CN109797884A - A kind of rapid construction moisture absorption self-desiccation wall - Google Patents

A kind of rapid construction moisture absorption self-desiccation wall Download PDF

Info

Publication number
CN109797884A
CN109797884A CN201910089398.3A CN201910089398A CN109797884A CN 109797884 A CN109797884 A CN 109797884A CN 201910089398 A CN201910089398 A CN 201910089398A CN 109797884 A CN109797884 A CN 109797884A
Authority
CN
China
Prior art keywords
wall
seal casinghousing
desiccation
gas permeability
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910089398.3A
Other languages
Chinese (zh)
Other versions
CN109797884B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Zhonghe Guangyuan Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910089398.3A priority Critical patent/CN109797884B/en
Publication of CN109797884A publication Critical patent/CN109797884A/en
Application granted granted Critical
Publication of CN109797884B publication Critical patent/CN109797884B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a kind of rapid construction moisture absorption self-desiccation walls, belong to construction wall field, a kind of rapid construction moisture absorption self-desiccation wall, including wall, seal casinghousing, gas permeability interlayer and air inlet pipe, the inside of wall is arranged in seal casinghousing, gas permeability interlayer is arranged on the inside of seal casinghousing, and four edges of gas permeability interlayer are connect with the inner wall of seal casinghousing, gas permeability interlayer will be divided into two parts of filled cavity and flowing lumen inside seal casinghousing, digging on the metope of wall and the side wall of seal casinghousing has the preformed hole being mutually matched, air inlet pipe is located at the right side of gas permeability interlayer, and one end of air inlet pipe passes through preformed hole and extends in flowing lumen, the other end of air inlet pipe is located at outside wall and is connected with sealed valve cap, it may be implemented after worker carries out coating application to metope, it can quickly make coating from interior by outer drying, improve construction Speed, while personnel escape in the scene of a fire can be helped when fire occurs.

Description

A kind of rapid construction moisture absorption self-desiccation wall
Technical field
The present invention relates to construction wall fields, more specifically to a kind of rapid construction moisture absorption self-desiccation wall.
Background technique
The decoration such as coating, wallpaper of surface of wall requires that being laid with base has sufficiently dry degree.If weather is damp for a long time Wet, wall ground layer is not enough dried with regard to carrying out surface construction, it is easy to which there is a situation where ornament materials to go mouldy.Such as Puttying, If, with regard to repeating to stamp putty or swabbing, wherein excessive moisture lock, wall will in the case where putty is not parched There is " perspiration " infiltration or even Large Area Cracking.
Currently, the method solved for problems is, when carrying out wall or ground layer is constructed, multilayer scumbling is taken Method, and extend after every layer of construction and drying time and carry out ventilation operation.
But since every layer of construction generally should be at least spaced 2 hours or more, and when weather temperature is not suitable for, need to lead to Air-dry the dry time can also continue extend, substantially prolong the duration of construction, influence construction speed, moreover, once because seek into Degree just applies second when drying is no abundant, it will and cause material the phenomenon that " not doing in surface drying " occur, can only finally root out, In addition, existing wall cannot help to escape when fire occurs.
Summary of the invention
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide a kind of rapid construction moisture absorption self-desiccation walls Body, it may be implemented after worker carries out coating application to metope, and coating can quickly be made, by outer drying, to improve construction speed from interior Degree, while personnel escape in the scene of a fire can be helped when fire occurs.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of rapid construction moisture absorption self-desiccation wall, including wall, seal casinghousing, gas permeability interlayer and air inlet pipe, it is described The inside of wall is arranged in seal casinghousing, and the gas permeability interlayer is arranged on the inside of seal casinghousing, and four sides of gas permeability interlayer Along connecting with the inner wall of seal casinghousing, the gas permeability interlayer will be divided into two portions of filled cavity and flowing lumen inside seal casinghousing Point, digging on the metope of the wall and the side wall of seal casinghousing has the preformed hole being mutually matched, and the air inlet pipe is located at ventilative Property interlayer right side, and one end of air inlet pipe pass through preformed hole extend in flowing lumen, the other end of the air inlet pipe is located at wall Outside and it is connected with sealed valve cap, may be implemented after worker carries out coating application to metope, can quickly make coating from interior by outer It is dry, speed of application is improved, while personnel escape in the scene of a fire can be helped when fire occurs.
Further, the inside of the seal casinghousing is filled with high-purity iron powder, active carbon, inorganic salts and water-absorbing resins The polymer of equal synthesis, is reacted under the action of catalyst with oxygen by high-purity iron powder and carries out heat release.
Further, the inner wall of the seal casinghousing is connected with vermiculite coating, and vermiculite coating can be kept the temperature, and enables temperature Enough last much longer, conducive to the drying to coating, the vermiculite coating is located at close to the side of air inlet pipe, and vermiculite coating Width is less than the width of flowing lumen, and the flowable space of air is reserved in flowing lumen.
Further, the gas permeability interlayer can be anticorrosion cloth, and the two sides of the gas permeability interlayer are equipped with setting net, And setting net is connect with seal casinghousing inner wall, keeps the shape of gas permeability interlayer.
Further, pumping oxygen processing can be done by taking out oxygen machine in the filled cavity and flowing lumen, it can also be true by taking out Empty machine vacuumizes, and does deoxygenation processing, protects filled cavity internal-response object, and the control exothermic reaction time makes it be not easy to carry out in advance, Vacuumize the heat-proof quality that can also enhance seal casinghousing.
Further, the inner wall of the seal casinghousing is uniformly coated with preserving and sealing coating, and the thickness of preserving and sealing coating Degree is 0.03-0.07mm, guarantees the leakproofness inside seal casinghousing, conducive to the use of the present apparatus.
Further, sealing ring is equipped between the air inlet pipe and preformed hole, and sealing ring and air inlet pipe and preformed hole are equal Interference fit improves leakproofness, makes to be not easy that there are gaps between air inlet pipe and preformed hole, and then air is effectively prevent to enter sealing In shell.
Further, the position of the preformed hole is arranged at away from ground 1m-1.5m, is more suitable for the height of human body, convenient Opening operation of the worker to sealed valve cap.
Further, three lateral coaming plates, the rotation connection of three lateral coaming plate lower end are fixedly connected on the metope of the wall There is unilateral curved cover plate, and sealed valve cap is located between three lateral coaming plates and unilateral curved cover plate, the unilateral side curved cover plate is separate Multiple lock-screws are connected between one end and metope of three lateral coaming plates, three lateral coaming plates and unilateral curved cover plate enclose sealed valve cap In inside, sealed valve cap is protected in order to avoid sealed valve cap is opened or lost by accidentally touching, three lateral coaming plate upper ends can also place article.
Further, the unilateral curved cover plate is made of glass material, in emergency circumstances opens sealing for convenience Valve deck can break unilateral curved cover plate, and the outer surface of the unilateral side curved cover plate is bonded with fluorescent adhesive paper, can in dark The position for reminding resident's sealed valve cap, effectively avoids being bruised when resident's activity.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) this programme may be implemented after worker carries out coating application to metope, can quickly make coating from interior by outer dry It is dry, speed of application is improved, while personnel escape in the scene of a fire can be helped when fire occurs.
(2) inside of seal casinghousing is filled with the poly- of the synthesis such as high-purity iron powder, active carbon, inorganic salts and water-absorbing resins Object is closed, is reacted under the action of catalyst with oxygen by high-purity iron powder and carries out heat release.
(3) inner wall of seal casinghousing is connected with vermiculite coating, and vermiculite coating can be kept the temperature, and keeps temperature persistently longer Time, conducive to the drying to coating, vermiculite coating is located at close to the side of air inlet pipe, and the width of vermiculite coating is less than flowing lumen Width, in flowing lumen reserve the flowable space of air.
(4) gas permeability interlayer can be anticorrosion cloth, and the two sides of gas permeability interlayer are equipped with setting net, and shape net and sealing Inner walls connection, keeps the shape of gas permeability interlayer.
(5) pumping oxygen processing can be done by taking out oxygen machine in filled cavity and flowing lumen, can also be vacuumized by evacuator, Deoxygenation processing is done, filled cavity internal-response object is protected, the control exothermic reaction time makes it be not easy to carry out in advance, and vacuumizing can also increase The heat-proof quality of strong seal casinghousing.
(6) inner wall of seal casinghousing is uniformly coated with preserving and sealing coating, and preserving and sealing coating with a thickness of 0.03- 0.07mm guarantees the leakproofness inside seal casinghousing, conducive to the use of the present apparatus.
(7) sealing ring is equipped between air inlet pipe and preformed hole, and sealing ring is interference fitted with air inlet pipe and preformed hole, is mentioned High leakproofness, makes to be not easy that there are gaps between air inlet pipe and preformed hole, and then air is effectively prevent to enter in seal casinghousing.
(8) position of preformed hole is arranged at away from ground 1m-1.5m, is more suitable for the height of human body, facilitates worker to sealing The opening operation of valve deck.
(9) three lateral coaming plates are fixedly connected on the metope of wall, three lateral coaming plate lower ends are rotatably connected to unilateral curved cover plate, And sealed valve cap is located between three lateral coaming plates and unilateral curved cover plate, unilateral curved cover plate one end and metope far from three lateral coaming plates Between be connected with multiple lock-screws, sealed valve cap is trapped among inside by three lateral coaming plates and unilateral curved cover plate, protects sealed valve cap In order to avoid sealed valve cap is opened or lost by accidentally touching, three lateral coaming plate upper ends can also place article.
(10) unilateral curved cover plate is made of glass material, and in emergency circumstances opening sealed valve cap for convenience can be by list Side curved cover plate is broken, and the outer surface of unilateral curved cover plate is bonded with fluorescent adhesive paper, and resident's sealing valve can be reminded in dark The position of lid effectively avoids being bruised when resident's activity.
Detailed description of the invention
Fig. 1 is side structure schematic diagram of the invention;
Fig. 2 is partial structure diagram of the invention;
Fig. 3 is part-structure side view of the invention;
Fig. 4 is positive structure schematic of the invention;
Fig. 5 is structural schematic diagram at A in Fig. 4.
Figure label explanation:
1 wall, 2 seal casinghousings, 21 filled cavities, 22 flowing lumens, 3 gas permeability interlayers, 4 air inlet pipe, 5 sealed valve caps, 6 vermiculites Coating, 71 3 lateral coaming plates, 72 unilateral curved cover plates.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention;Technical solution in the embodiment of the present invention carries out clear, complete Site preparation description;Obviously;Described embodiments are only a part of the embodiments of the present invention;Instead of all the embodiments, it is based on Embodiment in the present invention;It is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment;It shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instruction such as term " on ", "lower", "inner", "outside", " top/bottom end " Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot understand For indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
Please refer to Fig. 1-5, a kind of rapid construction moisture absorption self-desiccation wall, including wall 1, seal casinghousing 2, gas permeability interlayer 3 and air inlet pipe 4, seal casinghousing 2 is arranged in the inside of wall 1, and the setting of gas permeability interlayer 3 is in 2 inside of seal casinghousing, and gas permeability Four edges of interlayer 3 are connect with the inner wall of seal casinghousing 2, and gas permeability interlayer 3 will be divided into 21 He of filled cavity inside seal casinghousing 2 Digging on 22 two parts of flowing lumen, the metope of wall 1 and the side wall of seal casinghousing 2 has the preformed hole being mutually matched, air inlet pipe 4 Positioned at the right side of gas permeability interlayer 3, and one end of air inlet pipe 4 passes through preformed hole and extends in flowing lumen 22, air inlet pipe 4 it is another End is located at outside wall and is connected with sealed valve cap 5, and the thickness and seal casinghousing 2 of gas permeability interlayer 3 can away from the distance between metope It is configured after test of many times, it is desirable that when 2 inside heat release of seal casinghousing, metope temperature is to guarantee metope between 10-35 DEG C The adhesive force and intensity of coating.
Polymerization of the inside of seal casinghousing 2 filled with synthesis such as high-purity iron powder, active carbon, inorganic salts and water-absorbing resins Object is reacted under the action of catalyst with oxygen by high-purity iron powder and carries out heat release, and the inner wall of seal casinghousing 2 is connected with vermiculite painting Layer 6, vermiculite coating 6 can be kept the temperature, and temperature is enable to last much longer, and conducive to the drying to coating, vermiculite coating 6 is located at Close to the side of air inlet pipe 4, and the width of vermiculite coating 6 is less than the width of flowing lumen 22, and reserving air in flowing lumen 22 can The space of flowing, gas permeability interlayer 3 can be anticorrosion cloth, and the two sides of gas permeability interlayer 3 are equipped with setting net, and shape net with it is close The connection of 2 inner wall of capsule body, keeps the shape of gas permeability interlayer 3.
Pumping oxygen processing can be done by taking out oxygen machine in filled cavity 21 and flowing lumen 22, can also be taken out by evacuator true Sky does deoxygenation processing, protects 21 internal-response object of filled cavity, and the control exothermic reaction time makes it be not easy to carry out in advance, vacuumizes The heat-proof quality of seal casinghousing 2 can also be enhanced, the inner wall of seal casinghousing 2 is uniformly coated with preserving and sealing coating, and preserving and sealing Coating with a thickness of 0.03-0.07mm, guarantee the leakproofness inside seal casinghousing 2, conducive to the use of the present apparatus.
Sealing ring is equipped between air inlet pipe 4 and preformed hole, and sealing ring is interference fitted with air inlet pipe 4 and preformed hole, is mentioned High leakproofness, makes to be not easy that there are gaps between air inlet pipe 4 and preformed hole, and then air is effectively prevent to enter in seal casinghousing 2, in advance The position boxed out is arranged at away from ground 1m-1.5m, is more suitable for the height of human body, and worker is facilitated to grasp the opening of sealed valve cap 5 Make.
Three lateral coaming plates 71 are fixedly connected on the metope of wall 1, three lateral coaming plates, 71 lower end is rotatably connected to unilateral arc covers Plate 72, and sealed valve cap 5 is located between three lateral coaming plates 71 and unilateral curved cover plate 72, unilateral curved cover plate 72 is far from three lateral coaming plates Multiple lock-screws are connected between 71 one end and metope, three lateral coaming plates 71 and unilateral curved cover plate 72 enclose sealed valve cap 5 In inside, protecting sealed valve cap 5, touching is opened or loss, three lateral coaming plates, 71 upper end can also place article in order to avoid sealed valve cap 5 is missed, Unilateral curved cover plate 72 is made of glass material, and in emergency circumstances opening sealed valve cap 5 for convenience can be by unilateral arc covers Plate 72 is broken, and the outer surface of unilateral curved cover plate 72 is bonded with fluorescent adhesive paper, and resident's sealed valve cap 5 can be reminded in dark Position effectively avoids being bruised when resident's activity.
After carrying out coating application work to metope, worker can open sealed valve cap 5, and outside air is made to pass through air inlet pipe 4 It circulates in chamber 22, air circulates in flowing lumen 22 and inside the entrance filled cavity 21 of gas permeability interlayer 3, filled cavity 21 High-purity iron powder reacted under the action of catalyst with the oxygen in air generate iron oxide, this exothermic heat of reaction, the heat of releasing By being thermally conducted to that the coating being laid on metope is dried from inside to outside up to metope, in addition, can be used again after the completion of heat release Sealed valve cap 5 closes air inlet pipe 4, sealed valve cap 5 is opened when fire occurs, carbon monoxide enters in filled cavity 21, in high temperature Iron oxide is reduced into iron under effect, this exothermic heat of reaction can cool down while carbonomonoxide concentration in reducing fire, mention The escape rate of personnel in the high scene of a fire.
It is described above;It is merely preferred embodiments of the present invention;But scope of protection of the present invention is not limited thereto; Anyone skilled in the art is in the technical scope disclosed by the present invention;According to the technique and scheme of the present invention and its It improves design and is subject to equivalent substitution or change;It should be covered by the scope of protection of the present invention.

Claims (10)

1. a kind of rapid construction moisture absorption self-desiccation wall, including wall (1), seal casinghousing (2), gas permeability interlayer (3) and air inlet It manages (4), it is characterised in that: in the inside of wall (1), the gas permeability interlayer (3) is arranged close for seal casinghousing (2) setting On the inside of capsule body (2), and four edges of gas permeability interlayer (3) are connect with the inner wall of seal casinghousing (2), the gas permeability interlayer (3) (22) two parts of filled cavity (21) and flowing lumen will be divided into inside seal casinghousing (2), the metope of the wall (1) and close Digging on the side wall of capsule body (2) has the preformed hole being mutually matched, and the air inlet pipe (4) is located at the right side of gas permeability interlayer (3), And one end of air inlet pipe (4) passes through preformed hole and extends in flowing lumen (22), the other end of the air inlet pipe (4) is located at outside wall simultaneously It is connected with sealed valve cap (5).
2. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the seal casinghousing (2) polymer of the inside filled with synthesis such as high-purity iron powder, active carbon, inorganic salts and water-absorbing resins.
3. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the seal casinghousing (2) inner wall is connected with vermiculite coating (6), and the vermiculite coating (6) is located at close to the side of air inlet pipe (4), and vermiculite coating (6) width is less than the width of flowing lumen (22).
4. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the gas permeability interlayer (3) it can be anticorrosion cloth, the two sides of the gas permeability interlayer (3) are equipped with setting net, and shape net and seal casinghousing (2) inner wall Connection.
5. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the filled cavity (21) Pumping oxygen processing can be done by taking out oxygen machine in flowing lumen (22), can also be vacuumized by evacuator.
6. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the seal casinghousing (2) inner wall is uniformly coated with preserving and sealing coating, and preserving and sealing coating with a thickness of 0.03-0.07mm.
7. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the air inlet pipe (4) Sealing ring is equipped between preformed hole, and sealing ring is interference fitted with air inlet pipe (4) and preformed hole.
8. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the position of the preformed hole It installs at away from ground 1m-1.5m.
9. a kind of rapid construction moisture absorption self-desiccation wall according to claim 1, it is characterised in that: the wall (1) It being fixedly connected on metope three lateral coaming plates (71), three lateral coaming plate (71) lower end is rotatably connected to unilateral curved cover plate (72), And sealed valve cap (5) is located between three lateral coaming plates (71) and unilateral curved cover plate (72), the unilateral side curved cover plate (72) is separate Multiple lock-screws are connected between one end and metope of three lateral coaming plates (71).
10. a kind of rapid construction moisture absorption self-desiccation wall according to claim 9, it is characterised in that: the unilateral side arc Cover board (72) is made of glass material, and the outer surface of the unilateral side curved cover plate (72) is bonded with fluorescent adhesive paper.
CN201910089398.3A 2019-01-30 2019-01-30 Quick construction moisture absorption is from dry wall body Active CN109797884B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910089398.3A CN109797884B (en) 2019-01-30 2019-01-30 Quick construction moisture absorption is from dry wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910089398.3A CN109797884B (en) 2019-01-30 2019-01-30 Quick construction moisture absorption is from dry wall body

Publications (2)

Publication Number Publication Date
CN109797884A true CN109797884A (en) 2019-05-24
CN109797884B CN109797884B (en) 2020-09-18

Family

ID=66559188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910089398.3A Active CN109797884B (en) 2019-01-30 2019-01-30 Quick construction moisture absorption is from dry wall body

Country Status (1)

Country Link
CN (1) CN109797884B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657400A (en) * 2019-11-19 2020-01-07 湖南德霸照明制造有限公司 Antifog automobile headlamp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657400A (en) * 2019-11-19 2020-01-07 湖南德霸照明制造有限公司 Antifog automobile headlamp

Also Published As

Publication number Publication date
CN109797884B (en) 2020-09-18

Similar Documents

Publication Publication Date Title
CN104299981B (en) OLED display panel, packaging method of OLED display panel and OLED display device
CN109797884A (en) A kind of rapid construction moisture absorption self-desiccation wall
CN107460538B (en) A method of it improves and throws monocrystalline silicon crystal forming rate again
CN205498401U (en) Vacuum waterproof file bag
CN207759420U (en) A kind of livestock feed drying storage bin
CN104841501B (en) A kind of microwell plate of encapsulation micro liquid
CN207029891U (en) A kind of storage salt tank used in molysite production
CN102718006B (en) Top cover for container or transfer barn
CN206315648U (en) A kind of methoxy ethylene drying tower
CN208070290U (en) A kind of apparatus for placing in graphite powder reduction vanadic anhydride
CN207019395U (en) A kind of vacuum drying chamber
CN207836234U (en) A kind of attic window for grain storage
CN205986019U (en) Waterproof cable junction box structure
CN209506521U (en) Ventilative sealing cover for paint kettle
CN208668646U (en) A kind of building water-proof and enclosed structure
CN206152819U (en) Sealed desicator of easily regenerating of no fat
CN206704928U (en) A kind of moistureproof tea packaging box
CN219970634U (en) Medicine packaging bottle with dampproofing prevention of seepage function
CN213355608U (en) Tributyl borate storage device
CN213960481U (en) Water conservancy control device with dampproofing and waterproofing function
CN218173405U (en) Putty powder production is with dampproofing formula finished product storage jar
CN220375322U (en) Corrosion-resistant heat-insulating food packaging film
CN214085219U (en) Magnesium alloy tea caddy
CN210663673U (en) Drying room suitable for dry-hang glue A component resin
CN213595029U (en) Gland type moisture-proof bottle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200825

Address after: 443500 No. 58, Group I, Liujin Tan Village, Changyang Moshi Town, Yichang City, Hubei Province

Applicant after: HUBEI ZHONGHE GUANGYUAN CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 138000 No. 88 Danqing Street, Qian'an County, Songyuan City, Jilin Province

Applicant before: Shang Wenhui

GR01 Patent grant
GR01 Patent grant