CN109782699A - Production scheduling monitoring method - Google Patents
Production scheduling monitoring method Download PDFInfo
- Publication number
- CN109782699A CN109782699A CN201711124730.2A CN201711124730A CN109782699A CN 109782699 A CN109782699 A CN 109782699A CN 201711124730 A CN201711124730 A CN 201711124730A CN 109782699 A CN109782699 A CN 109782699A
- Authority
- CN
- China
- Prior art keywords
- production
- host
- production line
- raw material
- work order
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
A kind of production scheduling monitoring method reads work order and raw material relevant information from the database of host using the microprocessor of host;By the flow monitoring unit of host, whether enough judge to produce required raw material quantity;When raw material quantity is enough, then it whether there is a production line using the flow monitoring unit judges of host, and production line product produced is identical as the target product to be produced documented by work order;If the determination result is YES, then it specifies the production line to make this work order, reduces the operation matched to raw material and production equipment, make to produce spent time reduction.
Description
Technical field
A kind of production scheduling monitoring method, espespecially the condition of production according to each production line, judges whether there is a production line,
Currently product produced is identical as target product documented by work order for the production line;And the production line is specified to make this work
Single production scheduling monitoring method.
Background technique
Generally in process of production, production scheduling is carried out with manpower, since manpower is difficult to control the life of each production line in real time
Relevant information is produced, and leads to the problem of work order not as manufactured by optimum production line, therefore, it is necessary to before being produced,
The previous operations for being matched raw material and production equipment with manpower are executed, cause to produce spent time increase.
Therefore, how to solve the above problems and deficiencies of the prior art, as related dealer wants the project of research and development
Place.
Summary of the invention
It is a primary object of the present invention to obtain the production relevant information of each production line, and according to each production line in real time
The condition of production judges whether there is a production line, the current target product documented by product produced and work order of the production line
Unanimously, and the work order for making this by the production line is specified, avoids continually matching raw material and production equipment, thus subtracts
It is few to produce the spent time and be improved production efficiency.
In order to achieve the above object, production scheduling monitoring method of the invention, carries out according to the following steps: micro- place of (A) host
Device is managed, reads work order and raw material relevant information from the database of host;Using the flow monitoring unit of host, judge to produce institute
Whether the raw material quantity needed is enough;When raw material quantity is enough, step B is carried out;(B) the flow monitoring unit judges of host are utilized
With the presence or absence of a production line, production line product produced when flow monitoring unit carries out this judgement is remembered with work order
The target product of load is identical;If the determination result is YES, then the production line is specified, and carries out step C;(C) with specified production line
This work order is made, and carries out step D;(D) by the microprocessor of host, this work order is removed from database, and holds
Row step A.
Aforementioned production scheduling monitoring method, wherein step B if it has not, then carry out step E, supervise by the process for passing through host
Control unit specifies a production line to make this work order, and carries out according to production equipment of the raw material needed for production to the production line
Pairing executes step D.
Aforementioned production scheduling monitoring method, wherein in step E, the flow monitoring unit of host preferentially select in
The production line of machine state selects least production line of remaining production time if each production line is in production status.
Detailed description of the invention
Fig. 1 is the block diagram of production scheduling monitoring method of the invention.
Reference signs list: 1- host;11- microprocessor;111- flow monitoring unit;12- database;121- work order;
122- raw material relevant information;2- production line;21- production equipment.
Specific embodiment
Refering to Figure 1, by can be seen that in Fig. 1, production scheduling monitoring method of the invention, required equipment
It include host 1 and multiple production lines 2, in which:
The host 1 has microprocessor 11 and database 12, which stores flow monitoring unit 111,
And the database 12 stores work order 121 and raw material relevant information 122.Each production line 2 is connect by network with host 1, for master
The flow monitoring unit 111 of machine 1 obtains the various production relevant informations of each production line 2 in real time.And there is the production line 2 production to set
Standby 21.
When the present invention is monitored production procedure, carried out according to the following steps:
(A) microprocessor 11 for utilizing host 1 reads work order 121 and raw material relevant information from the database 12 of host 1
122;By the flow monitoring unit 111 of host 1, whether enough judge to produce required raw material quantity;When raw material quantity is enough
When, carry out step B.
(B) production line 2 is judged whether there is using the flow monitoring unit 111 of host 1, which supervises in process
Control unit 111 carries out product produced when this judges, identical as target product documented by work order 121;If judging result
Be it is yes, then specify the production line 2, and carry out step C.
(C) this work order 121 is made with specified production line 2, and carries out step D.
(D) microprocessor 11 for passing through host 1, this work order 121 is removed from database 12, and execute step A.
Through the above steps, it before being produced with specified production line 2, is not necessary to match raw material and production equipment 21
It is right, and it is improved production efficiency.
Furthermore above-mentioned steps A if it has not, i.e. raw material lazy weight when, A is thened follow the steps, to re-read next Zhang Gong
Single 121.
Above-mentioned steps B is if it has not, i.e. each production line 2 judges that product produced in process is remembered with work order 121 at this
The target product of load is inconsistent, then carries out step E, specifies a production line 2 production by the flow monitoring unit 111 of host 1
This work order 121, and according to production needed for raw material the production equipment 21 of the production line 2 is matched after, carry out this
The production of work order 121, and execute step D.
Wherein, in above-mentioned steps E, the process to manufacture the production line 2 of this work order 121, the stream of the host 1 are being specified
Range monitoring unit 111 preferentially selects the production line 2 being in standby, when the quantity for the production line 2 being in standby is more
When a, then a production line 2, raw material needed for the production line 2 raw material used in previous production and this manufacture are specified
Repetition degree it is high compared with other production lines 2, thus reduce the workload that the production equipment 21 of raw material and production line 2 is matched,
If each production line 2 is in production status, least production line 2 of remaining production time is selected.
Therefore, the present invention is that can solve problem of the prior art and missing, and key technology is, the present invention utilizes host
1 flow monitoring unit 111 judge it is whether enough to raw material quantity needed for producing target product documented by work order 121,
And a production line 2 is judged whether there is by flow monitoring unit 111, the production line 2 judge in process at this made by
Product is consistent with the target product, if the production line 2 exists, specifies the production line 2 to carry out the production of this work order 121, keeps away
Exempt from continually to match the production equipment 21 of raw material and production line 2, is improved production efficiency.
Claims (3)
1. a kind of production scheduling monitoring method, carries out according to the following steps:
(A) microprocessor for utilizing host reads work order and raw material relevant information from the database of host;Pass through the stream of host
Whether range monitoring unit judges to produce required raw material quantity enough;When raw material quantity is enough, step B is carried out;
(B) it whether there is a production line using the flow monitoring unit judges of host, which carries out in flow monitoring unit
Product produced, identical as target product documented by work order when this judges;If the determination result is YES, then the production is specified
Line, and carry out step C;
(C) this work order is made with specified production line, and carries out step D;
(D) by the microprocessor of host, this work order is removed from database, and execute step A.
2. production scheduling monitoring method as described in claim 1, which is characterized in that step B if it has not, then carry out step E,
This work order is made by the specified production line of the flow monitoring unit of host, and according to raw material needed for production to the production
After the production equipment of line is matched, step D is executed.
3. production scheduling monitoring method as claimed in claim 2, which is characterized in that in step E, the flow monitoring list of host
Member preferentially selects the production line being in standby to select the remaining production time if each production line is in production status
Least production line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711124730.2A CN109782699A (en) | 2017-11-14 | 2017-11-14 | Production scheduling monitoring method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711124730.2A CN109782699A (en) | 2017-11-14 | 2017-11-14 | Production scheduling monitoring method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109782699A true CN109782699A (en) | 2019-05-21 |
Family
ID=66493580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711124730.2A Withdrawn CN109782699A (en) | 2017-11-14 | 2017-11-14 | Production scheduling monitoring method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109782699A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115115271A (en) * | 2022-07-26 | 2022-09-27 | 广州中平智能科技有限公司 | Product production process management method, management platform, equipment and medium |
CN116502834A (en) * | 2023-04-10 | 2023-07-28 | 九河精微塑胶工业(深圳)有限公司 | Workshop intelligent management method and system based on digitization |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1504938A (en) * | 2002-12-05 | 2004-06-16 | 技嘉科技股份有限公司 | Customized production system and method thereof |
CN106022623A (en) * | 2016-05-27 | 2016-10-12 | 东莞晶苑毛织制衣有限公司 | Production plan making method and system |
CN106154989A (en) * | 2015-03-31 | 2016-11-23 | 上海米道信息科技有限公司 | A kind of enterprise manufactures mistake proofing management method and system |
CN106529871A (en) * | 2016-10-28 | 2017-03-22 | 上海福赛特机器人有限公司 | Intelligent manufacturing method and system |
CN106611381A (en) * | 2016-08-31 | 2017-05-03 | 四川用联信息技术有限公司 | Algorithm for analyzing influence of material purchase to production scheduling of manufacturing shop based on cloud manufacturing |
-
2017
- 2017-11-14 CN CN201711124730.2A patent/CN109782699A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1504938A (en) * | 2002-12-05 | 2004-06-16 | 技嘉科技股份有限公司 | Customized production system and method thereof |
CN106154989A (en) * | 2015-03-31 | 2016-11-23 | 上海米道信息科技有限公司 | A kind of enterprise manufactures mistake proofing management method and system |
CN106022623A (en) * | 2016-05-27 | 2016-10-12 | 东莞晶苑毛织制衣有限公司 | Production plan making method and system |
CN106611381A (en) * | 2016-08-31 | 2017-05-03 | 四川用联信息技术有限公司 | Algorithm for analyzing influence of material purchase to production scheduling of manufacturing shop based on cloud manufacturing |
CN106529871A (en) * | 2016-10-28 | 2017-03-22 | 上海福赛特机器人有限公司 | Intelligent manufacturing method and system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115115271A (en) * | 2022-07-26 | 2022-09-27 | 广州中平智能科技有限公司 | Product production process management method, management platform, equipment and medium |
CN116502834A (en) * | 2023-04-10 | 2023-07-28 | 九河精微塑胶工业(深圳)有限公司 | Workshop intelligent management method and system based on digitization |
CN116502834B (en) * | 2023-04-10 | 2024-01-09 | 九河精微塑胶工业(深圳)有限公司 | Workshop intelligent management method and system based on digitization |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108319243B (en) | Automatic management method of PCB equipment, storage medium and server | |
CN104765641B (en) | A kind of job scheduling method and system | |
CN110794800A (en) | Monitoring system for wisdom mill information management | |
CN109782699A (en) | Production scheduling monitoring method | |
US9208677B2 (en) | Systems and methods for process alarm reduction | |
CN104076770A (en) | Method and system for monitoring production line | |
CN103763127B (en) | A kind of equipment state alarm monitoring method and system | |
CN111723646B (en) | Method and device for remotely assisting in maintaining equipment | |
CN102222270B (en) | Manufacture and perform management system and production curves device | |
CN109581126B (en) | Electric power live detection system and method | |
CN110969341A (en) | Intelligent maintenance method, device and system for power distribution terminal | |
CN110322168A (en) | Quality management-control method | |
CN102129237A (en) | Intelligent voice prompting system and method for dry-mixed mortar mixing station | |
CN107417145B (en) | Method, device and system for controlling temperature of cement clinker sintering decomposing furnace | |
CN103414873B (en) | Die casting monitors protection system and method | |
CN109976294B (en) | Intelligent parking method and system | |
TWI656416B (en) | Production schedule monitoring method | |
CN105761015B (en) | Intelligent error preventing method and system suitable for operation ticket | |
CN108859041B (en) | Intelligent control system and control method of injection molding equipment | |
CN116578486A (en) | Intelligent manufacturing industrial software debugging system based on cloud computing | |
CN108881337B (en) | Injection molding production remote control system | |
CN111258276A (en) | Monitoring method, system and device for chip manufacturing equipment | |
CN110645048A (en) | Intelligent mine multi-system online linkage method | |
CN110118103A (en) | A kind of coal mine gas prewarning method | |
CN102638365A (en) | Implementation method for automatic discovery of mass equipment in network management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190521 |