CN109782699A - Production scheduling monitoring method - Google Patents

Production scheduling monitoring method Download PDF

Info

Publication number
CN109782699A
CN109782699A CN201711124730.2A CN201711124730A CN109782699A CN 109782699 A CN109782699 A CN 109782699A CN 201711124730 A CN201711124730 A CN 201711124730A CN 109782699 A CN109782699 A CN 109782699A
Authority
CN
China
Prior art keywords
production
host
production line
raw material
work order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711124730.2A
Other languages
Chinese (zh)
Inventor
张启原
王年清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCHMID AUTOMATION ASIA CO Ltd
Original Assignee
SCHMID AUTOMATION ASIA CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCHMID AUTOMATION ASIA CO Ltd filed Critical SCHMID AUTOMATION ASIA CO Ltd
Priority to CN201711124730.2A priority Critical patent/CN109782699A/en
Publication of CN109782699A publication Critical patent/CN109782699A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

A kind of production scheduling monitoring method reads work order and raw material relevant information from the database of host using the microprocessor of host;By the flow monitoring unit of host, whether enough judge to produce required raw material quantity;When raw material quantity is enough, then it whether there is a production line using the flow monitoring unit judges of host, and production line product produced is identical as the target product to be produced documented by work order;If the determination result is YES, then it specifies the production line to make this work order, reduces the operation matched to raw material and production equipment, make to produce spent time reduction.

Description

Production scheduling monitoring method
Technical field
A kind of production scheduling monitoring method, espespecially the condition of production according to each production line, judges whether there is a production line, Currently product produced is identical as target product documented by work order for the production line;And the production line is specified to make this work Single production scheduling monitoring method.
Background technique
Generally in process of production, production scheduling is carried out with manpower, since manpower is difficult to control the life of each production line in real time Relevant information is produced, and leads to the problem of work order not as manufactured by optimum production line, therefore, it is necessary to before being produced, The previous operations for being matched raw material and production equipment with manpower are executed, cause to produce spent time increase.
Therefore, how to solve the above problems and deficiencies of the prior art, as related dealer wants the project of research and development Place.
Summary of the invention
It is a primary object of the present invention to obtain the production relevant information of each production line, and according to each production line in real time The condition of production judges whether there is a production line, the current target product documented by product produced and work order of the production line Unanimously, and the work order for making this by the production line is specified, avoids continually matching raw material and production equipment, thus subtracts It is few to produce the spent time and be improved production efficiency.
In order to achieve the above object, production scheduling monitoring method of the invention, carries out according to the following steps: micro- place of (A) host Device is managed, reads work order and raw material relevant information from the database of host;Using the flow monitoring unit of host, judge to produce institute Whether the raw material quantity needed is enough;When raw material quantity is enough, step B is carried out;(B) the flow monitoring unit judges of host are utilized With the presence or absence of a production line, production line product produced when flow monitoring unit carries out this judgement is remembered with work order The target product of load is identical;If the determination result is YES, then the production line is specified, and carries out step C;(C) with specified production line This work order is made, and carries out step D;(D) by the microprocessor of host, this work order is removed from database, and holds Row step A.
Aforementioned production scheduling monitoring method, wherein step B if it has not, then carry out step E, supervise by the process for passing through host Control unit specifies a production line to make this work order, and carries out according to production equipment of the raw material needed for production to the production line Pairing executes step D.
Aforementioned production scheduling monitoring method, wherein in step E, the flow monitoring unit of host preferentially select in The production line of machine state selects least production line of remaining production time if each production line is in production status.
Detailed description of the invention
Fig. 1 is the block diagram of production scheduling monitoring method of the invention.
Reference signs list: 1- host;11- microprocessor;111- flow monitoring unit;12- database;121- work order; 122- raw material relevant information;2- production line;21- production equipment.
Specific embodiment
Refering to Figure 1, by can be seen that in Fig. 1, production scheduling monitoring method of the invention, required equipment It include host 1 and multiple production lines 2, in which:
The host 1 has microprocessor 11 and database 12, which stores flow monitoring unit 111, And the database 12 stores work order 121 and raw material relevant information 122.Each production line 2 is connect by network with host 1, for master The flow monitoring unit 111 of machine 1 obtains the various production relevant informations of each production line 2 in real time.And there is the production line 2 production to set Standby 21.
When the present invention is monitored production procedure, carried out according to the following steps:
(A) microprocessor 11 for utilizing host 1 reads work order 121 and raw material relevant information from the database 12 of host 1 122;By the flow monitoring unit 111 of host 1, whether enough judge to produce required raw material quantity;When raw material quantity is enough When, carry out step B.
(B) production line 2 is judged whether there is using the flow monitoring unit 111 of host 1, which supervises in process Control unit 111 carries out product produced when this judges, identical as target product documented by work order 121;If judging result Be it is yes, then specify the production line 2, and carry out step C.
(C) this work order 121 is made with specified production line 2, and carries out step D.
(D) microprocessor 11 for passing through host 1, this work order 121 is removed from database 12, and execute step A.
Through the above steps, it before being produced with specified production line 2, is not necessary to match raw material and production equipment 21 It is right, and it is improved production efficiency.
Furthermore above-mentioned steps A if it has not, i.e. raw material lazy weight when, A is thened follow the steps, to re-read next Zhang Gong Single 121.
Above-mentioned steps B is if it has not, i.e. each production line 2 judges that product produced in process is remembered with work order 121 at this The target product of load is inconsistent, then carries out step E, specifies a production line 2 production by the flow monitoring unit 111 of host 1 This work order 121, and according to production needed for raw material the production equipment 21 of the production line 2 is matched after, carry out this The production of work order 121, and execute step D.
Wherein, in above-mentioned steps E, the process to manufacture the production line 2 of this work order 121, the stream of the host 1 are being specified Range monitoring unit 111 preferentially selects the production line 2 being in standby, when the quantity for the production line 2 being in standby is more When a, then a production line 2, raw material needed for the production line 2 raw material used in previous production and this manufacture are specified Repetition degree it is high compared with other production lines 2, thus reduce the workload that the production equipment 21 of raw material and production line 2 is matched, If each production line 2 is in production status, least production line 2 of remaining production time is selected.
Therefore, the present invention is that can solve problem of the prior art and missing, and key technology is, the present invention utilizes host 1 flow monitoring unit 111 judge it is whether enough to raw material quantity needed for producing target product documented by work order 121, And a production line 2 is judged whether there is by flow monitoring unit 111, the production line 2 judge in process at this made by Product is consistent with the target product, if the production line 2 exists, specifies the production line 2 to carry out the production of this work order 121, keeps away Exempt from continually to match the production equipment 21 of raw material and production line 2, is improved production efficiency.

Claims (3)

1. a kind of production scheduling monitoring method, carries out according to the following steps:
(A) microprocessor for utilizing host reads work order and raw material relevant information from the database of host;Pass through the stream of host Whether range monitoring unit judges to produce required raw material quantity enough;When raw material quantity is enough, step B is carried out;
(B) it whether there is a production line using the flow monitoring unit judges of host, which carries out in flow monitoring unit Product produced, identical as target product documented by work order when this judges;If the determination result is YES, then the production is specified Line, and carry out step C;
(C) this work order is made with specified production line, and carries out step D;
(D) by the microprocessor of host, this work order is removed from database, and execute step A.
2. production scheduling monitoring method as described in claim 1, which is characterized in that step B if it has not, then carry out step E, This work order is made by the specified production line of the flow monitoring unit of host, and according to raw material needed for production to the production After the production equipment of line is matched, step D is executed.
3. production scheduling monitoring method as claimed in claim 2, which is characterized in that in step E, the flow monitoring list of host Member preferentially selects the production line being in standby to select the remaining production time if each production line is in production status Least production line.
CN201711124730.2A 2017-11-14 2017-11-14 Production scheduling monitoring method Withdrawn CN109782699A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711124730.2A CN109782699A (en) 2017-11-14 2017-11-14 Production scheduling monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711124730.2A CN109782699A (en) 2017-11-14 2017-11-14 Production scheduling monitoring method

Publications (1)

Publication Number Publication Date
CN109782699A true CN109782699A (en) 2019-05-21

Family

ID=66493580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711124730.2A Withdrawn CN109782699A (en) 2017-11-14 2017-11-14 Production scheduling monitoring method

Country Status (1)

Country Link
CN (1) CN109782699A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115115271A (en) * 2022-07-26 2022-09-27 广州中平智能科技有限公司 Product production process management method, management platform, equipment and medium
CN116502834A (en) * 2023-04-10 2023-07-28 九河精微塑胶工业(深圳)有限公司 Workshop intelligent management method and system based on digitization

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1504938A (en) * 2002-12-05 2004-06-16 技嘉科技股份有限公司 Customized production system and method thereof
CN106022623A (en) * 2016-05-27 2016-10-12 东莞晶苑毛织制衣有限公司 Production plan making method and system
CN106154989A (en) * 2015-03-31 2016-11-23 上海米道信息科技有限公司 A kind of enterprise manufactures mistake proofing management method and system
CN106529871A (en) * 2016-10-28 2017-03-22 上海福赛特机器人有限公司 Intelligent manufacturing method and system
CN106611381A (en) * 2016-08-31 2017-05-03 四川用联信息技术有限公司 Algorithm for analyzing influence of material purchase to production scheduling of manufacturing shop based on cloud manufacturing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1504938A (en) * 2002-12-05 2004-06-16 技嘉科技股份有限公司 Customized production system and method thereof
CN106154989A (en) * 2015-03-31 2016-11-23 上海米道信息科技有限公司 A kind of enterprise manufactures mistake proofing management method and system
CN106022623A (en) * 2016-05-27 2016-10-12 东莞晶苑毛织制衣有限公司 Production plan making method and system
CN106611381A (en) * 2016-08-31 2017-05-03 四川用联信息技术有限公司 Algorithm for analyzing influence of material purchase to production scheduling of manufacturing shop based on cloud manufacturing
CN106529871A (en) * 2016-10-28 2017-03-22 上海福赛特机器人有限公司 Intelligent manufacturing method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115115271A (en) * 2022-07-26 2022-09-27 广州中平智能科技有限公司 Product production process management method, management platform, equipment and medium
CN116502834A (en) * 2023-04-10 2023-07-28 九河精微塑胶工业(深圳)有限公司 Workshop intelligent management method and system based on digitization
CN116502834B (en) * 2023-04-10 2024-01-09 九河精微塑胶工业(深圳)有限公司 Workshop intelligent management method and system based on digitization

Similar Documents

Publication Publication Date Title
CN108319243B (en) Automatic management method of PCB equipment, storage medium and server
CN104765641B (en) A kind of job scheduling method and system
CN110794800A (en) Monitoring system for wisdom mill information management
CN109782699A (en) Production scheduling monitoring method
US9208677B2 (en) Systems and methods for process alarm reduction
CN104076770A (en) Method and system for monitoring production line
CN103763127B (en) A kind of equipment state alarm monitoring method and system
CN111723646B (en) Method and device for remotely assisting in maintaining equipment
CN102222270B (en) Manufacture and perform management system and production curves device
CN109581126B (en) Electric power live detection system and method
CN110969341A (en) Intelligent maintenance method, device and system for power distribution terminal
CN110322168A (en) Quality management-control method
CN102129237A (en) Intelligent voice prompting system and method for dry-mixed mortar mixing station
CN107417145B (en) Method, device and system for controlling temperature of cement clinker sintering decomposing furnace
CN103414873B (en) Die casting monitors protection system and method
CN109976294B (en) Intelligent parking method and system
TWI656416B (en) Production schedule monitoring method
CN105761015B (en) Intelligent error preventing method and system suitable for operation ticket
CN108859041B (en) Intelligent control system and control method of injection molding equipment
CN116578486A (en) Intelligent manufacturing industrial software debugging system based on cloud computing
CN108881337B (en) Injection molding production remote control system
CN111258276A (en) Monitoring method, system and device for chip manufacturing equipment
CN110645048A (en) Intelligent mine multi-system online linkage method
CN110118103A (en) A kind of coal mine gas prewarning method
CN102638365A (en) Implementation method for automatic discovery of mass equipment in network management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190521