CN109799385A - The power consumption test method and system of hardware device - Google Patents
The power consumption test method and system of hardware device Download PDFInfo
- Publication number
- CN109799385A CN109799385A CN201910045027.5A CN201910045027A CN109799385A CN 109799385 A CN109799385 A CN 109799385A CN 201910045027 A CN201910045027 A CN 201910045027A CN 109799385 A CN109799385 A CN 109799385A
- Authority
- CN
- China
- Prior art keywords
- test
- power consumption
- devices
- scene
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The invention discloses the power consumption test method of hardware device and systems, belong to Electronic Testing field.The present invention is instructed according to the test of acquisition, is ranked up to power consumption test scene, to generate test list;First device under test is initialized before test, prevents test abnormal to remove its internal data;Then the corresponding contextual data of power consumption test scene that do not test in list will be tested and be sent to Devices to test, Devices to test Run-time scenario data are controlled, obtain the feedback information of Devices to test;Identify whether the operating status of Devices to test is normal according to the feedback information, Devices to test normal for operating status carries out power consumption test according to preset test path, obtains corresponding test data;Test is re-started in the power consumption test scene that test list selects other not test for the Devices to test of operation exception.The present invention controls Devices to test according to test path and realizes and can reduce the consumption of manpower for the purpose that test scene is tested automatically.
Description
Technical field
The present invention relates to Electronic Testing field more particularly to the power consumption test methods and system of hardware device.
Background technique
The mode for generalling use manual operation Devices to test at present carries out power consumption test, sets according to test scene setting is to be measured
Standby state makes Devices to test enter special scenes, manually opened power consumption test and end test.The number of manual record power consumption
According to, labor intensive and use duration.Power consumption test increases with Products, and it is negative that manual test power consumption can just like increase manpower
Lotus.
Summary of the invention
Aiming at the problem that existing manual testing, a kind of power consumption test method for being intended to carry out hardware device automatically is now provided
And system.
A kind of power consumption test method of hardware device provides at least one power consumption test scene, each power consumption test scene
Corresponding corresponding contextual data and preset test path;The power consumption test method includes:
S1. test instruction is obtained, at least one described power consumption test scene is ranked up, generates test list;
S2. device under test is initialized;
S3. a corresponding contextual data of power consumption test scene that do not test in the test list is sent to described to be measured
Equipment;
S4. it controls the Devices to test and runs the contextual data, obtain the feedback information of the Devices to test;
S5. whether abnormal the feedback information is judged, if so, executing step S7;If it is not, executing step S6;
S6. the Devices to test is controlled according to the corresponding test path of the power consumption test scene and carry out power consumption test, adopt
Collect the test data of the Devices to test, and is the power consumption test scene tested by the power consumption test scene markers;
It S7. is the power consumption test scene tested by the power consumption test scene markers;
S8. identify whether the power consumption test scene that do not test in the test list is greater than 1, if so, step S3 is executed,
If it is not, terminating.
Preferably, at least one described power consumption test scene includes: that the Devices to test has closed in homepage surface model ShiShimonoseki
The test that WIFI mode closes wired connection is opened under the test scene and/or the Devices to test homepage surface model of line connection,
And/or the test that local video closes wired connection is played, and/or play the test of video online under cable network state,
And/or the test of Online Video under WIFI network state is played, and/or the test of installation application file.
Preferably, the step S2 device under test is initialized, comprising:
Test data in the Devices to test is deleted.
Preferably, the step S4 controls the Devices to test and runs the contextual data, obtains the Devices to test
Feedback information, comprising:
S41. the Devices to test carries out parsing configuration to the contextual data;
S42. contextual data is monitored whether normal operation, if so, executing step S43;If it is not, abnormal feedback information is generated,
Execute step S5;
Whether the operating status for S43. monitoring the Devices to test is abnormal, if so, generating abnormal feedback information, executes step
S5;If it is not, generating the feedback information that the Devices to test operates normally, step S5 is executed.
Preferably, the test data of the Devices to test, the test data packet are acquired using power consumption instrument in step s 6
It includes: the total voltage data of the Devices to test, the total current data of the Devices to test, memory module in the Devices to test
The current data of memory module in voltage data and the Devices to test.
The present invention also provides a kind of power consumption test systems of hardware device, comprising: test lead and acquisition equipment;
The test lead includes:
Storage unit, for storing the contextual data of at least one power consumption test scene, each power consumption test scene is corresponding
Corresponding contextual data and preset test path;
Generation unit is ranked up at least one described power consumption test scene, generates test for obtaining test instruction
List;
Initialization unit is initialized for device under test;
Transmission unit, for sending a corresponding contextual data of power consumption test scene that do not test in the test list
To the Devices to test;
Control unit runs the contextual data for controlling the Devices to test, obtains the feedback of the Devices to test
Information;
The power consumption test scene markers are to have tested for judging whether the feedback information is abnormal by processing unit
Power consumption test scene, identify it is described test list in the power consumption test scene that do not test whether be greater than 1;
Test cell, for be measured setting according to the acquisition equipment power dissipation test scene corresponding test path control is described
It is standby to carry out power consumption test, the test data of the acquisition Devices to test is controlled, and be by the power consumption test scene markers
The power consumption test scene tested.
Preferably, at least one described power consumption test scene includes: that the Devices to test has closed in homepage surface model ShiShimonoseki
The test that WIFI mode closes wired connection is opened under the test scene and/or the Devices to test homepage surface model of line connection,
And/or the test that local video closes wired connection is played, and/or play the test of video online under cable network state,
And/or the test of Online Video under WIFI network state is played, and/or the test of installation application file.
Preferably, the initialization unit is for deleting the test data in the Devices to test.
Preferably, described control unit carries out parsing configuration to the contextual data for controlling the Devices to test, supervises
Survey contextual data whether normal operation, whether the operating status for being also used to monitor the Devices to test is abnormal.
Preferably, the acquisition equipment acquires the test data of the Devices to test, the test data using power consumption instrument
It include: memory module in the total voltage data, the total current data of the Devices to test, the Devices to test of the Devices to test
Voltage data and the Devices to test in memory module current data.
Above-mentioned technical proposal the utility model has the advantages that
In the technical program, is instructed, power consumption test scene is ranked up, to generate tests column according to the test of acquisition
Table;First device under test is initialized before test, prevents test abnormal to remove its internal data;It then will test
The corresponding contextual data of power consumption test scene that do not test in list is sent to Devices to test, controls Devices to test Run-time scenario number
According to obtaining the feedback information of Devices to test;Identify whether the operating status of Devices to test is normal according to the feedback information, for fortune
The normal Devices to test of row state carries out power consumption test according to preset test path, obtains corresponding test data;For fortune
The abnormal Devices to test of row re-starts test in the power consumption test scene that test list selects other not test.Root of the present invention
Disappearing for manpower can be reduced for the purpose that test scene is tested automatically by realizing according to test path control Devices to test
Consumption.The present invention for multiple test scenes realize can it is multiple test follow-on tests effects, shorten the testing time, and improve
Testing efficiency.
Detailed description of the invention
Fig. 1 is the flow chart of the power consumption test method of hardware device of the present invention;
Fig. 2 is a kind of module map of embodiment of the power consumption test system of hardware device of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art without creative labor it is obtained it is all its
His embodiment, shall fall within the protection scope of the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.
The present invention will be further explained below with reference to the attached drawings and specific examples, but not as the limitation of the invention.
A kind of power consumption test method of hardware device provides at least one power consumption test scene, each power consumption test scene
Corresponding corresponding contextual data and preset test path;
Wherein, at least one described power consumption test scene include: the Devices to test closed in homepage surface model ShiShimonoseki it is wired
It is wired to connect unlatching WIFI mode closing under the test scene and/or the Devices to test homepage surface model of (or other peripheral hardwares)
The test of (or other peripheral hardwares) is connected, and/or plays the test that local video closes wired connection (or other peripheral hardwares), and/or
It plays the test of video (opening is wired, closes other peripheral hardwares) online under cable network state, and/or plays WIFI network shape
The test of Online Video (closing other peripheral hardwares) under state, and/or the test of installation application file.
For example and without limitation, the test for installing application file can be the survey for installing the application file of game
Examination, such as: opening the test that torrent speedboat installation kit closes other peripheral hardwares, open fishing intelligent's installation kit packet and close other peripheral hardwares
Test opens extremely visitor and runs the test etc. for dividing installation kit to close other peripheral hardwares.
It should be understood that Devices to test can be the mainboard of the Web TV or TV that are equipped with Android system, it can also
To be the mainboard of other electronic products.
As shown in Figure 1, the power consumption test method includes:
S1. test instruction is obtained, at least one described power consumption test scene is ranked up, generates test list;
In this step, test instruction can be the instruction tested single power consumption test scene, be also possible to pair
The instruction that multiple power consumption test scenes are tested.When test instruction is the instruction tested single power consumption test scene
When, the test list of generation only includes a power consumption test scene;When test instruction is that multiple power consumption test scenes are tested
Instruction when, test list includes corresponding multiple power consumption test scenes.
It should be noted that the power consumption test scene of test list storage is not test before test.
S2. device under test is initialized;
Specifically, the test data in the Devices to test is deleted, avoids the test because storing in Devices to test
The power consumption test of data influence Devices to test can be normally carried out for test and provide safeguard.
S3. a corresponding contextual data of power consumption test scene that do not test in the test list is sent to described to be measured
Equipment;
S4. it controls the Devices to test and runs the contextual data, obtain the feedback information of the Devices to test;
Specifically, the step S4 can include:
S41. the Devices to test carries out parsing configuration to the contextual data;
S42. contextual data is monitored whether normal operation (that is: whether test scene operation blocks), if so, executing step
S43;If it is not, generating abnormal feedback information, step S5 is executed;
S43. monitoring the operating status of the Devices to test, whether abnormal (that is: whether the operating status of Devices to test meets
The state of test), if so, generating abnormal feedback information, execute step S5;If it is not, generating what the Devices to test operated normally
Feedback information executes step S5.
In this step, by controlling Devices to test Run-time scenario data, understand the item whether Devices to test has test
Part, if so, tested, if it is not, then inform that the Devices to test pair has exception with current test by feedback information, and
The test data and record of Devices to test are acquired, to understand the data of Devices to test exception.
S5. whether abnormal the feedback information is judged, if so, executing step S7;If it is not, executing step S6;
S6. the Devices to test is controlled according to the corresponding test path of the power consumption test scene and carry out power consumption test, adopt
Collect the test data of the Devices to test, and is the power consumption test scene tested by the power consumption test scene markers;
In practical applications, the test data that power consumption instrument acquires the Devices to test can be used, the test data includes:
The total voltage data of the Devices to test, the total current data of the Devices to test, in the Devices to test memory module electricity
Press the current data of memory module in data and the Devices to test.
It S7. is the power consumption test scene tested by the power consumption test scene markers;
S8. identify whether the power consumption test scene that do not test in the test list is greater than whether 1 (that is: test list
There are also the power consumption test scenes that do not test), if so, step S3 is executed, if it is not, terminating.
In the present embodiment, it is instructed, power consumption test scene is ranked up, to generate tests column according to the test of acquisition
Table;First device under test is initialized before test, prevents test abnormal to remove its internal data;It then will test
The corresponding contextual data of power consumption test scene that do not test in list is sent to Devices to test, controls Devices to test Run-time scenario number
According to obtaining the feedback information of Devices to test;Identify whether the operating status of Devices to test is normal according to the feedback information, for fortune
The normal Devices to test of row state carries out power consumption test according to preset test path, obtains corresponding test data;For fortune
The abnormal Devices to test of row re-starts test in the power consumption test scene that test list selects other not test.Root of the present invention
The purpose tested automatically is realized according to test path control Devices to test, reduces the consumption of manpower.The present invention is for multiple surveys
Examination hall scape realize can it is multiple test follow-on tests effects, shorten the testing time, and improve testing efficiency.
As shown in Fig. 2, the present invention also provides a kind of power consumption test systems of hardware device, comprising: test lead 8 and acquisition
Equipment 10;
The test lead 8 includes:
Storage unit 1, for storing the contextual data of at least one power consumption test scene, each power consumption test scene is corresponding
Corresponding contextual data and preset test path;
Generation unit 3 is ranked up at least one described power consumption test scene, generates and survey for obtaining test instruction
Try list;
Initialization unit 5 is initialized for device under test 9;
Transmission unit 7, for sending out a corresponding contextual data of power consumption test scene that do not test in the test list
It send to the Devices to test 9;
Control unit 2 runs the contextual data for controlling the Devices to test 9, obtains the anti-of the Devices to test 9
Feedforward information;
The power consumption test scene markers are to have tested for judging whether the feedback information is abnormal by processing unit 4
Power consumption test scene, identify it is described test list in the power consumption test scene that do not test whether be greater than 1;
Test cell 6, for according to described in the 10 power consumption test scene of acquisition equipment corresponding test path control to
Measurement equipment 9 carries out power consumption test, controls the test data of the acquisition Devices to test 9, and by the power consumption test scene
Labeled as the power consumption test scene tested.
In the present embodiment, test lead 8 is instructed according to the test of acquisition, is ranked up to power consumption test scene, to generate
Test list;First device under test 9 is initialized before test, prevents test abnormal to remove its internal data;So
The corresponding contextual data of power consumption test scene that do not test in list will be tested afterwards and is sent to Devices to test 9, controls Devices to test 9
Run-time scenario data obtain the feedback information of Devices to test 9;According to the feedback information identify Devices to test 9 operating status be
No normal, Devices to test 9 normal for operating status carries out power consumption test according to preset test path, obtains corresponding survey
Try data;For the Devices to test 9 of operation exception, in the power consumption test scene that test list selects other not test, again into
Row test.The present invention, which controls Devices to test 9 according to test path by test lead 8, realizes the purpose tested automatically, reduces
The consumption of manpower.The present invention for multiple test scenes realize can it is multiple test follow-on tests effects, when shortening test
Between, and improve testing efficiency.The test path of use can realize that Devices to test 9 automatically configures and enter test scene, cooperation
Test lead 8 realizes number required for automation control power consumption instrument oneself measurement data, statistical data, and crawl test lead 8
According to.Power consumption test bring human load is reduced mostly.
In a preferred embodiment, at least one described power consumption test scene includes: the Devices to test 9 in homepage face mould
It is wired that unlatching WIFI mode closing under the 9 homepage surface model of test scene and/or the Devices to test of wired connection is closed under formula
The test of connection, and/or play local video and close the test of wired connection, and/or played online under cable network state
The test of video, and/or the test of Online Video under WIFI network state is played, and/or the test of installation application file.
In a preferred embodiment, the initialization unit 5 is for deleting the test data in the Devices to test 9
It removes, avoids influencing the power consumption test of Devices to test 9 because of the test data stored in Devices to test 9, can be normally carried out for test
It provides safeguard.
In a preferred embodiment, described control unit 2 carries out the contextual data for controlling the Devices to test 9
Parsing configuration, whether normal operation, whether the operating status for being also used to monitor the Devices to test 9 is abnormal for monitoring contextual data.
In the present embodiment, when scene data run occurs abnormal, the control acquisition equipment 10 of test lead 8 acquires to be measured set
Standby 9 data are in order to understanding test data of the Devices to test 9 in abnormality;When the operating status of Devices to test 9 occurs
When abnormal, the control acquisition equipment 10 of test lead 8 acquires the data of Devices to test 9 in order to understand Devices to test 9 in abnormality
When test data.
In a preferred embodiment, the acquisition equipment 10 acquires the test data of the Devices to test 9 using power consumption instrument,
The test data includes: the total voltage data of the Devices to test 9, the total current data of the Devices to test 9, described to be measured
In equipment 9 in the voltage data of memory module and the Devices to test 9 memory module current data.
The power consumption test system of hardware device realizes automation function based on test lead (PC), power consumption instrument, Devices to test
Consumption test.It is interacted in a manner of USB line ADB between test lead and Devices to test, with string between test lead and power consumption instrument
Mouth interacts, the power consumption apparatus measures connection Devices to test channel to be measured.With the serial ports on basis, USB between three
Realize communication, serial ports, USB are almost the standard configuration of tested terminal, without additionally modifying for automatic test.Test lead
Test path in a manner of shell script, use android standard interface realize, the general software different from android
Development kit version.In addition it is external on PC that required shell script, test film source etc. are tested, only does automation power consumption
When test, it is pushed to terminal, without being preset to normally using in version.
For example and without limitation, existing for installation for the test of application file (installation kit) to be installed
Wrap relevant test, because of the starting of most of installation kits during, authority application dialog box can be undergone, into installation kit height
Item is manually operated in the needs manual operation confirmation item such as item test and the running prompt confirmation of installation kit some first times.It examines
The dialog box for considering these pop-ups can not obtain its state, and the present invention provides " pm clear apk packet name " using android
Operation enters before installation kit test every time, removes in Devices to test and install bag data, reaches each run test installation kit
When, be all the process of first time installation and operation, using identical process, in conjunction with system " input keyevent key key assignments/
Input tap coordinate " carrys out the input of simulating infrared remote-controller and mouse clicks some region, reaches the movement of analog manual operation
(default test path).Using system provide " dumpsys activity activities " (binding test path and to
The information of measurement equipment feedback) it judges automatically, it is current to test whether installation kit has operated in foreground really to realize automatic survey
The purpose of examination.
Power consumption data of the present invention through actual test coincide with the data of manual testing, reaches alternative manually-operated
Condition.
The foregoing is merely preferred embodiments of the present invention, are not intended to limit embodiments of the present invention and protection model
It encloses, to those skilled in the art, should can appreciate that all with made by description of the invention and diagramatic content
Equivalent replacement and obviously change obtained scheme, should all be included within the scope of the present invention.
Claims (10)
1. a kind of power consumption test method of hardware device, which is characterized in that provide at least one power consumption test scene, each power consumption
Test scene corresponds to corresponding contextual data and preset test path;The power consumption test method includes:
S1. test instruction is obtained, at least one described power consumption test scene is ranked up, generates test list;
S2. device under test is initialized;
S3. a corresponding contextual data of power consumption test scene that do not test in the test list is sent to described to be measured set
It is standby;
S4. it controls the Devices to test and runs the contextual data, obtain the feedback information of the Devices to test;
S5. whether abnormal the feedback information is judged, if so, executing step S7;If it is not, executing step S6;
S6. the Devices to test is controlled according to the corresponding test path of the power consumption test scene and carry out power consumption test, acquire institute
The test data of Devices to test is stated, and is the power consumption test scene tested by the power consumption test scene markers;
It S7. is the power consumption test scene tested by the power consumption test scene markers;
S8. identify whether the power consumption test scene that do not test in the test list is greater than 1, if so, step S3 is executed, if
It is no, terminate.
2. the power consumption test method of hardware device according to claim 1, which is characterized in that at least one described power consumption is surveyed
Examination hall scape includes: that the Devices to test in homepage surface model ShiShimonoseki closes the test scene and/or the Devices to test of wired connection
The test that WIFI mode closes wired connection is opened under homepage surface model, and/or plays the survey that local video closes wired connection
It tries, and/or plays the test of video online under cable network state, and/or play Online Video under WIFI network state
Test, and/or the test of installation application file.
3. the power consumption test method of hardware device according to claim 1, which is characterized in that the step S2 is set to be measured
It is standby to be initialized, comprising:
Test data in the Devices to test is deleted.
4. the power consumption test method of hardware device according to claim 1, which is characterized in that described in the step S4 control
Devices to test runs the contextual data, obtains the feedback information of the Devices to test, comprising:
S41. the Devices to test carries out parsing configuration to the contextual data;
S42. contextual data is monitored whether normal operation, if so, executing step S43;If it is not, generating abnormal feedback information, execute
Step S5;
Whether the operating status for S43. monitoring the Devices to test is abnormal, if so, generating abnormal feedback information, executes step S5;
If it is not, generating the feedback information that the Devices to test operates normally, step S5 is executed.
5. the power consumption test method of hardware device according to claim 1, which is characterized in that use power consumption in step s 6
Instrument acquires the test data of the Devices to test, the test data include: the Devices to test total voltage data, it is described to
Memory module in the voltage data and the Devices to test of memory module in the total current data of measurement equipment, the Devices to test
Current data.
6. a kind of power consumption test system of hardware device characterized by comprising test lead and acquisition equipment;
The test lead includes:
Storage unit, for storing the contextual data of at least one power consumption test scene, each power consumption test scene is corresponding corresponding
Contextual data and preset test path;
Generation unit is ranked up at least one described power consumption test scene, generates tests column for obtaining test instruction
Table;
Initialization unit is initialized for device under test;
Transmission unit, for a corresponding contextual data of power consumption test scene that do not test in the test list to be sent to institute
State Devices to test;
Control unit runs the contextual data for controlling the Devices to test, obtains the feedback information of the Devices to test;
Processing unit, for judging whether the feedback information is abnormal, is the function tested by the power consumption test scene markers
Test scene is consumed, identifies whether the power consumption test scene that do not test in the test list is greater than 1;
Test cell, for according to the acquisition equipment power dissipation test scene corresponding test path control Devices to test into
Row power consumption test controls the test data of the acquisition Devices to test, and is to have surveyed by the power consumption test scene markers
The power consumption test scene of examination.
7. the power consumption test system of hardware device according to claim 6, which is characterized in that at least one described power consumption is surveyed
Examination hall scape includes: that the Devices to test in homepage surface model ShiShimonoseki closes the test scene and/or the Devices to test of wired connection
The test that WIFI mode closes wired connection is opened under homepage surface model, and/or plays the survey that local video closes wired connection
It tries, and/or plays the test of video online under cable network state, and/or play Online Video under WIFI network state
Test, and/or the test of installation application file.
8. the power consumption test system of hardware device according to claim 6, which is characterized in that the initialization unit is used for
Test data in the Devices to test is deleted.
9. the power consumption test system of hardware device according to claim 6, which is characterized in that described control unit is for controlling
It makes the Devices to test and parsing configuration is carried out to the contextual data, monitoring contextual data whether normal operation, is also used to monitor
Whether the operating status of the Devices to test is abnormal.
10. the power consumption test system of hardware device according to claim 6, which is characterized in that the acquisition equipment uses
Power consumption instrument acquires the test data of the Devices to test, and the test data includes: the total voltage data of the Devices to test, institute
It states the total current data of Devices to test, store mould in the voltage data and the Devices to test of memory module in the Devices to test
The current data of block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910045027.5A CN109799385A (en) | 2019-01-17 | 2019-01-17 | The power consumption test method and system of hardware device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910045027.5A CN109799385A (en) | 2019-01-17 | 2019-01-17 | The power consumption test method and system of hardware device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109799385A true CN109799385A (en) | 2019-05-24 |
Family
ID=66559556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910045027.5A Pending CN109799385A (en) | 2019-01-17 | 2019-01-17 | The power consumption test method and system of hardware device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109799385A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111240917A (en) * | 2020-01-13 | 2020-06-05 | 合肥联宝信息技术有限公司 | Equipment testing method and device |
CN113377599A (en) * | 2021-06-10 | 2021-09-10 | 深圳忆联信息系统有限公司 | Low-power-consumption hard disk test method and device for Windows system and computer equipment |
CN113866596A (en) * | 2021-09-15 | 2021-12-31 | 深圳市航顺芯片技术研发有限公司 | Power consumption test method, power consumption test device and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104065779A (en) * | 2014-07-17 | 2014-09-24 | 上海斐讯数据通信技术有限公司 | Method and system for testing module power consumption |
CN104092804A (en) * | 2014-07-17 | 2014-10-08 | 广东欧珀移动通信有限公司 | Mobile terminal power consumption test method and system |
CN106911826A (en) * | 2015-12-23 | 2017-06-30 | 联芯科技有限公司 | The automation power consumption test method and system of a kind of terminal |
CN108235357A (en) * | 2018-01-02 | 2018-06-29 | 深圳市闻耀电子科技有限公司 | Mobile telephone power consumption test method and relevant apparatus |
CN108548956A (en) * | 2018-05-07 | 2018-09-18 | Oppo广东移动通信有限公司 | Power consumption test device and method for intelligent terminal |
CN108881584A (en) * | 2017-05-12 | 2018-11-23 | 展讯通信(深圳)有限公司 | The power consumption test system of mobile terminal |
-
2019
- 2019-01-17 CN CN201910045027.5A patent/CN109799385A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104065779A (en) * | 2014-07-17 | 2014-09-24 | 上海斐讯数据通信技术有限公司 | Method and system for testing module power consumption |
CN104092804A (en) * | 2014-07-17 | 2014-10-08 | 广东欧珀移动通信有限公司 | Mobile terminal power consumption test method and system |
CN106911826A (en) * | 2015-12-23 | 2017-06-30 | 联芯科技有限公司 | The automation power consumption test method and system of a kind of terminal |
CN108881584A (en) * | 2017-05-12 | 2018-11-23 | 展讯通信(深圳)有限公司 | The power consumption test system of mobile terminal |
CN108235357A (en) * | 2018-01-02 | 2018-06-29 | 深圳市闻耀电子科技有限公司 | Mobile telephone power consumption test method and relevant apparatus |
CN108548956A (en) * | 2018-05-07 | 2018-09-18 | Oppo广东移动通信有限公司 | Power consumption test device and method for intelligent terminal |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111240917A (en) * | 2020-01-13 | 2020-06-05 | 合肥联宝信息技术有限公司 | Equipment testing method and device |
CN111240917B (en) * | 2020-01-13 | 2022-03-29 | 合肥联宝信息技术有限公司 | Equipment testing method and device |
CN113377599A (en) * | 2021-06-10 | 2021-09-10 | 深圳忆联信息系统有限公司 | Low-power-consumption hard disk test method and device for Windows system and computer equipment |
CN113866596A (en) * | 2021-09-15 | 2021-12-31 | 深圳市航顺芯片技术研发有限公司 | Power consumption test method, power consumption test device and storage medium |
CN113866596B (en) * | 2021-09-15 | 2024-05-03 | 深圳市航顺芯片技术研发有限公司 | Power consumption testing method, power consumption testing device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107769836B (en) | Satellite universal automatic test platform and data interaction method thereof | |
CN107885097B (en) | Nuclear power station simulator control system DCS transformation closed loop verification system and method | |
CN103746882B (en) | The method of intelligent substation station level test | |
CN109799385A (en) | The power consumption test method and system of hardware device | |
CN102567203B (en) | A kind of method and system of test distributed file system performance | |
CN111124850A (en) | MQTT server performance testing method, system, computer equipment and storage medium | |
CN112929236B (en) | Broadband micropower wireless protocol interoperability test system for electricity consumption information acquisition system | |
CN106155907B (en) | A kind of automated testing method, device and calculate equipment | |
CN105426298B (en) | A kind of method for testing software and system based on ADB | |
CN107632219A (en) | A kind of automatic switching test system and its method of testing | |
CN103544100A (en) | Method, system and client side for testing APP of portable data processing equipment | |
CN113014449A (en) | Local communication protocol pressure test method and system of electricity consumption information acquisition system | |
CN108322348B (en) | Transformer substation monitoring information automatic acceptance signal triggering operation subsystem and method | |
CN107483243A (en) | A kind of automatic deployment method and equipment of OpenStack platforms | |
CN109614321A (en) | For the continuous integrating of ATS software and the system of delivery | |
CN105025141A (en) | Method and device for testing electricity consumption of terminal | |
Maynard et al. | An open framework for deploying experimental scada testbed networks | |
CN110989547A (en) | Detection method and system for intelligent substation one-key sequence control system | |
CN105929803B (en) | A kind of satellite ground measuring and controlling equipment Automatic monitoring systems | |
CN104638767B (en) | Spacer layer data source simulation method and device for intelligent substation test | |
CN109618148A (en) | Based on set-top box large-size screen monitors automated testing method | |
CN109765451A (en) | A kind of intelligent distribution network terminal simulation test platform, system and method | |
KR100934607B1 (en) | Test device of the microgrid management system | |
CN116263595B (en) | Universal automatic test platform for satellite single machine environment test and control method thereof | |
CN110780630A (en) | Protocol library docking execution system suitable for Internet of things and working method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190524 |