CN109778714A - Assembled steel structure support platform and its installation and removal method - Google Patents

Assembled steel structure support platform and its installation and removal method Download PDF

Info

Publication number
CN109778714A
CN109778714A CN201910228463.6A CN201910228463A CN109778714A CN 109778714 A CN109778714 A CN 109778714A CN 201910228463 A CN201910228463 A CN 201910228463A CN 109778714 A CN109778714 A CN 109778714A
Authority
CN
China
Prior art keywords
steel
bracing members
cylinder
platform
buttress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910228463.6A
Other languages
Chinese (zh)
Inventor
陈国民
李涛
候杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201910228463.6A priority Critical patent/CN109778714A/en
Publication of CN109778714A publication Critical patent/CN109778714A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of assembled steel structure support platform and its installation and removal methods, the support platform includes multiple rows of spaced buttress, spacing between the adjacent buttress of every two rows is consistent, it is detachable on each buttress that multiple bracing members cylinders interconnected are installed, multiple connectors are respectively connected between the adjacent bracing members cylinder of every two rows;A longitudinal I-steel across all bracing members cylinders of the row is removably installed on bracing members cylinder of every ranking in top, all longitudinal direction I-steel form a lower supporting layer, interval is equipped with multiple lateral I-steel across multiple rows of longitudinal I-steel and with longitudinal I-steel detachable connection on lower supporting layer, all transverse direction I-steel form a upper supporting layer, and steel structure or plank platform are completely covered on upper supporting layer.Assembled steel structure support platform that the present invention obtains and its installation and removal method with high security, be convenient to mount and dismount, convenient for construction the advantages of.

Description

Assembled steel structure support platform and its installation and removal method
Technical field
The present invention relates to a kind of supporting bridge platforms, and in particular to a kind of assembled steel structure support platform and its peace installation and dismantling Discharging method.
Background technique
In the construction of bridge, the form of construction work of bridge is broadly divided into fabrication and erection construction and cast-in-situ construction Two major classes construction method.Wherein, cast-in-situ construction is mainly include the following types: (1), mobile formwork cast-in-place construction;(2), full Hall bracket support cast-in-place construction method;(3), steel-pipe pile bracket+Bailey bracket+bowl buckle part cast-in-place construction.Above-mentioned three kinds of construction parties In formula, mobile formwork cast-in-place construction mechanization degree is high, without the concern for surface state but is only applicable to that specific bridge type is cast-in-place to be applied Work, but there is a problem of that assembling is difficult, large-scale component transition transport inconvenience;For full framing, although being suitable for all Bridge type, bracket set up work consuming time-consuming, though upper load passed through rack rod share under upright bar partial zones Domain stress is still equal less than effective dispersion, therefore still somewhat high to the requirement of the bearing capacity of ground, for different geology items Part needs different Ground Treatment Schemes;And then to there is material quantity big for steel-pipe pile bracket+Bailey bracket+bowl buckle part cast-in-place construction, Not only higher cost, and working security is poor, difficulty is larger, is generally extremely difficult to the acceptance requirement of technical quality effect, And due to the limitation of construction site, it is unfavorable for a large amount of piles and the use of fragment data, considerably increases construction cost.
Based on this, a kind of assembled steel structure support platform how is designed, so that bridge is applied Cast-in-place concrete platform and is easily achieved, and energy Meet the safety of construction, lift bridge applies the construction quality of Cast-in-place concrete platform, reduces construction link, and it is anxious for making to assemble more convenient Problem to be solved.
Summary of the invention
In view of the above shortcomings of the prior art, the technical problems to be solved by the present invention are: how to provide it is a kind of installation and Convenient disassembly, quick and highly-safe assembled steel structure support platform and its installation and removal method.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
A kind of assembled steel structure support platform, which is characterized in that it includes multiple rows of spaced buttress, the adjacent buttress of every two rows Between spacing it is consistent, it is detachable on each buttress that multiple bracing members cylinders interconnected are installed, in every two rows of phases Multiple connectors are respectively connected between adjacent bracing members cylinder;It has been removably installed on bracing members cylinder of every ranking in top One longitudinal I-steel across all bracing members cylinders of the row, all longitudinal direction I-steel form a lower supporting layer, in lower support Interval is equipped with multiple lateral I-steel across multiple rows of longitudinal I-steel and with longitudinal I-steel detachable connection, institute on layer There is lateral I-steel to form a upper supporting layer, steel structure or plank platform are completely covered on upper supporting layer.In this way, using multiple steel Support tube forms multiple studdles, is consolidated by connector between adjacent two rows bracing members cylinder, and by above It sets up two layers of I-steel and forms platform, finally completely pave platform again, bracing members cylinder and I-steel are formed by entire supporter Architecture is firm, highly-safe;Meanwhile between bracing members cylinder, between bracing members cylinder and longitudinal I-steel, longitudinal I-steel and horizontal To between I-steel, between adjacent row bracing members cylinder and connector be detachable connection so that entire steel structure support platform Installation and removal it is very convenient.In addition, length is shorter since all parts are detachable, and then construction personnel can be facilitated to material The stacking of material easily facilitates construction.
Further, the end that one piece of outer is stretched out outside bracing members cylinder is respectively equipped in the upper and lower ends of each bracing members cylinder Plate is uniformly provided at least three grooves at one of end plate outer of every two adjacent steel support tube, in another end plate One side towards groove is equipped with multiple protrusions for corresponding with groove and being mutually inserted with groove.In this way, by by multiple steel The mode that support tube carries out grafting is fixed together, and then effectively shortens the lifting length of support tube, is more convenient to bracing members Cylinder is lifted and is assembled.Simultaneously as support tube is bracing members cylinder, middle part is in hollow shape, and therefore, weight is also small, lifting Also just more easy, lesser loop wheel machine can be used and lifted, and the support tube intensity of steel is high, has biggish supporting force. In addition, it is small using the length for being formed by platform supports after the assembling of multiple bracing members cylinders, facilitate transhipment, meanwhile, the mode of grafting Assembly or disassembly is quite convenient to.The end plate of each bracing members cylinder upper and lower ends can effectively increase between two neighboring bracing members Contact area improves the stability of two neighboring bracing members cylinder, and shares partial pressure for each bracing members cylinder, improves steel branch Support the compression strength of cylinder.
Further, it is equipped with multiple and connector in the middle part of each bracing members cylinder, trunnion is installed correspondingly, institute It states installation trunnion and bracing members cylinder is integrally formed, and install and be fixed together between trunnion and connector by fastener.In this way, Also it is to be detachably connected between bracing members cylinder and connector, can be easily installed and dismantle, meanwhile, the also more conducively recycling of connector It utilizes.
Further, be equipped at intervals with multiple enforced loop planes in each bracing members cylinder, between adjacent enforced loop plane plus Multiple vertical stiffening plates are equipped at intervals between strong ring flat-plate and end plate.In this way, enforced loop plane is homogeneously interconnected with end plate and bracing members cylinder It connects, the intensity of bracing members cylinder can be further increased, meanwhile, the hole in the middle part of enforced loop plane also will not influence the saturating of through-hole at end plate Water effect.
Further, it is fixed together between the buttress and the bracing members cylinder of bottom by multiple steady nails, the steady nail One end be placed in buttress, it is outer and pass through the end plate of bracing members cylinder lower end that the other end stretches out buttress.In this way, buttress and bracing members cylinder Between fixed by surely nail, and surely following closely mainly includes the screwed body of rod and the nut that is connected through a screw thread therewith, using this The bracing members cylinder of buttress and bottom is fixed kind mode, and not only installation and removal are convenient, meanwhile, the steel of bottom will not be destroyed Support tube persistently has enough to meet the need convenient for bracing members cylinder.
Further, between lateral I-steel and steel structure or template platform, between lateral I-steel and longitudinal I-steel, vertical It is locked by fastener to I-steel and between the bracing members cylinder at top.In this way it can be ensured that lateral I-steel with It connects and fastens between platform, lateral I-steel and longitudinal I-steel and longitudinal I-steel and bracing members cylinder, be not in position Offset.
Further, in the web of longitudinal I-steel lower end and bracing members cylinder joint, each bracing members for being located at top Multiple one-to-one through-holes are equipped on the end plate of cylinder upper end, end web and end web under lateral I-steel on longitudinal I-steel Upper, longitudinal I-steel and lateral I-steel joint are equipped at intervals with multiple one-to-one mounting holes.In this way, set is logical Hole and mounting hole are not only able to be positioned for all parts, it is ensured that the accuracy of packing density and quantity, additionally it is possible to be convenient for The installation of fastener provides a favorable security for installation fastener.
A kind of installation method of assembled steel structure support platform, which comprises the steps of: S1, smooth location, And the distribution of tapping structure platform and steel structure support platform structure chart are drawn according to the size in place and bridge depth of beam;S2, according to S1 In the distribution of steel structure platform and steel structure support platform structure chart be prefabricated in the factory out bracing members cylinder as described above, lateral I-shaped Steel, longitudinal I-steel and connector;S3, by between the distribution of buttress in steel structure support platform structure chart at smooth place on S1 Away from setting buttress, and the pre-buried steady nail when pouring buttress;S4, after buttress concrete strength reaches predetermined strength, by surely following closely installation The bracing members cylinder of bottom, and the installation connecting element between adjacent steel support tube;S5 using suspender, gradually lifts it from bottom to up Remaining bracing members cylinder, and after the completion of each layer of bracing members cylinder lifts, the installation connecting element between adjacent steel support tube was lifting Cheng Zhong need to bind more drawstrings on bracing members cylinder, and the direction of bracing members cylinder is adjusted by drawstring, makes bracing members cylinder during installation It is able to maintain vertical state, and ensures to be aligned between protrusion and groove or convex buckle and jack between upper and lower two bracing members cylinders, Carry out grafting;S6, after reaching bearing height, mounting platform longitudinal direction work steel and lateral work steel, last mounting platform steel plate or wood Plate is fixed using tiling spot welding or fastener.In this way, can be easy to lift since the length of bracing members cylinder is small, it is entire to prop up The installation steps for supportting platform are few, and construction is fast.
A kind of method for dismounting of assembled steel structure support platform, which comprises the steps of: S1 removes operation Before, first confirm platform terminated using and structure safety, platform removal operation can be carried out after having dismounting condition;S2 is removed Then the steel plate of stage+module or the fastener of plank remove the platform steel plate or plank of installation;It is longitudinal to remove mounting platform by S3 Work steel and lateral work steel, S4, bracing members cylinder and connector are removed in layering one by one, and when removing bracing members cylinder, dismounting sequence is pressed Working backward is carried out according to erection sequence, demounting procedure is few, and the component after disassembly is also convenient for stacking.
Compared with prior art, the assembled steel structure support platform and its installation and removal method that the present invention obtains have such as Lower advantage:
1, multiple studdles are formed using multiple bracing members cylinders, and forms platform branch by setting up two layers of I-steel above Support, finally completely paves platform, bracing members cylinder and I-steel are formed by entire support system stabilized structure, highly-safe again;Meanwhile All parts are detachable connection, so that installation and removal are also very convenient.
2, all parts are detachable, and length is shorter, and then construction personnel can be facilitated to easily facilitate and apply the stacking of material Work.
Detailed description of the invention
Fig. 1 is the mounting structure schematic diagram of steel structure support platform in embodiment;
Fig. 2 is the mounting structure schematic diagram of upper and lower two bracing members cylinders in embodiment;
Fig. 3 is vertical distributed architecture schematic diagram of the stiffening plate on enforced loop plane in embodiment;
Fig. 4 is the structural schematic diagram of embodiment end plates.
In figure: buttress 1, surely nail 2, bracing members cylinder 3, end plate 31, groove 32, protrusion 33, permeable hole 34, installation trunnion 35, Enforced loop plane 36, vertical stiffening plate 37, connector 4, longitudinal I-steel 5, lateral I-steel 6, platform 7.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
Embodiment:
As shown in Figure 1, assembled steel structure support platform provided in this embodiment includes multiple rows of spaced buttress 1, every two rows Spacing between adjacent buttress 1 is consistent, detachable on each buttress 1 to be equipped with multiple bracing members cylinders 3 interconnected, Multiple connectors 4 are respectively connected between the adjacent bracing members cylinder 3 of every two rows;On bracing members cylinder 3 of every ranking in top It is removably installed a longitudinal I-steel 5 across all bracing members cylinders 3 of the row, all longitudinal direction I-steel 5 form one Lower supporting layer, interval is equipped with multiple across multiple rows of longitudinal I-steel 5 and detachable with longitudinal I-steel 5 on lower supporting layer The lateral I-steel 6 of connection, all transverse direction I-steel 6 form a upper supporting layer, steel structure or wood are completely covered on upper supporting layer Plate platform 7.
It to ensure the intensity of bracing members cylinder 3, and is easily installed and it is lifted when dismantling, adopted in the present embodiment The wall thickness of bracing members cylinder 3 is 10-25mm, and longitudinal height is determined in combination with project blue print and arrangement and method for construction.
As shown in Figure 2 and Figure 3, it is the intensity for further strengthening bracing members cylinder 3, is equipped at intervals in each bracing members cylinder Multiple enforced loop planes 36, be equipped at intervals between adjacent enforced loop plane 36, between enforced loop plane 36 and end plate 31 it is multiple vertical plus Strong plate 37.The vertical stiffening plate 37 be in rectangle, can also be trapezoidal or polygon, the side of vertical stiffening plate 37 respectively with steel branch Inner wall, the enforced loop plane 36 of support cylinder 3 are fixedly connected.
As shown in Fig. 2, be originally two kinds it is red up and down two adjacent bracing members cylinders 3 specific connection structure it is as follows: every The upper and lower ends of a bracing members cylinder 3 are respectively equipped with the end plate 31 that one piece of outer is stretched out outside bracing members cylinder, in every two adjacent steel branch It supports and is uniformly provided at least three grooves 32 at 31 outer of one of end plate of cylinder 3, in another end plate 31 towards groove 32 It is equipped with multiple protrusions 33 for corresponding with groove 32 and being mutually inserted with groove 32 on one side.
To be equipped at intervals with four in same installation at the middle part of each bracing members cylinder 3 convenient for the installation to connector 4 Height simultaneously installs trunnion 35 in the connector of crossing distribution, and the connector installation trunnion 35 and bracing members cylinder 3 are integrally formed. It is equipped with a through-hole on each installation trunnion 35, is equipped with a mounting hole, connector in the left and right ends of each connector 4 4 left and right ends are affixed with installation trunnion 35 adjacent thereto respectively, and by using nut after bolt-through mounting hole and through-hole It is locked on bracing members cylinder 3.
Further, the connection structure between the bracing members cylinder 3 and buttress of bottom is as follows: be located at support column bottom and 31 outer of end plate of the bracing members cylinder 3 at top is stretched out outside the cylinder of bracing members cylinder 3, and is equipped on the two end plates 31 more A mounting hole.
Further, between lateral I-steel 6 and steel structure or template platform 7, lateral I-steel 6 and longitudinal I-steel 5 it Between, longitudinal I-steel 5 and be locked by fastener between the bracing members cylinder 3 at top.
Further, in the web of longitudinal 5 lower end of I-steel and 3 joint of bracing members cylinder, each steel branch for being located at top Multiple one-to-one through-holes are equipped on support 3 upper end end plate 31 of cylinder, end web and lateral I-steel 6 on longitudinal I-steel 5 On lower end web, longitudinal I-steel 5 and 6 joint of lateral I-steel be equipped at intervals with multiple one-to-one mounting holes.
As shown in figure 4, on every piece of end plate 31, the middle part of end plate 31 be equipped with a through-hole 34, the through-hole of setting is available The hole for hoist of suspender when being used as to lift, be also convenient for bracing members cylinder turnover transport and in bracing members cylinder internal water accumulation it is permeable.Meanwhile The center of all through-holes 34 is on same axis, and the diameter of through-hole is not influence the true in principle of steel cylinder production structure It is fixed.
It can be convenient for the setting of suspender, simultaneously, it is ensured that suspension centre is on same axis when lifting, so that bracing members cylinder when lifting It is more steady.
The installation method of above-mentioned assembled steel structure support platform includes the following steps: S1, smooth location, and according to place Size and bridge depth of beam draw the distribution of tapping structure platform and steel structure support platform structure chart;S2, according to the steel structure platform in S1 Distribution and steel structure support platform structure chart are prefabricated in the factory out bracing members cylinder 3 as described above, lateral I-steel 6, longitudinal I-shaped Steel 5 and connector 4;Branch is arranged by the distribution spacing of buttress 1 in steel structure support platform structure chart at smooth place on S1 in S3 Pier 1, and the pre-buried steady nail 2 when pouring buttress 1;S4, after 1 concrete strength of buttress reaches predetermined strength, by surely following closely 2 installation bottoms Bracing members cylinder 3, and the installation connecting element 4 between adjacent steel support tube 3;S5 using suspender, gradually lifts remaining from bottom to up Bracing members cylinder 3, and after the completion of each layer of bracing members cylinder 3 lifts, the installation connecting element 4 between adjacent steel support tube 3 is lifting In the process, more drawstrings need to be bound on bracing members cylinder 4 (when it is implemented, can bind one end of drawstring in bracing members cylinder 3 It installs on trunnion 35, the through-hole installed on trunnion 35 can provide binding point for drawstring, simultaneously, moreover it is possible to ensure that drawstring is in symmetrically to set The middle part for being placed in bracing members cylinder 3 is set, the later period is facilitated to pull), the direction of bracing members cylinder 3 is adjusted by drawstring, makes bracing members cylinder 3 It is able to maintain vertical state during installation, and ensures to be aligned between protrusion 33 and groove 32 between upper and lower two bracing members cylinders 3, Carry out grafting;S6, after reaching bearing height, successively mounting platform longitudinal direction work steel 6 and lateral work steel 7, finally install steel plate or Plank platform 8 is fixed using tiling spot welding or fastener.
In S5, when lifting to bracing members cylinder 3, the length of a settable sunpender, the sunpender is greater than single-unit bracing members cylinder 3 Height, wherein one end of sunpender be equipped with a lifting hole(eyelet), sunpender the other end be equipped with one with its be connected through a screw thread block up Head (diameter that the diameter of plug is greater than through-hole 34).Before lifting, sunpender is set up with one end of lifting hole(eyelet), and sunpender is passed through After wearing the hole at 36 middle part of through-hole 34 and all enforced loop planes of end plate 31, plug is mounted on sunpender, meanwhile, suspension hook is hung In the lifting hole(eyelet) of sunpender, suspender is opened, bracing members cylinder 3 can be sling.In addition, when lifting, the bracing members of 5-8m or less height Cylinder 3 can be used crane and be lifted, and the bracing members cylinder 3 of 8m or more can be used tower crane and be lifted.
Bracing members cylinder 3 is being lifted into suitable position and with 3 upper end of bracing members cylinder of next section to thereafter, is slowly transferring steel Support tube 3, under the self gravity of bracing members cylinder 3, upper and lower two sections bracing members cylinder 3 can complete grafting.
In addition, the taking-up for square steel supporting cylinder 3 after the completion of lifting, can not set lifting hole(eyelet) on sunpender, directly by sunpender End bent downward, form the bending part for hanging hook.
A kind of method for dismounting of assembled steel structure support platform includes the following steps: S1, and before removing operation, first confirmation is flat Platform terminated using and structure safety, platform removal operation can be carried out after having dismounting condition;S2 removes the steel of stage+module Then the fastener of plate or plank removes the platform steel plate or plank of installation;S3 removes mounting platform longitudinal direction work steel and lateral work Steel, S4, bracing members cylinder and connector are removed in layering one by one, and when removing bracing members cylinder, dismounting sequence is according to erection sequence Carry out working backward.
Finally, it should be noted that technical side the above examples are only used to illustrate the technical scheme of the present invention and are not limiting Case, although applicant describes the invention in detail referring to preferred embodiment, those skilled in the art should be managed Solution, modification or equivalent replacement of the technical solution of the present invention are made for those, without departing from the objective and range of the technical program, It is intended to be within the scope of the claims of the invention.

Claims (9)

1. a kind of assembled steel structure support platform, which is characterized in that it includes multiple rows of spaced buttress (1), every two rows phase Spacing between adjacent buttress (1) is consistent, detachable on each buttress (1) to be equipped with multiple bracing members cylinders interconnected (3), multiple connectors (4) are respectively connected between the adjacent bracing members cylinder (3) of every two rows;In every ranking in the bracing members on top A longitudinal I-steel (5) across all bracing members cylinders (3) of the row, all longitudinal direction works are removably installed on cylinder (3) Word steel (5) forms a lower supporting layer, on lower supporting layer interval be equipped with it is multiple across multiple rows of longitudinal I-steel (5) and with it is vertical To the lateral I-steel (6) of I-steel (5) detachable connection, all transverse direction I-steel (6) form a upper supporting layer, upper Steel structure or plank platform (7) are completely covered on supporting layer.
2. assembled steel structure support platform according to claim 1, which is characterized in that in the upper of each bracing members cylinder (3) Lower both ends are respectively equipped with the end plate (31) that one piece of outer is stretched out outside bracing members cylinder, every two adjacent steel support tube (3) wherein At least three grooves (32) are uniformly provided at one end plate (31) outer, in another one side of end plate (31) towards groove (32) Equipped with multiple protrusions (33) for corresponding with groove (32) and being mutually inserted with groove (32).
3. assembled steel structure support platform according to claim 1 or 2, which is characterized in that in each bracing members cylinder (3) Middle part is equipped with multiple and connector (4) and installs trunnion (35) correspondingly, the installation trunnion (35) and bracing members cylinder (3) It is integrally formed, and installs and be fixed together between trunnion (35) and connector (4) by fastener.
4. assembled steel structure support platform according to claim 3, which is characterized in that be spaced in each bracing members cylinder Equipped with multiple enforced loop planes (36), between adjacent enforced loop plane (36), it is spaced and sets between enforced loop plane (36) and end plate (31) There are multiple vertical stiffening plates (37).
5. assembled steel structure support platform according to claim 4, which is characterized in that the steel of buttress (1) and bottom It is fixed together between support tube (3) by multiple steady nails (2), one end of the steady nail (2) is placed in buttress (1), the other end It stretches out buttress (1) outside and passes through the end plate (31) of bracing members cylinder (3) lower end.
6. assembled steel structure support platform described according to claim 1 or 2 or 4 or 5, which is characterized in that lateral I-steel (6) Between steel structure or template platform (7), between lateral I-steel (6) and longitudinal I-steel (5), longitudinal direction I-steel (5) be located at It is locked by fastener between the bracing members cylinder (3) at top.
7. assembled steel structure support platform according to claim 6, which is characterized in that in longitudinal I-steel (5) lower end Web and bracing members cylinder (3) joint, it is each be equipped on bracing members cylinder (3) the upper end end plate (31) on top it is multiple one by one Corresponding through-hole, on longitudinal I-steel (5) under end web and lateral I-steel (6) on end web, longitudinal I-steel (5) and horizontal Multiple one-to-one mounting holes are equipped at intervals with to I-steel (6) joint.
8. a kind of installation method of assembled steel structure support platform, which comprises the steps of: S1, smooth location, and The distribution of tapping structure platform and steel structure support platform structure chart are drawn according to the size in place and bridge depth of beam;S2, according in S1 The distribution of steel structure platform and steel structure support platform structure chart be prefabricated in the factory out bracing members cylinder (3) as claimed in claim 2, horizontal To I-steel (6), longitudinal I-steel (5) and connector (4);S3 presses steel structure support platform structure on S1 at smooth place Buttress (1) is arranged in the distribution spacing of buttress (1) in figure, and the pre-buried steady nail (2) when pouring buttress (1);S4, in buttress (1) concrete After intensity reaches predetermined strength, the bracing members cylinder (3) of bottom is installed by surely following closely (2), and pacify between adjacent steel support tube (3) Load fitting (4);S5 using suspender, gradually lifts remaining bracing members cylinder (3) from bottom to up, and in each layer of bracing members cylinder (3) After the completion of lifting, the installation connecting element (4) between adjacent steel support tube (3) need to be on bracing members cylinder (4) in hoisting process More drawstrings are bound, by the direction of drawstring adjustment bracing members cylinder (3), are able to maintain bracing members cylinder (3) during installation vertically State, and ensure the protrusion (33) between two bracing members cylinders (3) and groove (32) or convex buckle (39) up and down and jack (38) it Between be aligned, carry out grafting;S6, after reaching bearing height, successively mounting platform longitudinal direction work steel (6) and lateral work steel (7), finally Steel plate or plank platform (8) are installed, are fixed using tiling spot welding or fastener.
9. a kind of method for dismounting of assembled steel structure support platform, which comprises the steps of: S1, before removing operation, First confirmation platform terminated using and structure safety, platform removal operation can be carried out after having dismounting condition;S2 removes platform Then the steel plate of installation or the fastener of plank remove the platform steel plate or plank of installation;S3 removes mounting platform longitudinal direction work steel And lateral work steel, S4, bracing members cylinder and connector are removed in layering one by one, and when removing bracing members cylinder, dismounting sequence is according to peace Dress sequence carries out working backward.
CN201910228463.6A 2019-03-25 2019-03-25 Assembled steel structure support platform and its installation and removal method Pending CN109778714A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910228463.6A CN109778714A (en) 2019-03-25 2019-03-25 Assembled steel structure support platform and its installation and removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910228463.6A CN109778714A (en) 2019-03-25 2019-03-25 Assembled steel structure support platform and its installation and removal method

Publications (1)

Publication Number Publication Date
CN109778714A true CN109778714A (en) 2019-05-21

Family

ID=66491556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910228463.6A Pending CN109778714A (en) 2019-03-25 2019-03-25 Assembled steel structure support platform and its installation and removal method

Country Status (1)

Country Link
CN (1) CN109778714A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805308A (en) * 2019-09-26 2020-02-18 中国一冶集团有限公司 Method for installing and dismantling temporary support at top center of silo
CN110820577A (en) * 2019-11-14 2020-02-21 李诺 Intelligent support system for highway bridge construction in frozen earth section and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100723229B1 (en) * 2005-12-22 2007-05-29 주식회사 포스코 Assembly for connecting the pipe
CN202705921U (en) * 2012-08-24 2013-01-30 中国建筑土木建设有限公司路桥分公司 Assembly type cast-in-place beam passing door opening support
CN104878695A (en) * 2015-05-21 2015-09-02 上海市政建设有限公司 Viaduct cover beam shaping bottom die support and application method thereof
CN206986749U (en) * 2017-08-02 2018-02-09 云南公投建设集团第六工程有限公司 Platform for lining available for Large-span Steel Box Beam construction
CN209703327U (en) * 2019-03-25 2019-11-29 中冶建工集团有限公司 Assembled steel structure support platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100723229B1 (en) * 2005-12-22 2007-05-29 주식회사 포스코 Assembly for connecting the pipe
CN202705921U (en) * 2012-08-24 2013-01-30 中国建筑土木建设有限公司路桥分公司 Assembly type cast-in-place beam passing door opening support
CN104878695A (en) * 2015-05-21 2015-09-02 上海市政建设有限公司 Viaduct cover beam shaping bottom die support and application method thereof
CN206986749U (en) * 2017-08-02 2018-02-09 云南公投建设集团第六工程有限公司 Platform for lining available for Large-span Steel Box Beam construction
CN209703327U (en) * 2019-03-25 2019-11-29 中冶建工集团有限公司 Assembled steel structure support platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805308A (en) * 2019-09-26 2020-02-18 中国一冶集团有限公司 Method for installing and dismantling temporary support at top center of silo
CN110820577A (en) * 2019-11-14 2020-02-21 李诺 Intelligent support system for highway bridge construction in frozen earth section and construction method thereof

Similar Documents

Publication Publication Date Title
CN110616809B (en) Construction method of suspended building structure
CN112411391A (en) Single-column capping beam steel pipe column Bailey beam construction supporting system and construction method thereof
CN114457698B (en) Method for circularly grading steel box girder and falling girder at high position
CN109778714A (en) Assembled steel structure support platform and its installation and removal method
CN211472207U (en) Suspension beam system for hoisting prefabricated section box girder
CN211006341U (en) Assembled strength nature skeleton suitable for mound tower reinforcing bar location
CN209780193U (en) Suspension type scaffold
CN109778715A (en) Assembled support platform and its installation and removal method
CN214656383U (en) Line is alternately low headroom and is pieced together wide cast-in-place case roof beam support
CN212200101U (en) Supporting upright post and structure for suspended casting of box girder at triangular area of hollow rigid frame bridge
CN112761187B (en) Electric lifting movable die carrier for large-diameter working well
CN209703327U (en) Assembled steel structure support platform
CN109356088B (en) High pile wharf cast-in-situ beam template suspension supporting device and supporting system
CN210684474U (en) Follow-up supporting device for bridge jacking construction
CN211257921U (en) Steel bar truss building carrier plate draws device and system to one side
CN212002169U (en) Shear force wall eminence concrete structure formwork platform of encorbelmenting
CN112342932A (en) Line-crossing low-clearance width-splicing cast-in-place box girder support and construction method
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
CN111424648A (en) Construction method for simultaneously hoisting steel column and cast-in-place pile reinforcement cage in reverse construction
CN217629455U (en) Dismantling device and system for box girder template supporting system
CN217299872U (en) Shaft hydraulic comprehensive distribution platform
CN215107150U (en) Stiff beam pouring support structure
CN216766824U (en) Prefabricated plate suspension rod
CN217629470U (en) Auxiliary device for construction of steel reinforcement cage of bent cap
CN217106297U (en) Node structure of reinforcing construction unloading device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521