CN109750591A - A kind of door machine access bridge being arranged on the gate dam of power station - Google Patents

A kind of door machine access bridge being arranged on the gate dam of power station Download PDF

Info

Publication number
CN109750591A
CN109750591A CN201910035633.9A CN201910035633A CN109750591A CN 109750591 A CN109750591 A CN 109750591A CN 201910035633 A CN201910035633 A CN 201910035633A CN 109750591 A CN109750591 A CN 109750591A
Authority
CN
China
Prior art keywords
box girder
door machine
beam body
gate
continuous box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910035633.9A
Other languages
Chinese (zh)
Inventor
秦中平
郭清
李波
李国鹏
马治国
简华伟
焦鹏程
王新
李征徽
赵轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Beijing Engineering Corp Ltd
Original Assignee
PowerChina Beijing Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Beijing Engineering Corp Ltd filed Critical PowerChina Beijing Engineering Corp Ltd
Priority to CN201910035633.9A priority Critical patent/CN109750591A/en
Publication of CN109750591A publication Critical patent/CN109750591A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of door machine access bridges being arranged on the gate dam of power station, the bridge of door machine access bridge includes the first continuous box girder beam body and the second continuous box girder beam body being arranged at the top of gate pier along gate dam axis direction, first continuous box girder beam body and the second continuous box girder beam body are located at the two sides of maintenance gate slot, and it is connect by support with gate pier, removable cover is provided at the top of maintenance gate slot, removable cover is provided with above maintenance gate slot, removable cover one end is placed on the first continuous box girder beam body downstream cantilever shoulder, the other end is placed on the second continuous box girder beam body upstream cantilever shoulder, the bridge floor of access bridge is formed positioned at the access bridge surface layer of two sides and intermediate removable cover, the embedded part slot of embedded wharf portal crane track built-in fitting is reserved in continuous box girder beam body and access bridge surface layer.Both the walking of gate dam lock roof door machine had been met, while also having met gate dam place river two sides Heavy Traffic vehicle pass-through.While meeting door machine and Heavy Traffic vehicle pass-through, the differential settlement deformation of gate dam has been adapted to.

Description

A kind of door machine access bridge being arranged on the gate dam of power station
Technical field
The present invention relates to the gate dam door machine access bridge arrangement form in a kind of hydraulic and hydroelectric engineering, especially one kind is arranged in Door machine access bridge on the gate dam of power station is suitable for being existed by river effect on building, difficult arrangement and gate dam foundation uneven The Heavy Traffic bridge of sedimentation.
Background technique
Dam door machine access bridge is located on the axis of dam, is a kind of building being located on gate dam gate pier, is used for lock roof door machine Walking and traffic are current, and undertake gate dam construction period two sides construction equipment, communications and transportation and personnel simultaneously, times that goods and materials are linked up Business.
Usual door machine access bridge uses Simple T-Girders, I beam or rectangular beam structures, current to meet door machine operation and traffic. But the gate dam big for port size, and gate pier basis is there are when differential settlement, if access bridge is using Simple T-Girders, I beam Or the structures such as rectangular beam, then need to increase beam body height, not only increased beam body amount of concrete, but hinder lower part river overcurrent, Floating row, ice discharging;Prestressed structure is such as used, then is difficult to scratch in beam body caused by resisting prestressing force when off working state.It is especially right In the gate dam for having special traffic requirement, such as door machine traffic, Heavy Traffic, simple beam structure will seem especially improper.For Design load is larger, and bridge height is restricted, and when structural shape is limited by construction condition, door machine access bridge is used The structures such as Simple T-Girders, I beam or rectangular beam are not suitable for.
Reinforced concrete hollow shear wall is common bridge type in Medium Span bridge.The continuous bridge of across footpath big or middle is general It is arranged using unequal span.Continuous beam is complicated compared with simply supported girder bridge and cantilever glider bridge stress, is a kind of statically indeterminate system.Continuous bridge with Simply supported girder bridge is compared with cantilever glider bridge, and Uniform Load moment of flexure maximum value can reduce 50% or so than simply supported beam, moment of flexure drawing Product can reduce 2/3 or so than simply supported beam.Due to the reduction of control moment, dead load is caused to reduce, keeps bridge self weight lighter.But it is continuous The differential settlement of beam bridge support can cause additional internal force, therefore continuous bridge is more demanding to foundation condition;But continuous bridge exists Jointless in one, driving condition are good.
Summary of the invention
The technical problem to be solved by the present invention is to, provide a kind of with strong applicability, bearing capacity is higher, be suitble to span compared with Greatly, globality is preferably arranged in the door machine access bridge on the gate dam of power station.
The technical scheme adopted by the invention is that: a kind of door machine access bridge being arranged on the gate dam of power station, door machine traffic The bridge of bridge includes the first continuous box girder beam body and the second continuous box girder beam being arranged at the top of gate pier along gate dam axis direction Body, the first continuous box girder beam body and the second continuous box girder beam body are located at the two sides of maintenance gate slot, and pass through support and gate pier Connection, removable cover is provided at the top of maintenance gate slot, removable cover, removable cover one are provided with above maintenance gate slot End is placed on the first continuous box girder beam body downstream cantilever shoulder, and the other end is placed in the second continuous box girder beam body upstream cantilever shoulder On, the bridge floor of access bridge is formed positioned at the access bridge surface layer of two sides and intermediate removable cover, in continuous box girder beam body and traffic The embedded part slot of embedded wharf portal crane track built-in fitting is reserved in bridge floor layer.
The gate dam is large aperture, porous, and every hole is independent, subsiding crack is respectively provided between hole, the first continuous box girder beam body and Second continuous box girder beam body is unequal span, unsymmetrical section, and lateral framing arranges that support is divided into side support and middle support, is Side activity, side hold-down support or two sides movable bearing support.
Door machine access bridge two sides are additionally provided with railing, and railing is located at the upper of door machine access bridge continuous box girder beam body top surface Downstream periphery is highly not less than 1.0m, is connect with door machine access bridge continuous box girder beam body using monoblock type or assembled.
The first continuous box girder beam body and the second continuous box girder beam body use cast-in-place or prefabricated In Reinforced Concrete Box Girder, Its strength grade of concrete is not less than C50.
The access bridge surface layer is laid in door machine access bridge continuous box girder beam body top surface, using cast-in-situ steel reinforced concrete or fibre Concrete is tieed up, thickness is not less than 10cm, and strength grade of concrete is not less than C50, and bridge floor can walk Heavy Traffic and crowd.
The removable cover is armored concrete or steel construction cover board.
Door machine access bridge continuous box girder beam body longitudinal direction a side support and middle support are arranged in same lock hole two sides On gate pier, to reduce influence of the gate pier foundation uneven settlement to door machine access bridge.
Beneficial effects of the present invention are suitable for the door machine access bridge of big port size gate dam, have both met gate dam door machine row It walks and requirement that traffic is current, also adapts to sluice foundation differential settlement and the restricted access bridge of bridge height.
Detailed description of the invention
Fig. 1 is the floor map of gate dam door machine access bridge of the present invention.
Fig. 2 is the elevational schematic view of gate dam door machine access bridge of the present invention.
Fig. 3 is the sectional schematic diagram of gate dam door machine access bridge of the present invention.
In figure: 1-access bridge continuous box girder beam body;2-access bridge continuous box girder beam bodies;3-supports;4-removable covers; 5-access bridge surface layers;6-railings;7-gate piers;8-gate piers basis;9-track preformed grooves;10-maintenance gate slots.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Figures 1 to 3, the door machine access bridge being arranged on the gate dam of power station of the invention, which is characterized in that door machine is handed over The bridge of logical bridge includes the first continuous box girder beam body 1 and the second continuous box girder being arranged at the top of gate pier along gate dam axis direction Beam body 2, the first continuous box girder beam body 1 and the second continuous box girder beam body 2 are located at the two sides of maintenance gate slot 10, and pass through support 3 connect with gate pier 7, and the top of maintenance gate slot 10 is provided with removable cover 4, and the top of maintenance gate slot 10 is provided with removable cover Plate 4,4 one end of removable cover are placed on 1 downstream cantilever shoulder of the first continuous box girder beam body, and the other end is placed in the second continuous box girder beam On 2 upstream cantilever shoulder of body, the bridge floor of access bridge is formed positioned at the access bridge surface layer 5 of two sides and intermediate removable cover 4, even The embedded part slot 9 of embedded wharf portal crane track built-in fitting is reserved in continuous box girder body and access bridge surface layer.
The gate dam is large aperture, porous, and every hole is independent, is respectively provided with subsiding crack, 1 He of the first continuous box girder beam body between hole Second continuous box girder beam body 2 is unequal span, unsymmetrical section, lateral framing arrangement, and support 3 divides for side support and middle support, For side activity, side hold-down support or two sides movable bearing support.
Door machine access bridge two sides are additionally provided with railing 6, and railing 6 is located at door machine access bridge continuous box girder beam body top surface Upstream and downstream outer rim is highly not less than 1.0m, is connect with door machine access bridge continuous box girder beam body using monoblock type or assembled.
The first continuous box girder beam body 1 and the second continuous box girder beam body 2 use cast-in-place or prefabricated reinforced concrete box Beam, strength grade of concrete are not less than C50.
The access bridge surface layer 5 is laid in door machine access bridge continuous box girder beam body top surface, using cast-in-situ steel reinforced concrete or Fiber concrete, thickness are not less than 10cm, and strength grade of concrete is not less than C50, and bridge floor can walk Heavy Traffic and crowd.
The removable cover 4 is armored concrete or steel construction cover board.
Door machine access bridge continuous box girder beam body longitudinal direction a side support and middle support are arranged in same lock hole two sides On gate pier, to reduce influence of the gate pier foundation uneven settlement to door machine access bridge.
Gate dam gate pier basis 8 is located on soft base, by the longitudinal a side support of access bridge continuous box girder beam body 1,2 And middle support is arranged on the gate pier of same lock hole two sides, reduces effect caused by differential settlement.The access bridge surface layer 5, access bridge continuous box girder beam body 1,2 and access bridge surface layer 5 reserve embedded part slot 9 and bury wharf portal crane track built-in fitting, therefore box beam is non- Symmetrical section.
The door machine access bridge is divided into two width box-beam structure of upstream and downstream i.e. access bridge continuous box girder beam body 1,2, middle part maintenance Gate slot top position uses removable cover 4.Usually removable cover 4 is placed on two width box girder cantilever bracket of upstream and downstream, and bridge floor is feasible Walk Heavy Traffic and crowd.When main gate need to overhaul, the removable cover 4 is opened, door machine orbits, and hangs Bulkhead gate water blocking;After the completion of main gate maintenance, bulkhead gate is hung out, the removable cover 4 is closed.
The door machine access bridge arranges that box beam top is reserved wharf portal crane track built-in groove and put using Reinforced Concrete Continuous Box Girder Set the bracket of removable cover.Access bridge surface layer is levelling and meets traffic passage.Bridge lateral is arranged as during two panels continuous box girder adds Between removable cover structure, therefore in addition to considering door machine operating load, also need to consider to drive a vehicle and when Heavy Traffic inter panel transverse direction Lever transmission effect.When main gate need to overhaul, removable cover is moved out of, and two panels continuous box girder is independent when door machine work is run Stress.
The present invention is different from the setting method of conventional door machine access bridge, substitutes Simple T-Girders, I beam using continuous box-beam structure Or rectangular beam structures, to improve the lateral globality and anti-twisting property of bridge.Traffic bridge uses beam structure, and will Traffic bridge longitudinal direction a side support and middle support are simutaneously arranged on the gate pier basis of corresponding side, reduce differential settlement Caused effect.Bracket is arranged to set up removable cover in box beam, while meeting the walking of gate dam lock roof door machine and the heavy duty of dam two sides The current requirement of vehicular traffic.Relative to traditional door machine access bridge, to meet door machine and Heavy Traffic vehicle logical described in this example While row, soft base gate dam foundation differential settlement and the restricted access bridge of bridge height are also adapted to.
It is described in detail combined with specific embodiments below:
Some hydropower station engineering, total power of station 40MW, 1.5 hundred million kWh of average annual energy output.Project playout from a left side to The right side is respectively left bank earth dam section, ship lock, connection earth dam section, flood discharge ice discharging lock, workshop, right bank earth dam section.Flood discharge ice discharging lock and water Power Plant linking, positioned at the center portion of major river bed.Flood discharge ice discharging lock is made of lock chamber section and energy dissipating section, and lock chamber section flows downstream To long 30.0m, vertical water flows to width 78.0m.Using WES practical weir flood discharge structure, the maximum high 20.5m of lock.Because of flood discharge ice discharging lock Gate pier span setting is 3 × 26m, for current built relatively large span setting gate pier in the world;And design load is heavy duty, is removed Consider outside door machine load, while needing to carry out the design checking of HK-80 load, the more common Highway Bridge load of design load wants high Very much.And flood discharge ice discharging gate foot 1m is with down toward the dolomite upper limit, lithology is mainly loam, sandy loam, and part is containing flour sand, thin Sand, the interlayer of middle sand and gravel or lenticular body are with a thickness of 0.1~0.2m, fine sand, middle sand, coarse sand between sandy loam and dolomite With thin layers or the lenticular body such as gravel, thickness about 0.0~4.6m, therefore flood discharge ice discharging gate foot is located on soft base, and basis is uneven Effect caused by settling is big.
Therefore flood discharge ice discharging gate machine access bridge of the invention is arranged using continuous box girder.Door machine access bridge span setting is (24+28+24) m, bridge porous across footpath overall length 76m, deck-molding 1.85m, box girder body are poured using C50 armored concrete.Door machine Access bridge is divided into two width of upstream and downstream i.e. access bridge continuous box girder beam body 1,2, and middle part flood discharge ice discharging lock maintenance gate slot position uses steel Reinforced concrete removable cover 4.1 width 4.35m of access bridge continuous box girder beam body, 2 width 3.1m of access bridge continuous box girder beam body, bridge are complete Width is 10.65m.Usually removable cover 4 is placed on two width box girder cantilever bracket of upstream and downstream, and bridge floor can walk Heavy Traffic and people Group.When main gate need to overhaul, the removable cover 4 is opened, door machine orbits, and hangs bulkhead gate water blocking; After the completion of main gate maintenance, bulkhead gate is hung out, the removable cover 4 is closed.
According to design water level and floor elevation, the setting of access bridge continuous box girder beam body 1,2 is height-limited and is not higher than 1.85m.Since this bridge track built-in fitting need to reserve 25cm × 45cm track preformed groove 9, and access bridge surface layer 5 is set as 15cm, Old friend is led to the continuous box girder body 1~2 of bridging and is poured constantly, and reserved 10cm × 45cm track preformed groove 9 is needed at web.
Access bridge continuous box girder beam body 1 span centre top plate thickness 20cm, bottom plate thickness 25cm;Top plate thickness 40cm, bottom plate near fulcrum Thick 45cm;Span centre web thickness 40cm, fulcrum are nearby thickeied to 95cm;Central bearing point beam width 2m, Bian Zhidian beam width 1.5m. Access bridge continuous box girder beam body 2 span centre top plate thickness 20cm, bottom plate thickness 25cm;Top plate thickness 40cm, bottom plate thickness 45cm near fulcrum;Across Midfield plate thickness 40cm, fulcrum are nearby thickeied to 50cm;Central bearing point beam width 2m, Bian Zhidian beam width 1.5m.
(600 × 30 × 600mm) Q235D steel plate support 3 is selected, railing 6 is arranged in bridge floor.
Embodiment described above is merely to illustrate technical idea and feature of the invention, in the art its object is to make Technical staff it will be appreciated that the contents of the present invention and implement accordingly, patent model of the invention only cannot be limited with the present embodiment It encloses, i.e., same changes or modifications made by all disclosed spirit are still fallen in the scope of the patents of the invention.

Claims (7)

1. a kind of door machine access bridge being arranged on the gate dam of power station, which is characterized in that the bridge of door machine access bridge include along The first continuous box girder beam body (1) and the second continuous box girder beam body (2) at the top of gate pier is arranged in gate dam axis direction, and first is continuous Box girder body (1) and the second continuous box girder beam body (2) are located at the two sides of maintenance gate slot (10), and pass through support (3) and lock Pier (7) connection, removable cover (4) are provided at the top of maintenance gate slot (10), are provided with work above maintenance gate slot (10) Dynamic cover board (4), removable cover (4) one end are placed on first continuous box girder beam body (1) downstream cantilever shoulder, and the other end is placed in second Access bridge surface layer (5) and intermediate removable cover (4) formation on the cantilever shoulder of continuous box girder beam body (2) upstream, positioned at two sides The bridge floor of access bridge reserves the embedded part slot (9) of embedded wharf portal crane track built-in fitting in continuous box girder beam body and access bridge surface layer.
2. the door machine access bridge being arranged on the gate dam of power station according to claim 1, which is characterized in that the gate dam is big It is aperture, porous, and every hole is independent, is respectively provided with subsiding crack, the first continuous box girder beam body (1) and the second continuous box girder beam body between hole It (2) is unequal span, unsymmetrical section, lateral framing arrangement, it is side activity, one that support (3), which is divided into side support and middle support, Side hold-down support or two sides movable bearing support.
3. the door machine access bridge being arranged on the gate dam of power station according to claim 1, which is characterized in that the door machine traffic Bridge two sides are additionally provided with railing (6), and railing (6) is located at the upstream and downstream outer rim of door machine access bridge continuous box girder beam body top surface, height Not less than 1.0m, it is connect with door machine access bridge continuous box girder beam body using monoblock type or assembled.
4. the door machine access bridge bridge being arranged on the gate dam of power station according to claim 1, which is characterized in that described first connects Continuous box girder body (1) and the second continuous box girder beam body (2) use cast-in-place or prefabricated In Reinforced Concrete Box Girder, concrete strength Grade is not less than C50.
5. the door machine access bridge being arranged on the gate dam of power station according to claim 1, which is characterized in that the traffic bridge floor Layer (5) is laid in door machine access bridge continuous box girder beam body top surface, and using cast-in-situ steel reinforced concrete or fiber concrete, thickness is not small In 10cm, strength grade of concrete is not less than C50, and bridge floor can walk Heavy Traffic and crowd.
6. the door machine access bridge being arranged on the gate dam of power station according to claim 1, which is characterized in that the removable cover It (4) is armored concrete or steel construction cover board.
7. the door machine access bridge being arranged on the gate dam of power station according to claim 2, which is characterized in that door machine traffic bridging Continuous box girder body longitudinal direction a side support and middle support are arranged on the gate pier of same lock hole two sides, uneven to reduce gate pier basis Influence of the even sedimentation to door machine access bridge.
CN201910035633.9A 2019-01-15 2019-01-15 A kind of door machine access bridge being arranged on the gate dam of power station Pending CN109750591A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910035633.9A CN109750591A (en) 2019-01-15 2019-01-15 A kind of door machine access bridge being arranged on the gate dam of power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910035633.9A CN109750591A (en) 2019-01-15 2019-01-15 A kind of door machine access bridge being arranged on the gate dam of power station

Publications (1)

Publication Number Publication Date
CN109750591A true CN109750591A (en) 2019-05-14

Family

ID=66405616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910035633.9A Pending CN109750591A (en) 2019-01-15 2019-01-15 A kind of door machine access bridge being arranged on the gate dam of power station

Country Status (1)

Country Link
CN (1) CN109750591A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164745A (en) * 2021-11-08 2022-03-11 长江勘测规划设计研究有限责任公司 Separated connecting structure and method for porous water gate and river-crossing bridge
CN116791539A (en) * 2023-08-16 2023-09-22 中国电建集团北京勘测设计研究院有限公司 Gate Gao Hunning soil-fixed end beam supporting structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130083410A (en) * 2012-01-12 2013-07-22 (주)태영이씨엠 Slab-type box girder of a varying longitudinal section made by prestressed precast concrete and method constructing the bridge therewith
CN203755127U (en) * 2014-03-10 2014-08-06 中交第三公路工程局有限公司 Pre-stress high-performance concrete continuous box girder bridge
CN105672213A (en) * 2016-03-24 2016-06-15 中水北方勘测设计研究有限责任公司 Floating transportation type integral steel gate dam for coastal region
CN205529845U (en) * 2016-01-28 2016-08-31 上海勘测设计研究院有限公司 Bridge structures that floodgate bridge combines
CN205576860U (en) * 2016-04-25 2016-09-14 珠江水利委员会珠江水利科学研究院 Dam crest is as floodgate dam structure of traffic bridge
CN106192913A (en) * 2016-08-31 2016-12-07 中国电建集团中南勘测设计研究院有限公司 A kind of bulkhead gate door library structure and repair method
CN107447736A (en) * 2017-09-08 2017-12-08 中国电建集团中南勘测设计研究院有限公司 A kind of power station inlet/outlet arrangement
CN209798507U (en) * 2019-01-15 2019-12-17 中国电建集团北京勘测设计研究院有限公司 Gate crane traffic bridge arranged on gate dam of hydropower station

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130083410A (en) * 2012-01-12 2013-07-22 (주)태영이씨엠 Slab-type box girder of a varying longitudinal section made by prestressed precast concrete and method constructing the bridge therewith
CN203755127U (en) * 2014-03-10 2014-08-06 中交第三公路工程局有限公司 Pre-stress high-performance concrete continuous box girder bridge
CN205529845U (en) * 2016-01-28 2016-08-31 上海勘测设计研究院有限公司 Bridge structures that floodgate bridge combines
CN105672213A (en) * 2016-03-24 2016-06-15 中水北方勘测设计研究有限责任公司 Floating transportation type integral steel gate dam for coastal region
CN205576860U (en) * 2016-04-25 2016-09-14 珠江水利委员会珠江水利科学研究院 Dam crest is as floodgate dam structure of traffic bridge
CN106192913A (en) * 2016-08-31 2016-12-07 中国电建集团中南勘测设计研究院有限公司 A kind of bulkhead gate door library structure and repair method
CN107447736A (en) * 2017-09-08 2017-12-08 中国电建集团中南勘测设计研究院有限公司 A kind of power station inlet/outlet arrangement
CN209798507U (en) * 2019-01-15 2019-12-17 中国电建集团北京勘测设计研究院有限公司 Gate crane traffic bridge arranged on gate dam of hydropower station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164745A (en) * 2021-11-08 2022-03-11 长江勘测规划设计研究有限责任公司 Separated connecting structure and method for porous water gate and river-crossing bridge
CN116791539A (en) * 2023-08-16 2023-09-22 中国电建集团北京勘测设计研究院有限公司 Gate Gao Hunning soil-fixed end beam supporting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106012797A (en) All-ground-anchor type single-tower double-span cable-stayed bridge structure and construction method thereof
CN101215819B (en) Separated double-layer bridge-floor cable stayed bridge
CN109750591A (en) A kind of door machine access bridge being arranged on the gate dam of power station
CN209798507U (en) Gate crane traffic bridge arranged on gate dam of hydropower station
CN110644380B (en) Mounting method for narrow space beam slab of widened engineering of large-span overpass
CN110258223A (en) A kind of armored concrete box frame roadbed
CN1335433A (en) Overhead road with composite foundation
CN114351572A (en) Bridge system for small-angle crossing of operation road without interrupting traffic construction
CN107299671A (en) Urban Storm Flood is regulated and stored with pump lock and lock station
CN209584815U (en) A kind of Very Low Clearance precast assembly integration UHPC spill beam bridge
CN205804278U (en) A kind of assembled long piled wharf superstructure system
CN209568377U (en) A kind of channel design that achievable crossings on different level is current
CN212612618U (en) Wide box channel top plate structure without downward crossing of open section
CN205474797U (en) Hold formula beam element and half through bridge girder construction among prefabricated ultra high performance concrete
CN220847057U (en) Hoisting construction railway simply supported beam
Hawthorne Double Duty
CN112982131A (en) Offshore open type airport runway and construction method thereof
Guyon et al. STRUCTURAL PAPER NO. 52: LONG-SPAN PRESTRESSED CONCRETE BRIDGES CONSTRUCTED BY THE FREYSSINET SYSTEM.
CN2709508Y (en) Pier structure of bridge
CN114541282A (en) Rapid transformation method for high-degree prestressed concrete continuous beam bridge obstructing navigation
Ward et al. THE NEW HOWRAH BRIDGE, CALCUTTA: DESIGN OF THE STRUCTURE, FOUNDATIONS AND APPROACHES.(INCLUDES PHOTOGRAPHS, PLATES AND APPENDICES).
Gongyi et al. Design of main span 938m cable-stayed bridge for Wuhan Qingshan Yangtze River Bridge
Smeardon et al. ENGINEERING WORKS AT TILBURY DOCKS, 1963-67.
Mower Locks and Dam No. 17, Black Warrior River, Alabama
Lee Hydroelectric Development of the Saguenay River The Duke-Price Power Company, Ltd., at Isle Maligne, Quebec, Canada

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination