CN109797774A - The processing method of equipment basic pre-buried bolt thread curtailment - Google Patents

The processing method of equipment basic pre-buried bolt thread curtailment Download PDF

Info

Publication number
CN109797774A
CN109797774A CN201910226171.9A CN201910226171A CN109797774A CN 109797774 A CN109797774 A CN 109797774A CN 201910226171 A CN201910226171 A CN 201910226171A CN 109797774 A CN109797774 A CN 109797774A
Authority
CN
China
Prior art keywords
cut
bolt
screw sleeve
straight screw
thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910226171.9A
Other languages
Chinese (zh)
Inventor
王弘旭
王凤杰
曹国辉
张寒伟
于涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910226171.9A priority Critical patent/CN109797774A/en
Publication of CN109797774A publication Critical patent/CN109797774A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The present invention relates to technical field of building construction, the processing method of specifically a kind of equipment basic pre-buried bolt thread curtailment.Including pre-embedded bolt is cut off from screw thread, position is cut off below secondary grout layer, special processing factory is taken into the upper half and adds straight screw sleeve, an equal diameter bolt is taken all to cut off threaded portion, it is held out against with former pre-embedded bolt in straight screw sleeve middle position and is tightened, straight screw sleeve upper and lower opening is fully welded with lengthening threaded rod and pre-embedded bolt respectively, entire sleeve is poured into secondary grout layer or less after the installation is completed by equipment.Construction method of the present invention is simple, easy to operate, does not destroy existing equipment basis, and intensity is up to standard, can effectively save labour turnover and material cost, shortens the construction period, reduces construction cost.

Description

The processing method of equipment basic pre-buried bolt thread curtailment
Technical field
The present invention relates to technical field of building construction, the place of specifically a kind of equipment basic pre-buried bolt thread curtailment Reason method.
Background technique
The saying of " high bolt low embedded part " is known as in construction, in order to avoid foundation settlement when equipment basic pre-buried bolt Bolt thread curtailment is caused, bolt absolute altitude can improve 0-20mm than design height, but in actual operation, can be because of measurement The case where reasons such as human error, design mistake, foundation settlement is excessive cause equipment basic pre-buried bolt thread curtailment, leads Cause nut when equipment installation that can not be fully screwed into.
Currently used conventional methods are all to cut bolt surrounding concrete, again pre- after bolt is integrally taken out It burying, this method not only elapsed time, waste material and can cut off obstacle reinforcing bar in operation, influence basic integral strength, or Person cuts off bolt piece longer bolt of direct butt welding, but this method welding difficulty is big, not can guarantee bolt strength, if not Change bolt, reduce equipment absolute altitude, it will cause coupled other equipment will drop absolute altitude simultaneously, and difficulty of construction increases.
Summary of the invention
Present invention seek to address that the above problem, to provide a kind of construction is simple, easy to operate, proof strength, shorten work Phase, reduce cost equipment basic pre-buried bolt thread curtailment processing method.
The present invention solves described problem, the technical solution adopted is that:
A kind of processing method of equipment basic pre-buried bolt thread curtailment, includes the following steps:
(1) pre-embedded bolt is cut off from screw thread, and polished flat, cut off position below secondary grout layer;
(2) upper half screw rod cut off is taken into special processing factory and processes straight screw sleeve;
(3) it takes an equal diameter bolt all to cut off threaded portion, and the threaded rod cut off is polished flat, as lengthening Threaded rod;
(4) lengthening threaded rod is held out against with original pre-embedded bolt in straight screw sleeve middle position and is tightened;
(5) straight screw sleeve upper and lower opening is fully welded welding with lengthening threaded rod and pre-embedded bolt respectively;
(6) entire straight screw sleeve is poured into secondary grout layer or less after the installation is completed by equipment.
The present invention by adopting the above technical scheme, compared with prior art, the feature protruded is:
Construction method is simple, easy to operate, do not destroy existing equipment basis, intensity is up to standard, can effectively save labour turnover and Material cost shortens the construction period, reduces construction cost.
Preferably, the further technical solution of the present invention is:
Pre-embedded bolt is cut off to the screw thread at least retaining straight screw sleeve half length from screw thread.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of step 1 of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of step 2 of the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of step 3 of the embodiment of the present invention;
Fig. 4 is the structural schematic diagram of step 4 of the embodiment of the present invention;
Fig. 5 is to lengthen threaded rod in step 4 of the embodiment of the present invention to hold out against with original pre-embedded bolt in sleeve middle position Structural schematic diagram;
Fig. 6 is the structural schematic diagram of step 5 of the embodiment of the present invention;
Fig. 7 is the structural schematic diagram that the embodiment of the present invention has been constructed;
In figure: lengthening threaded rod 1;Nut 2;Gasket 3;Plant bottom case 4;Straight screw sleeve 5;Secondary grout layer 6;Concrete equipment Basis 7;Pre-embedded bolt 8.
Specific embodiment:
Below with reference to embodiment, the invention will be further described, and purpose, which is only that, more fully understands the content of present invention, therefore, institute The example of act is not intended to limit protection scope of the present invention.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, a kind of place of equipment basic pre-buried bolt thread curtailment Reason method, includes the following steps:
(1) pre-embedded bolt 8 being embedded in concrete equipment basis 7 is cut off from screw thread, and polished flat, cut off position In secondary grout layer 6 hereinafter, simultaneously at least retaining the screw thread of 5 half length of straight screw sleeve.
(2) upper half screw rod cut off is taken into the high-intensitive straight screw sleeve 5 of special processing factory's processing.
(3) it takes an equal diameter bolt all to cut off threaded portion, and the threaded rod cut off is polished flat, as Lengthen threaded rod 1.
(4) threaded rod 1 will be lengthened with torque spanner to tighten in straight screw sleeve 5 with original pre-embedded bolt 8, and make Threaded rod 1 is lengthened to hold out against with original pre-embedded bolt 8 in 5 middle position of straight screw sleeve.
(5) 5 upper and lower opening of straight screw sleeve is fully welded welding and done and reinforced with lengthening threaded rod 1 and pre-embedded bolt 8 respectively, welded It is careful not to hurt base material when connecing.
(6) by 3 fixed equipment pedestal 4 of the lengthening threaded rod 1 of pre-embedded bolt 8, nut 2 and gasket, after the installation is completed will Entire straight screw sleeve 5 is poured into 6 or less secondary grout layer.
Construction method of the present invention is simple, easy to operate, does not destroy existing equipment basis, intensity is up to standard, can effectively save Cost of labor and material cost shorten the construction period, reduce construction cost.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to use equivalence changes made by description of the invention and its accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (2)

1. a kind of processing method of equipment basic pre-buried bolt thread curtailment, which comprises the steps of:
(1) pre-embedded bolt is cut off from screw thread, and polished flat, cut off position below secondary grout layer;
(2) upper half screw rod cut off is taken into special processing factory and processes straight screw sleeve;
(3) it takes an equal diameter bolt all to cut off threaded portion, and the threaded rod cut off is polished flat, as lengthening Threaded rod;
(4) lengthening threaded rod is held out against with original pre-embedded bolt in straight screw sleeve middle position and is tightened;
(5) straight screw sleeve upper and lower opening is fully welded welding with lengthening threaded rod and pre-embedded bolt respectively;
(6) entire straight screw sleeve is poured into secondary grout layer or less after the installation is completed by equipment.
2. the processing method of equipment basic pre-buried bolt thread curtailment according to claim 1, it is characterised in that: will Pre-embedded bolt cuts off the screw thread at least retaining straight screw sleeve half length from screw thread.
CN201910226171.9A 2019-03-25 2019-03-25 The processing method of equipment basic pre-buried bolt thread curtailment Pending CN109797774A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910226171.9A CN109797774A (en) 2019-03-25 2019-03-25 The processing method of equipment basic pre-buried bolt thread curtailment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910226171.9A CN109797774A (en) 2019-03-25 2019-03-25 The processing method of equipment basic pre-buried bolt thread curtailment

Publications (1)

Publication Number Publication Date
CN109797774A true CN109797774A (en) 2019-05-24

Family

ID=66563159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910226171.9A Pending CN109797774A (en) 2019-03-25 2019-03-25 The processing method of equipment basic pre-buried bolt thread curtailment

Country Status (1)

Country Link
CN (1) CN109797774A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001107376A (en) * 1999-10-07 2001-04-17 Hamanaka Nut Kk Connecting method between foundation pile and reinforcement
CN101776196A (en) * 2007-08-16 2010-07-14 中冶宝钢技术服务有限公司 Large damaged foundation bolt butt joint method
CN102444209A (en) * 2011-09-30 2012-05-09 中国二十二冶集团有限公司 Building steel-column foundation lengthening bolt and lengthening method thereof
CN103981909A (en) * 2014-06-06 2014-08-13 四川鸿舰重型机械制造有限责任公司 Rapid repair method and structure for broken foundation bolt

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001107376A (en) * 1999-10-07 2001-04-17 Hamanaka Nut Kk Connecting method between foundation pile and reinforcement
CN101776196A (en) * 2007-08-16 2010-07-14 中冶宝钢技术服务有限公司 Large damaged foundation bolt butt joint method
CN102444209A (en) * 2011-09-30 2012-05-09 中国二十二冶集团有限公司 Building steel-column foundation lengthening bolt and lengthening method thereof
CN103981909A (en) * 2014-06-06 2014-08-13 四川鸿舰重型机械制造有限责任公司 Rapid repair method and structure for broken foundation bolt

Similar Documents

Publication Publication Date Title
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN105201082A (en) Construction method of expansion joint shape setting formwork
CN103015735A (en) Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN203270599U (en) Foundation bolt pre-buried die
CN206971769U (en) A kind of rubber support installation positioning special purpose device
CN107476572A (en) A kind of Split bolt sleeve device for building
CN109797774A (en) The processing method of equipment basic pre-buried bolt thread curtailment
CN203247842U (en) Reinforcing device of concrete structure expansion joint formwork
CN204225471U (en) A kind of cantilever steel girder structure through walls
CN201137216Y (en) Steel element and concrete element connection anchor bolt connected long joint
CN202990111U (en) Embedded sleeve component
CN206942120U (en) A kind of pre-embedded device of builder's jack
JP2020060074A (en) Anchor frame
CN205134188U (en) Bury ground tackle deeply
CN210034108U (en) Bolt lengthening device
CN107386457A (en) A kind of built-in fitting in cast-in-situ concrete member
CN204728475U (en) A kind of secondary structure steel tie bar embedded part device
CN207131088U (en) A kind of shear wall support component
CN208235601U (en) A kind of concrete foundation and the reinforced base isolation reinforcement structure in foundation beam junction
CN102155097A (en) Locating device for installing large embedded member of concrete wall and installing method thereof
CN106567541B (en) A kind of multifunction formboard connector
CN203783144U (en) Composite split bolt for fixing prestressing tendon
CN219060844U (en) Cutting-free outer frame wall connecting piece for full concrete outer wall
CN216111675U (en) Pre-buried bolt extension sleeve device
CN207499248U (en) Reinforced concrete upright column structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination