooperation across the second sliding block 37 and the second sliding block 37.
The embodiment is one since the first belt pulley set 5 rotates the passed by distance of circulation when in use Definite value (i.e. the length of the first belt 16), thus time for being contacted with the second conducting block 10 of the first conducting block 7 and both do not contact Time be added together be a fixed value (length of the roadmarking sprayed plus between adjacent two roadmarking away from Sow discord every being similarly a fixed value), after we change the velocity of rotation of the first belt pulley set 5 by speed regulation device, although It can control the distance between adjacent two road graticule interval, but similarly affect the length of sprayed roadmarking, The length of roadmarking is not just being controlled at this time, equally also brings larger inconvenience to spraying operation;
Preferably, we are made that improvement to this, and 1 bottom longitudinal gap of trolley offers the first slideway being laterally extended respectively 34, the second slideway 35, the first sliding block 8 are snug fit in the first slideway 34, are sliding combined with the second sliding block in the second slideway 35 It 37 and first is connected to through rectangular opening 38 between slideway 34 and the second slideway 35, we are in the first sliding block 8 close to the second slideway 35 One end is fixedly connected with connecting rod 36 and 36 other end of connecting rod is fixedly connected on the second sliding block 37, is between connecting rod 36 and rectangular opening 38 It is slidably matched (referring to shown in attached drawing 14,15), the first sliding block 8 and the second conducting block 10 for sliding vertically cooperation therewith are sliding along first Meeting the second sliding block of synchronous drive 37 is slided along the second slideway 35 while road 34 is slided, we are in the second slideway 35 It is rotatably equipped with the first screw rod 39, the first screw rod 39 is spaced cooperation across the second sliding block 37 and the second sliding block 37, the On one screw rod 39 by be threadedly engaged the baffle 40 being slidably connected in the second slideway 35 and the first screw rod 39 to be pierced by second sliding Road 35 is placed in the outer one end of car body and is fixed with the first knob 62, and 40 position of baffle is arranged in the second sliding block 37 and the first knob 62 Between (referring to shown in attached drawing 4), we can by screw the first knob 62 and then by the first screw rod 39 driving baffle 40 the It is moved in two slideways 35, and is located in any required position, when we set the distance between adjacent two road graticule It (is realized afterwards by speed regulation device), when needing to change sprayed roadmarking length, we screw the first screw rod 39 at this time So that baffle 40 is parked at required position, the first conducting block 7 starts position (the i.e. baffle 40 contacted with the second conducting block 10 at this time Present position) change, but the two disengaging configuration or constant, still rectify for the first belt 16 far from the first knob 62 1 on Side's (referring to shown in attached drawing 13), in the case where 15 velocity of rotation of the first belt pulley determines, the first conducting block 7 is led with second at this time Corresponding variation occurs for the time of contact (i.e. spraying operation continuous working period) of electric block 10, thus determining adjacent two roads Between marking lines after distance, the effect of control roadmarking length may be implemented, so that the applicability of the device greatly improves.
Embodiment 6, on the basis of embodiment 1,2 upper end of paint can are equipped with internal gear disc 41 and 41 central part of internal gear disc Position is equipped with rotational installation in the sun gear 42 of 2 roof of paint can, and several rows are engaged between sun gear 42 and internal gear disc 41 Star gear 43 and several planetary gears 43 are rotatablely installed on the planet carrier 44 that 2 top of paint can is arranged in, the planet carrier 44 Through the rotational installation of cylinder 45 in 2 roof of paint can, the sun gear 42 is driven by be set on 2 roof of paint can second at end The driving of motor 46 and 42 lower end of sun gear are fixed with the first agitating shaft 47 of coaxial heart rotation, under several planetary gears 43 End is respectively fixed with the second agitating shaft 48 of co-axial heart rotation, is vertically spaced on the first agitating shaft 47, the second agitating shaft 48 Multiple flabellums 49 are fixed with, 46 output shaft of the second driving motor is arranged with the coaxial heart septum of cylinder 45.
The embodiment when in use, referring to attached drawing 8,9, it is shown, preferably, we are equipped in paint can 2 and are used for The agitating device for stirring coating can effectively avoid the coating being located in paint can 2 from generating precipitation status because long-time is placed Occur, influences the effect of scribing line;It is how to work to be described in detail following about the agitating device;Specifically, I 2 upper end of paint can is provided with internal gear disc 41 and is rotatably equipped on 2 roof of paint can and the concentric setting of internal gear disc 41 Sun gear 42, and we are provided with the second driving motor 46,46 output shaft of the second driving motor on 2 roof of paint can It is placed in paint can 2 and sun gear 42 is driven to rotate, we are equipped with several points between internal gear disc 41 and sun gear 42 The planetary gear 43 not being meshed with internal gear disc 41, sun gear 42, several rotational installations of planetary gear 43 are in setting in the sun On the planet carrier 44 of 42 top of gear, which is equipped with the cylinder 45 of connection fixed thereto and planet carrier 44 through circle 45 rotational installation of cylinder on 2 roof of paint can (referring to shown in attached drawing 10), 46 output shaft of the cylinder 45 and the second driving motor It is concentric and be spaced setting, we 42 lower end of sun gear be fixed with the first agitating shaft 47 of coaxial heart rotation and It is fixed with the second agitating shaft 48 of co-axial heart rotation in several 43 lower ends of planetary gear, we are in the first agitating shaft 47, the Multiple flabellums 49 are vertically fixed at intervals on two agitating shafts 48, the second driving motor 46 is connected with external power supply by conducting wire, I By 46 controller of the second driving motor control the second driving motor 46 work, at this time the second driving motor 46 drive sun tooth Wheel 42 rotates and multiple planetary gears 43 is driven to be rotated, so that several planetary gears 43 surround the sun while rotation Gear 42 revolves, therefore the first agitating shaft 47 being firmly connected with it, the second agitating shaft 48 is driven to drive flabellum 49 respectively Rotation, the first agitating shaft 47 rotated coaxially with sun gear 42 drive flabellum 49 to carry out the effect that stirring coating is played in rotation, Multiple second agitating shafts 48 itself carry out rotation under the drive of planetary gear 43 and surround the first agitating shaft 47 again and rotated, Therefore preferable mixing effect can be played, so that the coating deposited in paint can 2 will not sink due to after a long time The phenomenon that shallow lake, so that the graticule quality sprayed is guaranteed.
Embodiment 7, on the basis of embodiment 1, the nozzle 3 include circle that is being laterally extended and connecting with diaphragm pump 4 Cylindrical chamber 50,50 bottom end of circular cylindrical cavity offers several spray orifices 51 and circular cylindrical cavity 50 passes through far from 2 one end of paint can The second screw rod 52 has been threadedly engaged it, the second screw rod 52, which is placed in one end in circular cylindrical cavity 50 and is rotatably equipped with to slide laterally, to be connected to Plugging plate 53 in circular cylindrical cavity 50.
The embodiment when in use, about nozzle 3 be how will be located at volume that the coating in paint can 2 sprays will be It is described in detail below;Specifically, the diaphragm pump 4 is connected to through conduit 66 with paint can 2 and 4 other end of diaphragm pump is communicated with Circular cylindrical cavity 50,50 lower end of circular cylindrical cavity offer multiple spray orifices 51, will be located at paint can when diaphragm pump 4 works Coating in 2 is pumped into circular cylindrical cavity 50 through conduit 66, and will be set to the spray orifice 51 of 50 lower end of circular cylindrical cavity to Outer ejection, preferably, for the width of adjustable sprayed graticule, we are equipped in circular cylindrical cavity 50 and slide laterally It is connected to the plugging plate 53 of 50 inner wall of circular cylindrical cavity and the plugging plate 53 is rotatably equipped with and cylinder away from 2 one end of paint can By the second screw rod 52 being threadedly engaged between cavity 50, the second screw rod 52 is placed in the outer one end of circular cylindrical cavity 50 and is fixed with third Knob 64, we to slide laterally the plugging plate 53 being connected in circular cylindrical cavity 50 in cylinder by screwing third knob 64 It is slid laterally in shape cavity 50, and then spray orifice 51 of the plugging plate 53 away from 2 side of paint can will be located at and blocked and applied Material is sprayed out of 50 space of circular cylindrical cavity between plugging plate 53 and diaphragm pump 4 from spray orifice 51 outward, is changed to realize Become the effect of sprayed marking width, so that the applicability of the device, flexibility are higher.
Embodiment 8, on the basis of embodiment 3, the 1 bottom transverse ends of trolley be rotatably equipped with respectively shaft 54 and Cover intrinsic wheel 55 in shaft 54, the 4th belt pulley set 29 includes the third belt pulley 56 that set is fixed in first axle 27 and the Three belt pulleys 56 are connected with the 4th belt pulley 57 being fixed in shaft 54 through third belt 65.
The embodiment is the general how to move under the driving of the first driving motor 14 about trolley 1 when in use It is described in detail following;It is covered admittedly specifically, 1 bottom transverse ends of trolley are rotatably equipped with respectively in shaft 54 and shaft 54 There is wheel 55, the state referring to shown in attached drawing 3, the first axle 27 is driven by the first driving motor 14 and covered in first axle 27 intrinsic Third belt pulley 56, rotational installation is in covering intrinsic 4th belt pulley 57 in the shaft 54 of 1 bottom of trolley, third belt pulley 56 and the It is connected between four belt pulleys 57 by third belt 65, then passes through first axle 27 when the work of the first driving motor 14 and drive third skin Belt wheel 56 rotates and then drives the rotation of the 4th belt pulley 57 by third belt 65, and then realizes the mobile effect of driving trolley 1.
Embodiment 9, on the basis of embodiment 1,2 upper end of paint can are equipped with feed inlet 58, on the feed inlet 58 By being threadedly engaged capping 59.
When in use, we are equipped with feed inlet 58 in 2 upper end of paint can to the embodiment, when 2 inside courtyard of paint can makes Coating can be added into paint can 2 by the feed inlet 58 when being finished, we are sealed the feed inlet 58 by capping 59 Feed inlet 58 is opened by screwing the capping 59 when blocking up, and needing to add coating.
Embodiment 10, on the basis of embodiment 1, the trolley 1 are equipped with handrail 60 far from 2 one end of paint can.Preferably, We are equipped with handrail 60 in the lateral one end of trolley 1, push trolley 1 to advance under the driving of the first driving motor 14 for trolley 1.
The present invention provides a kind of traffic route maintenance pretreatment constructing device, traffic route maintenance pretreatment construction Device preferably resolves that traditional roadmarking device is relatively complicated and there are problems that error in scribing line, and device itself exists After having drawn one of pavement strip, the spray equipment being set on trolley 1 stops spraying under control of the control system, when trolley 1 After moving forward set specific range, the spray equipment being set on trolley 1 starts under control of the control system again Road pavement is sprayed, and the trouble manually measured is eliminated, and relative to manually measuring, the program makes roadmarking Accuracy greatly improve, and make entire graticule spraying process convenient, quick, improve the efficiency of roadmarking;Furthermore It is equipped with agitating device in coating cylinder, the coating being placed in paint can 2 can be effectively prevent to precipitate because placing the long period, So that the pavement strip marked is more beautiful.
It is described above simply to illustrate that of the invention, it is understood that the present invention is not limited to the above embodiments, meets The various variants of inventive concept are within the scope of the present invention.

Claims (10)

1. traffic route conserves pretreated constructing device, including trolley (1), which is characterized in that the trolley (1) is equipped with Paint can (2) and paint can (2) is communicated with nozzle (3), connect between the paint can (2) and nozzle (3) through diaphragm pump (4), Longitudinal gap is equipped with the first belt pulley set (5) and the second belt pulley set (6) being laterally extended, institute to trolley (1) bottom plate respectively It states and is fixed with the first conducting block (7) on the first belt pulley set (5) uplink belt, trolley (1) bottom plate, which slides laterally, is connected with first It is fixed with spaced limited post (9) on sliding block (8) and the first sliding block (8), slides vertically and be combined with and the on limited post (9) The second conducting block (10) that one conducting block (7) matches, the second conducting block (10) lower end both lateral sides are arranged respectively to tiltedly Face and the first conducting block (7) and the second conducting block (10) matching part are likewise provided as inclined-plane, and limited post is arranged with reset on (9) Spring (11) and reset spring (11) one end are connected to the first sliding block (8) other end and are connected to the second sliding block (37), the second belt It connect between wheel group (6) and the first belt pulley set (5) through reversing arrangement and on the second belt pulley set (6) downlink belt with first Conducting block (7) opposite position is fixed with driving lever (12), and driving lever (12) lower end surface is set as inclined-plane, the first conducting block (7) and the Two conducting blocks (10) are series at setting in the loop of voltage regulation on trolley (1) and constitute the switch of diaphragm pump (4), on trolley (1) Equipped with speed regulation device and speed regulation device output end through third belt pulley set (13) is connected to the second belt pulley set (6), speed regulation device Input terminal is connected with the first driving motor (14) being set on trolley (1) and the first driving motor (14) is responsible for driving trolley (1).
2. traffic route according to claim 1 conserves pretreated constructing device, which is characterized in that first skin Belt wheel group (5) includes being horizontally arranged at interval and being rotatablely installed two first belt pulleys (15) in trolley (1) bottom plate, two first belts It takes turns and is connected between (15) by the first belt (16), the second belt pulley set (6) includes being horizontally arranged at interval and being rotatablely installed in trolley (1) two second belt pulleys (17) of bottom plate are connected between two second belt pulleys (17), the reversing arrangement by the second belt (18) Including the first bevel gear (19) rotated coaxially with the first belt pulley (15) for being located at lateral one end and first bevel gear (19) is nibbled Conjunction has rotational installation in the second bevel gear (20) on trolley (1) bottom plate, and second bevel gear (20) is engaged with and the second belt pulley (17) third hand tap gear (21) rotated coaxially.
3. traffic route according to claim 1 conserves pretreated constructing device, which is characterized in that the speed regulation dress Setting includes: that trolley (1) bottom plate upper surface is rotatably equipped with four groups of rotating bars (22) for being horizontally arranged at interval and longitudinally extending, mutually The plectane (23) of longitudinal gap setting there are two being slidably connected jointly on two groups of rotating bars (22) of cooperation, diagonally positioned two It is concentric on plectane (23) to be rotatably equipped with the first drive disk (24), another diagonally positioned upper concentric turn of two plectanes (23) It is dynamic to be equipped with the second drive disk (25), driving belt (26) are combined on four drive disks jointly, positioned at the second of longitudinal side Drive disk (25) has been in axial sliding connection rotational installation in trolley (1) bottom away from the first drive disk (24) side with matching First axle (27) on plate, the second drive disk (25) positioned at longitudinal other side deviate from the first drive disk (24) with matching Side is in axial sliding connection rotational installation in the second axis (28) on trolley (1) bottom plate, and first axle (27) is by the first driving electricity Machine (14) driving and first axle (27) other end are connected with the 4th belt pulley set (29) and drive through the 4th belt pulley set (29) small Vehicle (1), the second axis (28) other end are connect with third belt pulley set (13), and trolley (1) bottom plate is equipped with drive disk regulating device For changing the transmission radius at driving belt (26) both ends, so as to realizing the effect of speed regulation.
4. traffic route according to claim 3 conserves pretreated constructing device, which is characterized in that the drive disk Regulating device includes: to be located at intermediate two rotating bars (22) to cover intrinsic driven gear respectively close to the first driving motor (14) one end (30) and between two driven gears (30) it is engaged with jointly driving gear (31), driving gear (31) is concentric to be rotatably equipped with snail It takes turns (32) and turbine is combined with the worm screw (33) being rotatably installed on trolley (1), it is corresponding to be located at intermediate two rotating bars (22) Plectane (23) to match position be to be threadedly engaged and two in same rotating bar (22) in oppositely arranged.
5. traffic route according to claim 1 conserves pretreated constructing device, which is characterized in that the trolley (1) bottom longitudinal gap offers two the first slideway (34), the second slideways (35) being laterally extended respectively, and the first sliding block (8) is sliding It is dynamic to be connected in the first slideway (34) and the first sliding block (8) close to the second slideway (35) side is fixedly connected with cunning through connecting rod (36) The second sliding block (37) being actively tied in the second slideway (35), through rectangular opening between the first slideway (34) and the second slideway (35) (38) it is connected to and connecting rod (36) is snug fit at rectangular opening (38), is rotatably equipped with first be laterally extended in the second slideway (35) Pass through on screw rod (39) and the first screw rod (39) and is threadedly engaged the baffle (40) being slidably connected in the second slideway (35), first Screw rod (39) is spaced cooperation across the second sliding block (37) and the second sliding block (37).
6. traffic route according to claim 1 conserves pretreated constructing device, which is characterized in that the paint can (2) upper end is equipped with internal gear disc (41) and internal gear disc (41) centre is equipped with rotational installation in the sun tooth of paint can (2) roof It takes turns (42), several planetary gears (43) is engaged between sun gear (42) and internal gear disc (41) and several planetary gears (43) turn Dynamic to be installed on the planet carrier (44) being arranged at the top of paint can (2), planet carrier (44) upper end is rotatablely installed through cylinder (45) In paint can (2) roof, the sun gear (42) is driven by the second driving motor (46) being set on paint can (2) roof And sun gear (42) lower end is fixed with the first agitating shaft (47) of coaxial heart rotation, several planetary gear (43) lower ends point The second agitating shaft (48) of co-axial heart rotation is not fixed with, between vertical on the first agitating shaft (47), the second agitating shaft (48) Every being fixed with multiple flabellums (49), the second driving motor (46) output shaft is arranged with the coaxial heart septum of cylinder (45).
7. traffic route according to claim 1 conserves pretreated constructing device, which is characterized in that the nozzle It (3) include circular cylindrical cavity (50) that is being laterally extended and being connect with diaphragm pump (4), circular cylindrical cavity (50) is if bottom end offers Dry spray orifice (51) and circular cylindrical cavity (50) pass through far from paint can (2) one end has been threadedly engaged the second screw rod (52), the second spiral shell Bar (52) is placed in circular cylindrical cavity (50) interior one end and is rotatably equipped with the closure for sliding laterally and being connected in circular cylindrical cavity (50) Plate (53).
8. traffic route according to claim 3 conserves pretreated constructing device, which is characterized in that the trolley (1) bottom transverse ends are rotatably equipped in shaft (54) and shaft (54) respectively and cover intrinsic wheel (55), the 4th belt Wheel group (29) includes covering the third belt pulley (56) being fixed on first axle (27) and third belt pulley (56) through third belt (65) It is connected with the 4th belt pulley (57) being fixed on shaft (54).
9. traffic route according to claim 1 conserves pretreated constructing device, which is characterized in that the paint can (2) upper end is equipped with feed inlet (58), by being threadedly engaged capping (59) on the feed inlet (58).
10. traffic route according to claim 1 conserves pretreated constructing device, which is characterized in that the trolley (1) handrail (60) are equipped with far from paint can (2) one end.
CN201910201193.XA 2019-03-18 2019-03-18 Construction equipment of preliminary treatment for traffic road maintenance Active CN109811631B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910201193.XA CN109811631B (en) 2019-03-18 2019-03-18 Construction equipment of preliminary treatment for traffic road maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910201193.XA CN109811631B (en) 2019-03-18 2019-03-18 Construction equipment of preliminary treatment for traffic road maintenance

Publications (2)

Publication Number Publication Date
CN109811631A true CN109811631A (en) 2019-05-28
CN109811631B CN109811631B (en) 2020-11-27

Family

ID=66609168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910201193.XA Active CN109811631B (en) 2019-03-18 2019-03-18 Construction equipment of preliminary treatment for traffic road maintenance

Country Status (1)

Country Link
CN (1) CN109811631B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110132216A (en) * 2019-06-24 2019-08-16 王道领 A kind of flatness detector calibration auxiliary device
CN110700110A (en) * 2019-10-31 2020-01-17 河南城建学院 Steel bar spacing point marking device
CN113668355A (en) * 2021-09-16 2021-11-19 王英帅 Automatic marking device for asphalt pavement
CN114351561A (en) * 2021-12-30 2022-04-15 冯满耀 Bionic magnetic control cavitation precipitation-prevention negative pressure type adsorption guide highway construction marking vehicle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2338894A (en) * 1941-05-17 1944-01-11 Lucian H Beebe Highway marking system and device for applying same
CN207376434U (en) * 2017-09-30 2018-05-18 浙江星球交通工程有限公司 A kind of energy saving and environment friendly road mark paint spraying equipment
US20180195242A1 (en) * 2017-01-09 2018-07-12 Graco Minnesota Inc. Electric line striper with inverter
CN109356013A (en) * 2018-11-27 2019-02-19 上海展富交通设施工程有限公司 Self-propelled two-component point automatic doubler surface glouer and application thereof and spot-on method
CN109407784A (en) * 2018-11-09 2019-03-01 郑州职业技术学院 A kind of multi-action computer data acquisition device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2338894A (en) * 1941-05-17 1944-01-11 Lucian H Beebe Highway marking system and device for applying same
US20180195242A1 (en) * 2017-01-09 2018-07-12 Graco Minnesota Inc. Electric line striper with inverter
CN207376434U (en) * 2017-09-30 2018-05-18 浙江星球交通工程有限公司 A kind of energy saving and environment friendly road mark paint spraying equipment
CN109407784A (en) * 2018-11-09 2019-03-01 郑州职业技术学院 A kind of multi-action computer data acquisition device
CN109356013A (en) * 2018-11-27 2019-02-19 上海展富交通设施工程有限公司 Self-propelled two-component point automatic doubler surface glouer and application thereof and spot-on method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110132216A (en) * 2019-06-24 2019-08-16 王道领 A kind of flatness detector calibration auxiliary device
CN110132216B (en) * 2019-06-24 2020-10-27 上海铜正技术服务中心(有限合伙) Flatness detector calibration auxiliary device
CN110700110A (en) * 2019-10-31 2020-01-17 河南城建学院 Steel bar spacing point marking device
CN113668355A (en) * 2021-09-16 2021-11-19 王英帅 Automatic marking device for asphalt pavement
CN114351561A (en) * 2021-12-30 2022-04-15 冯满耀 Bionic magnetic control cavitation precipitation-prevention negative pressure type adsorption guide highway construction marking vehicle
CN114351561B (en) * 2021-12-30 2024-06-21 冯满耀 Bionic magnetic control air pocket anti-precipitation negative pressure type adsorption guiding highway construction scribing vehicle

Also Published As

Publication number Publication date
CN109811631B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
CN109811631A (en) Traffic route conserves pretreated constructing device
CN211726297U (en) Trees spraying device is used in gardens maintenance
CN204444072U (en) Cream automatic spray apparatus
CN109524178A (en) A kind of auxiliary material filling device for cable
CN206128576U (en) Spraying apparatus for construction coating
CN206311411U (en) For the small-sized pugmill of cohesive soil combined measurement method of liquid and plastic limits experiment
CN204887905U (en) Medicine multiple purpose aeroplane is fertilizied, spouted
CN206433346U (en) Soil-repairing agent flusher
CN204608586U (en) A kind of identifier marking car
CN208830102U (en) One kind of multiple microballon mixing arrangements
CN209753184U (en) Anticorrosive paint spraying device of water conservancy water and electricity gate
CN212349232U (en) Trunk whitewash device for agriculture and forestry
CN111083981B (en) Water conservancy self-driven liquid manure integration fertigation device
CN110652916A (en) Vehicle body paint vehicle processing device for electric vehicle production and using method
CN112586321A (en) Agricultural irrigation equipment based on thing networking
CN218941931U (en) Water-saving type garden irrigation device
CN116374259A (en) Filling equipment and method for producing oil wax type cosmetics with high pearlescent content
CN210832651U (en) Snow making device for ice and snow amusement park
CN113853917A (en) Water and fertilizer integrated water-saving irrigation device
CN107938490B (en) A kind of road and bridge construction surface spraying device
CN216137457U (en) Device is paintd with trees truck in gardens maintenance
CN111622467A (en) Municipal construction is with whitewashing device
CN212065460U (en) Landscape plant spills medicine device
CN109224990A (en) A kind of emulsion paint agitating device
CN202061781U (en) Waterproof coiled material multi-color forming device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant