CN109766190A - Cloud resource dispatching method, device, equipment and storage medium - Google Patents

Cloud resource dispatching method, device, equipment and storage medium Download PDF

Info

Publication number
CN109766190A
CN109766190A CN201910039466.5A CN201910039466A CN109766190A CN 109766190 A CN109766190 A CN 109766190A CN 201910039466 A CN201910039466 A CN 201910039466A CN 109766190 A CN109766190 A CN 109766190A
Authority
CN
China
Prior art keywords
subregion
cloud host
cloud
load information
cpu
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910039466.5A
Other languages
Chinese (zh)
Inventor
许广彬
许刚
谭瑞忠
郭晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huayun Data Technology Service Co Ltd
Original Assignee
Wuxi Huayun Data Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huayun Data Technology Service Co Ltd filed Critical Wuxi Huayun Data Technology Service Co Ltd
Priority to CN201910039466.5A priority Critical patent/CN109766190A/en
Publication of CN109766190A publication Critical patent/CN109766190A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Power Sources (AREA)

Abstract

Cloud resource dispatching method, device, equipment and storage medium provided by the present application, belong to field of cloud calculation.The cloud resource dispatching method includes: the load information for obtaining the CPU of each cloud host in the first subregion;Determine whether the load information of the CPU of each cloud host meets the first preset rules;When load information meets the first preset rules, the cloud host migration corresponding to the load information of first preset rules will be met to the second subregion of cloud platform.Thus by the cloud host migration of the first subregion to the second subregion, and then the power consumption difference between different subregions is balanced, reduce power consumption cost.

Description

Cloud resource dispatching method, device, equipment and storage medium
Technical field
This application involves field of cloud calculation, in particular to cloud resource dispatching method, device, equipment and storage medium.
Background technique
Isomery CPU (Central Processing Unit, central processing unit) manager of data center traditional at present The isomery CPU device newly introduced is often respectively deployed in cloud platform management system (hereinafter referred to as " cloud platform ", portion by case Be deployed on inside data center, for will data center's hardware capabilities virtualization after be supplied to user) different subregions, to carry out list Solely management, and then can using CPU self-characteristic realize reduce data center power consumption, but still result in power consumption cost compared with It is high.
Summary of the invention
In view of this, cloud resource dispatching method, device, equipment and storage medium provided by the embodiments of the present application.
In a first aspect, a kind of cloud resource dispatching method provided by the embodiments of the present application, comprising: obtain each in the first subregion The load information of the CPU of cloud host;Determine whether the load information of the CPU of each cloud host meets the first default rule Then;If so, the cloud host migration corresponding to the load information of first preset rules will be met to cloud platform Second subregion.
During above-mentioned realization, by the load information for obtaining the CPU of each cloud host in the first subregion;It determines each Whether the load information of the CPU of the cloud host meets the first preset rules;Meet the first preset rules in load information When, the cloud host migration corresponding to the load information of first preset rules will be met to second point of cloud platform Area.Thus by the cloud host migration of the first subregion to the second subregion, and then the power consumption difference between different subregions is balanced, reduce function Consume cost.
With reference to first aspect, the embodiment of the present application provides the first possible embodiment of first aspect, and described The power consumption of one subregion is higher than the power consumption of second subregion;The load information of the CPU of each cloud host of determination Whether first preset rules are met, comprising: determine load value entrained by the load information of the CPU of each cloud host Whether less than the first preset threshold;If so, characterizing the load information meets the first preset rules.
During above-mentioned realization, when being higher than the power consumption of second subregion by the power consumption in the first subregion, acquisition the Load value entrained by the load information of the CPU of one subregion medium cloud host, thus by judging load value whether less than the One preset threshold determines whether the load information of the CPU of each cloud host meets the first preset rules, Jin Eryou Effect improves the accuracy to load information judgement.
With reference to first aspect, the embodiment of the present application provides second of possible embodiment of first aspect, described to incite somebody to action Meet the second subregion of the cloud host migration corresponding to the load information of first preset rules to cloud platform, wraps It includes: determining whether the quantity of second subregion is unique;If it is not, determining target point from least two second subregions Area;To meet the cloud host corresponding to the load information of first preset rules from first zoned migration to The target partition in the cloud platform.
During above-mentioned realization, whether the quantity by determination second subregion is unique;In the quantity of the second subregion When not unique, target partition is determined from least two second subregions;It will meet described in first preset rules The target partition of the cloud host from first zoned migration into the cloud platform corresponding to load information.To It can make cloud host migration to target partition, and then realize the power-consumption balance of optimization the first subregion and the second subregion, effectively Power consumption cost is saved.
The possible embodiment of second with reference to first aspect, the embodiment of the present application provide the third of first aspect Possible embodiment, it is described to determine target partition from least two second subregions, comprising: to determine at least two institutes State whether the second subregion has cloud host to move into before current time;If it is not, by any at least two second subregions One second subregion is as target partition.
During above-mentioned realization, by determining whether at least two second subregions have cloud master before current time Machine is moved into;If moved into without cloud host before current time, by any one institute at least two second subregions The second subregion is stated as target partition.So as to control the cloud host number for moving to each second subregion, avoid moving to Cloud host number in a certain second subregion is excessive, leads to excess load.And then the cloud host number of each second subregion is balanced, into One step ensures that the cloud host in each second subregion can operate normally.
With reference to first aspect, the embodiment of the present application provides the 4th kind of possible embodiment of first aspect, and described The power consumption of one subregion is lower than second subregion;Whether the load information of the CPU of each cloud host of determination is full The first preset rules of foot, comprising: determine whether load value entrained by the load information of the CPU of each cloud host is big In the second preset threshold;If so, characterizing the load information meets the first preset rules.
During above-mentioned realization, when being lower than second subregion by the power consumption in the first subregion, the first subregion is acquired Load value entrained by the load information of the CPU of medium cloud host, thus by judging it is default whether load value is greater than second Threshold values determines whether the load information of the CPU of each cloud host meets the first preset rules, and then effectively improves To the accuracy of load information judgement.
With reference to first aspect, the embodiment of the present application provides the 5th kind of possible embodiment of first aspect, described true Whether the load information of the CPU of fixed each cloud host meets the first preset rules, comprising: determines each cloud master Whether load value entrained by the load information of the CPU of machine matches with third preset threshold within a preset period of time;If so, It will be with the matched cloud host of third preset threshold as cloud host to be migrated;Determine each cloud master to be migrated Whether machine carries migration mark;If it is not, characterizing the load information meets the first preset rules.
During above-mentioned realization, by judge each cloud host CPU the load information entrained by bear Whether load value matches with third preset threshold within a preset period of time;Load value within a preset period of time with third preset threshold It, will be with the matched cloud host of third preset threshold as cloud host to be migrated when matching;Judge again each described Whether cloud host to be migrated carries migration mark;If it is not, characterizing the load information meets the first preset rules.So that The cloud host to be migrated determined is more accurate, and the cloud host that will have just moved into is avoided to migrate out again, and then reduces money It is chaotic to avoid cloud host migration for source processing pressure.
The 5th kind of possible embodiment with reference to first aspect, the embodiment of the present application provide the 6th kind of first aspect Possible embodiment, after determining whether each cloud host to be migrated carries migration mark, further includes: if so, Determine the transit time for carrying the corresponding cloud host to be migrated of the migration mark;Whether determine the transit time Greater than the 4th preset threshold;If so, characterizing the load information meets the first preset rules.
During above-mentioned realization, by determining that this is to be migrated when the cloud carrying host to be migrated is with migration mark Transit time corresponding to cloud host;It determines whether the transit time is greater than the 4th preset threshold again, is being greater than or equal to the When four preset thresholds, determine that load information meets the first preset rules.So as to further avoid the cloud master that will have just moved into Machine migrates out again, and then reduces resource processing pressure, and it is chaotic to avoid cloud host migration.
With reference to first aspect, the embodiment of the present application provides the 7th kind of possible embodiment of first aspect, the side Method further include: generate and recorded for recording from first zoned migration to the migration of second subregion;According to the migration Record determines the power consumption save the cost of the cloud platform.
During above-mentioned realization, by generating for recording from the first zoned migration moving to second subregion Move record;The power consumption save the cost of the cloud platform is determined according to the migration record.User can be made more intuitive and clear Understand to Chu power consumption save the cost brought by migration.
Second aspect, a kind of cloud resource dispatching device provided by the embodiments of the present application, comprising: module is obtained, for obtaining The load information of the CPU of each cloud host in first subregion;Processing module, the institute of the CPU for determining each cloud host State whether load information meets the first preset rules;Transferring module, for if so, will meet described in first preset rules The cloud host migration corresponding to load information to cloud platform the second subregion.
In conjunction with second aspect, the embodiment of the present application provides the first possible embodiment of second aspect, and described The power consumption of one subregion is higher than the power consumption of second subregion;The processing module, is also used to: determining each cloud host Whether load value entrained by the load information of CPU is less than the first preset threshold;If so, it is full to characterize the load information The first preset rules of foot.
In conjunction with second aspect, the embodiment of the present application provides second of possible embodiment of second aspect, described to move Shifting formwork block, is also used to: determining whether the quantity of second subregion is unique;If it is not, from least two second subregions really Make target partition;The cloud host corresponding to the load information of first preset rules will be met from described first The target partition of the zoned migration into the cloud platform.
In conjunction with second of possible embodiment of second aspect, the embodiment of the present application provides the third of second aspect Possible embodiment, it is described to determine target partition from least two second subregions, comprising: to determine at least two institutes State whether the second subregion has cloud host to move into before current time;If it is not, by any at least two second subregions One second subregion is as target partition.
In conjunction with second aspect, the embodiment of the present application provides the 4th kind of possible embodiment of second aspect, and described The power consumption of one subregion is lower than second subregion;The processing module, is also used to: determining the institute of the CPU of each cloud host State whether load value entrained by load information is greater than the second preset threshold;If so, characterizing the load information meets first Preset rules.
In conjunction with second aspect, the embodiment of the present application provides the 5th kind of possible embodiment of second aspect, the place Module is managed, is also used to: determining load value entrained by the load information of the CPU of each cloud host whether when default Between matched with third preset threshold in section;If so, will be used as with the matched cloud host of the third preset threshold institute wait move Move cloud host;Determine whether each cloud host to be migrated carries migration mark;Meet if it is not, characterizing the load information First preset rules.
In conjunction with the 5th kind of possible embodiment of second aspect, the embodiment of the present application provides the 6th kind of second aspect Possible embodiment, after determining whether each cloud host to be migrated carries migration mark, the processing module, It is also used to: if so, determining the transit time for carrying the corresponding cloud host to be migrated of the migration mark;Described in determination Whether transit time is greater than the 4th preset threshold;If so, characterizing the load information meets the first preset rules.
In conjunction with second aspect, the embodiment of the present application provides the 7th kind of possible embodiment of second aspect, the cloud Resource scheduling device further include: generation module is used for: it generates for recording from first zoned migration to second subregion Migration record;The power consumption save the cost of the cloud platform is determined according to the migration record.
The third aspect, a kind of terminal device provided by the embodiments of the present application, comprising: memory, processor and be stored in In the memory and the computer program that can run on the processor, when the processor executes the computer program It realizes as described in any one of first aspect the step of cloud resource dispatching method.
Fourth aspect, a kind of storage medium provided by the embodiments of the present application are stored with instruction on the storage medium, work as institute Instruction is stated when running on computers, so that the computer executes such as the described in any item cloud resource dispatching parties of first aspect Method.
Other feature and advantage of the disclosure will illustrate in the following description, alternatively, Partial Feature and advantage can be with Deduce from specification or unambiguously determine, or by implement the disclosure above-mentioned technology it can be learnt that.
To enable the above objects, features, and advantages of the application to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the flow chart for the cloud resource dispatching method that the application first embodiment provides;
Fig. 2 is the functional block diagram for the cloud resource dispatching device that the application second embodiment provides;
Fig. 3 is a kind of schematic diagram for terminal device that the application 3rd embodiment provides.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In attached drawing, technical solutions in the embodiments of the present application is described.
With reference to the accompanying drawing, it elaborates to some embodiments of the application.In the absence of conflict, following Feature in embodiment and embodiment can be combined with each other.
First embodiment
Due to the isomery CPU Managed Solution of existing data center, the isomery CPU device difference portion that often will newly introduce It is deployed on different subregions individually to be managed, the reduction of power consumption of data center is realized using CPU self-characteristic, and then lead to different points Power consumption between area differs greatly.In order to optimize the power consumption between different subregions and reduce power consumption cost, the present embodiment mentions first A kind of cloud resource dispatching method is supplied, it should be noted that step shown in the flowchart of the accompanying drawings can be in such as one group of meter It is executed in the computer system of calculation machine executable instruction, although also, logical order is shown in flow charts, certain In the case of, it can be with the steps shown or described are performed in an order that is different from the one herein.It is situated between in detail to the present embodiment below It continues.
Referring to Fig. 1, being the flow chart of cloud resource dispatching method provided by the embodiments of the present application.It below will be to shown in Fig. 1 Detailed process be described in detail.
Step S101 obtains the load information of the CPU of each cloud host in the first subregion.
Optionally, load information includes load value.For example, the load value of CPU can be 30%.
Certainly, in actual use, load information can also include the duration of load value, for example, the load of CPU is It continue for 20 seconds when 30%.Here, being not especially limited.
Optionally, the first subregion can be default partition, be also possible to non-default subregion.In general, default partition can make With the relatively high standard CPU of power consumption, therefore its power consumption is higher than non-default subregion.
Optionally, operation has multiple cloud hosts in the first subregion.
Optionally, the multiple cloud hosts run in the first subregion can be what user was created before current time.
As an implementation, step S101 includes: that each cloud host in the first subregion is obtained in special time period CPU load information.
Optionally, special time period is 7 days.
Certainly, in actual use, special time period can be adjusted according to user demand, for example, special time period It can also be 6 days either 14 days etc..Here, being not especially limited.
In the embodiment of the present application, by periodically obtaining the load information of the CPU of each cloud host in the first subregion, thus The load information of the CPU of cloud host is periodically acquired, and then realizes and cloud host each in the first subregion is stablized Monitoring, effectively improve the monitoring efficiency to cloud host.
In a possible embodiment, before step S101, cloud resource dispatching method further include: obtain for flat in cloud Platform creates the creation instruction of cloud host;Cloud host corresponding with the creation instruction is created in the cloud platform.For example, when the When one subregion is default partition, cloud host corresponding with the creation instruction is created in the first subregion.
Optionally, cloud host refers to the virtual unit of cloud platform bottom actual creation.For example, Client-initiated creation instruction It can also be and create a virtual router or dummy load balanced device etc., but the still cloud master of cloud platform bottom actual creation Machine.Here, being not especially limited.
Optionally, pipe of receiving in cloud platform has the CPU device of isomery, when carrying out new isomery CPU device deployment, Ke Yizeng Add a new subregion to dispose new CPU device.
Step S102, determines whether the load information of the CPU of each cloud host meets the first preset rules.
As an implementation, the power consumption of the first subregion is higher than the power consumption of the second subregion, and step S102 is comprised determining that often Whether load value entrained by the load information of the CPU of a cloud host is less than the first preset threshold;If so, characterization The load information meets the first preset rules.
Optionally, the first preset threshold is 30%.
Certainly, in actual use, the setting of the first preset threshold can be set according to user's actual need, for example, It can be set to 35% or other numerical value.Here, being not especially limited.
In the embodiment of the present application, when being higher than the power consumption of the second subregion by the power consumption in the first subregion, first point is acquired Load value entrained by the load information of the CPU of area's medium cloud host, thus by judging whether load value is pre- less than first If threshold values determines whether the load information of the CPU of each cloud host meets the first preset rules, and then effectively mentions The high accuracy to load information judgement, further such that when load value is less than the first preset threshold, it can be by the load It is worth corresponding cloud host from the first zoned migration to the second subregion, i.e., from the zoned migration of high power consumption to the subregion of low-power consumption.Into And the power consumption of the first subregion is effectively reduced, save power consumption cost.
As another embodiment, the power consumption of the first subregion is lower than the second subregion;Step S102 comprises determining that each institute State whether load value entrained by the load information of the CPU of cloud host is greater than the second preset threshold;If so, described in characterization Load information meets the first preset rules.
Optionally, the second preset threshold is 70%.
Certainly, in actual use, the setting of the first preset threshold can be set according to user's actual need, for example, It can be set to 75% or other numerical value.Here, being not especially limited.
In the embodiment of the present application, when being lower than the second subregion by the power consumption in the first subregion, the first subregion medium cloud is acquired Load value entrained by the load information of the CPU of host, thus by judging whether load value is greater than the second preset threshold It determines whether the load information of the CPU of each cloud host meets the first preset rules, and then effectively increases pair The accuracy of load information judgement, further such that when load value is greater than the first preset threshold, it can be corresponding by the load value Cloud host from the first zoned migration to the second subregion, i.e., from the zoned migration of low-power consumption to the subregion of high power consumption.And then effectively The power consumption for reducing the first subregion has saved power consumption cost.And at the same time also allowing the better work of cloud host being migrated Make, improves the working efficiency of cloud host.
As another embodiment, step S102 comprises determining that the load information of the CPU of each cloud host Whether entrained load value matches with third preset threshold within a preset period of time;If so, will be with the third preset threshold The matched cloud host of institute is as cloud host to be migrated;Determine whether each cloud host to be migrated carries migration mark Know;If it is not, characterizing the load information meets the first preset rules.
Optionally, preset time period is 20 seconds.
Certainly, in actual use, preset time period can be adjusted according to user demand, for example, special time period It can also be 10 seconds either 30 seconds etc..Here, being not especially limited.
Optionally, if the power consumption of the first subregion is lower than the power consumption of the second subregion, third preset threshold is second default Threshold values.Determine load value entrained by the load information of the CPU of each cloud host whether within a preset period of time with Third preset threshold matching, comprising: whether determine load value entrained by the load information of the CPU of each cloud host It is greater than third preset threshold within a preset period of time.It will be used as with the matched cloud host of the third preset threshold institute wait move Move cloud host, comprising: will be greater than the cloud host of third preset threshold as cloud host to be migrated.
Optionally, if the power consumption of the first subregion is higher than the power consumption of the second subregion, third preset threshold is first default Threshold values.Determine load value entrained by the load information of the CPU of each cloud host whether within a preset period of time with Third preset threshold matching, comprising: whether determine load value entrained by the load information of the CPU of each cloud host Within a preset period of time less than the first preset threshold.It will be used as with the matched cloud host of the third preset threshold institute wait move Move cloud host, comprising: using the cloud host less than the first preset threshold as cloud host to be migrated.
Optionally, migration mark can be character, be also possible to a character string.
Optionally, migration mark is the cloud host being migrated for characterizing the cloud host, for example, from the first zoned migration To the second subregion, or from the second zoned migration to the first subregion.
In the embodiment of the present application, by judge each cloud host CPU the load information entrained by bear Whether load value matches with third preset threshold within a preset period of time;Load value within a preset period of time with third preset threshold It, will be with the matched cloud host of third preset threshold as cloud host to be migrated when matching;Judgement is each respectively again Whether the cloud host to be migrated carries migration mark;If each cloud host to be migrated does not carry migration mark, table It levies the load information and meets the first preset rules.So that the cloud host to be migrated determined is more accurate, avoid The cloud host just moved into is migrated out again, and then reduces resource processing pressure, it is chaotic to avoid cloud host migration.
Optionally, after determining whether each cloud host to be migrated carries migration mark, further includes: if described Cloud carrying host to be migrated determines with migration mark and carries moving for the corresponding cloud host to be migrated of the migration mark Shift time;Determine whether the transit time is greater than or equal to the 4th preset threshold;If so, characterizing the load information meets the One preset rules.
Optionally, transit time refers to after from the first zoned migration to the second subregion, and the cloud host is deposited in the second subregion Time, or after from the second zoned migration to the first subregion, cloud host time existing for the first subregion.
As an example it is assumed that cloud host A is after from the first zoned migration to the second subregion, the time existing for the second subregion For t, then transit time is t.
Optionally, the 4th preset threshold is 4 hours.
Certainly, in actual use, the 4th preset threshold can also be 3.5 hours either 4.5 hours etc..Here, not Make specific limit.
In the embodiment of the present application, by determining the migration when the cloud carrying host to be migrated is with migration mark The transit time of the corresponding cloud host to be migrated of mark;Determine whether the transit time is greater than the 4th preset threshold, When being greater than or equal to four preset thresholds, determine that load information meets the first preset rules.So as to further avoid by The cloud host just moved into migrates out again, and then reduces resource processing pressure, and it is chaotic to avoid cloud host migration.
As an example it is assumed that cloud host B is 3 hours from the first zoned migration to the time of the second subregion, when due to migration Between less than the 4th preset threshold, it is likely that cause cloud host B also not completely from high power consumption state be converted to low-power consumption (or from Low power consumpting state is converted to high power consumption state), and then Wu is avoided to migrate out cloud host B from current partition again.
Step S103, if so, the cloud host corresponding to the load information of first preset rules will be met It migrates to the second subregion of cloud platform.
Optionally, if the power consumption of the second subregion is lower than the first subregion, the quantity of the second subregion can be multiple.
Certainly, if the power consumption of the first subregion is lower than the second subregion, the quantity of the first subregion can be multiple.
Optionally, the first subregion can not be waited with the CPU sum in the second subregion.
As a kind of implement scene, each first subregion and the second subregion are disposed using isomorphism CPU type, but the first subregion and The super quota of different CPU (the logic CPU amount that i.e. 1 physical cpu can be virtual) is arranged in second subregion, and introduces under different super quotas The difference weight of power consumption, and then to simulate the scene of isomery CPU.And then more complicated changeable enterprise-level business field is coped with to realize The technical effect of scape.
As an implementation, step S201, comprising: determine whether the quantity of second subregion is unique;If it is not, from Target partition is determined at least two second subregions;The load information institute for meeting first preset rules is right The target partition of the cloud host answered from first zoned migration into the cloud platform.
Optionally, target partition is determined from least two second subregions, comprising: determine at least two described Whether two subregions have cloud host to move into before current time;If it is not, by any one at least two second subregions Second subregion is as target partition.
In the embodiment of the present application, by determining whether at least two second subregions have cloud master before current time Machine is moved into;If moved into without cloud host before current time, by any one institute at least two second subregions The second subregion is stated as target partition.So as to control the cloud host number for moving to each second subregion, avoid moving to Cloud host number in a certain second subregion is excessive, leads to excess load.And then the cloud host number of each second subregion is balanced, into One step ensures that the cloud host in each second subregion can operate normally.
Optionally, target partition is determined from least two second subregions, comprising: at random from described at least two Target partition is determined in second subregion.
It certainly, in actual use, can also be according to migration sequence, for example, having migrated a cloud master before current time For machine to one of them the second subregion, then the cloud host that current time is migrated just moves to another second subregion.
In the embodiment of the present application, whether the quantity by determination second subregion is unique;In the quantity of the second subregion When not unique, target partition is determined from least two second subregions;It will meet described in first preset rules The target partition of the cloud host from first zoned migration into the cloud platform corresponding to load information.To It can make cloud host migration to target partition, and then realize the power-consumption balance of optimization the first subregion and the second subregion, effectively Power consumption cost is saved.
As an example it is assumed that every cloud host average power consumption of the first subregion is 60 watts per hour, every cloud of the second subregion Host average power consumption is 25 watts per hour, after by cloud host from the first zoned migration to the second subregion, can save 35 per hour Watt.
In a possible embodiment, cloud resource dispatching method provided by the embodiment of the present application, further includes: generation is used for Record is recorded from first zoned migration to the migration of second subregion;The cloud platform is determined according to migration record Power consumption save the cost.
Optionally, migration record include but is not limited to the subregion before migrating and partition information after migration, migration frequency, Migrate quantity etc..For example, further including the saved power consumption of each migration.
Optionally, the power consumption save the cost of the cloud platform is determined according to the migration record, comprising: according to cloud host Migration quantity and each power consumption save the cost for migrating saved power consumption and determining the cloud platform.
Continuing for by taking above-mentioned example as an example, it is assumed that the first cloud host average power consumption of subregion every is 60 watts per hour, the The two cloud host average power consumptions of subregion every are 25 watts per hour, are 10 from the migration quantity of the first zoned migration to the second subregion, Saved power consumption 35 is then migrated every time, then power consumption save the cost is 10*35=350, i.e., saves 350 watts per hour.
In the embodiment of the present application, by generating for recording from the first zoned migration moving to second subregion Move record;The power consumption save the cost of the cloud platform is determined according to the migration record.User can be made more intuitive and clear Understand to Chu power consumption save the cost brought by migration.
Cloud resource dispatching method provided by the embodiment of the present application, by the CPU for obtaining each cloud host in the first subregion Load information;Determine whether the load information of the CPU of each cloud host meets the first preset rules;Believe in load When breath meets the first preset rules, the cloud host corresponding to the load information for meeting first preset rules is moved Move to the second subregion of cloud platform.To by the cloud host migration of the first subregion to the second subregion, so balance different subregions it Between power consumption difference, reduce power consumption cost.
Second embodiment
Corresponding to the cloud resource dispatching method in first embodiment, Fig. 2 shows using the money of cloud shown in first embodiment The one-to-one cloud resource dispatching device of source dispatching method.As shown in Fig. 2, the cloud resource dispatching device 400 includes obtaining mould Block 410, processing module 420 and transferring module 430.Wherein, module 410, the reality of processing module 420 and transferring module 430 are obtained Existing function is gathered with step corresponding in first embodiment to be corresponded, and to avoid repeating, the present embodiment is not described in detail one by one.
Module 410 is obtained, for obtaining the load information of the CPU of each cloud host in the first subregion.
Processing module 420, for determining it is default whether the load information of CPU of each cloud host meets first Rule.
As an implementation, the power consumption of first subregion is higher than the power consumption of second subregion;The processing mould Whether block 420, is also used to: determining load value entrained by the load information of the CPU of each cloud host less than first Preset threshold;If so, characterizing the load information meets the first preset rules.
As another embodiment, the power consumption of first subregion is lower than second subregion;The processing module 420, it is also used to: it is pre- to determine whether load value entrained by the load information of the CPU of each cloud host is greater than second If threshold values;If so, characterizing the load information meets the first preset rules.
As another embodiment, the processing module 420, is also used to: determining the institute of the CPU of each cloud host State whether load value entrained by load information matches with third preset threshold within a preset period of time;If so, will be with described The matched cloud host of three preset thresholds institute is as cloud host to be migrated;Determine whether each cloud host to be migrated carries There is migration to identify;If it is not, characterizing the load information meets the first preset rules.
Optionally, after determining whether each cloud host to be migrated carries migration mark, the processing module 420, it is also used to: if so, determining the transit time for carrying the corresponding cloud host to be migrated of the migration mark;It determines Whether the transit time is greater than the 4th preset threshold;If so, characterizing the load information meets the first preset rules.
Transferring module 430, described in if so, will meet corresponding to the load information of first preset rules Cloud host migration to cloud platform the second subregion.
Optionally, the transferring module 430, is also used to: determining whether the quantity of second subregion is unique;If it is not, from Target partition is determined at least two second subregions;The load information institute for meeting first preset rules is right The target partition of the cloud host answered from first zoned migration into the cloud platform.
Optionally, described to determine target partition from least two second subregions, comprising: to determine at least two institutes State whether the second subregion has cloud host to move into before current time;If it is not, by any at least two second subregions One second subregion is as target partition.
In a possible embodiment, the cloud resource dispatching device 400 further include: generation module is used for: generation is used for Record is recorded from first zoned migration to the migration of second subregion;The cloud platform is determined according to migration record Power consumption save the cost.
3rd embodiment
As shown in figure 3, being the schematic diagram of terminal device 500.The terminal device 500 includes memory 502, processor 504 and it is stored in the computer program 503 that can be run in the memory 502 and on the processor 504, the calculating The cloud resource dispatching method in first embodiment is realized when machine program 503 is executed by processor 504, to avoid repeating, this Place repeats no more.Alternatively, realizing cloud resource tune described in second embodiment when the computer program 503 is executed by processor 504 The function of each module/unit in device is spent, to avoid repeating, details are not described herein again.
Illustratively, computer program 503 can be divided into one or more module/units, one or more mould Block/unit is stored in memory 502, and is executed by processor 504, to complete the application.One or more module/units It can be the series of computation machine program instruction section that can complete specific function, the instruction segment is for describing computer program 503 Implementation procedure in terminal device 500.For example, computer program 503 can be divided into the acquisition mould in second embodiment Block 410, processing module 420 and transferring module 430, the concrete function of each module as described in the first embodiment or the second embodiment, It will not repeat them here.
Terminal device 500 can be desktop PC and cloud server etc. and calculate equipment.
Wherein, memory 502 may be, but not limited to, random access memory (Random Access Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), Electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc.. Wherein, memory 502 is for storing program, and the processor 504 executes described program after receiving and executing instruction, aforementioned The method for the flow definition that the embodiment of the present application any embodiment discloses can be applied in processor 504, or by processor 504 realize.
Processor 504 may be a kind of IC chip, the processing capacity with signal.Above-mentioned processor 504 can To be general processor, including central processing unit (Central Processing Unit, CPU), network processing unit (Network Processor, NP) etc.;It can also be digital signal processor (Digital Signal Processor, DSP), dedicated integrated Circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components.It may be implemented or execute disclosed each method, step and the logic diagram in the embodiment of the present application.It is general Processor can be microprocessor or the processor is also possible to any conventional processor etc..
It is understood that structure shown in Fig. 3 is only a kind of structural schematic diagram of terminal device 500, terminal device 500 It can also include than more or fewer components shown in Fig. 3.Each component shown in Fig. 3 can use hardware, software or its group It closes and realizes.
Fourth embodiment
The embodiment of the present application also provides a kind of storage medium, and instruction is stored on the storage medium, when described instruction exists The cloud resource dispatching party in first embodiment is realized when running on computer, when the computer program is executed by processor Method, to avoid repeating, details are not described herein again.Alternatively, realizing second embodiment institute when the computer program is executed by processor The function of each module/unit in cloud resource dispatching device is stated, to avoid repeating, details are not described herein again.
Through the above description of the embodiments, those skilled in the art can be understood that the application can lead to Hardware realization is crossed, the mode of necessary general hardware platform can also be added to realize by software, based on this understanding, this Shen Technical solution please can be embodied in the form of software products, which can store in a non-volatile memories In medium (can be CD-ROM, USB flash disk, mobile hard disk etc.), including some instructions are used so that a computer equipment (can be Personal computer, server or network equipment etc.) execute each implement scene of the application method.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.It should also be noted that similar label and letter exist Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing It is further defined and explained.

Claims (11)

1. a kind of cloud resource dispatching method characterized by comprising
Obtain the load information of the CPU of each cloud host in the first subregion;
Determine whether the load information of the CPU of each cloud host meets the first preset rules;
If so, the cloud host migration corresponding to the load information of first preset rules will be met to cloud platform Second subregion.
2. the method according to claim 1, wherein the power consumption of first subregion is higher than second subregion Power consumption;Whether the load information of the CPU of each cloud host of determination meets the first preset rules, comprising:
Determine load value entrained by the load information of the CPU of each cloud host whether less than the first preset threshold;
If so, characterizing the load information meets the first preset rules.
3. the method according to claim 1, wherein the load that first preset rules will be met The cloud host migration corresponding to information to cloud platform the second subregion, comprising:
Determine whether the quantity of second subregion is unique;
If it is not, determining target partition from least two second subregions;
The cloud host corresponding to the load information of first preset rules will be met from first zoned migration To the target partition in the cloud platform.
4. according to the method described in claim 3, it is characterized in that, described determine mesh from least two second subregions Mark subregion, comprising:
Determine whether at least two second subregions have cloud host to move into before current time;
If it is not, using any one of second subregion at least two second subregions as target partition.
5. the method according to claim 1, wherein the power consumption of first subregion is lower than second subregion; Whether the load information of the CPU of each cloud host of determination meets the first preset rules, comprising:
Determine whether load value entrained by the load information of the CPU of each cloud host is greater than the second preset threshold;
If so, characterizing the load information meets the first preset rules.
6. the method according to claim 1, wherein the CPU's of each cloud host of the determination is described negative Whether information carrying breath meets the first preset rules, comprising:
Determine load value entrained by the load information of the CPU of each cloud host whether within a preset period of time with The matching of three preset thresholds;
If so, will be with the matched cloud host of third preset threshold as cloud host to be migrated;
Determine whether each cloud host to be migrated carries migration mark;
If it is not, characterizing the load information meets the first preset rules.
7. according to the method described in claim 6, it is characterized in that, determining whether each cloud host to be migrated carries After migration mark, further includes:
If so, determining the transit time for carrying the corresponding cloud host to be migrated of the migration mark;
Determine whether the transit time is greater than the 4th preset threshold;
If so, characterizing the load information meets the first preset rules.
8. the method according to claim 1, wherein the method also includes:
It generates and is recorded for recording from first zoned migration to the migration of second subregion;
The power consumption save the cost of the cloud platform is determined according to the migration record.
9. a kind of cloud resource dispatching device characterized by comprising
Module is obtained, for obtaining the load information of the CPU of each cloud host in the first subregion;
Processing module, for determining whether the load information of CPU of each cloud host meets the first preset rules;
Transferring module, for if so, the cloud host corresponding to the load information of first preset rules will be met It migrates to the second subregion of cloud platform.
10. a kind of terminal device characterized by comprising memory, processor and storage are in the memory and can be The computer program run on the processor, the processor realize such as claim 1 to 8 when executing the computer program The step of described in any item cloud resource dispatching methods.
11. a kind of storage medium, which is characterized in that the storage medium for storing instruction, when described instruction on computers When operation, so that the computer executes cloud resource dispatching method as claimed in any one of claims 1 to 8.
CN201910039466.5A 2019-01-15 2019-01-15 Cloud resource dispatching method, device, equipment and storage medium Pending CN109766190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910039466.5A CN109766190A (en) 2019-01-15 2019-01-15 Cloud resource dispatching method, device, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910039466.5A CN109766190A (en) 2019-01-15 2019-01-15 Cloud resource dispatching method, device, equipment and storage medium

Publications (1)

Publication Number Publication Date
CN109766190A true CN109766190A (en) 2019-05-17

Family

ID=66454031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910039466.5A Pending CN109766190A (en) 2019-01-15 2019-01-15 Cloud resource dispatching method, device, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109766190A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112181124A (en) * 2020-09-11 2021-01-05 华为技术有限公司 Method for power consumption management and related device
CN112272218A (en) * 2020-10-16 2021-01-26 苏州浪潮智能科技有限公司 Cloud platform instance resource operation method and device, computer equipment and storage medium
CN113515364A (en) * 2021-09-14 2021-10-19 腾讯科技(深圳)有限公司 Data migration method and device, computer equipment and storage medium
CN114384995A (en) * 2020-10-20 2022-04-22 华为技术有限公司 Power consumption management method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120042034A1 (en) * 2010-08-13 2012-02-16 Vmware, Inc. Live migration of virtual machine during direct access to storage over sr iov adapter
US20140068608A1 (en) * 2012-09-05 2014-03-06 Cisco Technology, Inc. Dynamic Virtual Machine Consolidation
CN104657215A (en) * 2013-11-19 2015-05-27 南京鼎盟科技有限公司 Virtualization energy-saving system in Cloud computing
CN105302630A (en) * 2015-10-26 2016-02-03 深圳大学 Dynamic adjustment method and system for virtual machine
CN107220125A (en) * 2017-05-27 2017-09-29 郑州云海信息技术有限公司 A kind of cloud resource dispatching method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120042034A1 (en) * 2010-08-13 2012-02-16 Vmware, Inc. Live migration of virtual machine during direct access to storage over sr iov adapter
US20140068608A1 (en) * 2012-09-05 2014-03-06 Cisco Technology, Inc. Dynamic Virtual Machine Consolidation
CN104657215A (en) * 2013-11-19 2015-05-27 南京鼎盟科技有限公司 Virtualization energy-saving system in Cloud computing
CN105302630A (en) * 2015-10-26 2016-02-03 深圳大学 Dynamic adjustment method and system for virtual machine
CN107220125A (en) * 2017-05-27 2017-09-29 郑州云海信息技术有限公司 A kind of cloud resource dispatching method and device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112181124A (en) * 2020-09-11 2021-01-05 华为技术有限公司 Method for power consumption management and related device
CN112181124B (en) * 2020-09-11 2023-09-01 华为技术有限公司 Method for managing power consumption and related equipment
CN112272218A (en) * 2020-10-16 2021-01-26 苏州浪潮智能科技有限公司 Cloud platform instance resource operation method and device, computer equipment and storage medium
CN112272218B (en) * 2020-10-16 2023-01-06 苏州浪潮智能科技有限公司 Cloud platform instance resource operation method and device, computer equipment and storage medium
CN114384995A (en) * 2020-10-20 2022-04-22 华为技术有限公司 Power consumption management method and device
CN113515364A (en) * 2021-09-14 2021-10-19 腾讯科技(深圳)有限公司 Data migration method and device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109766190A (en) Cloud resource dispatching method, device, equipment and storage medium
US11593179B2 (en) Capacity and load analysis using storage attributes
CN110869909B (en) System and method for applying machine learning algorithms to calculate health scores for workload scheduling
US8117613B2 (en) Optimized virtual machine migration mechanism
US8751657B2 (en) Multi-client storage system and storage system management method
JP5756478B2 (en) Optimizing power consumption in the data center
JP5756240B2 (en) Management system and management method
CN104516475A (en) Method and apparatus for managing global chip power on multicore system on chip
US9600343B2 (en) System and method for analyzing computing system resources
CN109408590B (en) Method, device and equipment for expanding distributed database and storage medium
CN115562870B (en) Task node resource construction method of cluster
CN109062666A (en) A kind of cluster virtual machine management method and relevant apparatus
JP5515889B2 (en) Virtual machine system, automatic migration method and automatic migration program
Balouek-Thomert et al. Parallel differential evolution approach for cloud workflow placements under simultaneous optimization of multiple objectives
JP6960491B2 (en) Management system and infrastructure system management method
US11379130B2 (en) Predicting and preparing volume configurations
CN116048773B (en) Distributed collaborative task assignment method and system based on wave function collapse
CN115373860B (en) Scheduling method, device and equipment of GPU (graphics processing Unit) tasks and storage medium
CN110806918A (en) Virtual machine operation method and device based on deep learning neural network
CN114047883B (en) Data equalization method and device based on distributed storage system
WO2022062937A1 (en) Task scheduling method and apparatus, and computer system
CN115660344A (en) User scheduling method and device, electronic equipment and storage medium
CN112748850B (en) Method, apparatus and computer program product for storage management
US11307889B2 (en) Schedule virtual machines
Oyekanmi et al. An efficient reducing mechanism for energy consumption in data center using hybrid consolidation techniques

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517