CN109762608A - A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature - Google Patents

A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature Download PDF

Info

Publication number
CN109762608A
CN109762608A CN201910224496.3A CN201910224496A CN109762608A CN 109762608 A CN109762608 A CN 109762608A CN 201910224496 A CN201910224496 A CN 201910224496A CN 109762608 A CN109762608 A CN 109762608A
Authority
CN
China
Prior art keywords
tracheae
valve
gasification furnace
operated valve
hand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910224496.3A
Other languages
Chinese (zh)
Inventor
陈宣龙
杨涛
刘三举
徐亚南
刘俊
陈超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Huadian Xiangyang Power Generation Co Ltd
Original Assignee
Hubei Huadian Xiangyang Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Huadian Xiangyang Power Generation Co Ltd filed Critical Hubei Huadian Xiangyang Power Generation Co Ltd
Priority to CN201910224496.3A priority Critical patent/CN109762608A/en
Publication of CN109762608A publication Critical patent/CN109762608A/en
Pending legal-status Critical Current

Links

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature, the first pipe fitting, blank-plate valve, the first water valve, pressure reducing valve, the 5th hand-operated valve, the first pneumatic operated valve, third water valve, the 6th hand-operated valve f and outgoing gas connection tube head are sequentially arranged on the first tracheae respectively;Second pipe joint is fitted together with the annular main pipe on gasification furnace, and first the first pipe fitting of tracheae left end links together with steam line gas outlet;Second tracheae one end is attached separately on the first tracheae between pressure reducing valve and the 5th hand-operated valve, first manual valve, water delivery apparatus, the second hand-operated valve and heat exchanger are successively mounted on the second tracheae, and one end dress of oil guide pipe is on heat exchangers;On the first tracheae on the right side of the second tracheae, the third tracheae other end is fitted together with the first tracheae right end for third tracheae one end;By third hand-operated valve, the second pneumatic operated valve, the second delivery valve and the 4th hand-operated valve, successively on third tracheae;Form a kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature.

Description

A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature
Technical field
The present invention relates to a kind of gasification furnace temperature regulating device, specifically a kind of biomass fluidized bed gasification furnace steam drainage Control system for regulating temperature.
Background technique
In power industry, existing coal unit is largely economized on coal and First air, Secondary Air ratio or coal and water supply using control Than controlling boiler hearth temperature.When fire box temperature is excessively high, origin of heat can be reduced very well by reducing coal-supplying amount, increase air quantity Ignition temperature is reduced, to reduce burner hearth wall temperature, gaining water-supplying amount can be with direct reducing furnace bore temperature;When fire box temperature is too low When, otherwise improve fire box temperature.But for biomass gasifying furnace, existing 10.8 MW of biomass gasifying furnace load, and biology Matter gasification is more difficult to control vaporising fuel amount compared to biomass direct-fired, so the bed temperature control of biomass gasifying furnace is more difficult to It realizes.
Steam pipeline is a kind of common heat distribution pipeline, is mainly used in industry, building etc..Patented technology application Number: 201820395572.8 (a kind of titles: water delivery device of waste incinerator) can alleviate air preheater and water delivery dilatation Corrosive pipeline between device improves the heat exchange performance of boiler, is a kind of inexpensive, efficient water delivery device;Application number: 201720507864.1 (a kind of steam water delivery devices), it is low can effectively to solve emptying effectiveness in existing heavy caliber vapor line The problem of.It is a kind of water delivery device for reducing steam water content in waterline.
But the above-mentioned prior art is not able to satisfy biomass gasifying furnace temperature in recirculating fluidized bed and adjusts control, influences to give birth to The safe operation of gasification substance furnace.
When biomass gasifying furnace bed temperature is excessively high or gasification furnace bed temperature increases too fast, biomass block is not only influenced in gas Change the gasification in furnace, influences CO, H in gasification burning2、CH4Equal gas contents, reduce biomass gasifying furnace gasification burning Calorific value;And biomass block fast pyrogenation in gasification furnace can be made to gasify when bed temperature is excessively high, bulk gas is generated, gas is easily caused Change positive pressure in furnace furnace, causes QFT protection act failure, lead to gasification furnace blowing out.
Summary of the invention
The purpose of the present invention is overcoming defect existing in the prior art, a kind of biomass fluidized bed gasification furnace steam is provided Hydrophobic control system for regulating temperature, the system adjust the bed of biomass gasifying furnace using the steam in steam drainage control system for regulating temperature Temperature solves the problems, such as the temperature control of biomass gasifying furnace in the process of running, ensures biomass gasifying furnace safe and stable operation.
A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature, including tracheae, blank-plate valve, the first water valve, Pressure reducing valve, manually dynamic valve, water delivery apparatus, heat-conducting oil pipes, heat exchanger, pneumatic operated valve, gasification furnace, annular main pipe, steam lead, pipe connect Head.
The technical scheme adopted by the invention is that: it will be for the first pipe fitting, blank-plate valve, the first water valve, pressure reducing valve, the 5th hand Dynamic valve, the first pneumatic operated valve, third water valve, the 6th hand-operated valve f and the second pipe joint, are sequentially arranged at respectively on the first tracheae;The Two pipe joints are fitted together with the annular main pipe on gasification furnace, and first the first pipe fitting of tracheae left end and steam line gas outlet connect It is connected together;One end of second tracheae is attached separately on the first tracheae between pressure reducing valve and the 5th hand-operated valve, first manual Valve, water delivery apparatus, the second hand-operated valve are sequentially arranged on the second tracheae;The outlet of second tracheae is connected with heat exchanger entrance, oil guide pipe One end connection heat exchanger on;: third tracheae one end is on the first tracheae on the right side of the second tracheae, the other end of third tracheae It is fitted together with the first tracheae right end;By third hand-operated valve, the second pneumatic operated valve, the second delivery valve and the 4th hand-operated valve, successively fill On third tracheae;Form a kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature.
The gasification furnace: being laid with air guide pore on the furnace wall of gasification furnace bottom, steam conduit is mounted in air guide pore, One end of steam conduit and the air inlet mouth of pipe in gasification furnace peripheral annular main pipe are installed together respectively, the steam conduit other end It is inserted into the air guide pore on gasification furnace furnace wall.
The beneficial effects of the present invention are: a kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature, works as biology In fluidized bed gasifier operation, when biomass gasifying furnace bed temperature is excessively high or gasification furnace bed temperature increases too fast, pass through biomass Fluidized-bed gasification furnace temperature regulating device and steam conduit spray into suitable steam into gasification furnace, and gasification furnace bed temperature is effectively reduced, control The bed temperature of gasification furnace processed within the set range, ensures biomass fluidized bed gasification furnace steam drainage control system for regulating temperature and gasification furnace Safe and stable operation makes the safe and efficient gasification of gasification furnace endogenous substance, generates high-quality synthesis gas.
Detailed description of the invention
It elaborates with reference to the accompanying drawings and detailed description to the present invention.
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the gasification furnace body enlarged plan view in Fig. 1.
In above-mentioned figure: 1. first tracheaes (steam), 2. blank-plate valve, 3. first delivery valves, 4. pressure reducing valves, 5a. are first-hand Dynamic valve, the second hand-operated valve of 5b., 6. water delivery apparatus, 7. heat-conducting oil pipes, 8. heat exchangers, 9. second tracheaes (steam), 10c third are manual Valve, the 4th hand-operated valve of 5d., 11. second delivery valves;12. third tracheae (steam), the 5th hand-operated valve of 13e., the 6th hand of 13f. Dynamic valve, the first pneumatic operated valve of 14g., the second pneumatic operated valve of 14k., 15. third delivery valves, 16. gasification furnaces, 17. annular main pipes, 18. Steam conduit, 19. filler materials, 20. insulating layers, the first pipe fitting of m. (air inlet), the second pipe fitting of n. (outlet).
Specific embodiment
In the embodiment that the present invention provides Fig. 1 and Fig. 2, by the first pipe fitting m, blank-plate valve 2, the first water valve 3, decompression Valve 4, the 5th hand-operated valve 13e, the first pneumatic operated valve 14g, third water valve 15, the 6th hand-operated valve 13f and the second pipe joint n, successively pacify On the first tracheae 1;The air inlet mouth of pipe in the annular main pipe 17 on the second pipe joint n and gasification furnace 16 is mounted on one respectively It rises, the first pipe fitting m links together with steam line.
In embodiments of the present invention, one end of the second tracheae 9 is attached separately to pressure reducing valve 4 and the 5th hand-operated valve 13e Between the first tracheae 1 on, first manual valve 5a, water delivery apparatus 6, the second hand-operated valve 5b are sequentially arranged on the second tracheae 9;The Two tracheaes, 9 outlet end is connected with 8 entrance of heat exchanger, on one end connection heat exchanger 8 of oil guide pipe.
The hydrophobic outlet of second tracheae 9 is connected with 8 thermal source inlet of heat exchanger, and 8 heat source medium of heat exchanger is hydrophobic, cold source Jie Matter is conduction oil 7;It is hydrophobic sufficiently to exchange heat in heat exchanger 8 with conduction oil 7,7 parameter of conduction oil is improved, is made effective use of Draining system it is hydrophobic.According to actual needs, specific heat transferring medium is designed, it is ensured that hydrophobic to be used effectively.
In embodiments of the present invention, 12 one end of third tracheae is mounted on first tracheae 1 on 9 right side of the second tracheae, the The other end of three tracheaes 12 is fitted together with 1 right end of the first tracheae, and third hand-operated valve 10c, the second pneumatic operated valve 14k, second are dredged Water valve 11 and the 4th hand-operated valve 10d, are sequentially arranged on third tracheae 12.
In the present embodiment, it is laid with guide hole on 16 bottom furnace wall of gasification furnace, steam conduit 18 is fixed on In guide hole, at 50-70 ° of angle, optimum angle is 60 degree of angles for steam conduit 18 and 16 vertical center line angle of gasification furnace;Respectively One end of steam conduit 18 is connected with annular main pipe 17, the other end of steam conduit (4-12) 18 is mounted on gasification furnace In guide hole on 16 furnace walls.
Steam parameter in first tracheae: 290 DEG C of temperature, 2.9 MPa of pressure.
Steam parameter in third tracheae 12: 290 DEG C of temperature, 1.0 MPa of pressure.
The diameter of first tracheae 1 is 125 mm, and the diameter of the second tracheae 9 is 25 mm, and the diameter of third tracheae 12 is 40 mm。
Working principle:
During gasification furnace 16 is started and run, after the steam in steam line passes through the first tracheae 1 and annular main pipe 17, then Enter in gasification furnace 16 through steam conduit 18, since steam pressure is big, temperature is high, gasification furnace 16 is carried out to biomass material Bed temperature fluctuation is big during gasification;When 16 stable operation of gasification furnace, the temperature fluctuation of gasification furnace 16 is smaller, to steam requirement compared with It is small.
First tracheae, 1 inner vapor pressure is reduced to 1.0 MPa from 2.9 MPa by pressure reducing valve 4, avoids high pressure desuperheat Steam enters in gasification furnace 16, causes to impact to burner hearth, while ensureing that biomass fluidized bed gasification furnace steam drainage temperature adjustment controls The safety of system;When gasification furnace 16 is run surely, 16 temperature fluctuation of gasification furnace is smaller, smaller to steam requirement;Pass through the first gas Blank-plate valve, delivery valve, pressure reducing valve, hand-operated valve, pneumatic operated valve and the heat exchanger installed on pipe 1, the second tracheae 9 and third tracheae 12, 16 steam pressure of gasification furnace and temperature are regulated and controled;Effectively control 16 bed temperature of gasification furnace within the set range, guarantees gasification furnace 16 safe and stable operations make the safe and efficient gasification of 16 endogenous substance of gasification furnace, generate high-quality synthesis gas.
And logical biomass fluidized bed gasification furnace steam drainage control system for regulating temperature, by the first tracheae 1, the second tracheae 9, third The outlet pipe of delivery valve connection on tracheae 12 is connected with collecting-tank, to pool inner water recycling of catchmenting.

Claims (2)

1. a kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature, including tracheae, blank-plate valve, the first water valve, subtract Pressure valve moves valve, water delivery apparatus, heat-conducting oil pipes, heat exchanger, pneumatic operated valve, gasification furnace, annular main pipe, steam lead, pipe fitting manually; It is characterized in that: by the first pipe fitting, blank-plate valve, the first water valve, pressure reducing valve, the 5th hand-operated valve, the first pneumatic operated valve, third water valve, 6th hand-operated valve f and the second pipe joint are sequentially arranged at respectively on the first tracheae;Annular on second pipe joint and gasification furnace is female Pipe is fitted together, and first the first pipe fitting of tracheae left end links together with steam line gas outlet;By one end of the second tracheae It is attached separately on the first tracheae between pressure reducing valve and the 5th hand-operated valve, first manual valve, water delivery apparatus, the second hand-operated valve are successively pacified On the second tracheae;The outlet of second tracheae is connected with heat exchanger entrance, on one end connection heat exchanger of oil guide pipe;: third gas On the first tracheae on the right side of the second tracheae, the other end of third tracheae is fitted together with the first tracheae right end for pipe one end;It will Third hand-operated valve, the second pneumatic operated valve, the second delivery valve and the 4th hand-operated valve, successively on third tracheae;Form a kind of biology Fluidized bed gasification furnace steam drainage control system for regulating temperature.
2. a kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature according to claim 1, it is characterized in that: Air guide pore is laid on the furnace wall of gasification furnace bottom, steam conduit is in air guide pore, respectively by one end of steam conduit It is fitted together with the air inlet mouth of pipe in the annular main pipe of gasification furnace periphery, the steam conduit other end is inserted on gasification furnace furnace wall In air guide pore.
CN201910224496.3A 2019-03-23 2019-03-23 A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature Pending CN109762608A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910224496.3A CN109762608A (en) 2019-03-23 2019-03-23 A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910224496.3A CN109762608A (en) 2019-03-23 2019-03-23 A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature

Publications (1)

Publication Number Publication Date
CN109762608A true CN109762608A (en) 2019-05-17

Family

ID=66458711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910224496.3A Pending CN109762608A (en) 2019-03-23 2019-03-23 A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature

Country Status (1)

Country Link
CN (1) CN109762608A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111978996A (en) * 2020-07-30 2020-11-24 哈尔滨锅炉厂有限责任公司 Bed temperature control device and method for biomass gasification furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105698388A (en) * 2014-11-28 2016-06-22 西安上尚机电有限公司 Recycling system of waste heat of industrial heat conduction oil boiler
CN107699290A (en) * 2017-11-13 2018-02-16 煤炭科学技术研究院有限公司 One kind classification oxygen supply fixed bed slag tap gasification installation
CN209602474U (en) * 2019-03-23 2019-11-08 湖北华电襄阳发电有限公司 A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105698388A (en) * 2014-11-28 2016-06-22 西安上尚机电有限公司 Recycling system of waste heat of industrial heat conduction oil boiler
CN107699290A (en) * 2017-11-13 2018-02-16 煤炭科学技术研究院有限公司 One kind classification oxygen supply fixed bed slag tap gasification installation
CN209602474U (en) * 2019-03-23 2019-11-08 湖北华电襄阳发电有限公司 A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
饲料工业职业培训系列教材编审委员会: "《饲料制粒技术》", 中国农业出版社, pages: 243 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111978996A (en) * 2020-07-30 2020-11-24 哈尔滨锅炉厂有限责任公司 Bed temperature control device and method for biomass gasification furnace

Similar Documents

Publication Publication Date Title
CN103423869B (en) A kind of Horizontal type circulating fluid bed heat-conducting oil furnace
US9476582B2 (en) System and method for removing slag inside a utility furnace
US20160290638A1 (en) System and method for injecting compound into utility furnace
CN209602474U (en) A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature
CN102042600A (en) Circulating fluidized bed refuse incineration boiler and refuse incineration method thereof
CN109762608A (en) A kind of biomass fluidized bed gasification furnace steam drainage control system for regulating temperature
CN201526976U (en) Refuse-fired boiler for circulating fluidized bed
CN203464262U (en) Circulating fluidized bed boiler for combusting palm dreg
CN106152114B (en) Supercritical CFB Boiler loss protecting device
CN203880691U (en) Chimney-free multifunctional oil/gas-fired boiler
CN203824063U (en) Biomass fuel gas hot water circulating boiler
CN2745934Y (en) Blast furnace air intake device
CN206094007U (en) Vapor generator
CN105782989B (en) The air inlet method and its garbage burning boiler equipment of garbage burning boiler burner hearth
RU2443760C1 (en) Gas generator plant
CN206269390U (en) Explosion-proof automatically unloading boiler
CN111765488B (en) Primary air secondary preheating system
CN110145759B (en) Oxygen content control system during low-load of boiler
CN207649085U (en) Crude oil heater
CN207762878U (en) The high level that waste incinerator low-lying level working medium is coupled with coal-burning boiler utilizes system
CN204593372U (en) Supercritical CFB Boiler loss protecting device
CN109967005A (en) A kind of reacting furnace using coke-stove gas fluidized bed acid regeneration process
CA2511480A1 (en) Method for feeding a mixture comprising a burnable solid and water
CN205383658U (en) Steam cauldron stove
CN101109504A (en) Chemical industry heating stove using water coal slurry as fuel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190517