CN109763992A - The service life method for early warning and device of equipment fan - Google Patents

The service life method for early warning and device of equipment fan Download PDF

Info

Publication number
CN109763992A
CN109763992A CN201910252862.6A CN201910252862A CN109763992A CN 109763992 A CN109763992 A CN 109763992A CN 201910252862 A CN201910252862 A CN 201910252862A CN 109763992 A CN109763992 A CN 109763992A
Authority
CN
China
Prior art keywords
fan
target fan
target
early warning
revolving speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910252862.6A
Other languages
Chinese (zh)
Other versions
CN109763992B (en
Inventor
程振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New H3C Technologies Co Ltd
Original Assignee
New H3C Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New H3C Technologies Co Ltd filed Critical New H3C Technologies Co Ltd
Priority to CN201910252862.6A priority Critical patent/CN109763992B/en
Publication of CN109763992A publication Critical patent/CN109763992A/en
Application granted granted Critical
Publication of CN109763992B publication Critical patent/CN109763992B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Positive-Displacement Air Blowers (AREA)

Abstract

The application provides the service life method for early warning and device of a kind of equipment fan, to give warning in advance, equipment fan service life will terminate, to avoid leading to equipment fault because equipment fan service life terminates, this method comprises: selecting a fan as target fan from the fan group of the equipment;The target fan is closed, and following test operation is executed to the target fan: obtaining the power parameter of the target fan, and the target fan is powered on based on the power parameter;If the revolving speed of the target fan is less than preset rotation speed, early warning is carried out to the service life of the target fan;After the completion of the test operation, a fan is reselected as target fan, and execute test operation, until completing the test of the fan group.

Description

The service life method for early warning and device of equipment fan
Technical field
This application involves electronic technology field more particularly to the service life method for early warning and device of a kind of equipment fan.
Background technique
Since chip power-consumption is higher on complex electronic equipment, it usually needs configuration fan carries out wind-cooling heat dissipating to equipment, with Guarantee the temperature of chip when equipment operation in safe range.However, in the use process of equipment, inside fan spindle bearing The volatilization of grease and fan run at high speed the abrasion of process middle (center) bearing, and the rotary resistance of fan will be increasing, finally makes Fan service life termination, if replacement fan will will affect equipment cooling not in time before fan service life termination, thus Lead to equipment fault.
Summary of the invention
In view of this, the application provides the service life method for early warning and device of a kind of equipment fan, to give warning in advance Equipment fan service life will terminate, to avoid leading to equipment fault because equipment fan service life terminates.
In a first aspect, this application provides a kind of service life method for early warning of equipment fan, which comprises
Select a fan as target fan from the fan group of the equipment;
The target fan is closed, and following test operation is executed to the target fan:
The power parameter of the target fan is obtained, and the target fan is powered on based on the power parameter;
If the revolving speed of the target fan is less than preset rotation speed, early warning is carried out to the service life of the target fan;
After the completion of the test operation, a fan is reselected as target fan, and execute test operation, until Complete the test of the fan group.
The above method during target fan test, first obtains the power parameter of target fan, and be based on the power parameter The target fan is powered on, if the revolving speed of test to the target fan is less than preset rotation speed, which is made Carry out early warning with the service life, so as to remind in advance maintenance personnel's equipment fan service life will terminate, and then can to avoid because Equipment fan service life termination can not be replaced in time and lead to equipment fault.
In a possible implementation, if the revolving speed of the target fan be less than preset rotation speed, carry out described in The service life of target fan carries out early warning, comprising:
If the revolving speed of the target fan is zero, first order early warning is carried out to the target fan;
If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, it is pre- to carry out the second level to the target fan Alert, the rank of the second level early warning is lower than the rank of the first order early warning.
In this method, graduation carry out service life early warning, if the revolving speed of target fan is zero, to the target fan into Row first order early warning carries out warning level to the target fan if the revolving speed of target fan is greater than zero and is less than preset rotation speed Lower than the second level early warning of the rank of first order early warning, so that plant maintenance personnel understanding equipment is general from what service life terminated Time, so as to arrange the time to replace fan in time.
In a possible implementation, this method further include:
If the revolving speed of the target fan is zero, the first flag tag target fan is used;
If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, the second flag tag target wind is used Fan, wherein second mark preferentially carries out test operation for marking when testing the fan group next time Fan;
After the test for completing all fans in the fan group, the volume of the corresponding fan of first mark is exported Number.
It in this method, is marked to needing the fan of early warning to classify, and after completing the test of all fans of equipment, The number (i.e. the number of the high fan of warning level) of the corresponding fan of the first mark of output, with remind maintenance personnel in time into Row replacement;And it is possible to when testing the fan of fan group next time, the preferential wind testing most probable and breaking down Fan, to promote the timeliness of test early warning.
In a possible implementation, the power parameter is lowest starting voltage;
After the service life to the target fan carries out early warning, this method further include:
Obtain the voltage rating for making the full revolving speed operation of the target fan;
It is powered with the voltage rating to the target fan.
In this method, early warning is carried out and then with voltage rating to the target fan in the service life to target fan Power supply, so that the target fan continues to run, so as to not influence the heat dissipation of equipment.
In a possible implementation, the power parameter is minimum pulse-width modulation PWM duty ratio;
After the service life to the target fan carries out early warning, this method further include:
Obtain the pwm signal comprising making the PWM duty cycle of the full revolving speed operation of the target fan;
The revolving speed of the target fan is controlled based on the pwm signal.
In this method, early warning is carried out in the service life to target fan and then based on comprising keeping the target fan complete The pwm signal of the PWM duty cycle of revolving speed operation controls the revolving speed of the target fan, so that the target fan continues to run, thus It can not influence the heat dissipation of equipment.
Second aspect, the embodiment of the present application also provides a kind of service life prior-warning devices of equipment fan, including are used for Execute the mould of the service life method for early warning of the equipment fan in any possible implementation of first aspect or first aspect Block.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of the service life method for early warning of equipment fan provided by the embodiments of the present application;
Fig. 2 is a kind of structural schematic diagram of the service life prior-warning device of equipment fan provided by the embodiments of the present application.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistent with the application.On the contrary, they be only with it is such as appended The example of the consistent device and method of some aspects be described in detail in claims, the application.
It is only to be not intended to be limiting the application merely for for the purpose of describing particular embodiments in term used in this application. It is also intended in the application and the "an" of singular used in the attached claims, " described " and "the" including majority Form, unless the context clearly indicates other meaning.It is also understood that term "and/or" used herein refers to and wraps It may be combined containing one or more associated any or all of project listed.
It will be appreciated that though various information, but this may be described using term first, second, third, etc. in the application A little information should not necessarily be limited by these terms.These terms are only used to for same type of information being distinguished from each other out.For example, not departing from In the case where the application range, the first information can also be referred to as the second information, and similarly, the second information can also be referred to as One information.Depending on context, word as used in this " if " can be construed to " ... when " or " when ... When " or " in response to determination ".
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description.
Referring to Fig. 1, the embodiment of the present application provides a kind of service life method for early warning of equipment fan, and this method can wrap Include following steps:
S101, select a fan as target fan from the fan group of the equipment.
For equipment, the multiple fans of deployment radiate generally in the form of fan group, to reach its radiating requirements, The equipment can be the network equipment of such as router, interchanger, be also possible to server, PC etc..Wherein, fan group In each fan can be provided with a number, for position a fan.
When equipment selects fan as target fan from fan group, can be selected according to preset sequence, example Such as, include 12 fans in fan group, be respectively labeled as 1-12, can be selected according to the sequence of number from small to large It selects.First using the fan of number 1 as target fan.
Following test operation is executed to the target fan:
S102, the target fan is closed.
The power supply for cutting off the target fan selected, makes the target fan stop working.
S103, the power parameter for obtaining the target fan, and the target fan is carried out based on the power parameter Electricity.
If the revolving speed of S104, the target fan is less than preset rotation speed, the service life of the target fan is carried out Early warning.
If the revolving speed of the target fan is greater than preset rotation speed, then it is assumed that the target fan is normal, woth no need to carry out early warning, The target fan is restored to normal operating conditions.And return to S101 and reselect a fan as target fan, into Row test operation.
According to the number of the target fan, the power parameter of the target fan is obtained, the power parameter is for being again started up The fan receives detraction to determine whether the service life of the fan receives, and the mode of judgement is started based on this power parameter Afterwards, when detecting its starting the case where revolving speed.During fan work, since the factors such as abrasion will cause asking for revolving speed decline Topic, under rated voltage when steady operation, the reduction of revolving speed is unobvious, is difficult to be judged.But in starting fan, due to not Influence of the case where formation stable state, abrasion to revolving speed is easier to highlight, and therefore, selection is first closed fan and started again to be sentenced It is disconnected.
Control form of the power parameter based on fan stored by fan is different, which, which can be, is based on Equipment obtained value when being tested early period, and be stored in equipment and used for equipment in advance.Optionally, it is carried out by voltage value In the case where speed regulation, which can be lowest starting voltage, for example, the voltage rating of fan can be 12V, this is minimum Starting voltage can be 5V;Alternatively, the power parameter can be minimum in the case where being adjusted the speed by digital pulse signal Pulse-width modulation PWM duty ratio, for example, the specified PWM duty cycle of fan is 80%, which is 30%.
If the revolving speed of the target fan fails to reach preset revolving speed, it may be considered that the target fan has occurred one The abrasion for determining degree, works on, and may cause the target fan and stalls suddenly.Due to that can include many fans in fan group, All there are problems that abrasion, if left, it works on, the case where stopping working respectively there are several fans, such one Come, be unable to satisfy the radiating requirements of equipment entirety, and replaces fan one by one and be also required to a period of time, in this period, deposit The apparatus overheat the problems such as, equipment reliability of operation is reduced.
When the target rotation speed of the fan started under determining power parameter is less than preset rotation speed, based on corresponding to the target fan Number 1 export early warning, prompt staff, fan service life corresponding to the number 1 is substantially reduced.
After the completion of the test operation, a fan is reselected as target fan, and execute test operation, until The test of the fan group is completed, that is, restarts the step of executing S101-S104.
After the completion of being directed to the test of a fan, selects a fan as target fan again, repeat above-mentioned Test operation, until all fans are all completed.At this point, the case where staff can be according to equipment early warning, in advance into Row replacement, stops working brought equipment fault so as to avoid occurring a large amount of fans in the short time.
When in order to avoid carrying out test operation to the fan in fan group, the heat dissipation of equipment is influenced.Further, to institute After the service life progress early warning for stating target fan, further includes:
The voltage rating for making the full revolving speed operation of the target fan is obtained, is supplied with the voltage rating to the target fan Electricity;Alternatively,
The pwm signal comprising making the PWM duty cycle of the full revolving speed operation of the target fan is obtained, the pwm signal is based on Control the revolving speed of the target fan.
Because during testing fan group, inevitably needing to close fan, also, be based on power supply When parameter is tested, revolving speed is centainly lower than the revolving speed of fan normal work.So, it is tested for a fan Afterwards, the problem of needing to restore the normal work of the fan, declining to avoid the heat dissipation effect of this period between early warning and replacement. Certainly, the normal fan of preset rotation speed is greater than for revolving speed, it is also desirable to execute the step, fan is made to restore to work normally.
At this point, equipment (can be the feelings of minimum operating voltage relative to power parameter according to the voltage rating got Condition) or PWM duty cycle the case where (relative to power parameter being minimum PWM duty cycle) of full speed running be that target fan carries out Power supply, so that the target fan restores normal operating conditions after a test.
For the S104 in above-mentioned test operation, it is possible to further use the mode of grading forewarning system to refine early warning Form keeps equipment more accurate for the early warning of fan, comprising:
If the revolving speed of the target fan is zero, first order early warning is carried out to the target fan;
If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, it is pre- to carry out the second level to the target fan Alert, the rank of the second level early warning is lower than the rank of the first order early warning.
During test operation, when detecting that revolving speed is when starting according to power parameter to target fan It is zero, then can be confirmed that target fan abrasion has been difficult to work on, carry out first order early warning, directly informing staff, It needs to replace fan as early as possible.At this point it is possible to carry out the first mark, at regular intervals, example to the fan in first order early warning Such as, 1 hour, an early warning is carried out with regard to the corresponding number of one time first mark of output, staff's carelessness is avoided to forget to replace.
When detect target fan is started according to power parameter when, revolving speed be greater than zero but be less than preset rotation speed when, It may be considered that the target fan can still work a period of time, and non-critical, replacement is not had to temporarily.At this point it is possible to carry out Second level early warning, the rank of the second level early warning are lower than the rank of first order early warning.
It is possible to further indicate to the fan label second of second level early warning, equipment can store the second mark and wind Fan the corresponding relationship of number.For fan group all fan tests operation, be carried out according to certain period, then, After the completion of this test operation, the corresponding relationship of equipment storage the second mark and fan number.Since these fans have gone out Show a degree of abrasion, the stage not up to needed replacing, but first order early warning is likely to be breached after a period of time of reruning Degree, therefore, when test operation starts next time, preferential test is by the fan of the second flag tag, to promote test With the effect of early warning.
Based on the same inventive concept, the embodiment of the present application also provides a kind of service life prior-warning device of equipment fan, Referring to fig. 2, which includes:
Selecting module 10, for selecting a fan as target fan from the fan group of the equipment;;
Warning module 11 is tested, for executing following test operation to the target fan: closing the target fan, obtain The power parameter of the target fan is taken, and the target fan is powered on based on the power parameter;If the target wind The revolving speed of fan is less than preset rotation speed, then carries out early warning to the service life of the target fan;
The selecting module 10, is also used to after the completion of the test operation, reselects a fan as target wind Fan, and test operation is executed, until completing the test of the fan group.
In a possible implementation, if the test warning module 11 is in the revolving speed for executing the target fan Less than preset rotation speed, then when carrying out early warning to the service life of the target fan, specifically can be used for:
If the revolving speed of the target fan is zero, first order early warning is carried out to the target fan;
If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, it is pre- to carry out the second level to the target fan Alert, the rank of the second level early warning is lower than the rank of the first order early warning.
In a possible implementation, if the revolving speed that above-mentioned test warning module 11 is also used to the target fan is Zero, then use the first flag tag target fan;If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, adopt With the second flag tag target fan, wherein second mark surveys the fan group next time for marking When examination, the preferential fan for carrying out test operation;After the test for completing all fans in the fan group, output described first The number of the corresponding fan of mark.
In a possible implementation, power parameter can be lowest starting voltage;
The test warning module 11 is also used to after the service life to the target fan carries out early warning, is obtained The voltage rating for making the full revolving speed operation of the target fan, is powered with the voltage rating to the target fan.
In another possible implementation, power parameter is minimum PWM duty cycle;
The test warning module 11 is also used to after the service life to the target fan carries out early warning, is obtained Comprising making the pwm signal of the PWM duty cycle of the full revolving speed operation of the target fan, and the mesh is controlled based on the pwm signal Mark the revolving speed of fan.
The function of each unit and the realization process of effect are specifically detailed in the above method and correspond to step in above-mentioned apparatus Realization process, details are not described herein.
For device embodiment, since it corresponds essentially to embodiment of the method, so related place is referring to method reality Apply the part explanation of example.The apparatus embodiments described above are merely exemplary, wherein described be used as separation unit The unit of explanation may or may not be physically separated, and component shown as a unit can be or can also be with It is not physical unit, it can it is in one place, or may be distributed over multiple network units.It can be according to actual The purpose for needing to select some or all of the modules therein to realize application scheme.Those of ordinary skill in the art are not paying Out in the case where creative work, it can understand and implement.
The foregoing is merely the preferred embodiments of the application, not to limit the application, all essences in the application Within mind and principle, any modification, equivalent substitution, improvement and etc. done be should be included within the scope of the application protection.

Claims (10)

1. a kind of service life method for early warning of equipment fan, which is characterized in that the described method includes:
Select a fan as target fan from the fan group of the equipment;
Following test operation is executed to the target fan:
Close the target fan;
The power parameter of the target fan is obtained, and the target fan is powered on based on the power parameter;
If the revolving speed of the target fan is less than preset rotation speed, early warning is carried out to the service life of the target fan;
After the completion of the test operation, a fan is reselected as target fan, and execute test operation, until completing The test of the fan group.
2. if the method according to claim 1, wherein the revolving speed of the target fan is less than default turn Speed, the then service life for carrying out the target fan carry out early warning, comprising:
If the revolving speed of the target fan is zero, first order early warning is carried out to the target fan;
If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, second level early warning is carried out to the target fan, The rank of the second level early warning is lower than the rank of the first order early warning.
3. according to the method described in claim 2, it is characterized in that, this method further include:
If the revolving speed of the target fan is zero, the first flag tag target fan is used;
If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, the second flag tag target fan is used, In, second mark is for marking when testing the fan group next time, the preferential fan for carrying out test operation;
After the test for completing all fans in the fan group, the number of the corresponding fan of first mark is exported.
4. method according to claim 1-3, which is characterized in that the power parameter is lowest starting voltage;
After the service life to the target fan carries out early warning, this method further include:
Obtain the voltage rating for making the full revolving speed operation of the target fan;
It is powered with the voltage rating to the target fan.
5. method according to claim 1-3, which is characterized in that the power parameter is minimum pulsewidth modulation PWM duty cycle;
After the service life to the target fan carries out early warning, the method also includes:
Obtain the pwm signal comprising making the PWM duty cycle of the full revolving speed operation of the target fan;
The revolving speed of the target fan is controlled based on the pwm signal.
6. a kind of service life prior-warning device of equipment fan, which is characterized in that described device includes:
Selecting module, for selecting a fan as target fan from the fan group of the equipment;;
Warning module is tested, for executing following test operation to the target fan: the target fan is closed, described in acquisition The power parameter of target fan, and the target fan is powered on based on the power parameter;If the target fan turns Speed is less than preset rotation speed, then carries out early warning to the service life of the target fan;
The selecting module is also used to after the completion of the test operation, reselects a fan as target fan, and hold Row test operation, until completing the test of the fan group.
7. device according to claim 6, which is characterized in that if the test warning module is executing the target The revolving speed of fan is less than preset rotation speed, then when carrying out early warning to the service life of the target fan, is specifically used for:
If the revolving speed of the target fan is zero, first order early warning is carried out to the target fan;
If the revolving speed of the target fan is greater than zero and is less than preset rotation speed, second level early warning is carried out to the target fan, The rank of the second level early warning is lower than the rank of the first order early warning.
8. device according to claim 7, which is characterized in that if the test warning module is also used to the target fan Revolving speed be zero, then use the first flag tag target fan;If the revolving speed of the target fan is greater than zero and is less than default Revolving speed then uses the second flag tag target fan, wherein second mark is for marking next time to the fan When group is tested, the preferential fan for carrying out test operation;
After the test for completing all fans in the fan group, the number of the corresponding fan of first mark is exported.
9. according to the described in any item devices of claim 6-8, which is characterized in that the power parameter is lowest starting voltage;
The test warning module is also used to after the service life to the target fan carries out early warning, and acquisition makes described The voltage rating of the full revolving speed operation of target fan, is powered with the voltage rating to the target fan.
10. according to the described in any item devices of claim 6-8, which is characterized in that the power parameter is minimum pulsewidth modulation PWM duty cycle;
The test warning module is also used to after the service life to the target fan carries out early warning, is obtained comprising making The pwm signal of the PWM duty cycle of the full revolving speed operation of target fan, and the target fan is controlled based on the pwm signal Revolving speed.
CN201910252862.6A 2019-03-29 2019-03-29 Service life early warning method and device for equipment fan Active CN109763992B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910252862.6A CN109763992B (en) 2019-03-29 2019-03-29 Service life early warning method and device for equipment fan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910252862.6A CN109763992B (en) 2019-03-29 2019-03-29 Service life early warning method and device for equipment fan

Publications (2)

Publication Number Publication Date
CN109763992A true CN109763992A (en) 2019-05-17
CN109763992B CN109763992B (en) 2020-12-29

Family

ID=66460235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910252862.6A Active CN109763992B (en) 2019-03-29 2019-03-29 Service life early warning method and device for equipment fan

Country Status (1)

Country Link
CN (1) CN109763992B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114320970A (en) * 2021-12-31 2022-04-12 浪潮(北京)电子信息产业有限公司 Abnormity early warning method, device, equipment and medium for fan

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02108896A (en) * 1988-10-19 1990-04-20 Fujitsu Ltd Life detecting device for cooling fan
JP2004027987A (en) * 2002-06-26 2004-01-29 Nec Tohoku Ltd Fan life detecting device
CN1566713A (en) * 2003-07-07 2005-01-19 新巨企业股份有限公司 Method and apparatus for controlling rotation speed of complementary fan
CN101074966A (en) * 2007-06-15 2007-11-21 华为技术有限公司 Method and apparatus for warning fan life
CN104763665A (en) * 2015-03-04 2015-07-08 杭州华三通信技术有限公司 Fan fault detection method and device of network device
CN106681886A (en) * 2016-12-26 2017-05-17 郑州云海信息技术有限公司 Method and system for judging server fan damage
CN108280016A (en) * 2018-02-27 2018-07-13 郑州云海信息技术有限公司 A kind of fan detection method, device, equipment and computer readable storage medium

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02108896A (en) * 1988-10-19 1990-04-20 Fujitsu Ltd Life detecting device for cooling fan
JP2004027987A (en) * 2002-06-26 2004-01-29 Nec Tohoku Ltd Fan life detecting device
CN1566713A (en) * 2003-07-07 2005-01-19 新巨企业股份有限公司 Method and apparatus for controlling rotation speed of complementary fan
CN101074966A (en) * 2007-06-15 2007-11-21 华为技术有限公司 Method and apparatus for warning fan life
CN104763665A (en) * 2015-03-04 2015-07-08 杭州华三通信技术有限公司 Fan fault detection method and device of network device
CN106681886A (en) * 2016-12-26 2017-05-17 郑州云海信息技术有限公司 Method and system for judging server fan damage
CN108280016A (en) * 2018-02-27 2018-07-13 郑州云海信息技术有限公司 A kind of fan detection method, device, equipment and computer readable storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114320970A (en) * 2021-12-31 2022-04-12 浪潮(北京)电子信息产业有限公司 Abnormity early warning method, device, equipment and medium for fan
CN114320970B (en) * 2021-12-31 2023-09-22 浪潮(北京)电子信息产业有限公司 Fan abnormality early warning method, device, equipment and medium

Also Published As

Publication number Publication date
CN109763992B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN103250058B (en) Intelligent transformer
JP7005771B2 (en) Power monitoring method, system and power supply
US8652697B2 (en) Controlling a fuel cell system based on fuel cell impedance characteristic
CN108537426A (en) Power equipment operating status method of estimation, device and computer equipment
JP2016519284A (en) Battery internal short detection system and method
CN105765857B (en) Solar power generation manages device
US8498830B2 (en) Testing of a battery of a computing device
CN104699589B (en) Fan fault detection system and method
CN110708172A (en) Chip power-on sequence control method and device and electronic equipment
CN109763992A (en) The service life method for early warning and device of equipment fan
CN109932592A (en) The method and apparatus that failure for power equipment determines
CN109916448A (en) Supply vehicle detection method, system, computer equipment and storage medium
JP2020020654A (en) Capacity estimating system, capacity estimating method, communication device, and computer program
JP2018036970A (en) Facility management system, facility management method, and program
CN109442677A (en) Fault control method, the electronic equipment of air-conditioning system
CN107843839A (en) Host test system, method, apparatus and readable storage medium storing program for executing based on voltage
CN115808640B (en) Power failure detection circuit, method, system, electronic device and storage medium
CN103308819B (en) There is the test system for service life of fuses of remote information transmission and controlling functions
CN109752624A (en) Liquid cooling flow path on-off detection method and device
CN108710357A (en) Solar power generation manages device
CN108973709A (en) Method for running the determination battery portion characteristic of the battery pack of the module with different chemical composition areas
CN106774067B (en) A kind of short circuit monitoring system and method for link of powering
AU2018398489B2 (en) Information processing device, information processing system, information processing method, and computer program
US20230407165A1 (en) Information processing device, information processing system, information processing method, and computer program
CN108391353A (en) Wisdom illumination monitoring method, apparatus, terminal and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant