CN109753491A - Data operational system and method, electronic equipment, storage medium - Google Patents

Data operational system and method, electronic equipment, storage medium Download PDF

Info

Publication number
CN109753491A
CN109753491A CN201811646304.XA CN201811646304A CN109753491A CN 109753491 A CN109753491 A CN 109753491A CN 201811646304 A CN201811646304 A CN 201811646304A CN 109753491 A CN109753491 A CN 109753491A
Authority
CN
China
Prior art keywords
work order
recipient
initiator
data
corporation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811646304.XA
Other languages
Chinese (zh)
Other versions
CN109753491B (en
Inventor
朱文进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Century Internet Information Technology Co.,Ltd.
Original Assignee
BEIJING CENTURY BROADBAND INTERNET DATA CENTER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CENTURY BROADBAND INTERNET DATA CENTER Co Ltd filed Critical BEIJING CENTURY BROADBAND INTERNET DATA CENTER Co Ltd
Priority to CN201811646304.XA priority Critical patent/CN109753491B/en
Publication of CN109753491A publication Critical patent/CN109753491A/en
Application granted granted Critical
Publication of CN109753491B publication Critical patent/CN109753491B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The embodiment of the present application provides a kind of data operational system and method, electronic equipment, storage medium, and wherein system includes: initiator, recipient and control data corporation;First work order request for generating the request of the first work order according to data requirements, and is sent to recipient by initiator;Data needed for initiator are submitted to control data corporation for requesting according to first work order by recipient;Control data corporation, data for being submitted according to first work order request and recipient form the first work order comprising initiator and recipient's joint project categorical data, while generating the second work order of initiator and the second work order of recipient and being sent respectively to initiator and recipient;The embodiment of the present application by generate only include initiator and recipient's joint project categorical data first work order, solve when carrying out data interchange between each department, the problem of data corruption.

Description

Data operational system and method, electronic equipment, storage medium
Technical field
This application involves internet area more particularly to a kind of data operational system and method, electronic equipment, storage Jie Matter.
Background technique
Internet data center (Internet Data Center, abbreviation IDC) is exactly telecommunication department using it is existing mutually Connected network communication route, bandwidth resources, establish standardized telecommunication field grade building environment, provide server support for enterprise, government The all-around service of pipe, rental and related increment etc..
In the prior art, pass through the bottom functional module of IDC data platform between business enterprice sector, realize data work order hair Rise, return and data interchange;But the exclusive project category data of oneself existing department are also in the work order initiated between department There are common project category data between other departments, so that between department when carrying out data interchange, work order data corruption, Be inconvenient to manage, be easy error.
Therefore, a kind of data operational system and method are needed, at present to solve the technical problems existing in the prior art.
Summary of the invention
In view of this, the main purpose of the application is to provide a kind of flow bandwidth data statistical approach and its device, electricity Sub- equipment, storage medium, for solving the technical problems existing in the prior art.
In a first aspect, this application provides a kind of data operational systems, comprising: initiator, in recipient and data management The heart;
Initiator for generating the request of the first work order according to data requirements, and first work order request is sent to and is connect Debit;
Data needed for initiator are submitted to control data corporation for requesting according to first work order by recipient;
Control data corporation, it includes initiator that the data for being submitted according to first work order request and recipient, which are formed, With the first work order of recipient's joint project categorical data, while generate the second work order of initiator and the second work order of recipient and point Initiator and recipient are not sent to it.
Optionally, in one embodiment of the application, control data corporation is further used for arriving the first work order storage The work order of initiator initiates list and the work order of recipient receives list and the data of the first work order forming process are stored in system System log database.
Optionally, in one embodiment of the application, the second work order of initiator includes initiator and recipient's joint project class Other data and the privately owned project category data of initiator;Corresponding, the second work order of recipient includes that initiator and recipient are common Project category data and the privately owned project category data of recipient.
Optionally, in one embodiment of the application, control data corporation be also used to when initiator or recipient to its After joint project categorical data is modified in two work orders, joint project classification is corresponded in automatic the second work order for changing another party Data.
Optionally, in one embodiment of the application, control data corporation is also used to the second work order of initiator and recipient Second work order is respectively stored into the account work order list of initiator and recipient.
Optionally, in one embodiment of the application, control data corporation is also used to be submitted according to initiator or recipient Data form a privately owned work order only comprising initiator or the privately owned project category data of recipient, and the privately owned work order is deposited It stores up in corresponding account work order list;It is also used to the privately owned work order forcible aborting by initiator or recipient.
Second aspect, this application provides a kind of data O&M methods, comprising:
Recipient receives the first work order request that initiator sends;
Recipient requests data needed for by initiator to be submitted to control data corporation according to first work order, by counting The data formation submitted according to administrative center according to first work order request and recipient is only common comprising initiator and recipient First work order of project category data, while generating the second work order of initiator and the second work order of recipient and being sent respectively to initiate Side and recipient.
The third aspect, this application provides a kind of data O&M methods, comprising:
Obtain the data that initiator is sent to the first work order request of recipient and recipient submits;
Being formed according to the data that first work order request and recipient are submitted includes initiator and recipient's joint project First work order of categorical data, at the same generate the second work order of initiator and the second work order of recipient and be sent respectively to initiator and Recipient.
Fourth aspect, this application provides a kind of electronic equipment, comprising:
One or more first processors;
Computer-readable medium is configured to store one or more programs,
When one or more of programs are executed by one or more of processors, so that one or more of processing Device realizes any of the above-described method as described in the examples.
5th aspect, this application provides a kind of computer-readable mediums, are stored thereon with computer program, and feature exists In the program realizes any of the above-described method as described in the examples when being executed by processor.
To sum up, in above-mentioned technical proposal provided by the present application, by initiator, recipient and control data corporation;It initiates First work order request for generating the request of the first work order according to data requirements, and is sent to recipient by side;Recipient, For requesting according to first work order, data needed for initiator are submitted to control data corporation;Control data corporation is used Being formed in the data submitted according to first work order request and recipient includes initiator and recipient's joint project classification number According to the first work order, while generating the second work order of initiator and the second work order of recipient and being sent respectively to initiator and reception Side;It solves when carrying out data interchange between each department, the problem of data corruption.
Detailed description of the invention
In order to illustrate more clearly of the application or technical solution in the prior art, below by use required in embodiment Attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only it is more as described in this application, for this For the those of ordinary skill of field, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of data operational system in the embodiment of the present application one.
Fig. 2 is the flow diagram of data O&M method in the embodiment of the present application two.
Fig. 3 is the flow diagram of data O&M method in the embodiment of the present application three.
Fig. 4 is the structural schematic diagram of data O&M device in the embodiment of the present application four.
Fig. 5 is the structural schematic diagram of data O&M device in the embodiment of the present application five.
Fig. 6 is the structural schematic diagram of electronic equipment in the embodiment of the present application six.
Fig. 7 is the hardware configuration of electronic equipment in the embodiment of the present application seven.Specific embodiment
Any technical solution for implementing the embodiment of the present application must be not necessarily required to reach simultaneously above all advantages.
In order to make those skilled in the art more fully understand the technical solution in the embodiment of the present application, below in conjunction with the application Attached drawing in embodiment, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described reality Applying example only is the embodiment of the present application a part of the embodiment, instead of all the embodiments.Based on the implementation in the embodiment of the present application The range of the embodiment of the present application protection all should belong in example, those of ordinary skill in the art's every other embodiment obtained.
Further illustrate that the embodiment of the present application implements below with reference to the embodiment of the present application attached drawing.
Fig. 1 is the structural schematic diagram of data operational system in the embodiment of the present application one.As shown in Figure 1, comprising:
Initiator 101, for generating the request of the first work order according to data requirements, and first work order request are sent to Recipient 102;Needs are from the acquisition data of recipient 102 when carrying out data statistics by the initiator 101, then according to oneself needs Data select corresponding project category, to generate the request of the first work order, and first work order request is sent to reception Side 102.Specifically, control data corporation 103 will project category ID relevant to 101 user job of initiator and initiator 101 User ID binding, establishes the first incidence relation;When 101 user of initiator initiates the request of the first work order, control data corporation 103 Show corresponding project category for its selection according to 101 User ID of initiator;It wherein include that initiator 101 uses in the request of the first work order The project category of family selection.
Recipient 102, and for requesting according to first work order, data needed for initiator 101 are submitted to data pipe Reason center 103;After the recipient 102 receives the first work order request, by the project category pair in the request of the first work order Data needed for the data answered i.e. initiator 101 are submitted to control data corporation 103.Specifically, control data corporation 103 will be with The relevant project category ID of 102 user job of recipient and 102 User ID of recipient are bound, and the second incidence relation is established;Data First work order request is screened by administrative center 103, so that the first work order request that recipient 102 receives only is shown The project category bound simultaneously with 102 User ID of recipient and 101 User ID of initiator.
Control data corporation 103, the data formation for being submitted according to first work order request and recipient 102 include First work order of 102 joint project categorical data of initiator 101 and recipient, while generating 101 second work order of initiator and connecing 102 second work order of debit is simultaneously sent respectively to initiator 101 and recipient 102.
In the present embodiment, project category is screened by control data corporation 103, so that recipient 102 receives The first work order request project category that only display is bound simultaneously with 102 User ID of recipient and 101 User ID of initiator so that The first work order that control data corporation 103 is formed also only shows that display is same with 102 User ID of recipient and 101 User ID of initiator When the project category data bound, i.e. 102 joint project categorical data of initiator 101 and recipient, belong to initiator 101 and connect Respectively privately owned project category data do not show debit 102 in first work order, and compared with prior art, initiator 101 It is very clear when checking the first work order with recipient 102, it is not necessary to oneself is needed when repartitioning those project category data, which Project category data are unrelated with oneself a bit, and initiator 101 and 102 communication exchange of recipient are convenient.
In a specific implementation scene, control data corporation 103 is further used for storing first work order to initiation The work order of side 101 initiates list and the work order of recipient 102 receives list and is stored in the data of the first work order forming process Syslog data library.
In the present embodiment, 101 second work order of initiator includes 102 joint project categorical data of initiator 101 and recipient And the privately owned project category data of initiator 101;Corresponding, 102 second work order of recipient includes initiator 101 and recipient 102 joint project categorical datas and the privately owned project category data of recipient 102.Specifically, control data corporation 103 is according to The project category data of one work order filter out the number only with the project category ID of 101 User ID of initiator binding from database According to, merge with the project category data in the first work order, formed 101 second work order of initiator;It is corresponding, control data corporation 103 according to the project category data of the first work order, and the item class as the binding of 102 User ID of recipient is filtered out from database The data of other ID merge with the project category data in the first work order, form 102 second work order of recipient.
In a specific implementation scene, control data corporation 103 is also used to work as initiator 101 or recipient 102 to it After joint project categorical data in second work order is modified, corresponding common item in automatic the second work order for changing another party Mesh categorical data.After control data corporation 103 generates the first work order in the prior art, when initiator 101 and recipient 102 are common When project category data change, it is also necessary to which both sides link up, and modification data are very inconvenient.In the application, when common item When mesh categorical data changes, it is only necessary to which initiator 101 or recipient 102 modify data, another party in the second work order The second work order data also will do it update, the data in the first work order also can synchronized update, control data corporation 103 simultaneously will Process data is stored into syslog data library.
In a specific implementation scene, control data corporation 103 is also used to 101 second work order of initiator and recipient 102 second work orders are respectively stored into the account work order list of initiator 101 and recipient 102, in order to being checked in user or Person modifies the data of the second work order.
In a specific implementation scene, initiator 101 or recipient 102 are further used for initiation the first work order of release and ask It asks, another party agrees to discharge first work order, and first work order discharges;Corresponding, control data corporation 103 is further Resource for the first work order of release to be respectively stored into initiator 101 and recipient 102 has discharged work order list, will be described The work order state of first work order is designated as resource and has discharged, and by process data storage into log database.
In the present embodiment, control data corporation 103 is also used to the data submitted according to initiator 101 or recipient 102 The only privately owned work order comprising initiator 101 or the privately owned project category data of recipient 102 is formed, and the privately owned work order is deposited It stores up in corresponding account work order list.Needing to count in business enterprice sector when being pertaining only to the project category data of oneself department can be with Privately owned work order request is initiated, adds the privately owned project category data in privately owned work order, control data corporation 103 is submitted according to user Privately owned project category data form privately owned work order, be saved in the account work order list of user, and by privately owned work order state mark It is MAXIMO to be designated as privately owned work order for privately owned work order, such as state.Control data corporation 103 also stores process data to being In system log database.
In a specific implementation scene, control data corporation 103 is further used for initiator 101 or recipient 102 The privately owned work order forcible aborting.Specifically, after user completes privately owned work order data record, privately owned work order can be forced Release, deposit resource has discharged in list, and work order state is designated as resource and has been discharged.
Fig. 2 is the flow diagram of data O&M method in the embodiment of the present application two.As shown in Figure 2 comprising following step It is rapid:
S201, recipient receive the first work order request that initiator sends.
S202, recipient request data needed for by initiator to be submitted to control data corporation according to first work order, To be formed according to the data that first work order request and recipient are submitted comprising initiator and recipient by control data corporation First work order of joint project categorical data, while generating the second work order of initiator and the second work order of recipient and being sent respectively to Initiator and recipient.
In the present embodiment, the second work order of recipient includes initiator and recipient's joint project categorical data and recipient Privately owned project category data.
In a specific implementation scene, when recipient modifies to joint project categorical data in the second work order of recipient Afterwards, modified data are submitted to control data corporation.
In another specific implementation scene, the privately owned project category data of recipient are submitted into control data corporation, with by Control data corporation forms the privately owned work order of recipient according to data, and privately owned work order is stored the account work order list to recipient In.
Fig. 3 is the flow diagram of data O&M method in the embodiment of the present application three.As shown in Figure 3 comprising following step It is rapid:
S301, the data that initiator is sent to the first work order request of recipient and recipient submits are obtained;
S302, the data formation submitted according to first work order request and recipient are only total comprising initiator and recipient With the first work order of project category data, while generating the second work order of initiator and the second work order of recipient and being sent respectively to send out Play side and recipient.
It further include when initiator or recipient carry out joint project categorical data in its second work order in the present embodiment After modification, joint project categorical data is corresponded in automatic the second work order for changing another party.
It further include that the second work order of initiator and the second work order of recipient are respectively stored into hair in a specific implementation scene In the account work order list for playing side and recipient.
It further include that the data formation submitted according to initiator or recipient only includes initiator or connects in the present embodiment The privately owned work order of the privately owned project category data of debit, and by the privately owned work order storage into corresponding account work order list.Into One step further includes the privately owned work order forcible aborting by initiator or recipient.
Fig. 4 is the structural schematic diagram of data O&M device in the embodiment of the present application four.As shown in figure 4, comprising:
Receiving module 401 receives the first work order request that initiator sends for recipient.
Module 402 is submitted, recipient requests data needed for by initiator to be submitted to data pipe according to first work order Reason center, with by control data corporation according to first work order request and recipient submit data is formed comprising initiator with First work order of recipient's joint project categorical data, while generating the second work order of initiator and the second work order of recipient and difference It is sent to initiator and recipient.
In the present embodiment, the second work order of recipient for submitting module 402 to generate includes initiator and recipient's joint project The privately owned project category data of categorical data and recipient.
In a specific implementation scene, module 402 is submitted to be also used to when recipient is to common item in the second work order of recipient After mesh categorical data is modified, modified data are submitted to control data corporation.
In another specific implementation scene, module 402 is submitted to be further used for mentioning the privately owned project category data of recipient Control data corporation is given, to form the privately owned work order of recipient according to data by control data corporation, and privately owned work order is stored Into the account work order list of recipient.
Fig. 5 is the structural schematic diagram of data O&M device in the embodiment of the present application five.As shown in figure 5, comprising:
Module 501 is obtained, for obtaining the number that initiator is sent to the first work order request of recipient and recipient submits According to.
Generation module 502, the data for being submitted according to first work order request and recipient are formed only comprising initiating First work order of side and recipient's joint project categorical data, while generating the second work order of initiator and the second work order of recipient simultaneously It is sent respectively to initiator and recipient.
In the present embodiment, generation module 502 is also used to work as initiator or recipient to joint project in its second work order After categorical data is modified, joint project categorical data is corresponded in automatic the second work order for changing another party.
In a specific implementation scene, generation module 502 is also used to the second work order of the second work order of initiator and recipient It is respectively stored into the account work order list of initiator and recipient.
In the present embodiment, generation module 502 is further used for being formed only according to the data that initiator or recipient submit Privately owned work order comprising initiator or the privately owned project category data of recipient, and by the privately owned work order storage to corresponding In account work order list.Further it is also used to the privately owned work order forcible aborting by initiator or recipient.
Fig. 6 is the structural schematic diagram of electronic equipment in the embodiment of the present application six.
The electronic equipment may include:
One or more processors 601;
Computer-readable medium 602 is configurable to store one or more programs,
When one or more of programs are executed by one or more of processors, so that one or more of processing Device realizes the access method as described in above-mentioned any embodiment.
Fig. 7 is the hardware configuration of electronic equipment in the embodiment of the present application seven;As shown in fig. 7, the hardware knot of the electronic equipment Structure may include: processor 701, communication interface 402, computer-readable medium 703 and communication bus 704;
Wherein processor 701, communication interface 702, computer-readable medium 703 are completed each other by communication bus 704 Communication;
Optionally, communication interface 402 can be the interface of communication module, such as the interface of gsm module;
Wherein, processor 701 is specifically configurable to: recipient receives the first work order request that initiator sends;It receives Root requests data needed for initiator being submitted to control data corporation according to first work order, by control data corporation root Being formed according to the data that first work order request and recipient are submitted only includes initiator and recipient's joint project categorical data The first work order, while generating the second work order of initiator and the second work order of recipient and being sent respectively to initiator and recipient. Processor 701 is specifically also configured as: obtaining the request of the first work order and recipient's submission that initiator is sent to recipient Data;Being formed according to the data that first work order request and recipient are submitted includes initiator and recipient's joint project classification First work order of data, while generating the second work order of initiator and the second work order of recipient and being sent respectively to initiator and reception Side.
Processor 701 can be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit (Network Processor, abbreviation NP) etc.;It can also be digital signal processor (DSP), dedicated Integrated circuit (ASIC), ready-made programmable gate array (FPGA) either other programmable logic device, discrete gate or transistor Logical device, discrete hardware components.It may be implemented or execute disclosed each method, step and the logic in the embodiment of the present application Block diagram.General processor can be microprocessor or the processor is also possible to any conventional processor etc..
In above-described embodiment, electronic equipment can be the intelligent terminal of front end, or the server on backstage, when for before When the intelligent terminal at end, to be intelligent appliance.The household electrical appliances may include following at least one, such as: TV, digital video disc (DVD) player, audio device, refrigerator, air-conditioning, vacuum cleaner, oven, micro-wave oven, washing machine, air purifier, machine top Box, home automation controlling panel, security control panel, TV box are (for example, SAMSUNG HOMESYNCTM, APPLE TVTM Or GOOGLE TVTM), game machine (for example, XBOXTM and PLAYSTATIONTM), electronic dictionary, electron key, video camera and Digital photo frame.
According to another embodiment, electronic equipment may include following at least one: various Medical Devices are (for example, various Portable medical measuring device is (for example, blood glucose monitoring device, heart rate monitor apparatus, blood pressure measurement device, body temperature measuring devices Deng), magnetic resonance angiography (MRA), magnetic resonance imaging (MRI), computed tomography (CT) instrument and Ultrasound Instrument), navigation Equipment, global positioning system (GPS) receiver, event data recorder (EDR), flight data recorder (FDR), vehicle entertainment Information equipment, the electronic equipment navigation equipment and gyro compass of ship (for example, be used for) for ship, avionic device, Safety equipment, motor vehicle head unit, household or industrial robot, the ATM (ATM) in bank, the sale in shop Point (POS) or internet of things equipment are (for example, bulb, various sensors, voltameter or gas gauge, sprinkling equipment, fire protection warning Device, constant temperature controller, street lamp, toaster, sports apparatus, boiler, heater, water heater etc.).
According to some embodiments, electronic equipment may include following at least one: furniture or building/structure a part, Electron plate, electronic signature receiving device, projector and various types of measuring instruments are (for example, watermeter, voltameter, gas gauge Or radio wave meter).It can be the one or more of above-mentioned various equipment according to the electronic equipment of the various embodiments of the disclosure Combination.It can be flexible apparatus according to the electronic equipment of some embodiments of the disclosure.In addition, according to disclosure embodiment party The electronic equipment of formula is not limited to above equipment, and may include the new electronic equipment developed according to technology.
Particularly, in accordance with an embodiment of the present disclosure, it may be implemented as computer above with reference to the process of flow chart description Software program.For example, embodiment of the disclosure includes a kind of computer program product comprising be carried on computer-readable medium On computer program, which includes to be configured to the program code of method shown in execution flow chart.Such In embodiment, which can be downloaded and installed from network by communications portion, and/or from detachable media quilt Installation.When the computer program is executed by central processing unit (CPU), the above-mentioned function limited in the present processes is executed Energy.It should be noted that computer-readable medium described herein can be computer-readable signal media or computer Readable storage medium storing program for executing either the two any combination.Computer-readable medium for example can be, but not limited to be electricity, magnetic, Optical, electromagnetic, the system of infrared ray or semiconductor, device or device, or any above combination.Computer-readable storage medium The more specific example of matter can include but is not limited to: have the electrical connections of one or more conducting wires, portable computer diskette, Hard disk, random access storage medium (RAM), read-only storage medium (ROM), erasable type may be programmed read-only storage medium (EPROM or Flash memory), optical fiber, the read-only storage medium of portable compact disc (CD-ROM), optical storage media part, magnetic storage medium part or Above-mentioned any appropriate combination.In this application, computer readable storage medium can be it is any include or storage program Tangible medium, the program can be commanded execution system, device or device use or in connection.And in the application In, computer-readable signal media may include in a base band or as carrier wave a part propagate data-signal, wherein Carry computer-readable program code.The data-signal of this propagation can take various forms, including but not limited to electric Magnetic signal, optical signal or above-mentioned any appropriate combination.Computer-readable signal media can also be computer-readable and deposit Any computer-readable medium other than storage media, which can send, propagate or transmission configuration is served as reasons Instruction execution system, device or device use or program in connection.The journey for including on computer-readable medium Sequence code can transmit with any suitable medium, including but not limited to: wireless, electric wire, optical cable, RF etc. are above-mentioned Any appropriate combination.
It can be write by one or more programming languages or combinations thereof in terms of the operation for being configured to execute the application Calculation machine program code, described program design language include object oriented program language-such as Java, Smalltalk, C ++, further include conventional procedural programming language-such as " C " language or similar programming language.Program code can Fully to execute, partly execute on the user computer on the user computer, be executed as an independent software package, Part executes on the remote computer or executes on a remote computer or server completely on the user computer for part. In situations involving remote computers, remote computer can pass through the network of any kind: including local area network (LAN) or extensively Domain net (WAN)-be connected to subscriber computer, or, it may be connected to outer computer (such as provided using Internet service Quotient is connected by internet).
Flow chart and block diagram in attached drawing are illustrated according to the system of the various embodiments of the application, method and computer journey The architecture, function and operation in the cards of sequence product.In this regard, each box in flowchart or block diagram can generation A part of one module, program segment or code of table, a part of the module, program segment or code are matched comprising one or more It is set to the executable instruction of logic function as defined in realizing.There is specific precedence relationship in above-mentioned specific embodiment, but these are successively Relationship is only exemplary, when specific implementation, these steps may less, more or execution sequence have adjustment.I.e. In some implementations as replacements, function marked in the box can also be sent out in a different order than that indicated in the drawings It is raw.For example, two boxes succeedingly indicated can actually be basically executed in parallel, they sometimes can also be by opposite suitable Sequence executes, and this depends on the function involved.It is also noted that each box and block diagram in block diagram and or flow chart And/or the combination of the box in flow chart, can with execute as defined in functions or operations dedicated hardware based system come It realizes, or can realize using a combination of dedicated hardware and computer instructions.
Being described in module involved in the embodiment of the present application can be realized by way of software, can also be by hard The mode of part is realized.Described module also can be set in the processor, for example, can be described as: a kind of processor packet Receiving module 401 is included, receives the first work order request that initiator sends for recipient.Module 402 is submitted, recipient is according to institute State the request of the first work order and data needed for initiator be submitted to control data corporation, with by control data corporation according to described the The data that the request of one work order and recipient submit form the first work order comprising initiator and recipient's joint project categorical data, It generates the second work order of initiator and the second work order of recipient simultaneously and is sent respectively to initiator and recipient.For example, receiving mould Block is also described as " module for the first work order request that initiator sends is received for recipient ".
As on the other hand, present invention also provides a kind of computer-readable mediums, are stored thereon with computer program, should The method as described in above-mentioned any embodiment is realized when program is executed by processor.
As on the other hand, present invention also provides a kind of computer-readable medium, which be can be Included in device described in above-described embodiment;It is also possible to individualism, and without in the supplying device.Above-mentioned calculating Machine readable medium carries one or more program, when said one or multiple programs are executed by the device, so that should Device: recipient receives the first work order request that initiator sends;Recipient requests according to first work order by initiator institute The data needed are submitted to control data corporation, with what is submitted by control data corporation according to first work order request and recipient Data form the first work order only comprising initiator and recipient's joint project categorical data, while generating the second work order of initiator With the second work order of recipient and be sent respectively to initiator and recipient.Or make the device: acquisition initiator, which is sent to, to be connect The data that the first work order request of debit and recipient submit;The data shape submitted according to first work order request and recipient At the first work order comprising initiator and recipient's joint project categorical data, while generating the second work order of initiator and recipient Second work order is simultaneously sent respectively to initiator and recipient.
Statement " first ", " second " used in various embodiments of the present disclosure, " first " or " described the Two " can modify various parts and unrelated with sequence and/or importance, but these statements do not limit corresponding component.The above statement It is only configured to the purpose for distinguishing element and other elements.For example, the first user equipment and second user equipment indicate different User equipment, although being both user equipment.For example, first element can under the premise of without departing substantially from the scope of the present disclosure Referred to as second element, similarly, second element can be referred to as first element.
When an element (for example, first element) referred to as " (operationally or can with another element (for example, second element) Communicatedly) connection " or " (operationally or communicably) being attached to " another element (for example, second element) or " being connected to " are another When one element (for example, second element), it is thus understood that an element is connected directly to another element or an element Another element is indirectly connected to via another element (for example, third element).On the contrary, it is appreciated that when element (for example, First element) it referred to as " is directly connected to " or when " directly connection " to another element (second element), then without element (for example, the Three elements) it is inserted between the two.
Term " module " used herein or " functional unit " can for example mean to include hardware, software and firmware Unit or include two or more in hardware, software and firmware combined unit." module " can be " single with such as term Member ", " logic ", " logical block ", " component " or " circuit " convertibly use." module " or " functional unit " can be integral part The minimum unit of part element or a part of integrated component element." module " can be for executing one or more functions most Junior unit or part of it." module " or " functional unit " mechanically or is electrically implemented.For example, according to the " mould of the disclosure Block " or " functional unit " may include following at least one: specific integrated circuit (ASIC) chip, field programmable gate array (FPGA) And it is known or leaved for development from now on for executing the programmable logic device of operation.
Although having been described that the application's is preferred, once a person skilled in the art knows basic creative general It reads, then can these be made with other change and modification.So it includes preferably and falling into that the following claims are intended to be interpreted as All change and modification of the application range.Obviously, those skilled in the art can carry out various changes and change to the application Type is without departing from spirit and scope.If being wanted in this way, these modifications and variations of the application belong to the application right Ask and its equivalent technologies within the scope of, then the application is also intended to include these modifications and variations.

Claims (10)

1. a kind of data operational system characterized by comprising initiator, recipient and control data corporation;Wherein,
First work order request for generating the request of the first work order according to data requirements, and is sent to recipient by initiator;
Data needed for initiator are submitted to control data corporation for requesting according to first work order by recipient;
Control data corporation, the data for being submitted according to first work order request and recipient are formed comprising initiator and are connect First work order of debit's joint project categorical data, while generating the second work order of initiator and the second work order of recipient and sending out respectively Give initiator and recipient.
2. system according to claim 1, which is characterized in that control data corporation is further used for first work order The work order for storing initiator initiates the work order of list and recipient and receives list and by the data of the first work order forming process It is stored in syslog data library.
3. system according to claim 1, which is characterized in that the second work order of initiator includes that initiator and recipient are common Project category data and the privately owned project category data of initiator;Corresponding, the second work order of recipient includes initiator and reception Square joint project categorical data and the privately owned project category data of recipient.
4. system according to claim 3, which is characterized in that control data corporation is also used to as initiator or recipient After modifying to joint project categorical data in its second work order, common item is corresponded in automatic the second work order for changing another party Mesh categorical data.
5. system according to claim 1, which is characterized in that control data corporation be also used to the second work order of initiator and The second work order of recipient is respectively stored into the account work order list of initiator and recipient.
6. system according to claim 1, which is characterized in that control data corporation is also used to according to initiator or reception The data just submitted form the only privately owned work order comprising initiator or the privately owned project category data of recipient, and will be described privately owned Work order is stored into corresponding account work order list;It is also used to release the privately owned work order pressure of initiator or recipient It puts.
7. a kind of data O&M method characterized by comprising
Recipient receives the first work order request that initiator sends;
Recipient requests data needed for by initiator to be submitted to control data corporation according to first work order, by data pipe It only includes initiator and recipient's joint project that reason center is formed according to the data that first work order request and recipient are submitted First work order of categorical data, at the same generate the second work order of initiator and the second work order of recipient and be sent respectively to initiator and Recipient.
8. a kind of data O&M method characterized by comprising
Obtain the data that initiator is sent to the first work order request of recipient and recipient submits;
Being formed according to the data that first work order request and recipient are submitted includes initiator and recipient's joint project classification First work order of data, while generating the second work order of initiator and the second work order of recipient and being sent respectively to initiator and reception Side.
9. a kind of electronic equipment, comprising:
One or more first processors;
Computer-readable medium is configured to store one or more programs,
When one or more of programs are executed by one or more of processors, so that one or more of processors are real The now method as described in any in claim 7-8.
10. a kind of computer-readable medium, is stored thereon with computer program, which is characterized in that the program is executed by processor Method of the Shi Shixian as described in any in claim 7-8.
CN201811646304.XA 2018-12-29 2018-12-29 Data operation and maintenance system and method, electronic equipment and storage medium Active CN109753491B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811646304.XA CN109753491B (en) 2018-12-29 2018-12-29 Data operation and maintenance system and method, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811646304.XA CN109753491B (en) 2018-12-29 2018-12-29 Data operation and maintenance system and method, electronic equipment and storage medium

Publications (2)

Publication Number Publication Date
CN109753491A true CN109753491A (en) 2019-05-14
CN109753491B CN109753491B (en) 2021-03-26

Family

ID=66405076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811646304.XA Active CN109753491B (en) 2018-12-29 2018-12-29 Data operation and maintenance system and method, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109753491B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102957544A (en) * 2011-08-17 2013-03-06 中国移动通信集团上海有限公司 Method and device for transmitting service work orders and service work order processing system
US20160110345A1 (en) * 2014-10-17 2016-04-21 International Business Machines Corporation Perspective data management for common features of multiple items
US20160162367A1 (en) * 2013-11-01 2016-06-09 International Business Machines Corporation Plural architecture master data management
WO2016189673A1 (en) * 2015-05-26 2016-12-01 株式会社野村総合研究所 Securities trading management system
CN107992537A (en) * 2017-11-24 2018-05-04 金蝶软件(中国)有限公司 Service attribute transmission method, device, computer equipment and storage medium
CN108390786A (en) * 2018-02-27 2018-08-10 北京奇艺世纪科技有限公司 A kind of business O&M method, apparatus and electronic equipment
CN108510242A (en) * 2018-03-27 2018-09-07 国网河北省电力有限公司电力科学研究院 Worksheet method, system and terminal device
CN108833504A (en) * 2018-05-31 2018-11-16 阿里巴巴集团控股有限公司 cross-site information synchronization method and device
CN108846072A (en) * 2018-06-08 2018-11-20 国网山东省电力公司临沂供电公司 A kind of data realization encapsulation technology based on visual analyzing
CN109040192A (en) * 2018-07-04 2018-12-18 广州圣亚科技有限公司 A kind of environmental monitoring operational system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102957544A (en) * 2011-08-17 2013-03-06 中国移动通信集团上海有限公司 Method and device for transmitting service work orders and service work order processing system
US20160162367A1 (en) * 2013-11-01 2016-06-09 International Business Machines Corporation Plural architecture master data management
US20160110345A1 (en) * 2014-10-17 2016-04-21 International Business Machines Corporation Perspective data management for common features of multiple items
WO2016189673A1 (en) * 2015-05-26 2016-12-01 株式会社野村総合研究所 Securities trading management system
CN107992537A (en) * 2017-11-24 2018-05-04 金蝶软件(中国)有限公司 Service attribute transmission method, device, computer equipment and storage medium
CN108390786A (en) * 2018-02-27 2018-08-10 北京奇艺世纪科技有限公司 A kind of business O&M method, apparatus and electronic equipment
CN108510242A (en) * 2018-03-27 2018-09-07 国网河北省电力有限公司电力科学研究院 Worksheet method, system and terminal device
CN108833504A (en) * 2018-05-31 2018-11-16 阿里巴巴集团控股有限公司 cross-site information synchronization method and device
CN108846072A (en) * 2018-06-08 2018-11-20 国网山东省电力公司临沂供电公司 A kind of data realization encapsulation technology based on visual analyzing
CN109040192A (en) * 2018-07-04 2018-12-18 广州圣亚科技有限公司 A kind of environmental monitoring operational system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
ZHANG TIE-LIN等: "Design and Implementation of IDC Engine Room Intelligent Management and Control System Based on Data Mining", 《2012 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND SERVICE SYSTEM (CSSS)》 *
周兴石: "互联网数据中心(IDC)机房综合管理系统的实现", 《通讯世界》 *
王一: "铁通家庭宽带安装管理系统的分析与设计", 《中国优秀硕士学位论文全文数据库信息科技辑》 *

Also Published As

Publication number Publication date
CN109753491B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
EP3639466B1 (en) Expendable cryptographic key access
EP3639496B1 (en) Improved network access point
US20210083856A1 (en) Improved hardware security module management
CN103369022B (en) Method and system for communication with memory device
CN110069941A (en) A kind of interface access authentication method, apparatus and computer-readable medium
US20200205000A1 (en) Expendable network access
WO2018228950A1 (en) Home network access
CN110298740A (en) Data account checking method, device, equipment and storage medium
CN109767089A (en) Performance statistical method and its device, electronic equipment, computer-readable medium
CN104765621B (en) A kind of method and system of the deployment program in clustered node
CN110519379A (en) Request processing method and equipment based on micro services
CN109995866A (en) Distributed document method of calibration, device, computer installation and storage medium
CN110502519A (en) A kind of method, apparatus of data aggregate, equipment and storage medium
CN108595316A (en) Life cycle management method, manager, equipment and the medium of Distributed Application
CN104247322B (en) Promote method, system and the computer-readable medium of the communication in computing environment
CN108665272A (en) Block chain data processing method, device, equipment and storage medium
CN109769144A (en) Right management method and its device, electronic equipment, computer-readable medium
US20230353633A1 (en) Providing managed services in a cloud environment
CN109951553A (en) Data processing method, system, electronic equipment and computer readable storage medium
CN109739927A (en) Date storage method and its device, electronic equipment, computer-readable medium
CN109783190A (en) Data migration method and its device, electronic equipment, computer-readable medium
CN109325744A (en) Payment processing method, device, medium and electronic equipment
JP2024500770A (en) Techniques for modifying aspects of computational instances
CN109753491A (en) Data operational system and method, electronic equipment, storage medium
CN109669807A (en) The method of calibration and device of business event, processor, storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221208

Address after: 310,018 Building 7 and Building 9, Standard Factory Area, Hangzhou Comprehensive Bonded Zone, Hangzhou, Zhejiang

Patentee after: Hangzhou Century Internet Information Technology Co.,Ltd.

Address before: 100015 3rd floor, building 5, yard 1, Jiuxianqiao East Road, Chaoyang District, Beijing

Patentee before: 21VIANET Group Inc.