CN109802393B - 铁路再生电能潮流控制算法 - Google Patents

铁路再生电能潮流控制算法 Download PDF

Info

Publication number
CN109802393B
CN109802393B CN201910227808.6A CN201910227808A CN109802393B CN 109802393 B CN109802393 B CN 109802393B CN 201910227808 A CN201910227808 A CN 201910227808A CN 109802393 B CN109802393 B CN 109802393B
Authority
CN
China
Prior art keywords
meter
locomotive
power
power supply
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910227808.6A
Other languages
English (en)
Other versions
CN109802393A (zh
Inventor
邓西川
高革平
李攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Kaitian Electrical Reliability Experiment Co ltd
Original Assignee
Xi'an Kaitian Railway Electrical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Kaitian Railway Electrical Co ltd filed Critical Xi'an Kaitian Railway Electrical Co ltd
Priority to CN201910227808.6A priority Critical patent/CN109802393B/zh
Publication of CN109802393A publication Critical patent/CN109802393A/zh
Application granted granted Critical
Publication of CN109802393B publication Critical patent/CN109802393B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

本发明公开了一种铁路再生电能潮流控制算法,包括根据铁路再生电能的大小和位置,结合牵引和储能的状态,按照优先级别对所述再生电能进行消纳分配,计算得到再生电能潮流大小和方向。本发明铁路再生电能潮流控制算法,通过功率削峰作用,降低牵引变压器的最大需量设定值,实现最大化消纳利用再生电能。

Description

铁路再生电能潮流控制算法
技术领域
本发明属于铁路牵引供电系统技术领域,具体涉及一种铁路再生电能潮流控制算法。
背景技术
电力系统在运行时,在电源电势激励作用下,电流或功率从电源通过系统各元件流入负荷,分布于电力网各处,称为电力潮流。电力系统是把很多的发电站、变电站、配电站、用户等由输电和配电线路连接起来形成的系统。电力(电能)是在发电站产生的,其中一部分在经过输配电线、变电站和配电站时损失掉,剩下的绝大部分最终被负荷所消耗。这样,从电的产生到被负荷消耗,流过哪一路输配电线,各节点电压是多少,这种计算就叫电力潮流计算或简称潮流计算。
目前,在铁路牵引供电系统的再生电能利用方面,对于再生电能潮流的控制计算,主要在单个牵引变电所内部的两个供电臂之间进行。对于把再生电能通过分区所融通到其他牵引变电所的供电臂,则没有进行考虑。加之,再生电能潮流控制目标的侧重点不同,因而不能实现再生电能潮流的最优化流动。
发明内容
本发明的目的是提供一种铁路再生电能潮流控制算法,解决现有再生电能潮流控制算法没有把再生电能融通到其他牵引变电所供电臂的问题。
本发明所采用的技术方案是,一种铁路再生电能潮流控制算法,包括根据铁路再生电能的大小和位置,结合牵引和储能的状态,按照优先级别对再生电能进行消纳分配,计算得到再生电能潮流大小和方向。
本发明的技术特征还在于,
具体包括以下步骤:
步骤1,确定再生电能消纳的供电臂范围;
步骤2,读取各供电臂实时功率P(t);
步骤3,根据实时功率P(t)计算各供电臂实时电能值E,若电能值E为负,则表明是再生电能,若电能值E为正,则表明是牵引电能;
步骤4,根据两个供电臂实时功率代数和∑P(t)以及设定的峰值门槛值PT,判断是否需要进行削峰;若∑P(t)>PT,则需要进行削峰,计算出削峰功率大小和方向;若不需要进行削峰,根据储能单元的储能状况,判断是否需要进行储能;如果需要储能,计算出储能功率的大小和方向,如果不需要储能,计算牵引功率的大小和方向;
步骤5,将步骤4中的削峰功率、储能功率或牵引功率转换成再生电能消纳指令,再发送给分布式电能融通设备,即完成对再生电能潮流控制的一个循环。
步骤1中,通过铁路牵引电网动态自动组网技术确定再生电能消纳的供电臂范围。
步骤2中,各供电臂实时功率P(t)包括左侧供电臂机车的实时功率PL机车(t)和右侧供电臂机车的实时功率PR机车(t),其中
PL机车(t)=PL(t)+PA(t)+PCL(t) (1)
PR机车(t)=PR(t)+PB(t)+PCR(t) (2)
式中,PL(t)表示左侧供电臂牵引变压器的实时功率,PA(t)表示左侧供电臂变流器的实时功率,PCL(t)表示左侧供电臂从相邻牵引变电所借用的实时功率,PR(t)表示右侧供电臂牵引变压器的实时功率,PB(t)表示右侧供电臂变流器的实时功率,PCR(t)表示右侧供电臂从相邻牵引变电所借用的实时功率。
步骤3中,根据实时功率P(t)计算所述各供电臂的实时电能值E,计算表达式为
Figure BDA0002005763220000031
步骤4中,峰值门槛值PT的确定,根据所述分布式电能融通设备的额定功率Pe以及牵引变压器的额定容量PBY,与供电公司签订的最大需量合同,把最大需量按PBY-Pe确定,则峰值门槛值PT最低可以设定为:
PT=PBY-Pe-PG (4)
式中,PG表示容量安全阈值。
步骤4中,削峰包括首次削峰和后续削峰,分布式电能融通设备首次削峰前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (5)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (6)
若∑P(t)>PT,则判断需要削峰。需要削峰的峰值功率差额为:
ΔP(t)=∑P(t)-PT (7)
若储能单元SOC≥30%,则令:
PCL计(t)=PCR计(t)=0 (8)
对于分布式电能融通设备的各个功率值来说,带“计”下标的为计算值,不带“计”下标的为实时检测值;
1.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PA计(t)=∑P(t)-PT,PB计(t)=0 (9)
1.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PB计(t)=∑P(t)-PT,PA计(t)=0 (10)
1.3当PL机车(t)>0,PR机车(t)>0时,两侧同时进行等值削峰,左右两侧供电臂削峰功率分别为:
Figure BDA0002005763220000041
以上三种情况下,均有:
PS计(t)=PA计(t)+PB计(t) (12)
式中:PS计(t)表示DC/DC机组的计算功率;
分布式电能融通设备后续削峰时,有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PA(t)+PR(t)+PB(t) (13)
若∑P(t)>PT,则判断需要继续削峰,此时,若储能单元SOC≥30%,则令:
PCL计(t)=PCR计(t)=0 (14)
2.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PA计(t)=∑P(t)-PT,PB计(t)=0 (15)
2.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PB计(t)=∑P(t)-PT,PA计(t)=0 (16)
2.3当PL机车(t)>0,PR机车(t)>0时,需两侧供电臂同时进行等值削峰,左右两侧供电臂削峰功率分别为:
Figure BDA0002005763220000051
以上三种情况下,均有:
PS计(t)=PA计(t)+PB计(t) (18)
此时,若储能单元SOC<30%,则令:
PA计(t)=PB计(t)=0 (19)
故有:
PS计(t)=PA计(t)+PB计(t)=0 (20)
3.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左侧供电臂借用削峰功率为:
PCL计(t)=∑P(t)-PT,PCR计(t)=0 (21)
3.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,右侧供电臂借用削峰功率为:
PCR计(t)=∑P(t)-PT,PCL计(t)=0 (22)
3.3当PL机车(t)>0,PR机车(t)>0时,需两侧供电臂同时进行等值削峰,左右两侧供电臂借用削峰功率分别为:
Figure BDA0002005763220000061
除以上削峰要满足的条件外,分布式电能融通设备削峰还必须同时满足以下约束条件:
Figure BDA0002005763220000062
在开始从相邻牵引变电所借用功率进行削峰后,有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PCL(t)+PR(t)+PCR(t) (25)
若∑P(t)>PT,则判断需要继续削峰;
循环进行以上过程,直至∑P(t)≤PT,不满足削峰条件为止。
步骤4中,分布式电能融通设备储能前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (26)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (27)
若∑P(t)<0,且储能单元SOC<100%,则判断需要进行储能;
首次储能时:
1.1当PL机车(t)<0,PR机车(t)≥0时,仅需左侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (28)
1.2当PL机车(t)≥0,PR机车(t)<0时,仅需右侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (29)
1.3当PL机车(t)<0,PR机车(t)<0时,需两侧供电臂同时进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PL(t),PB计(t)=PR(t),PS计(t)=∑P(t) (30)
首次储能后,有:
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t) (31)
若∑P(t)<0,且储能单元SOC<100%,则判断需要继续进行储能;
2.1当PL机车(t)<0,PR机车(t)≥0时,仅需左侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (32)
2.2当PL机车(t)≥0,PR机车(t)<0时,仅需右侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (33)
2.3当PL机车(t)<0,PR机车(t)<0时,需要两侧同时进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PL(t)+PA(t),PB计(t)=PR(t)+PB(t),PS计(t)=∑P(t) (34)
除以上条件外,储能还需要满足以下约束条件:
Figure BDA0002005763220000071
循环进行以上过程,直至∑P(t)或SOC不满足储能条件为止。
步骤4中,分布式电能融通设备释能前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (36)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (37)
若0<∑P(t)≤PT,且储能单元SOC>60%,则判断需要进行牵引释能;
首次进行牵引释能时:
1.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (38)
1.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行释能,右左右两侧供电臂及DC/DC机组释能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (39)
1.3当PL机车(t)>0,PR机车(t)≤0时,两侧同时进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PL(t),PB计(t)=PR(t),PS计(t)=∑P(t) (40)
首次释能后,
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t) (41)
若∑P(t)<0,且储能单元SOC>60%,则判断需要继续进行释能,此时:
2.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (42)
2.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (43)
2.3当PL机车(t)>0,PR机车(t)≤0时,两侧同时进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PL(t)+PA(t),PB计(t)=PR(t)+PB(t),PS计(t)=∑P(t) (44)
除以上条件外,释能还需要满足以下约束条件:
Figure BDA0002005763220000091
循环进行以上过程,直至∑P(t)或SOC不满足释能条件为止。
本发明的有益效果在于,
(1)通过功率削峰作用,降低牵引变压器的最大需量设定值;
(2)最大化消纳利用再生电能;
(3)最优化储能单元工作模式,延长储能单元寿命。
附图说明
图1是本发明铁路再生电能潮流控制算法流程图;
图2是本发明铁路再生电能潮流控制算法中供电臂的实时功率关系示意图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步的详细说明。
本发明一种铁路再生电能潮流控制算法,参照图1,包括根据铁路再生电能的大小和位置,结合牵引和储能的状态,按照优先级别对再生电能进行消纳分配,计算得到再生电能潮流大小和方向。
具体包括以下步骤:
步骤1,确定再生电能消纳的供电臂范围,在此范围内进行再生电能潮流计算;
步骤2,通过智能数据采集系统,读取各供电臂实时功率P(t);
步骤3,根据实时功率P(t)计算各供电臂实时电能值E,若电能值E为负,则表明是再生电能,若电能值E为正,则表明是牵引电能;
步骤4,列出供电臂的实时功率关系式,参照图2,图中各功率箭头所指方向定义为正;根据两个供电臂实时功率代数和∑P(t)以及设定的峰值门槛值PT,判断是否需要进行削峰;若∑P(t)>PT,则需要进行削峰,计算出削峰功率大小和方向;若不需要进行削峰,根据储能单元的储能状况,判断是否需要进行储能;如果需要储能,计算出储能功率的大小和方向,如果不需要储能,计算牵引功率的大小和方向;储能单元的储能状况为储能单元的电池荷电状态SOC,即储能单元的剩余电量;
SOC,全称是State of Charge,电池荷电状态,也叫剩余电量,代表的是电池使用一段时间或长期搁置不用后的剩余可放电电量与其完全充电状态的电量的比值,常用百分数表示。其一般用一个字节也就是两位的十六进制表示(取值范围为0~100),含义是剩余电量为0%~100%,当SOC=0时表示电池放电完全,当SOC=100%时表示电池完全充满。
步骤5,将步骤4中的削峰功率、储能功率或牵引功率转换成再生电能消纳指令,再发送给分布式电能融通设备,即完成对再生电能潮流控制的一个循环。
步骤1中,通过“铁路牵引电网动态自动组网技术”确定再生电能消纳的供电臂范围;
步骤2中,各供电臂实时功率P(t)包括左侧供电臂机车的实时功率PL机车(t)和右侧供电臂机车的实时功率PR机车(t),其中
PL机车(t)=PL(t)+PA(t)+PCL(t) (1)
PR机车(t)=PR(t)+PB(t)+PCR(t) (2)
式中,PL(t)表示左侧供电臂牵引变压器的实时功率,PA(t)表示左侧供电臂变流器的实时功率,PCL(t)表示左侧供电臂从相邻牵引变电所借用的实时功率,PR(t)表示右侧供电臂牵引变压器的实时功率,PB(t)表示右侧供电臂变流器的实时功率,PCR(t)表示右侧供电臂从相邻牵引变电所借用的实时功率。PA(t)和PB(t)的优先级别高于PCL(t)和PCR(t),即当储能单元SOC≥30%有能量供给PA(t)和PB(t)时,不必动用PCL(t)和PCR(t)。
步骤3中,根据实时功率p(t)计算各供电臂的实时电能值E,计算表达式为
Figure BDA0002005763220000111
步骤4中,峰值门槛值PT的确定。根据所述分布式电能融通设备的额定功率Pe以及牵引变压器的额定容量PBY,与供电公司签订的最大需量合同,把最大需量按PBY-Pe确定,则峰值门槛值PT最低可以设定为:
PT=PBY-Pe-PG (4)
式中,PG表示容量安全阈值。
步骤4中,分布式电能融通设备削峰前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (5)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (6)
若∑P(t)>PT,则判断需要削峰。需要削峰的峰值功率差额为:
ΔP(t)=∑P(t)-PT (7)
削峰包括首次削峰和后续削峰;
若储能单元SOC≥30%,则令:
PCL计(t)=PCR计(t)=0 (8)
注:对于分布式电能融通设备的各个功率值来说,带“计”下标的为计算值,不带“计”下标的为实时检测值。
1.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PA计(t)=∑P(t)-PT,PB计(t)=0 (9)
1.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PB计(t)=∑P(t)-PT,PA计(t)=0 (10)
1.3当PL机车(t)>0,PR机车(t)>0时,两侧同时进行等值削峰,左右两侧供电臂削峰功率分别为:
Figure BDA0002005763220000131
以上三种情况下,均有:
PS计(t)=PA计(t)+PB计(t) (12)
式中:PS计(t)表示DC/DC机组的计算功率。
分布式电能融通设备后续削峰时,有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PA(t)+PR(t)+PB(t) (13)
若∑P(t)>PT,则判断需要继续削峰,此时,若储能单元SOC≥30%,则令:
PCL计(t)=PCR计(t)=0 (14)
2.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PA计(t)=∑P(t)-PT,PB计(t)=0 (15)
2.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PB计(t)=∑P(t)-PT,PA计(t)=0 (16)
2.3当PL机车(t)>0,PR机车(t)>0时,需两侧供电臂同时进行等值削峰,左右两侧供电臂削峰功率分别为:
Figure BDA0002005763220000132
以上三种情况下,均有:
PS计(t)=PA计(t)+PB计(t) (18)
此时,若储能单元SOC<30%,则令:
PA计(t)=PB计(t)=0 (19)
故有:
PS计(t)=PA计(t)+PB计(t)=0 (20)
3.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左侧供电臂借用削峰功率为:
PCL计(t)=∑P(t)-PT,PCR计(t)=0 (21)
3.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,右侧供电臂借用削峰功率为:
PCR计(t)=∑P(t)-PT,PCL计(t)=0 (22)
3.3当PL机车(t)>0,PR机车(t)>0时,需两侧供电臂同时进行等值削峰,左右两侧供电臂借用削峰功率分别为:
Figure BDA0002005763220000141
除以上削峰要满足的条件外,分布式电能融通设备削峰还必须同时满足以下约束条件:
Figure BDA0002005763220000142
在开始从相邻牵引变电所借用功率进行削峰后,有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PCL(t)+PR(t)+PCR(t) (25)
若∑P(t)>PT,则判断需要继续削峰。
循环进行以上过程,直至∑P(t)≤PT,不满足削峰条件为止。
步骤4中,分布式电能融通设备储能前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (26)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (27)
若∑P(t)<0,且储能单元SOC<100%,则判断需要进行储能;
首次储能时:
1.1当PL机车(t)<0,PR机车(t)≥0时,仅需左侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (28)
1.2当PL机车(t)≥0,PR机车(t)<0时,仅需右侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (29)
1.3当PL机车(t)<0,PR机车(t)<0时,需两侧供电臂同时进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PL(t),PB计(t)=PR(t),PS计(t)=∑P(t) (30)
首次储能后,有:
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t) (31)
若∑P(t)<0,且储能单元SOC<100%,则判断需要继续进行储能。
2.1当PL机车(t)<0,PR机车(t)≥0时,仅需左侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (32)
2.2当PL机车(t)≥0,PR机车(t)<0时,仅需右侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (33)
2.3当PL机车(t)<0,PR机车(t)<0时,需要两侧同时进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PL(t)+PA(t),PB计(t)=PR(t)+PB(t),PS计(t)=∑P(t) (34)
除以上条件外,储能还需要满足以下约束条件:
Figure BDA0002005763220000161
循环进行以上过程,直至∑P(t)或SOC不满足储能条件为止。
步骤4中,分布式电能融通设备释能前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (36)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (37)
若0<∑P(t)≤PT,且储能单元SOC>60%,则判断需要进行牵引释能;
首次进行牵引释能时:
1.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (38)
1.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (39)
1.3当PL机车(t)>0,PR机车(t)≤0时,两侧同时进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PL(t),PB计(t)=PR(t),PS计(t)=∑P(t) (40)
首次释能后,
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t) (41)
若∑P(t)<0,且储能单元SOC>60%,则判断需要继续进行释能,此时:
2.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (42)
2.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (43)
2.3当PL机车(t)>0,PR机车(t)≤0时,两侧同时进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PL(t)+PA(t),PB计(t)=PR(t)+PB(t),PS计(t)=∑P(t) (44)
除以上条件外,释能还需要满足以下约束条件:
Figure BDA0002005763220000171
循环进行以上过程,直至∑P(t)或SOC不满足释能条件为止。
步骤5中,将步骤4中的削峰功率、储能功率或牵引功率转换成再生电能消纳指令采用的通信帧格式为:
Figure BDA0002005763220000172
Figure BDA0002005763220000181
通信帧字段说明:
Figure BDA0002005763220000182
Figure BDA0002005763220000191
实施例1
假设分布式电能融通设备的额定功率为Pe=5MW,牵引变压器额定容量为PBY=40MVA,安全阈值取PG=0.1MVA,则峰值门槛值为PT=PBY-Pe-PG=40-5-0.1=34.9MVA。
当检测到左侧供电臂实时功率为PL(t)=21MW,右侧供电臂实时功率为PR(t)=16MW时,
PA(t)=PCL(t)=PB(t)=PCR(t)=0,PS(t)=0
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t)=21+16=37MW
因∑P(t)>PT,则判断需要进行削峰,需要削峰的峰值功率差额为:
ΔP(t)=∑P(t)-PT=2.1MW
此时,若储能单元SOC≥30%,则不需要从相邻牵引变电所借用功率,故令:
PCL计(t)=PCR计(t)=0
又因PL机车(t)=PL(t)>0,PR机车(t)=PR(t)>0,故需两侧供电臂进行等值削峰,两侧供电臂的削峰功率均为:
Figure BDA0002005763220000201
此时,DC/DC机组的削峰功率为:
PS计(t)=PA计(t)+PB计(t)=2.1MW
满足
Figure BDA0002005763220000202
将计算出的上述削峰功率PCL计(t)、PCR计(t)、PA计(t)、PB计(t)和PS计(t)转换成再生电能消纳指令,发送给分布式电能融通设备,即完成首次削峰潮流控制。
分布式电能融通设备首次削峰后,假设检测到左侧供电臂实时功率为PL(t)=20MW,左侧供电臂变流器的实时功率为PA(t)=1.05MW,右侧供电臂实时功率为PR(t)=15MW,右侧供电臂变流器的实时功率为PB(t)=1.05MW,则:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PA(t)+PR(t)+PB(t)
=20+1.05+15+1.05=37.1MW
因∑P(t)>PT,则判断需要继续进行削峰。
此时,若储能单元SOC≥30%,则不需要从相邻牵引变电所借用功率,故令:
PCL计(t)=PCR计(t)=0
又因PL机车(t)=PL(t)+PA(t)>0,PR机车(t)=PR(t)+PB(t)>0,故需两侧供电臂进行等值削峰,两侧供电臂的削峰功率均为:
Figure BDA0002005763220000211
此时,DC/DC机组的削峰功率为:
PS计(t)=PA计(t)+PB计(t)=2.2MW
满足
Figure BDA0002005763220000212
将计算出的上述削峰功率PCL计(t)、PCR计(t)、PA计(t)、PB计(t)和PS计(t)转换成再生电能消纳指令,发送给分布式电能融通设备,即完成再次削峰潮流控制。
上述过程循环一段时间后,假设检测到左侧供电臂实时功率为PL(t)=19MW,左侧供电臂变流器的实时功率为PA(t)=0.9MW,右侧供电臂实时功率为PR(t)=15MW,右侧供电臂变流器的实时功率为PB(t)=0.9MW,则:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PA(t)+PR(t)+PB(t)
=19+0.9+15+0.9=35.8MW
因∑P(t)>PT,则判断需要继续进行削峰。
此时,若储能单元SOC<30%,则必须需从相邻牵引变电所借用功率,而停止从储能单元取功率,故令:
PA计(t)=PB计(t)=0
PS计(t)=PA计(t)+PB计(t)=0
又因PL机车(t)=PL(t)+PA(t)>0,PR机车(t)=PR(t)+PB(t)>0,故需两侧供电臂进行等值削峰,两侧供电臂的借用削峰功率均为:
Figure BDA0002005763220000221
满足
Figure BDA0002005763220000222
将计算出的上述削峰功率PCL计(t)、PCR计(t)、PA计(t)、PB计(t)和PS计(t)转换成再生电能消纳指令,发送给分布式电能融通设备,即完成首次从相邻牵引变电所借用功率进行削峰的潮流控制。
在后续循环中,有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PCL(t)+PR(t)+PCR(t)
若∑P(t)>PT,则判断需要继续借用功率进行削峰。
循环进行以上过程,直至∑P(t)≤PT,不满足削峰条件为止。
实施例2
假设分布式电能融通设备的额定功率为Pe=5MW,牵引变压器额定容量为PBY=40MVA,安全阈值取PG=0.1MVA,则峰值门槛值为PT=PBY-Pe-PG=40-5-0.1=34.9MVA。
当检测到左侧供电臂实时功率为PL(t)=-1MW,右侧供电臂实时功率为PR(t)=-2MW时,
PA(t)=PCL(t)=PB(t)=PCR(t)=0
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t)=-3MW
因∑P(t)<0,假设储能单元SOC<100%,则判断需要进行储能;
又因PL机车(t)=PL(t)<0,PR机车(t)=PR(t)<0,故需两侧供电臂同时进行储能,储能功率分别为:
PA计(t)=PL(t)=-1MW
PB计(t)=PR(t)=-2MW
PS计(t)=∑P(t)=-3MW
满足
Figure BDA0002005763220000231
将计算出的储能功率PA计(t)、PB计(t)、PS计(t)转换成再生电能消纳指令,发送给分布式电能融通设备,即完成本次再生电能储能潮流控制。
若开始储能后,检测到左侧供电臂牵引变压器实时功率为PL(t)=-0.1MW,左侧供电臂变流器实时功率为PA(t)=-1MW,右侧供电臂牵引变压器实时功率为PR(t)=-0.1MW,右侧供电臂变流器实时功率为PB(t)=-2MW,则
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t)
=(-0.1)+(-1)+(-0.1)+(-2)
=-3.2MW
因∑P(t)<0,假设储能单元SOC<100%,则判断需要继续进行储能;
又因PL机车(t)=PL(t)+PA(t)<0,PR机车(t)=PR(t)+PB(t)<0,故需两侧供电臂同时进行储能,储能功率分别为:
PA计(t)=PL(t)+PA(t)=(-0.1)+(-1)=-1.1MW
PB计(t)=PR(t)+PB(t)=(-0.1)+(-2)=-2.1MW
PS计(t)=∑P(t)=-3.2MW
满足
Figure BDA0002005763220000241
将计算出的储能功率PA计(t)、PB计(t)、PS计(t)转换成再生电能消纳指令,发送给分布式电能融通设备,即完成本次再生电能储能潮流控制。
循环进行以上过程,直至∑P(t)或SOC不满足储能条件为止。
实施例3
假设分布式电能融通设备的额定功率为Pe=5MW,牵引变压器额定容量为PBY=40MVA,安全阈值取PG=0.1MVA,则峰值门槛值为PT=PBY-Pe-PG=40-5-0.1=34.9MVA。
当检测到左侧供电臂实时功率为PL(t)=15MW,右侧供电臂实时功率为PR(t)=-3MW时,
PA(t)=PCL(t)=PB(t)=PCR(t)=0
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t)=12MW
因0<∑P(t)≤PT,若储能单元SOC>60%,则判断需要进行牵引释能;
又因PL机车(t)=PL(t)>0,PR机车(t)=PR(t)≤0,则仅需对左侧供电臂进行牵引释能,释能功率为:
PA计(t)=PS计(t)=∑P(t)=12MW,PB计(t)=0
因PA计(t)+PB计(t)=12MW>Pe
不满足
Figure BDA0002005763220000251
所以分布式电能融通设备最大只能以额定功率进行释能,即令:
PA计(t)=PS计(t)=Pe=5MW,PB计(t)=0
将计算出的释能功率PA计(t)、PB计(t)、PS计(t)转换成再生电能消纳指令,发送给分布式电能融通设备,即完成本次再生电能释能潮流控制。
若开始释能后,检测到左侧供电臂牵引变压器实时功率为PL(t)=9.8MW,左侧供电臂变流器实时功率为PA(t)=5MW,右侧供电臂牵引变压器实时功率为PR(t)=-3MW,右侧供电臂变流器实时功率为PB(t)=0MW,则
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t)
=9.8+5+(-3)+0
=11.8MW
又因PL机车(t)=PL(t)+PA(t)>0,PR机车(t)=PR(t)+PB(t)≤0,则仅需对左侧供电臂进行牵引释能,释能功率为:
PA计(t)=PS计(t)=∑P(t)=11.8MW,PB计(t)=0
因PA计(t)+PB计(t)=11.8MW>Pe
不满足
Figure BDA0002005763220000261
所以分布式电能融通设备最大只能以额定功率进行释能,即令:
PA计(t)=PS计(t)=Pe=5MW,PB计(t)=0
将计算出的释能功率PA计(t)、PB计(t)、PS计(t)转换成再生电能消纳指令,发送给分布式电能融通设备,即完成本次再生电能释能潮流控制。
循环进行以上过程,直至∑P(t)或SOC不满足释能条件为止。

Claims (3)

1.一种铁路再生电能潮流控制算法,其特征在于,包括根据铁路再生电能的大小和位置,结合牵引和储能的状态,按照优先级别对所述再生电能进行消纳分配,计算得到再生电能潮流大小和方向;
具体包括以下步骤:
步骤1,确定再生电能消纳的供电臂范围;
步骤2,读取各供电臂实时功率P(t);
步骤3,根据实时功率P(t)计算各供电臂实时电能值E,若电能值E为负,则表明是再生电能,若电能值E为正,则表明是牵引电能;
步骤4,根据两个供电臂实时功率代数和∑P(t)以及设定的峰值门槛值PT,判断是否需要进行削峰;若∑P(t)>PT,则需要进行削峰,计算出削峰功率大小和方向;若不需要进行削峰,根据储能单元的储能状况,判断是否需要进行储能;如果需要储能,计算出储能功率的大小和方向,如果不需要储能,计算牵引功率的大小和方向;
步骤5,将步骤4中的削峰功率、储能功率或牵引功率转换成再生电能消纳指令,发送给分布式电能融通设备,即完成对再生电能潮流控制的一个循环;
所述步骤1中,通过铁路牵引电网动态自动组网技术确定再生电能消纳的供电臂范围;
所述步骤2中,各供电臂实时功率P(t)包括左侧供电臂机车的实时功率PL机车(t)和右侧供电臂机车的实时功率PR机车(t),其中
PL机车(t)=PL(t)+PA(t)+PCL(t) (1)
PR机车(t)=PR(t)+PB(t)+PCR(t) (2)
式中,PL(t)表示左侧供电臂牵引变压器的实时功率,PA(t)表示左侧供电臂变流器的实时功率,PCL(t)表示左侧供电臂从相邻牵引变电所借用的实时功率,PR(t)表示右侧供电臂牵引变压器的实时功率,PB(t)表示右侧供电臂变流器的实时功率,PCR(t)表示右侧供电臂从相邻牵引变电所借用的实时功率;
所述步骤3中,根据实时功率p(t)计算所述各供电臂的实时电能值E,计算表达式为
Figure FDA0002524525270000021
所述步骤4中,峰值门槛值PT的确定,根据所述分布式电能融通设备的额定功率Pe以及牵引变压器的额定容量PBY,与供电公司签订的最大需量合同,把最大需量按PBY-Pe确定,则峰值门槛值PT最低设定为:
PT=PBY-Pe-PG (4)
式中,PG表示容量安全阈值;
所述步骤4中,削峰包括首次削峰和后续削峰,分布式电能融通设备首次削峰前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (5)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (6)
若∑P(t)>PT,则判断需要削峰,需要削峰的峰值功率差额为:
ΔP(t)=∑P(t)-PT (7)
若储能单元SOC≥30%,则令:
PCL计(t)=PCR计(t)=0 (8)
对于分布式电能融通设备的各个功率值来说,带“计”下标的为计算值,不带“计”下标的为实时检测值;
1.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PA计(t)=∑P(t)-PT,PB计(t)=0 (9)
1.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PB计(t)=∑P(t)-PT,PA计(t)=0 (10)
1.3当PL机车(t)>0,PR机车(t)>0时,两侧同时进行等值削峰,左右两侧供电臂削峰功率分别为:
Figure FDA0002524525270000031
以上三种情况下,均有:
PS计(t)=PA计(t)+PB计(t) (12)
式中:PS计(t)表示DC/DC机组的计算功率;
分布式电能融通设备后续削峰时,有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PA(t)+PR(t)+PB(t) (13)
若∑P(t)>PT,则判断需要继续削峰,此时,若储能单元SOC≥30%,则令:
PCL计(t)=PCR计(t)=0 (14)
2.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PA计(t)=∑P(t)-PT,PB计(t)=0 (15)
2.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,左右两侧供电臂削峰功率分别为:
PB计(t)=∑P(t)-PT,PA计(t)=0 (16)
2.3当PL机车(t)>0,PR机车(t)>0时,需两侧供电臂同时进行等值削峰,左右两侧供电臂削峰功率分别为:
Figure FDA0002524525270000041
以上三种情况下,均有:
PS计(t)=PA计(t)+PB计(t) (18)
此时,若储能单元SOC<30%,则令:
PA计(t)=PB计(t)=0 (19)
故有:
PS计(t)=PA计(t)+PB计(t)=0 (20)
3.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行削峰,左侧供电臂借用削峰功率为:
PCL计(t)=∑P(t)-PT,PCR计(t)=0 (21)
3.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行削峰,右侧供电臂借用削峰功率为:
PCR计(t)=∑P(t)-PT,PCL计(t)=0 (22)
3.3当PL机车(t)>0,PR机车(t)>0时,需两侧供电臂同时进行等值削峰,左右两侧供电臂借用削峰功率分别为:
Figure FDA0002524525270000051
除以上削峰要满足的条件外,分布式电能融通设备削峰还必须同时满足以下约束条件:
Figure FDA0002524525270000052
在开始从相邻牵引变电所借用功率进行削峰后,有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PCL(t)+PR(t)+PCR(t) (25)
若∑P(t)>PT,则判断需要继续削峰;
循环进行以上过程,直至∑P(t)≤PT,不满足削峰条件为止。
2.根据权利要求1所述的一种铁路再生电能潮流控制算法,其特征在于,所述步骤4中,分布式电能融通设备储能前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (26)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (27)
若∑P(t)<0,且储能单元SOC<100%,则判断需要进行储能;
首次储能时:
1.1当PL机车(t)<0,PR机车(t)≥0时,仅需左侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (28)
1.2当PL机车(t)≥0,PR机车(t)<0时,仅需右侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (29)
1.3当PL机车(t)<0,PR机车(t)<0时,需两侧供电臂同时进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PL(t),PB计(t)=PR(t),PS计(t)=∑P(t) (30)
首次储能后,有:
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t) (31)
若∑P(t)<0,且储能单元SOC<100%,则判断需要继续进行储能;
2.1当PL机车(t)<0,PR机车(t)≥0时,仅需左侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (32)
2.2当PL机车(t)≥0,PR机车(t)<0时,仅需右侧供电臂进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (33)
2.3当PL机车(t)<0,PR机车(t)<0时,需要两侧同时进行储能,左右两侧供电臂及DC/DC机组储能功率分别为:
PA计(t)=PL(t)+PA(t),PB计(t)=PR(t)+PB(t),PS计(t)=∑P(t) (34)
除以上条件外,储能还需要满足以下约束条件:
Figure FDA0002524525270000061
循环进行以上过程,直至∑P(t)或SOC不满足储能条件为止。
3.根据权利要求1所述的一种铁路再生电能潮流控制算法,其特征在于,所述步骤4中,分布式电能融通设备释能前一瞬间:
PA(t)=PCL(t)=PB(t)=PCR(t)=0 (36)
故有:
∑P(t)=PL机车(t)+PR机车(t)=PL(t)+PR(t) (37)
若0<∑P(t)≤PT,且储能单元SOC>60%,则判断需要进行牵引释能;
首次进行牵引释能时:
1.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (38)
1.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (39)
1.3当PL机车(t)>0,PR机车(t)≤0时,两侧同时进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PL(t),PB计(t)=PR(t),PS计(t)=∑P(t) (40)
首次释能后,
∑P(t)=PL(t)+PA(t)+PR(t)+PB(t) (41)
若∑P(t)<0,且储能单元SOC>60%,则判断需要继续进行释能,此时:
2.1当PL机车(t)>0,PR机车(t)≤0时,仅需左侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PS计(t)=∑P(t),PB计(t)=0 (42)
2.2当PL机车(t)≤0,PR机车(t)>0时,仅需右侧供电臂进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PB计(t)=PS计(t)=∑P(t),PA计(t)=0 (43)
2.3当PL机车(t)>0,PR机车(t)≤0时,两侧同时进行释能,左右两侧供电臂及DC/DC机组释能功率分别为:
PA计(t)=PL(t)+PA(t),PB计(t)=PR(t)+PB(t),PS计(t)=∑P(t) (44)
除以上条件外,释能还需要满足以下约束条件:
Figure FDA0002524525270000081
循环进行以上过程,直至∑P(t)或SOC不满足释能条件为止。
CN201910227808.6A 2019-03-25 2019-03-25 铁路再生电能潮流控制算法 Active CN109802393B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910227808.6A CN109802393B (zh) 2019-03-25 2019-03-25 铁路再生电能潮流控制算法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910227808.6A CN109802393B (zh) 2019-03-25 2019-03-25 铁路再生电能潮流控制算法

Publications (2)

Publication Number Publication Date
CN109802393A CN109802393A (zh) 2019-05-24
CN109802393B true CN109802393B (zh) 2020-08-11

Family

ID=66563178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910227808.6A Active CN109802393B (zh) 2019-03-25 2019-03-25 铁路再生电能潮流控制算法

Country Status (1)

Country Link
CN (1) CN109802393B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113131484A (zh) * 2021-04-29 2021-07-16 西安开天铁路电气股份有限公司 一种分布式铁路再生电能云控制系统

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108336727B (zh) * 2018-01-23 2023-11-24 西南交通大学 一种用于贯通式牵引供电的新能源供应系统及控制方法
CN108539772B (zh) * 2018-03-30 2020-06-05 中车青岛四方车辆研究所有限公司 城市轨道交通再生制动能量控制分配系统及方法
CN109149611A (zh) * 2018-10-09 2019-01-04 西南交通大学 一种牵引负荷削峰填谷的储能控制方法
CN109449963B (zh) * 2018-12-19 2021-11-19 南京亚派科技股份有限公司 一种混合型再生电能吸收利用装置的容量配置与控制方法

Also Published As

Publication number Publication date
CN109802393A (zh) 2019-05-24

Similar Documents

Publication Publication Date Title
Liu et al. Optimal sizing of a wind-energy storage system considering battery life
KR101528079B1 (ko) 배터리 교환 스테이션 및 배터리 교환 스테이션의 운영 방법
CN109217290A (zh) 计及电动汽车充放电的微网能量优化管理方法
CN108599215B (zh) 基于互联网云平台及分布式储能的配电网电压调控方法
CN113300395B (zh) 一种柔性牵引供电系统混合储能最优容量配置方法
CN104410089A (zh) 基于电动汽车的风力发电微网功率平衡实时调度方法
CN111064214A (zh) 基于电动汽车两阶段滚动式策略的配电网优化调度方法
CN109849694B (zh) 一种基于在线凸规划的混合储能式有轨电车能量管理方法
CN107039697A (zh) 一种基于最优效率的多功率段充电方法
CN110783959A (zh) 一种新能源发电系统的稳定状态控制系统
CN110474321A (zh) 组合式清洁能源发电系统及其运行方法
CN103560533B (zh) 基于变化率控制储能电站平滑风光发电波动的方法及系统
CN115764927A (zh) 一种基于风光水火多能互补特性的电网调峰方法及系统
CN113452045B (zh) 一种基于多应用场景下的电气化铁路储能装置优化选型方法
CN113270884B (zh) 一种基于v2g微网系统的电力能源管理系统和方法
CN109802393B (zh) 铁路再生电能潮流控制算法
Li et al. Double-layer optimized configuration of distributed energy storage and transformer capacity in distribution network
CN102555830A (zh) 基于双储能单元的汽车供电系统和汽车供电控制方法
CN210838986U (zh) 通信电池双向dcdc高压充放电能量控制管理系统
CN110707736B (zh) 一种智能小区用户需求侧响应的微电网运行方法
CN201758280U (zh) 新型能源互联网系统
CN116544982A (zh) 一种光伏消纳与峰谷套利的光储系统及其控制方法
Zhang et al. Optimum sizing of non-grid-connected wind power system incorporating battery-exchange stations
CN111680816A (zh) 一种提供多重服务的储能系统运营方法及系统
CN113610429B (zh) 一种应用于光-储-充一体化电站的能量管理算法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230407

Address after: No.85, Jinye 1st Road, high tech Zone, Xi'an, Shaanxi 710077

Patentee after: XIAN KAITIAN ELECTRICAL RELIABILITY EXPERIMENT Co.,Ltd.

Address before: No.85, Jinye 1st Road, high tech Zone, Xi'an, Shaanxi 710077

Patentee before: XI'AN KAITIAN RAILWAY ELECTRICAL Co.,Ltd.