CN109797774A - The processing method of equipment basic pre-buried bolt thread curtailment - Google Patents
The processing method of equipment basic pre-buried bolt thread curtailment Download PDFInfo
- Publication number
- CN109797774A CN109797774A CN201910226171.9A CN201910226171A CN109797774A CN 109797774 A CN109797774 A CN 109797774A CN 201910226171 A CN201910226171 A CN 201910226171A CN 109797774 A CN109797774 A CN 109797774A
- Authority
- CN
- China
- Prior art keywords
- cut
- bolt
- screw sleeve
- straight screw
- thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 7
- 239000011440 grout Substances 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 5
- 238000012545 processing Methods 0.000 claims abstract description 5
- 238000000034 method Methods 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 12
- 239000000463 material Substances 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 230000007306 turnover Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 7
- 238000013461 design Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The present invention relates to technical field of building construction, the processing method of specifically a kind of equipment basic pre-buried bolt thread curtailment.Including pre-embedded bolt is cut off from screw thread, position is cut off below secondary grout layer, special processing factory is taken into the upper half and adds straight screw sleeve, an equal diameter bolt is taken all to cut off threaded portion, it is held out against with former pre-embedded bolt in straight screw sleeve middle position and is tightened, straight screw sleeve upper and lower opening is fully welded with lengthening threaded rod and pre-embedded bolt respectively, entire sleeve is poured into secondary grout layer or less after the installation is completed by equipment.Construction method of the present invention is simple, easy to operate, does not destroy existing equipment basis, and intensity is up to standard, can effectively save labour turnover and material cost, shortens the construction period, reduces construction cost.
Description
Technical field
The present invention relates to technical field of building construction, the place of specifically a kind of equipment basic pre-buried bolt thread curtailment
Reason method.
Background technique
The saying of " high bolt low embedded part " is known as in construction, in order to avoid foundation settlement when equipment basic pre-buried bolt
Bolt thread curtailment is caused, bolt absolute altitude can improve 0-20mm than design height, but in actual operation, can be because of measurement
The case where reasons such as human error, design mistake, foundation settlement is excessive cause equipment basic pre-buried bolt thread curtailment, leads
Cause nut when equipment installation that can not be fully screwed into.
Currently used conventional methods are all to cut bolt surrounding concrete, again pre- after bolt is integrally taken out
It burying, this method not only elapsed time, waste material and can cut off obstacle reinforcing bar in operation, influence basic integral strength, or
Person cuts off bolt piece longer bolt of direct butt welding, but this method welding difficulty is big, not can guarantee bolt strength, if not
Change bolt, reduce equipment absolute altitude, it will cause coupled other equipment will drop absolute altitude simultaneously, and difficulty of construction increases.
Summary of the invention
Present invention seek to address that the above problem, to provide a kind of construction is simple, easy to operate, proof strength, shorten work
Phase, reduce cost equipment basic pre-buried bolt thread curtailment processing method.
The present invention solves described problem, the technical solution adopted is that:
A kind of processing method of equipment basic pre-buried bolt thread curtailment, includes the following steps:
(1) pre-embedded bolt is cut off from screw thread, and polished flat, cut off position below secondary grout layer;
(2) upper half screw rod cut off is taken into special processing factory and processes straight screw sleeve;
(3) it takes an equal diameter bolt all to cut off threaded portion, and the threaded rod cut off is polished flat, as lengthening
Threaded rod;
(4) lengthening threaded rod is held out against with original pre-embedded bolt in straight screw sleeve middle position and is tightened;
(5) straight screw sleeve upper and lower opening is fully welded welding with lengthening threaded rod and pre-embedded bolt respectively;
(6) entire straight screw sleeve is poured into secondary grout layer or less after the installation is completed by equipment.
The present invention by adopting the above technical scheme, compared with prior art, the feature protruded is:
Construction method is simple, easy to operate, do not destroy existing equipment basis, intensity is up to standard, can effectively save labour turnover and
Material cost shortens the construction period, reduces construction cost.
Preferably, the further technical solution of the present invention is:
Pre-embedded bolt is cut off to the screw thread at least retaining straight screw sleeve half length from screw thread.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of step 1 of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of step 2 of the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of step 3 of the embodiment of the present invention;
Fig. 4 is the structural schematic diagram of step 4 of the embodiment of the present invention;
Fig. 5 is to lengthen threaded rod in step 4 of the embodiment of the present invention to hold out against with original pre-embedded bolt in sleeve middle position
Structural schematic diagram;
Fig. 6 is the structural schematic diagram of step 5 of the embodiment of the present invention;
Fig. 7 is the structural schematic diagram that the embodiment of the present invention has been constructed;
In figure: lengthening threaded rod 1;Nut 2;Gasket 3;Plant bottom case 4;Straight screw sleeve 5;Secondary grout layer 6;Concrete equipment
Basis 7;Pre-embedded bolt 8.
Specific embodiment:
Below with reference to embodiment, the invention will be further described, and purpose, which is only that, more fully understands the content of present invention, therefore, institute
The example of act is not intended to limit protection scope of the present invention.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, a kind of place of equipment basic pre-buried bolt thread curtailment
Reason method, includes the following steps:
(1) pre-embedded bolt 8 being embedded in concrete equipment basis 7 is cut off from screw thread, and polished flat, cut off position
In secondary grout layer 6 hereinafter, simultaneously at least retaining the screw thread of 5 half length of straight screw sleeve.
(2) upper half screw rod cut off is taken into the high-intensitive straight screw sleeve 5 of special processing factory's processing.
(3) it takes an equal diameter bolt all to cut off threaded portion, and the threaded rod cut off is polished flat, as
Lengthen threaded rod 1.
(4) threaded rod 1 will be lengthened with torque spanner to tighten in straight screw sleeve 5 with original pre-embedded bolt 8, and make
Threaded rod 1 is lengthened to hold out against with original pre-embedded bolt 8 in 5 middle position of straight screw sleeve.
(5) 5 upper and lower opening of straight screw sleeve is fully welded welding and done and reinforced with lengthening threaded rod 1 and pre-embedded bolt 8 respectively, welded
It is careful not to hurt base material when connecing.
(6) by 3 fixed equipment pedestal 4 of the lengthening threaded rod 1 of pre-embedded bolt 8, nut 2 and gasket, after the installation is completed will
Entire straight screw sleeve 5 is poured into 6 or less secondary grout layer.
Construction method of the present invention is simple, easy to operate, does not destroy existing equipment basis, intensity is up to standard, can effectively save
Cost of labor and material cost shorten the construction period, reduce construction cost.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention,
It is all to use equivalence changes made by description of the invention and its accompanying drawing content, it is intended to be included within the scope of the present invention.
Claims (2)
1. a kind of processing method of equipment basic pre-buried bolt thread curtailment, which comprises the steps of:
(1) pre-embedded bolt is cut off from screw thread, and polished flat, cut off position below secondary grout layer;
(2) upper half screw rod cut off is taken into special processing factory and processes straight screw sleeve;
(3) it takes an equal diameter bolt all to cut off threaded portion, and the threaded rod cut off is polished flat, as lengthening
Threaded rod;
(4) lengthening threaded rod is held out against with original pre-embedded bolt in straight screw sleeve middle position and is tightened;
(5) straight screw sleeve upper and lower opening is fully welded welding with lengthening threaded rod and pre-embedded bolt respectively;
(6) entire straight screw sleeve is poured into secondary grout layer or less after the installation is completed by equipment.
2. the processing method of equipment basic pre-buried bolt thread curtailment according to claim 1, it is characterised in that: will
Pre-embedded bolt cuts off the screw thread at least retaining straight screw sleeve half length from screw thread.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910226171.9A CN109797774A (en) | 2019-03-25 | 2019-03-25 | The processing method of equipment basic pre-buried bolt thread curtailment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910226171.9A CN109797774A (en) | 2019-03-25 | 2019-03-25 | The processing method of equipment basic pre-buried bolt thread curtailment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109797774A true CN109797774A (en) | 2019-05-24 |
Family
ID=66563159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910226171.9A Pending CN109797774A (en) | 2019-03-25 | 2019-03-25 | The processing method of equipment basic pre-buried bolt thread curtailment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109797774A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001107376A (en) * | 1999-10-07 | 2001-04-17 | Hamanaka Nut Kk | Connecting method between foundation pile and reinforcement |
CN101776196A (en) * | 2007-08-16 | 2010-07-14 | 中冶宝钢技术服务有限公司 | Large damaged foundation bolt butt joint method |
CN102444209A (en) * | 2011-09-30 | 2012-05-09 | 中国二十二冶集团有限公司 | Building steel-column foundation lengthening bolt and lengthening method thereof |
CN103981909A (en) * | 2014-06-06 | 2014-08-13 | 四川鸿舰重型机械制造有限责任公司 | Rapid repair method and structure for broken foundation bolt |
-
2019
- 2019-03-25 CN CN201910226171.9A patent/CN109797774A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001107376A (en) * | 1999-10-07 | 2001-04-17 | Hamanaka Nut Kk | Connecting method between foundation pile and reinforcement |
CN101776196A (en) * | 2007-08-16 | 2010-07-14 | 中冶宝钢技术服务有限公司 | Large damaged foundation bolt butt joint method |
CN102444209A (en) * | 2011-09-30 | 2012-05-09 | 中国二十二冶集团有限公司 | Building steel-column foundation lengthening bolt and lengthening method thereof |
CN103981909A (en) * | 2014-06-06 | 2014-08-13 | 四川鸿舰重型机械制造有限责任公司 | Rapid repair method and structure for broken foundation bolt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205421616U (en) | Assemble integral shear force wall with steel pipe concrete edge member | |
CN105201082A (en) | Construction method of expansion joint shape setting formwork | |
CN103015735A (en) | Construction method for planting wall lacing bars after pre-burying of sleeve assemblies | |
CN203270599U (en) | Foundation bolt pre-buried die | |
CN206971769U (en) | A kind of rubber support installation positioning special purpose device | |
CN107476572A (en) | A kind of Split bolt sleeve device for building | |
CN109797774A (en) | The processing method of equipment basic pre-buried bolt thread curtailment | |
CN203247842U (en) | Reinforcing device of concrete structure expansion joint formwork | |
CN204225471U (en) | A kind of cantilever steel girder structure through walls | |
CN201137216Y (en) | Steel element and concrete element connection anchor bolt connected long joint | |
CN202990111U (en) | Embedded sleeve component | |
CN206942120U (en) | A kind of pre-embedded device of builder's jack | |
JP2020060074A (en) | Anchor frame | |
CN205134188U (en) | Bury ground tackle deeply | |
CN210034108U (en) | Bolt lengthening device | |
CN107386457A (en) | A kind of built-in fitting in cast-in-situ concrete member | |
CN204728475U (en) | A kind of secondary structure steel tie bar embedded part device | |
CN207131088U (en) | A kind of shear wall support component | |
CN208235601U (en) | A kind of concrete foundation and the reinforced base isolation reinforcement structure in foundation beam junction | |
CN102155097A (en) | Locating device for installing large embedded member of concrete wall and installing method thereof | |
CN106567541B (en) | A kind of multifunction formboard connector | |
CN203783144U (en) | Composite split bolt for fixing prestressing tendon | |
CN219060844U (en) | Cutting-free outer frame wall connecting piece for full concrete outer wall | |
CN216111675U (en) | Pre-buried bolt extension sleeve device | |
CN207499248U (en) | Reinforced concrete upright column structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |