CN109763429A - The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine - Google Patents
The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine Download PDFInfo
- Publication number
- CN109763429A CN109763429A CN201910050843.5A CN201910050843A CN109763429A CN 109763429 A CN109763429 A CN 109763429A CN 201910050843 A CN201910050843 A CN 201910050843A CN 109763429 A CN109763429 A CN 109763429A
- Authority
- CN
- China
- Prior art keywords
- machine
- foundation
- basic case
- basic
- case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 23
- 239000002689 soil Substances 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000000926 separation method Methods 0.000 claims description 5
- 230000000694 effects Effects 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 230000001681 protective effect Effects 0.000 abstract description 2
- 230000009467 reduction Effects 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 abstract description 2
- 230000008901 benefit Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 210000000078 claw Anatomy 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Abstract
The invention discloses the front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine, front end supporting construction is made of support column, basic case, mobile device, fixed device and interim foundation pile etc.;Support column flexible length;Basic case is in circular or rectangular cancelled structure, hangs on all-in-one machine, can go up and down in vertical direction;Basic case and fixed device can be put into ground stratum or promote by mobile device;Fixed device can be reused after completing supporting role by support column and basic case locking and by the device of basic case and the locking of interim foundation pile.The supporting mass and moving method improve the safety and stability of all-in-one machine, eliminate bridge construction needs and largely build temporary road and the waste of job platform bring, the substantial economics with environmentally protective social value and reduction bridge construction project cost.
Description
Technical field
The present invention relates to technical field of civil engineering, are specifically related to the side to be set a roof beam in place in bridge construction with foundation construction
Method.
Background technique
In field of civil engineering, bridge is as main traffic facility, and quickly, safety and the construction technology not disturbed residents be by more
Carry out more favors.It is well known that the beam body construction of bridge is most to use precast beam, installed using erecting machine, realizes quick, peace
The purpose constructed entirely.But the construction of bridge foundation needs to build by building temporary construction road, occupying a large amount of construction sites
Material and facility passes through these temporary construction road transports to construction site, and need to take up an area stacking.Due to the position to construct a bridge
It is typically in traffic prosperity location, or crosses over the important main line of communication or important production and living facility, or is located at zanjon shoal and paddy
Domain and waters are built temporary construction road, trestle and setting construction site, are both needed at these position construction bridges bases
Do the work such as a large amount of basement process, relocation of services, building moving, it may be said that be time consuming and expensive, often build these
The working measure expense that temporary construction facility (construction road, trestle and construction site) generates accounts for the ratio of the project cost up to 50%
More than, the construction time of occupancy can exceed that the direct construction time of bridge.
Currently, the box beam and bridge pier of pontic, are realized prefabricated installation substantially, are set up using erecting machine, it is not only quickly but also safe,
Influence simultaneously to construction site is smaller, using installed bridge as transport routes, is not required in addition build temporary road.
But current erecting machine, during mobile set a roof beam in place, the front end of stretching need to be supported on the bridge foundation constructed, otherwise frame
Beam machine is in cantilever position, and the load capacity of receiving is small, and stability is poor.If developing a kind of bridge foundation and erecting beam construction one
Machine, then the bridge foundation that the front end of this equipment is not completed is as supporting station, since pile driving equipment self weight and process generate
Vibration, it is ensured that the stabilization of the integrated machine equipment is more difficult, that is to say, that the construction method of this all-in-one machine is uneasy
Complete.
For the stability and security problem of all-in-one machine, need to make temporary support to the front end of all-in-one machine, this is also engineering circles
Technical problem in the urgent need to address.
Summary of the invention
Technical problem to be solved by the present invention lies in overcome problems of the prior art, provide bridge foundation
With the front end temporary support body scheme of erecting beam construction all-in-one machine.
The front end temporary support body structure is by support column, basic case, mobile device, fixed device and interim foundation pile
Deng composition;
The support column flexible length, the upper end are connect with all-in-one machine, and lower end is connect with basic case;Support column is 2
Steel column more than root is fixed on the front end of all-in-one machine, can slip into water;Its stretch mode is that screw type rotary is flexible or hydraulic
Cylinder body pushes flexible.
The basic case is in circular or rectangular cancelled structure, hangs on all-in-one machine, can go up and down in vertical direction;
Basic case is made of steel, in the cabinet of multiple separations, multiple pawl nails is distributed on cabinet lower end surface, can be inserted into foundation soil
In layer;Cabinet is in seal shape, can increase self weight full of water when being put on ground, and water discharge in case is reduced self weight when above mentioning;When
Basic case slips into water, and the water energy emptied in case when above mentioning generates buoyancy;
The mobile device is a kind of pulling equipment, can basic case and fixed device is put into ground stratum or be mentioned
It pulls out up;
The fixation device is by support column and basic case locking and the device for locking basic case and interim foundation pile;
The interim foundation pile is to be drilled into basic stratum to form pile foundation when playing supporting role, and completes Zhi Chengzuo
It can extract and reuse after.Interim foundation pile is made of spiral drilling rod and drill bit, and basic ground can be drilled by rotating in the forward direction
Pile foundation is formed in layer, when reverse rotation, can be extracted from basic stratum.
When foundation bearing capacity is higher, interim foundation pile can not used.
The moving method of the bridge foundation and erecting beam construction all-in-one machine front end temporary support body, specific step is such as
Under:
(1) the large arm beam of all-in-one machine is forward extended out, stops movement when reaching scheduled bearing position;
(2) elongate support column reaches design position;
(3) mobile device is opened, basic case is transferred on ground, the pawl in basic bottom face is followed closely and is embedded into foundation soil
In;
(4) hydraulic jack on support column is opened, one side elongate support column on one side adds basic case
Pressure, detects its bearing capacity, when reaching 1.3 times of design supporting forces, stops upper pressurization, using fixation device by support column
It is locked with basic case.
(5) it when the bearing capacity of foundation soil body is lower, needs to increase interim foundation pile to improve supporting force, is grasped from basic case
Make in platform, auger stem is screwed into foundation soil, forms interim foundation pile.Foundation pile is not less than 2;When basic case by great waves or
When tidal effect, the horizontal resist forces of basic case can be improved using interim foundation pile.
(6) when all-in-one machine needs to be moved to next position, auger stem should be first reversely rotated if any interim foundation pile, it will
Interim foundation pile promotes out;When being full of water in basic case, the water of cabinet should be emptied;Unlock fixed device, by support column with
Basic case separation;Using mobile device certain altitude will be mentioned on basic case;Simultaneously will support column length shorten, in order to
The large arm beam of all-in-one machine is advanced forward into next position.
The utility model has the advantages that bridge foundation and erecting beam construction all-in-one machine front end temporary support body solve piling process all-in-one machine
Problem is supported, blank on the equipment of quick bridge construction has been filled up under complex foundation, waters and ocean condition, with prior art phase
Than improving the safety and stability set a roof beam in place with foundation construction all-in-one machine, eliminating bridge foundation construction needs and largely build
Temporary road and the waste of job platform bring, the great warp with environmentally protective social value and reduction bridge construction project cost
Ji benefit.
Detailed description of the invention
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments;
Fig. 1 is the relational graph of the present invention set a roof beam in place with foundation construction all-in-one machine and front end temporary support body.
Fig. 2 is of the present invention sets a roof beam in place and foundation construction all-in-one machine front end temporary support body schematic diagram.
Fig. 3 is basic case floor map of the present invention.
In figure: 1-- sets a roof beam in place and foundation construction all-in-one machine;11-temporary support bodies;12-bridge pile foundations;13-have set up bridge
Beam;14-temporary support body box foundations;2-- mobile device;3-- support column;4-fixed devices;5-basic casees;51-- is close
Closed box;The basis 52-- bottom;53-- tack claw;The water filling discharge outlet of 54-- closed box;6-ground stratum;7-interim foundation piles;8--
Hydraulic jack;9-- support adjusts beam.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below
Conjunction is specifically illustrating, and the present invention is further explained.
It is described to absolutely prove to set a roof beam in place with foundation construction all-in-one machine front end temporary support body, combination schematic diagram.
The relational graph of the present invention set a roof beam in place with foundation construction all-in-one machine and front end temporary support body, Cong Tuzhong shown in Fig. 1
It sets a roof beam in place and piling integrated construction as can be seen that set a roof beam in place and to be realized with foundation construction all-in-one machine 1, needs first to set up an interim branch
Hold body 11, all-in-one machine 1 is fixed on bridge pile foundation 12 and has built a bridge and 13 and provided by temporary support body box foundation 14 steady
Qualitative foundation, such all-in-one machine 1 safely and reliably could drive piles and set a roof beam in place.
As can be seen from Figure 2, bridge foundation and 1 front end temporary support body of erecting beam construction all-in-one machine are by support column 3, basic case
5, the composition such as mobile device 2, fixed device 4 and interim foundation pile 7;
The 3 flexible length of support column, the upper end are connect with all-in-one machine 1, and lower end is connect with basic case 5;Support column 3
Generally by 2 or more steel columns, it is fixed on the front end of all-in-one machine 1, can be slipped into water;Its stretch mode is stretched for screw type rotary
Contracting or hydraulic cylinder push flexible.
The basic case 5 is in circular or rectangular cancelled structure, hangs on all-in-one machine 1, can go up and down in vertical direction;
Basic case 5 is made of steel, is composed in the closed case 51 of multiple separations, and multiple pawl nails are distributed in basic bottom 52
53, it can be inserted into foundation soil 6;
A water filling discharge outlet 54 is distributed in closed case 51, as shown in Figure 3.The energy when basic case 5 is put on ground
Increase full of water and be self-possessed, water discharge in case is reduced into self weight when above mentioning;When basic case slips into water, when above mentioning in emptying case
Water energy generates buoyancy;
The mobile device 2 is a kind of pulling equipment, basic case and fixed device can will be put into ground stratum 6
Or it promotes;
The fixation device 4 is by support column 3 and the basic locking of case 5 and the dress for locking basic case 5 with interim foundation pile 7
It sets;
The interim foundation pile 7 is to be drilled into basic stratum 6 to form pile foundation when playing supporting role, and completes to support
It can extract and reuse after effect.Interim foundation pile is made of spiral drilling rod and drill bit, and basis can be drilled by rotating in the forward direction
It forms pile foundation in stratum, when reverse rotation, can be extracted from basic stratum
The bridge foundation and erecting beam construction all-in-one machine front end temporary support body moving method, specific steps are as follows:
(1) the large arm beam of all-in-one machine 1 is forward extended out, stops movement when reaching scheduled bearing position;
(2) elongate support column 3 reaches design position;
(3) mobile device 2 is opened, basic case 5 is transferred on ground 6, so that the pawl in basic bottom face 52 is followed closely 53 and is embedded into
In foundation soil 6;
(4) hydraulic jack 8 on support column 3 is opened, support is pushed to adjust beam 9, adjusts the length of support column 3, on one side
It pressurizes to basic case 5, detects its bearing capacity, when reaching 1.3 times of design supporting forces, stop upper pressurization, it will branch using fixed device 4
Dagger 3 and basic case 5 lock.
(5) when the bearing capacity of foundation soil body 6 is lower, need to increase interim foundation pile 7 to improve supporting force, from basic case 5
Operating platform in, auger stem is screwed into foundation soil, interim foundation pile 7 is formed.Foundation pile is not less than 2;When basic case 5 by
When great waves or tidal effect, the horizontal resist forces of basic case 5 can be improved using interim foundation pile 7.
(6) when all-in-one machine 1 needs to be moved to next position, auger stem should be first reversely rotated if any interim foundation pile 7,
The promotion of interim foundation pile 7 is come out;When being full of water in basic case 5, the water of cabinet should be emptied;Fixed device 4 is unlocked, will be supported
Column 3 is separated with basic case 5;Using mobile device 2 certain altitude will be mentioned on basic case 5;3 length of support column is contracted simultaneously
It is short, in order to be advanced forward into next position with the large arm beam of all-in-one machine 1.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry
Personnel only illustrate the present invention it should be appreciated that the present invention is not limited by examples detailed above described in examples detailed above and specification
Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and
Improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its is equal
Object defines.
Claims (5)
1. bridge foundation and erecting beam construction all-in-one machine front end temporary support body, characterized in that front end temporary support body by support column,
Basic case, mobile device, fixed device and interim foundation pile composition;The support column flexible length, the upper end and all-in-one machine
Connection, lower end are connect with basic case;The basic case is in circular or rectangular cancelled structure, is hung on all-in-one machine, vertical
It can be gone up and down on direction;The mobile device is a kind of pulling equipment, basic case and fixed device can will be put into ground
In stratum or promote;The fixation device is locked by support column and basic case locking and by basic case and interim foundation pile
Device;The interim foundation pile is to be drilled into basic stratum to form pile foundation when playing supporting role, and completes Zhi Chengzuo
It can extract and reuse after.
2. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body, it is characterized in that support
The steel column that column is 2 or more, is fixed on the front end of all-in-one machine, can slip into water;Its stretch mode is flexible for screw type rotary
Or hydraulic cylinder is pushed and is stretched.
3. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body, it is characterized in that basic
Case is made of steel, in the cabinet of multiple separations, multiple pawl nails is distributed on cabinet lower end surface, can be inserted into foundation soil
In;Cabinet is in seal shape, can increase self weight full of water when being put on ground, and water discharge in case is reduced self weight when above mentioning;Work as base
Plinth case slips into water, and the water energy emptied in case when above mentioning generates buoyancy.
4. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body, it is characterized in that temporarily
Foundation pile is made of spiral drilling rod and drill bit, is rotated in the forward direction to be drilled into basic stratum and is formed pile foundation, when reverse rotation, energy
It is extracted from basic stratum.
5. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body moving method, special
Sign is, specific steps are as follows:
(1) all-in-one machine large arm beam is forward extended out, stops movement when reaching predetermined bearing position;
(2) elongate support column reaches design position;
(3) mobile device is opened, basic case is transferred on ground, the pawl in basic bottom face is followed closely and is embedded into foundation soil;
(4) hydraulic jack on support column is opened, one side elongate support column on one side pressurizes to basic case, detects its bearing capacity,
When reaching 1.3 times of design supporting forces, stop upper pressurization, is locked support column and basic case using fixed device.
(5) it when the bearing capacity of foundation soil body is lower, needs to increase interim foundation pile to improve supporting force, is operated from basic case flat
In platform, auger stem is screwed into foundation soil, forms interim foundation pile.Interim foundation pile arrangement is not less than 2;When basic case is by wave
When great waves or tidal effect, the horizontal resist forces of basic case can be improved using interim foundation pile.
(6) when all-in-one machine needs to be moved to next position, auger stem should be first reversely rotated if any interim foundation pile, it will be interim
Foundation pile promotes out;When being full of water in basic case, the water of cabinet should be emptied;Fixed device is unlocked, by support column and basis
Case separation;Using mobile device certain altitude will be mentioned on basic case;Support column length is shortened simultaneously, in order to one
The large arm beam of machine is advanced forward into next position.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2018113704858 | 2018-11-17 | ||
CN201811370485 | 2018-11-17 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109763429A true CN109763429A (en) | 2019-05-17 |
Family
ID=66454562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910050843.5A Pending CN109763429A (en) | 2018-11-17 | 2019-01-20 | The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109763429A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112663514A (en) * | 2020-12-21 | 2021-04-16 | 中建八局第三建设有限公司 | Novel pier-beam integrated bridge girder erection machine |
CN113152289A (en) * | 2021-04-06 | 2021-07-23 | 中交第一航务工程局有限公司 | Pile driving and beam erecting integrated construction method |
CN114717928A (en) * | 2022-04-19 | 2022-07-08 | 湖北工业大学 | Temporary construction trestle suitable for muddy area and construction method |
-
2019
- 2019-01-20 CN CN201910050843.5A patent/CN109763429A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112663514A (en) * | 2020-12-21 | 2021-04-16 | 中建八局第三建设有限公司 | Novel pier-beam integrated bridge girder erection machine |
CN113152289A (en) * | 2021-04-06 | 2021-07-23 | 中交第一航务工程局有限公司 | Pile driving and beam erecting integrated construction method |
CN113152289B (en) * | 2021-04-06 | 2022-09-13 | 中交第一航务工程局有限公司 | Pile driving and beam erecting integrated construction method |
CN114717928A (en) * | 2022-04-19 | 2022-07-08 | 湖北工业大学 | Temporary construction trestle suitable for muddy area and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Viggiani et al. | Piles and pile foundations | |
CN103195158B (en) | Municipal drainage pipeline slurry balance pipe-jacking construction method | |
CN109763429A (en) | The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine | |
CN105442605B (en) | Extract PHC and be reused in deep foundation pit supporting construction method | |
CN107542108A (en) | A kind of reverse construction method of building basement structure | |
CN100473790C (en) | Tower crane foundation for construction and manufacturing method thereof | |
CN107869144A (en) | A kind of pre- slotting ring seal Double-Wall Steel Boxed Cofferdam deep water foundation comprehensive construction method | |
Paul et al. | Comparative study of construction technologies for underground metro stations in India | |
CN112575670B (en) | T-shaped rigid frame bridge suitable for tunnel to pass through giant karst cave and construction technology thereof | |
CN105735354A (en) | Covered-excavation full-top-down construction method of municipal underground engineering | |
CN208748662U (en) | Foundation pit front-supporting type slip casting steel pipe support structure | |
CN109706952A (en) | Large-scale well-sinking construction method | |
CN206635599U (en) | A kind of road surface for caving in road, which is speedily carried out rescue work, fixes device | |
CN210238534U (en) | Flexible reverse-wrapping backfill structure for annular inner support large-diameter corrugated pipe culvert | |
CN111676987A (en) | Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method | |
CN101608452A (en) | The bottom-connected reinforced concrete open caisson water-washed sinking job practices | |
CN104878786A (en) | Inclined-straight alternating group piles-soil-structure interaction experiment model | |
CN207659986U (en) | A kind of building or structures foundation stabilization underpin pier | |
CN207211188U (en) | Outer wall of underground structure HCMW engineering methods overlap wall | |
CN107700521A (en) | One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method | |
CN108104115A (en) | Cast-in-place pile construction method | |
CN107326924A (en) | Outer wall of underground structure HCMW engineering methods overlap wall and its construction method | |
Yang | Application of comprehensive rectification method in rectification of buildings | |
CN110820756A (en) | Shield well and vertical shaft deep foundation pit excavation safety construction method | |
CN113123233B (en) | Anchorage design and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190517 |
|
WD01 | Invention patent application deemed withdrawn after publication |