CN109763429A CN201910050843.5A CN201910050843A CN109763429A CN 109763429 A CN109763429 A CN 109763429A CN 201910050843 A CN201910050843 A CN 201910050843A CN 109763429 A CN109763429 A CN 109763429A
Authority
CN
China
Prior art keywords
machine
foundation
basic case
basic
case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910050843.5A
Other languages
Chinese (zh)
Inventor
刘斐然
张越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN109763429A publication Critical patent/CN109763429A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses the front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine, front end supporting construction is made of support column, basic case, mobile device, fixed device and interim foundation pile etc.;Support column flexible length;Basic case is in circular or rectangular cancelled structure, hangs on all-in-one machine, can go up and down in vertical direction;Basic case and fixed device can be put into ground stratum or promote by mobile device;Fixed device can be reused after completing supporting role by support column and basic case locking and by the device of basic case and the locking of interim foundation pile.The supporting mass and moving method improve the safety and stability of all-in-one machine, eliminate bridge construction needs and largely build temporary road and the waste of job platform bring, the substantial economics with environmentally protective social value and reduction bridge construction project cost.

Description

The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine
Technical field
The present invention relates to technical field of civil engineering, are specifically related to the side to be set a roof beam in place in bridge construction with foundation construction Method.
Background technique
In field of civil engineering, bridge is as main traffic facility, and quickly, safety and the construction technology not disturbed residents be by more Carry out more favors.It is well known that the beam body construction of bridge is most to use precast beam, installed using erecting machine, realizes quick, peace The purpose constructed entirely.But the construction of bridge foundation needs to build by building temporary construction road, occupying a large amount of construction sites Material and facility passes through these temporary construction road transports to construction site, and need to take up an area stacking.Due to the position to construct a bridge It is typically in traffic prosperity location, or crosses over the important main line of communication or important production and living facility, or is located at zanjon shoal and paddy Domain and waters are built temporary construction road, trestle and setting construction site, are both needed at these position construction bridges bases Do the work such as a large amount of basement process, relocation of services, building moving, it may be said that be time consuming and expensive, often build these The working measure expense that temporary construction facility (construction road, trestle and construction site) generates accounts for the ratio of the project cost up to 50% More than, the construction time of occupancy can exceed that the direct construction time of bridge.
Currently, the box beam and bridge pier of pontic, are realized prefabricated installation substantially, are set up using erecting machine, it is not only quickly but also safe, Influence simultaneously to construction site is smaller, using installed bridge as transport routes, is not required in addition build temporary road. But current erecting machine, during mobile set a roof beam in place, the front end of stretching need to be supported on the bridge foundation constructed, otherwise frame Beam machine is in cantilever position, and the load capacity of receiving is small, and stability is poor.If developing a kind of bridge foundation and erecting beam construction one Machine, then the bridge foundation that the front end of this equipment is not completed is as supporting station, since pile driving equipment self weight and process generate Vibration, it is ensured that the stabilization of the integrated machine equipment is more difficult, that is to say, that the construction method of this all-in-one machine is uneasy Complete.
For the stability and security problem of all-in-one machine, need to make temporary support to the front end of all-in-one machine, this is also engineering circles Technical problem in the urgent need to address.
Summary of the invention
Technical problem to be solved by the present invention lies in overcome problems of the prior art, provide bridge foundation With the front end temporary support body scheme of erecting beam construction all-in-one machine.
The front end temporary support body structure is by support column, basic case, mobile device, fixed device and interim foundation pile Deng composition;
The support column flexible length, the upper end are connect with all-in-one machine, and lower end is connect with basic case;Support column is 2 Steel column more than root is fixed on the front end of all-in-one machine, can slip into water;Its stretch mode is that screw type rotary is flexible or hydraulic Cylinder body pushes flexible.
The basic case is in circular or rectangular cancelled structure, hangs on all-in-one machine, can go up and down in vertical direction; Basic case is made of steel, in the cabinet of multiple separations, multiple pawl nails is distributed on cabinet lower end surface, can be inserted into foundation soil In layer;Cabinet is in seal shape, can increase self weight full of water when being put on ground, and water discharge in case is reduced self weight when above mentioning;When Basic case slips into water, and the water energy emptied in case when above mentioning generates buoyancy;
The mobile device is a kind of pulling equipment, can basic case and fixed device is put into ground stratum or be mentioned It pulls out up;
The fixation device is by support column and basic case locking and the device for locking basic case and interim foundation pile;
The interim foundation pile is to be drilled into basic stratum to form pile foundation when playing supporting role, and completes Zhi Chengzuo It can extract and reuse after.Interim foundation pile is made of spiral drilling rod and drill bit, and basic ground can be drilled by rotating in the forward direction Pile foundation is formed in layer, when reverse rotation, can be extracted from basic stratum.
When foundation bearing capacity is higher, interim foundation pile can not used.
The moving method of the bridge foundation and erecting beam construction all-in-one machine front end temporary support body, specific step is such as Under:
(1) the large arm beam of all-in-one machine is forward extended out, stops movement when reaching scheduled bearing position;
(2) elongate support column reaches design position;
(3) mobile device is opened, basic case is transferred on ground, the pawl in basic bottom face is followed closely and is embedded into foundation soil In;
(4) hydraulic jack on support column is opened, one side elongate support column on one side adds basic case
Pressure, detects its bearing capacity, when reaching 1.3 times of design supporting forces, stops upper pressurization, using fixation device by support column It is locked with basic case.
(5) it when the bearing capacity of foundation soil body is lower, needs to increase interim foundation pile to improve supporting force, is grasped from basic case Make in platform, auger stem is screwed into foundation soil, forms interim foundation pile.Foundation pile is not less than 2;When basic case by great waves or When tidal effect, the horizontal resist forces of basic case can be improved using interim foundation pile.
(6) when all-in-one machine needs to be moved to next position, auger stem should be first reversely rotated if any interim foundation pile, it will Interim foundation pile promotes out;When being full of water in basic case, the water of cabinet should be emptied;Unlock fixed device, by support column with Basic case separation;Using mobile device certain altitude will be mentioned on basic case;Simultaneously will support column length shorten, in order to The large arm beam of all-in-one machine is advanced forward into next position.
The utility model has the advantages that bridge foundation and erecting beam construction all-in-one machine front end temporary support body solve piling process all-in-one machine Problem is supported, blank on the equipment of quick bridge construction has been filled up under complex foundation, waters and ocean condition, with prior art phase Than improving the safety and stability set a roof beam in place with foundation construction all-in-one machine, eliminating bridge foundation construction needs and largely build Temporary road and the waste of job platform bring, the great warp with environmentally protective social value and reduction bridge construction project cost Ji benefit.
Detailed description of the invention
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments;
Fig. 1 is the relational graph of the present invention set a roof beam in place with foundation construction all-in-one machine and front end temporary support body.
Fig. 2 is of the present invention sets a roof beam in place and foundation construction all-in-one machine front end temporary support body schematic diagram.
Fig. 3 is basic case floor map of the present invention.
In figure: 1-- sets a roof beam in place and foundation construction all-in-one machine;11-temporary support bodies;12-bridge pile foundations;13-have set up bridge Beam;14-temporary support body box foundations;2-- mobile device;3-- support column;4-fixed devices;5-basic casees;51-- is close Closed box;The basis 52-- bottom;53-- tack claw;The water filling discharge outlet of 54-- closed box;6-ground stratum;7-interim foundation piles;8-- Hydraulic jack;9-- support adjusts beam.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Conjunction is specifically illustrating, and the present invention is further explained.
It is described to absolutely prove to set a roof beam in place with foundation construction all-in-one machine front end temporary support body, combination schematic diagram.
The relational graph of the present invention set a roof beam in place with foundation construction all-in-one machine and front end temporary support body, Cong Tuzhong shown in Fig. 1 It sets a roof beam in place and piling integrated construction as can be seen that set a roof beam in place and to be realized with foundation construction all-in-one machine 1, needs first to set up an interim branch Hold body 11, all-in-one machine 1 is fixed on bridge pile foundation 12 and has built a bridge and 13 and provided by temporary support body box foundation 14 steady Qualitative foundation, such all-in-one machine 1 safely and reliably could drive piles and set a roof beam in place.
As can be seen from Figure 2, bridge foundation and 1 front end temporary support body of erecting beam construction all-in-one machine are by support column 3, basic case 5, the composition such as mobile device 2, fixed device 4 and interim foundation pile 7;
The 3 flexible length of support column, the upper end are connect with all-in-one machine 1, and lower end is connect with basic case 5;Support column 3 Generally by 2 or more steel columns, it is fixed on the front end of all-in-one machine 1, can be slipped into water;Its stretch mode is stretched for screw type rotary Contracting or hydraulic cylinder push flexible.
The basic case 5 is in circular or rectangular cancelled structure, hangs on all-in-one machine 1, can go up and down in vertical direction; Basic case 5 is made of steel, is composed in the closed case 51 of multiple separations, and multiple pawl nails are distributed in basic bottom 52 53, it can be inserted into foundation soil 6;
A water filling discharge outlet 54 is distributed in closed case 51, as shown in Figure 3.The energy when basic case 5 is put on ground Increase full of water and be self-possessed, water discharge in case is reduced into self weight when above mentioning;When basic case slips into water, when above mentioning in emptying case Water energy generates buoyancy;
The mobile device 2 is a kind of pulling equipment, basic case and fixed device can will be put into ground stratum 6 Or it promotes;
The fixation device 4 is by support column 3 and the basic locking of case 5 and the dress for locking basic case 5 with interim foundation pile 7 It sets;
The interim foundation pile 7 is to be drilled into basic stratum 6 to form pile foundation when playing supporting role, and completes to support It can extract and reuse after effect.Interim foundation pile is made of spiral drilling rod and drill bit, and basis can be drilled by rotating in the forward direction It forms pile foundation in stratum, when reverse rotation, can be extracted from basic stratum
The bridge foundation and erecting beam construction all-in-one machine front end temporary support body moving method, specific steps are as follows:
(1) the large arm beam of all-in-one machine 1 is forward extended out, stops movement when reaching scheduled bearing position;
(2) elongate support column 3 reaches design position;
(3) mobile device 2 is opened, basic case 5 is transferred on ground 6, so that the pawl in basic bottom face 52 is followed closely 53 and is embedded into In foundation soil 6;
(4) hydraulic jack 8 on support column 3 is opened, support is pushed to adjust beam 9, adjusts the length of support column 3, on one side It pressurizes to basic case 5, detects its bearing capacity, when reaching 1.3 times of design supporting forces, stop upper pressurization, it will branch using fixed device 4 Dagger 3 and basic case 5 lock.
(5) when the bearing capacity of foundation soil body 6 is lower, need to increase interim foundation pile 7 to improve supporting force, from basic case 5 Operating platform in, auger stem is screwed into foundation soil, interim foundation pile 7 is formed.Foundation pile is not less than 2;When basic case 5 by When great waves or tidal effect, the horizontal resist forces of basic case 5 can be improved using interim foundation pile 7.
(6) when all-in-one machine 1 needs to be moved to next position, auger stem should be first reversely rotated if any interim foundation pile 7, The promotion of interim foundation pile 7 is come out;When being full of water in basic case 5, the water of cabinet should be emptied;Fixed device 4 is unlocked, will be supported Column 3 is separated with basic case 5;Using mobile device 2 certain altitude will be mentioned on basic case 5;3 length of support column is contracted simultaneously It is short, in order to be advanced forward into next position with the large arm beam of all-in-one machine 1.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel only illustrate the present invention it should be appreciated that the present invention is not limited by examples detailed above described in examples detailed above and specification Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and Improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its is equal Object defines.

Claims (5)

1. bridge foundation and erecting beam construction all-in-one machine front end temporary support body, characterized in that front end temporary support body by support column, Basic case, mobile device, fixed device and interim foundation pile composition;The support column flexible length, the upper end and all-in-one machine Connection, lower end are connect with basic case;The basic case is in circular or rectangular cancelled structure, is hung on all-in-one machine, vertical It can be gone up and down on direction;The mobile device is a kind of pulling equipment, basic case and fixed device can will be put into ground In stratum or promote;The fixation device is locked by support column and basic case locking and by basic case and interim foundation pile Device;The interim foundation pile is to be drilled into basic stratum to form pile foundation when playing supporting role, and completes Zhi Chengzuo It can extract and reuse after.
2. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body, it is characterized in that support The steel column that column is 2 or more, is fixed on the front end of all-in-one machine, can slip into water;Its stretch mode is flexible for screw type rotary Or hydraulic cylinder is pushed and is stretched.
3. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body, it is characterized in that basic Case is made of steel, in the cabinet of multiple separations, multiple pawl nails is distributed on cabinet lower end surface, can be inserted into foundation soil In;Cabinet is in seal shape, can increase self weight full of water when being put on ground, and water discharge in case is reduced self weight when above mentioning;Work as base Plinth case slips into water, and the water energy emptied in case when above mentioning generates buoyancy.
4. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body, it is characterized in that temporarily Foundation pile is made of spiral drilling rod and drill bit, is rotated in the forward direction to be drilled into basic stratum and is formed pile foundation, when reverse rotation, energy It is extracted from basic stratum.
5. bridge foundation according to claim 1 and erecting beam construction all-in-one machine front end temporary support body moving method, special Sign is, specific steps are as follows:
(1) all-in-one machine large arm beam is forward extended out, stops movement when reaching predetermined bearing position;
(2) elongate support column reaches design position;
(3) mobile device is opened, basic case is transferred on ground, the pawl in basic bottom face is followed closely and is embedded into foundation soil;
(4) hydraulic jack on support column is opened, one side elongate support column on one side pressurizes to basic case, detects its bearing capacity, When reaching 1.3 times of design supporting forces, stop upper pressurization, is locked support column and basic case using fixed device.
(5) it when the bearing capacity of foundation soil body is lower, needs to increase interim foundation pile to improve supporting force, is operated from basic case flat In platform, auger stem is screwed into foundation soil, forms interim foundation pile.Interim foundation pile arrangement is not less than 2;When basic case is by wave When great waves or tidal effect, the horizontal resist forces of basic case can be improved using interim foundation pile.
(6) when all-in-one machine needs to be moved to next position, auger stem should be first reversely rotated if any interim foundation pile, it will be interim Foundation pile promotes out;When being full of water in basic case, the water of cabinet should be emptied;Fixed device is unlocked, by support column and basis Case separation;Using mobile device certain altitude will be mentioned on basic case;Support column length is shortened simultaneously, in order to one The large arm beam of machine is advanced forward into next position.
CN201910050843.5A 2018-11-17 2019-01-20 The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine Pending CN109763429A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018113704858 2018-11-17
CN201811370485 2018-11-17

Publications (1)

Publication Number Publication Date
CN109763429A true CN109763429A (en) 2019-05-17

Family

ID=66454562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910050843.5A Pending CN109763429A (en) 2018-11-17 2019-01-20 The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine

Country Status (1)

Country Link
CN (1) CN109763429A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663514A (en) * 2020-12-21 2021-04-16 中建八局第三建设有限公司 Novel pier-beam integrated bridge girder erection machine
CN113152289A (en) * 2021-04-06 2021-07-23 中交第一航务工程局有限公司 Pile driving and beam erecting integrated construction method
CN114717928A (en) * 2022-04-19 2022-07-08 湖北工业大学 Temporary construction trestle suitable for muddy area and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663514A (en) * 2020-12-21 2021-04-16 中建八局第三建设有限公司 Novel pier-beam integrated bridge girder erection machine
CN113152289A (en) * 2021-04-06 2021-07-23 中交第一航务工程局有限公司 Pile driving and beam erecting integrated construction method
CN113152289B (en) * 2021-04-06 2022-09-13 中交第一航务工程局有限公司 Pile driving and beam erecting integrated construction method
CN114717928A (en) * 2022-04-19 2022-07-08 湖北工业大学 Temporary construction trestle suitable for muddy area and construction method

Similar Documents

Publication Publication Date Title
Viggiani et al. Piles and pile foundations
CN103195158B (en) Municipal drainage pipeline slurry balance pipe-jacking construction method
CN109763429A (en) The front end temporary support body and moving method of bridge foundation and erecting beam construction all-in-one machine
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN107542108A (en) A kind of reverse construction method of building basement structure
CN100473790C (en) Tower crane foundation for construction and manufacturing method thereof
CN107869144A (en) A kind of pre- slotting ring seal Double-Wall Steel Boxed Cofferdam deep water foundation comprehensive construction method
Paul et al. Comparative study of construction technologies for underground metro stations in India
CN112575670B (en) T-shaped rigid frame bridge suitable for tunnel to pass through giant karst cave and construction technology thereof
CN105735354A (en) Covered-excavation full-top-down construction method of municipal underground engineering
CN208748662U (en) Foundation pit front-supporting type slip casting steel pipe support structure
CN109706952A (en) Large-scale well-sinking construction method
CN206635599U (en) A kind of road surface for caving in road, which is speedily carried out rescue work, fixes device
CN210238534U (en) Flexible reverse-wrapping backfill structure for annular inner support large-diameter corrugated pipe culvert
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN101608452A (en) The bottom-connected reinforced concrete open caisson water-washed sinking job practices
CN104878786A (en) Inclined-straight alternating group piles-soil-structure interaction experiment model
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN207211188U (en) Outer wall of underground structure HCMW engineering methods overlap wall
CN107700521A (en) One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method
CN108104115A (en) Cast-in-place pile construction method
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
Yang Application of comprehensive rectification method in rectification of buildings
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN113123233B (en) Anchorage design and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination