CN109753427A - It is a kind of to send out for electrical test unit discrimination system - Google Patents
It is a kind of to send out for electrical test unit discrimination system Download PDFInfo
- Publication number
- CN109753427A CN109753427A CN201811476085.5A CN201811476085A CN109753427A CN 109753427 A CN109753427 A CN 109753427A CN 201811476085 A CN201811476085 A CN 201811476085A CN 109753427 A CN109753427 A CN 109753427A
- Authority
- CN
- China
- Prior art keywords
- test
- test cell
- version
- cell
- default
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention provides a kind of send out for electrical test unit discrimination system, the keyword for electrical testing keyword configuration module setting controller switching equipment monitoring programme test cell is sent out, setting power data runs the keyword of monitoring software test cell and the keyword of setting power generation data monitoring module test cell;Hair collects the keyword that module extracts controller switching equipment monitoring programme test cell respectively for electrical test unit, power data runs the keyword of the keyword of monitoring software test cell and the data monitoring module test cell that generates electricity, according to keyword to controller switching equipment monitoring programme test cell, power data operation monitoring software test cell and power generation data monitoring module test cell are classified, and according to classified storage to hair for electrical test unit memory.So that being classified storage for electrical test unit to all types of hairs, used convenient for extracting, the classification for being also based on hair for electrical test unit uses.
Description
Technical field
The present invention relates to computer lab management fields more particularly to a kind of hair for electrical test unit discrimination system.
Background technique
Power monitoring platform is applied relatively broad at present, can detect electricity by power monitoring platform with monitoring electrical equipment
Force parameter, and analyzed, according to resulting data are analyzed, power equipment is adjusted in long-range control, and realization is exceeded to be automatically powered off, superthreshold
Value alarm monitors electric power system data and equipment in real time, and manipulates conveniently, and use is safe, effective control for emergency case
System.
For example application No. is CN201810403140.1, a kind of electric power analysis method applied to power monitoring, is exactly base
In power monitoring, above-mentioned beneficial effect is realized.
Usual above-mentioned power monitoring platform or electric power monitoring system, which can be seen that, realizes real time monitoring electric system number
According to and equipment, and manipulate convenient, use is safe.
But with the increase of electric power data amount, the increase and variation of the electric power data type of monitoring are set also as scene
Standby more new change, also as weeding out the old and bring forth the new for equipment, program is weeded out the old and bring forth the new.A variety of power monitoring programs are needed to configure, or
Power SCADA software or electric management control module realize the function of monitoring.Controller switching equipment monitoring programme or power data operation prison
It generally requires to be tested after controlling software, or power generation data monitoring module research and development, or after updating, examines power monitoring program, or
Whether power SCADA software or electric management control module meet monitoring requirement, if being capable of stable operation.Due to based on different electricity
Power monitoring programme or power SCADA software or mould electric management control module need to configure a variety of power test units, this just includes
Numerous power test units, but also including a variety of power test unit versions, how to pick out numerous power test units
Corresponding test-types and power test unit version are a technical problem to be solved urgently.
Summary of the invention
In order to overcome the deficiencies in the prior art described above, the present invention provides a kind of send out for electrical test unit discrimination system, packet
Include: hair collects module for electrical test unit for electrical testing keyword configuration module and hair for electrical test unit memory, hair;
Hair is stored with the controller switching equipment monitoring programme test cell of multiple versions, the confession of multiple versions for electrical test unit memory
The power generation data monitoring module test cell of electric data run monitoring software test cell and multiple versions;
Send out the keyword for being used to be arranged controller switching equipment monitoring programme test cell for electrical testing keyword configuration module, setting power supply
The keyword of data run monitoring software test cell and the keyword of setting power generation data monitoring module test cell;
It sends out and collects module for extracting the keyword of controller switching equipment monitoring programme test cell, power supply number respectively for electrical test unit
According to the keyword of operation monitoring software test cell and the keyword for the data monitoring module test cell that generates electricity, according to keyword
To controller switching equipment monitoring programme test cell, power data runs monitoring software test cell and power generation data monitoring module is surveyed
Examination unit is classified, and according to classified storage to hair for electrical test unit memory.
Preferably, further includes: hair transfers module for electrical test unit, sends out power supply test processes module and compares displaying mould
Block;
Hair collects module for electrical test unit and is also used to encode each version of controller switching equipment monitoring programme test cell,
Coding is carried out to each version of power data operation monitoring software test cell and to power generation data monitoring module test list
Each version of member is encoded;
It sends out and transfers module for obtaining the test cell transferred coding for electrical test unit, and transferred;
Hair power supply test processes module is for obtaining the first default test cell version, the second default test cell version and the
Three default test cell versions;
By the test cell transferred respectively with the first default test cell version, the second default test cell version and third are pre-
If test cell version is compared;
Compare display module for comparison result to be shown.
Preferably, hair power supply test processes module is also used to the type according to the test cell transferred, all types of electric power
Monitoring test cell individually divides, and is ranked up according to the setup time of each version, forms power monitoring test cell and surveys
Examination set;
Configure test process one, test process two and test process three;
Test process one execute the first default test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process two execute the second default test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process three execute third preset test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process one, test process two and test process three carry out test processes using the parallel method of operation;By comparing
Display module shows comparison result.
Preferably, hair power supply test processes module is also used to test power monitoring test cell in set, pre- with first
If the identical power monitoring test cell of test cell version is identified;By in power monitoring test cell test set with the
The one default different power monitoring test cell of test cell version forms the first not same power monitoring test cell test
Set, is configured to test process two;Test process two executes the second default test cell version to the first not same power monitoring
Test cell test set is tested one by one;
By in power monitoring test cell test set, power monitoring test cell identical with the second default test cell version
It is identified;It will be surveyed in power monitoring test cell test set with the second default different power monitoring of test cell version
The not same power monitoring test cell test set of unit formation second is tried, test process three is configured to;Test process three executes
Third preset test cell version to second not same power monitoring test cell test set tested one by one;
By in power monitoring test cell test set, the identical power monitoring test cell of test cell version is preset with third
It is identified;It is surveyed the different power monitoring of test cell version is preset with third in power monitoring test cell test set
It tries unit and forms third not same power monitoring test cell test set, be configured to test process one;Test process one executes
First default test cell version to third, do not tested one by one by same power monitoring test cell test set;By comparing
Display module shows comparison result.
Preferably, hair transfers module for electrical test unit and is also used to continue to obtain the test cell transferred coding, and carries out
It transfers;To transfer needs power monitoring test cell test set to be tested to be arranged in power monitoring test cell cycle tests;
It carries out transferring test in the way of first in first out;
The power monitoring test cell test set that hair power supply test processes module is also used to transfer passes through test process one respectively,
After test process two and test process three are tested, terminate when the secondary test to power monitoring test cell test set,
Output test result;New power monitoring test cell test set is discharged into be tested.
Preferably, it sends out power supply test processes module to be also used in executing test process, or test starts preceding acquisition the 4th
Default test cell version and N preset test cell version;
Configure test process four and test process N;
Test process four execute the 4th default test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process N, which executes N and presets test cell version and test the power monitoring test cell transferred, gathers progress one by one
Test.
Preferably, hair power supply test processes module is also used in executing test process, obtains the 4th default test cell
When version and N preset test cell version, the specified power monitoring test cell of the 4th default test cell version is obtained
Test set merging is tested;
The specified power monitoring test cell test set merging for obtaining the default test cell version of N is tested;
Test obtains the 4th default test cell version before starting and N presets test cell version;
Test process one, test process two, test process three, test process four and test process N use the parallel method of operation
Carry out test processes;Comparison result is shown by comparing display module.
Preferably, hair power supply test processes module is also used to extract each comparison in power monitoring test cell to be tested
Parameter;Extract the comparison parameter in the first default test cell version, the comparison parameter in the second default test cell version with
And third presets the comparison parameter in test cell version;
By each relatively parameter correspondence in power monitoring test cell to be tested and the ratio in the first default test cell version
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared in the first default test cell version parameter phase one
It causes, power monitoring test cell to be tested is the first default test cell version if consistent;
By each relatively parameter correspondence in power monitoring test cell to be tested and the ratio in the second default test cell version
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared in the second default test cell version parameter phase one
It causes, power monitoring test cell to be tested is the second default test cell version if consistent;
By the ratio in each relatively parameter correspondence and the default test cell version of third in power monitoring test cell to be tested
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared with third is preset in test cell version parameter phase one
It causes, power monitoring test cell to be tested is the default test cell version of third if consistent.
Preferably, further includes: hair changes to delete for the increasing of electrical testing keyword looks into I/O port, and the increasing of version coding rule, which changes to delete, looks into the end IO
Mouthful, default test cell version increasing, which changes to delete, looks into I/O port, transfers test cell increasing and changes to delete and looks into I/O port.
As can be seen from the above technical solutions, the invention has the following advantages that
The present invention configures keyword for electrical test unit to hair, and according to keyword to controller switching equipment monitoring programme test cell,
Power data operation monitoring software test cell and power generation data monitoring module test cell are classified, and are stored up according to classification
It deposits to hair for electrical test unit memory.So that storage is classified for electrical test unit to all types of hairs, convenient for extracting
It uses, the classification for being also based on hair for electrical test unit uses.
In the present invention, for a variety of power test unit versions, by presetting test cell version, and based on default test
Unit version realizes compared with power test unit version and picks out test class corresponding to numerous power test units
Type and power test unit version.Parallel synchronous manner of comparison is additionally provided, identification efficiency is improved.
Detailed description of the invention
In order to illustrate more clearly of technical solution of the present invention, attached drawing needed in description will be made below simple
Ground introduction, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ordinary skill
For personnel, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is hair for electrical test unit discrimination system schematic;
Fig. 2 is hair for electrical test unit discrimination system embodiment schematic diagram.
Fig. 3 is hair for electrical test unit discrimination embodiment schematic diagram.
Specific embodiment
The present invention provides a kind of send out for electrical test unit discrimination system, as shown in Figure 1, comprising: hair is deposited for electrical test unit
Reservoir 1, hair collect module 3 for electrical test unit for electrical testing keyword configuration module 2 and hair;
Hair is stored with the controller switching equipment monitoring programme test cell of multiple versions for electrical test unit memory 1, multiple versions
Power data runs the power generation data monitoring module test cell of monitoring software test cell and multiple versions;
The keyword for being used to be arranged controller switching equipment monitoring programme test cell for electrical testing keyword configuration module 2 is sent out, setting supplies
The keyword of electric data run monitoring software test cell and the keyword of setting power generation data monitoring module test cell;
It sends out and collects module 3 for extracting the keyword of controller switching equipment monitoring programme test cell, power supply respectively for electrical test unit
The keyword of the keyword of data run monitoring software test cell and the data monitoring module test cell that generates electricity, according to key
For word to controller switching equipment monitoring programme test cell, power data runs monitoring software test cell and power generation data monitoring module
Test cell is classified, and according to classified storage to hair for electrical test unit memory 1.
Hair is stored with the controller switching equipment monitoring programme test cell of multiple versions, multiple versions for electrical test unit memory 1
This power data runs the power generation data monitoring module test cell of monitoring software test cell and multiple versions, when unlimited
In above-mentioned test cell, configuration test cell can also be carried out according to actual needs.
Keyword can be according to user preset setting, be also possible to according to hair for electrical test unit function and usage come
It is configured, system automatically configures hair for electrical test unit.
Explanation is needed further exist for, as shown in Fig. 2, system further include: hair transfers module 4 for electrical test unit, and hair supplies
Electrical testing processing module 5 and compare display module 6;Hair collects module 3 for electrical test unit and is also used to monitor controller switching equipment
Each version of program test unit is encoded, and is compiled to each version of power data operation monitoring software test cell
Code and to power generation data monitoring module test cell each version encode;Hair transfers module 4 for electrical test unit
It encodes, and is transferred in obtaining the test cell transferred;Hair power supply test processes module 5 is single for obtaining the first default test
First version, the second default test cell version and third preset test cell version;By the test cell transferred respectively with
One default test cell version, the second default test cell version and third are preset test cell version and are compared;Compare
Display module 6 is for comparison result to be shown.Can show test result, test result can be and default test cell
Version is identical, or belong to which default test cell version etc..
In embodiment provided by the invention, as shown in figure 3, hair power supply test processes module 5 is also used to according to the survey transferred
The type of unit is tried, all types of power monitoring test cells individually divides, and is arranged according to the setup time of each version
Sequence forms power monitoring test cell test set 11;
All types of power monitoring test cells includes: controller switching equipment monitoring programme test cell, and power data operation monitoring is soft
Part test cell and power generation data monitoring module test cell.
Power monitoring test cell test set 11 includes: controller switching equipment monitoring programme test cell test set, power supply
Data run monitoring software test cell test set and power generation data monitoring module test cell test set.
Namely controller switching equipment monitoring programme test cell is individually divided, and is carried out according to the setup time of each version
Sequence forms controller switching equipment monitoring programme test cell set;Power data operation monitoring software test cell is individually divided,
And be ranked up according to the setup time of each version, it forms power data and runs monitoring software test cell set;It will power generation
Data monitoring module test cell individually divides, and is ranked up according to the setup time of each version, forms power generation data prison
Control module testing unit set;
Configure test process 1, test process 28 and test process 39;It is single that test process 1 executes the first default test
First version tests the power monitoring test cell test set 11 transferred one by one;It is default that test process 28 executes second
Test cell version tests the power monitoring test cell test set 11 transferred one by one;Test process 39 executes the
Three default test cell versions test the power monitoring test cell test set 11 transferred one by one;Test process 1,
Test process 28 and test process 39 are using parallel method of operation progress test processes;It is shown by comparing display module 6
Comparison result.
In embodiment provided by the invention, hair power supply test processes module 5 is also used to test power monitoring test cell
In set 11, power monitoring test cell identical with the first default test cell version is identified;Power monitoring is tested
It is not identical as the first default different power monitoring test cell formation first of test cell version in unit testing set 11
Power monitoring test cell test set 11, is configured to test process 28;Test process 28 executes the second default test cell
Version to first not same power monitoring test cell test set 11 tested one by one;
By in power monitoring test cell test set 11, power monitoring test identical with the second default test cell version is single
Member is identified;It will be supervised in power monitoring test cell test set 11 with the second default different electric power of test cell version
The not same power monitoring test cell test set 11 of test cell formation second is controlled, test process 39 is configured to;Test process
39 execution thirds preset test cell versions to second not same power monitoring test cell test set 11 surveyed one by one
Examination;
By in power monitoring test cell test set 11, it is single that the identical power monitoring test of test cell version is preset with third
Member is identified;It is supervised the different electric power of test cell version is preset with third in power monitoring test cell test set 11
It controls test cell and forms third not same power monitoring test cell test set 11, be configured to test process 1;Test process
One 7 the first default test cell versions of execution to third, do not surveyed one by one by same power monitoring test cell test set 11
Examination;Comparison result is shown by comparing display module 6.
In embodiment provided by the invention, hair transfers module 4 for electrical test unit and is also used to continue to obtain the test transferred
Cell encoding, and transferred;To transfer needs power monitoring test cell test set 11 to be tested to be arranged in power monitoring
Test cell cycle tests;It carries out transferring test in the way of first in first out;
The power monitoring test cell test set 11 that hair power supply test processes module 5 is also used to transfer is respectively by test process
One 7, after test process 28 and test process 39 are tested, terminate when time to power monitoring test cell test set 11
Test, output test result;New power monitoring test cell test set 11 is discharged into be tested.
It should be further noted that hair power supply test processes module 5 is also used in executing test process, or test is opened
The 4th default test cell version is obtained before beginning and N presets test cell version;
Configure test process four and test process N;
Test process four executes the 4th default test cell version and carries out to the power monitoring test cell test set 11 transferred
It tests one by one;
Test process N execute N preset test cell version to transfer power monitoring test cell test set 11 carry out by
One test.
Multiple default test cell versions namely can be set, equally configure multiple test processes and tested to synchronize
Improve testing efficiency.
It should be further noted that hair power supply test processes module 5 is also used in executing test process, the 4th is obtained
When default test cell version and N preset test cell version, the specified electric power of the 4th default test cell version is obtained
Monitoring test cell test set 11 is simultaneously tested;
N is obtained to preset the specified power monitoring test cell test set 11 of test cell version and tested;
Test obtains the 4th default test cell version before starting and N presets test cell version;
Test process 1, test process 28, test process 39, test process four and test process N are using parallel operation side
Formula carries out test processes;Comparison result is shown by comparing display module 6.
It should be further noted that hair power supply test processes module 5 is also used to extract power monitoring test list to be tested
Each relatively parameter in member;Extract the comparison parameter in the first default test cell version, the second default test cell version
In comparison parameter and third preset test cell version in comparison parameter;
By each relatively parameter correspondence in power monitoring test cell to be tested and the ratio in the first default test cell version
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared in the first default test cell version parameter phase one
It causes, power monitoring test cell to be tested is the first default test cell version if consistent;
By each relatively parameter correspondence in power monitoring test cell to be tested and the ratio in the second default test cell version
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared in the second default test cell version parameter phase one
It causes, power monitoring test cell to be tested is the second default test cell version if consistent;
By the ratio in each relatively parameter correspondence and the default test cell version of third in power monitoring test cell to be tested
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared with third is preset in test cell version parameter phase one
It causes, power monitoring test cell to be tested is the default test cell version of third if consistent.
In the present invention, system further include: hair changes to delete for the increasing of electrical testing keyword looks into I/O port, and the increasing of version coding rule, which changes, deletes
I/O port is looked into, default test cell version increasing, which changes to delete, looks into I/O port, transfers test cell increasing and changes to delete and looks into I/O port.Can also include
Other ports that system is operated based on user.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (9)
1. a kind of hair is for electrical test unit discrimination system characterized by comprising hair is for electrical test unit memory, hair power supply
It tests keyword configuration module and hair and collects module for electrical test unit;
Hair is stored with the controller switching equipment monitoring programme test cell of multiple versions, the confession of multiple versions for electrical test unit memory
The power generation data monitoring module test cell of electric data run monitoring software test cell and multiple versions;
Send out the keyword for being used to be arranged controller switching equipment monitoring programme test cell for electrical testing keyword configuration module, setting power supply
The keyword of data run monitoring software test cell and the keyword of setting power generation data monitoring module test cell;
It sends out and collects module for extracting the keyword of controller switching equipment monitoring programme test cell, power supply number respectively for electrical test unit
According to the keyword of operation monitoring software test cell and the keyword for the data monitoring module test cell that generates electricity, according to keyword
To controller switching equipment monitoring programme test cell, power data runs monitoring software test cell and power generation data monitoring module is surveyed
Examination unit is classified, and according to classified storage to hair for electrical test unit memory.
2. hair according to claim 1 is for electrical test unit discrimination system, which is characterized in that
Further include: hair transfers module for electrical test unit, sends out power supply test processes module and compares display module;
Hair collects module for electrical test unit and is also used to encode each version of controller switching equipment monitoring programme test cell,
Coding is carried out to each version of power data operation monitoring software test cell and to power generation data monitoring module test list
Each version of member is encoded;
It sends out and transfers module for obtaining the test cell transferred coding for electrical test unit, and transferred;
Hair power supply test processes module is for obtaining the first default test cell version, the second default test cell version and the
Three default test cell versions;
By the test cell transferred respectively with the first default test cell version, the second default test cell version and third are pre-
If test cell version is compared;
Compare display module for comparison result to be shown.
3. hair according to claim 2 is for electrical test unit discrimination system, which is characterized in that
Hair power supply test processes module is also used to the type according to the test cell transferred, all types of power monitoring test cells
It individually divides, and is ranked up according to the setup time of each version, form power monitoring test cell test set;
Configure test process one, test process two and test process three;
Test process one execute the first default test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process two execute the second default test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process three execute third preset test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process one, test process two and test process three carry out test processes using the parallel method of operation;By comparing
Display module shows comparison result.
4. hair according to claim 3 is for electrical test unit discrimination system, which is characterized in that
Hair power supply test processes module is also used to test power monitoring test cell in set, with the first default test cell version
This identical power monitoring test cell is identified;It will be single with the first default test in power monitoring test cell test set
The test of same power monitoring test cell is not gathered for first different power monitoring test cell formation first of version, is configured to survey
Examination process two;Test process two execute the second default test cell version to first not same power monitor test cell test set
Conjunction is tested one by one;
By in power monitoring test cell test set, power monitoring test cell identical with the second default test cell version
It is identified;It will be surveyed in power monitoring test cell test set with the second default different power monitoring of test cell version
The not same power monitoring test cell test set of unit formation second is tried, test process three is configured to;Test process three executes
Third preset test cell version to second not same power monitoring test cell test set tested one by one;
By in power monitoring test cell test set, the identical power monitoring test cell of test cell version is preset with third
It is identified;It is surveyed the different power monitoring of test cell version is preset with third in power monitoring test cell test set
It tries unit and forms third not same power monitoring test cell test set, be configured to test process one;Test process one executes
First default test cell version to third, do not tested one by one by same power monitoring test cell test set;By comparing
Display module shows comparison result.
5. hair according to claim 3 is for electrical test unit discrimination system, which is characterized in that
Hair transfers module for electrical test unit and is also used to continue to obtain the test cell transferred coding, and is transferred;It will transfer
Power monitoring test cell test set to be tested is needed to be arranged in power monitoring test cell cycle tests;According to first in first out
Mode carry out transferring test;
The power monitoring test cell test set that hair power supply test processes module is also used to transfer passes through test process one respectively,
After test process two and test process three are tested, terminate when the secondary test to power monitoring test cell test set,
Output test result;New power monitoring test cell test set is discharged into be tested.
6. hair according to claim 5 is for electrical test unit discrimination system, which is characterized in that
It sends out power supply test processes module to be also used in executing test process, or test starts the 4th default test cell of preceding acquisition
Version and N preset test cell version;
Configure test process four and test process N;
Test process four execute the 4th default test cell version to transfer power monitoring test cell test set carry out by
One test;
Test process N, which executes N and presets test cell version and test the power monitoring test cell transferred, gathers progress one by one
Test.
7. hair according to claim 6 is for electrical test unit discrimination system, which is characterized in that
Hair power supply test processes module is also used in executing test process, obtains the 4th default test cell version and N
When default test cell version, the specified power monitoring test cell test set for obtaining the 4th default test cell version is merged into
Row test;
The specified power monitoring test cell test set merging for obtaining the default test cell version of N is tested;
Test obtains the 4th default test cell version before starting and N presets test cell version;
Test process one, test process two, test process three, test process four and test process N use the parallel method of operation
Carry out test processes;Comparison result is shown by comparing display module.
8. hair according to claim 2 is for electrical test unit discrimination system, which is characterized in that
Hair power supply test processes module is also used to extract each relatively parameter in power monitoring test cell to be tested;Extract the
Comparison parameter in one default test cell version, comparison parameter and third in the second default test cell version are default to be surveyed
Try the comparison parameter in unit version;
By each relatively parameter correspondence in power monitoring test cell to be tested and the ratio in the first default test cell version
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared in the first default test cell version parameter phase one
It causes, power monitoring test cell to be tested is the first default test cell version if consistent;
By each relatively parameter correspondence in power monitoring test cell to be tested and the ratio in the second default test cell version
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared in the second default test cell version parameter phase one
It causes, power monitoring test cell to be tested is the second default test cell version if consistent;
By the ratio in each relatively parameter correspondence and the default test cell version of third in power monitoring test cell to be tested
Accordingly compared compared with parameter, judge it is each relatively parameter whether compared with third is preset in test cell version parameter phase one
It causes, power monitoring test cell to be tested is the default test cell version of third if consistent.
9. hair according to claim 1 or 2 is for electrical test unit discrimination system, which is characterized in that
Further include: hair changes to delete for the increasing of electrical testing keyword looks into I/O port, and the increasing of version coding rule, which changes to delete, looks into I/O port, presets test
The increasing of unit version changes to delete and looks into I/O port, transfers test cell increasing and changes to delete and looks into I/O port.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811476085.5A CN109753427B (en) | 2018-12-04 | 2018-12-04 | Analysis system for power generation and supply test unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811476085.5A CN109753427B (en) | 2018-12-04 | 2018-12-04 | Analysis system for power generation and supply test unit |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109753427A true CN109753427A (en) | 2019-05-14 |
CN109753427B CN109753427B (en) | 2023-05-23 |
Family
ID=66403624
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811476085.5A Active CN109753427B (en) | 2018-12-04 | 2018-12-04 | Analysis system for power generation and supply test unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109753427B (en) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090217302A1 (en) * | 2008-02-27 | 2009-08-27 | Accenture Global Services Gmbh | Test script transformation architecture |
CN101556550A (en) * | 2009-05-22 | 2009-10-14 | 北京星网锐捷网络技术有限公司 | Analysis method for automatic test log and device |
CN101853163A (en) * | 2010-06-01 | 2010-10-06 | 中科软科技股份有限公司 | Industry application software system construction method based on assembly business modeling |
CN102289460A (en) * | 2011-07-13 | 2011-12-21 | 中国工商银行股份有限公司 | Method and system for performing report metadata synchronization on testing environments |
US8635124B1 (en) * | 2012-11-28 | 2014-01-21 | Ebay, Inc. | Message based generation of item listings |
CN103678124A (en) * | 2013-12-03 | 2014-03-26 | 浙江宇视科技有限公司 | Video surveillance platform auto-test method and device based on continuous integrated environment |
CN104462258A (en) * | 2014-11-21 | 2015-03-25 | 浙江中测新图地理信息技术有限公司 | Organizational management method for multi-version unstructured model |
US20150286556A1 (en) * | 2014-04-08 | 2015-10-08 | Turnkey Solutions Corp. | Software Test Automation System and Method |
US9280442B1 (en) * | 2011-01-27 | 2016-03-08 | Trimble Navigation Limited | System and method for generating coverage reports for software unit tests |
CN105630975A (en) * | 2015-12-24 | 2016-06-01 | 联想(北京)有限公司 | Information processing method and electronic device |
CN106056879A (en) * | 2016-06-30 | 2016-10-26 | 国网山东省电力公司无棣县供电公司 | Electric meter remote control system based on intelligent identification |
CN106649110A (en) * | 2016-12-15 | 2017-05-10 | 中标软件有限公司 | Software test method and system |
US20180113801A1 (en) * | 2016-10-25 | 2018-04-26 | International Business Machines Corporation | Adaptive dynamic code analysis |
CN108062219A (en) * | 2017-11-16 | 2018-05-22 | 南京轩世琪源软件科技有限公司 | A kind of distributed software development process control method |
CN108182217A (en) * | 2017-12-23 | 2018-06-19 | 合肥弹刚信息科技有限公司 | A kind of APP development systems and dissemination method based on mobile Internet |
-
2018
- 2018-12-04 CN CN201811476085.5A patent/CN109753427B/en active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090217302A1 (en) * | 2008-02-27 | 2009-08-27 | Accenture Global Services Gmbh | Test script transformation architecture |
CN101556550A (en) * | 2009-05-22 | 2009-10-14 | 北京星网锐捷网络技术有限公司 | Analysis method for automatic test log and device |
CN101853163A (en) * | 2010-06-01 | 2010-10-06 | 中科软科技股份有限公司 | Industry application software system construction method based on assembly business modeling |
US9280442B1 (en) * | 2011-01-27 | 2016-03-08 | Trimble Navigation Limited | System and method for generating coverage reports for software unit tests |
CN102289460A (en) * | 2011-07-13 | 2011-12-21 | 中国工商银行股份有限公司 | Method and system for performing report metadata synchronization on testing environments |
US8635124B1 (en) * | 2012-11-28 | 2014-01-21 | Ebay, Inc. | Message based generation of item listings |
CN103678124A (en) * | 2013-12-03 | 2014-03-26 | 浙江宇视科技有限公司 | Video surveillance platform auto-test method and device based on continuous integrated environment |
US20150286556A1 (en) * | 2014-04-08 | 2015-10-08 | Turnkey Solutions Corp. | Software Test Automation System and Method |
CN104462258A (en) * | 2014-11-21 | 2015-03-25 | 浙江中测新图地理信息技术有限公司 | Organizational management method for multi-version unstructured model |
CN105630975A (en) * | 2015-12-24 | 2016-06-01 | 联想(北京)有限公司 | Information processing method and electronic device |
CN106056879A (en) * | 2016-06-30 | 2016-10-26 | 国网山东省电力公司无棣县供电公司 | Electric meter remote control system based on intelligent identification |
US20180113801A1 (en) * | 2016-10-25 | 2018-04-26 | International Business Machines Corporation | Adaptive dynamic code analysis |
CN106649110A (en) * | 2016-12-15 | 2017-05-10 | 中标软件有限公司 | Software test method and system |
CN108062219A (en) * | 2017-11-16 | 2018-05-22 | 南京轩世琪源软件科技有限公司 | A kind of distributed software development process control method |
CN108182217A (en) * | 2017-12-23 | 2018-06-19 | 合肥弹刚信息科技有限公司 | A kind of APP development systems and dissemination method based on mobile Internet |
Non-Patent Citations (2)
Title |
---|
YOUAKIM BADR等: "Software versioning and evolution in digital ecosystems", 《 4TH IEEE INTERNATIONAL CONFERENCE ON DIGITAL ECOSYSTEMS AND TECHNOLOGIES》 * |
张海攀: "基于需求追踪的Web应用测试脚本修复和版本控制技术研究", 《中国优秀硕士学位论文全文数据库》 * |
Also Published As
Publication number | Publication date |
---|---|
CN109753427B (en) | 2023-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5284469B2 (en) | Automatic discovery of physical connectivity between power outlets and IT equipment | |
WO2016119181A1 (en) | Photovoltaic power generation system and fault detection method therefor | |
CN107632219A (en) | A kind of automatic switching test system and its method of testing | |
CN109151072A (en) | A kind of edge calculations system based on mist node | |
CN103197138A (en) | Intelligent electric meter with function of detecting power supply reliability and voltage qualified rate and detecting method thereof | |
CN105071539B (en) | Monitoring method and device for power distribution network | |
CN109975694A (en) | A kind of relay status monitoring system | |
CN111722028A (en) | Load identification method based on high-frequency data | |
CN102230948A (en) | Active high voltage direct current switch oscillation loop parameter on-line measuring system and method thereof | |
CN108572562A (en) | Intelligent household intelligent energy management system based on Internet of things and QT graphical interface | |
CN108400584A (en) | A kind of micro-capacitance sensor method for diagnosing faults based on correlation analysis matching degree | |
CN106877309B (en) | Stability judgment method for direct-current micro-grid in master-slave control mode | |
CN101820356A (en) | Network fault diagnosis system based on ARM-Linux | |
CN208890843U (en) | A kind of edge calculations system based on mist node | |
CN109753427A (en) | It is a kind of to send out for electrical test unit discrimination system | |
CN103246814A (en) | Personal electric device state identification method based on K-means modeling | |
CN112769234A (en) | Intelligent sensing system and method for power load | |
CN105335824B (en) | Distribution network failure repairing command methods and system based on data center | |
CN207456493U (en) | A kind of intelligence vibratory string harvester | |
Billinton et al. | Monte Carlo simulation model for multiarea generation system reliability studies | |
CN111476316B (en) | Method and system for clustering mean value of power load characteristic data based on cloud computing | |
CN204424919U (en) | A kind of low cost energy storage backup power supply system | |
CN209264887U (en) | A kind of non-maintaining circulation terminal monitoring device | |
CN105576825A (en) | An energy management system and method for a smart micro-grid comprising a plurality of renewable energy sources | |
CN110943538A (en) | Smart electric power thing networking intelligent electric quantity terminal based on embedded ARM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |