CN109741592A - The automatic data collection implementation method of plant stand electric energy acquisition terminal - Google Patents

The automatic data collection implementation method of plant stand electric energy acquisition terminal Download PDF

Info

Publication number
CN109741592A
CN109741592A CN201910022089.4A CN201910022089A CN109741592A CN 109741592 A CN109741592 A CN 109741592A CN 201910022089 A CN201910022089 A CN 201910022089A CN 109741592 A CN109741592 A CN 109741592A
Authority
CN
China
Prior art keywords
electric energy
acquisition
meter
data
reading channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910022089.4A
Other languages
Chinese (zh)
Other versions
CN109741592B (en
Inventor
金双喜
李俊臣
赵辉
李永
吴骅
王俊锴
李中刚
张卫东
袁廷利
李春雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Integrated Electronic Systems Lab Co Ltd
State Grid Shaanxi Electric Power Co Ltd
Original Assignee
Integrated Electronic Systems Lab Co Ltd
State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Integrated Electronic Systems Lab Co Ltd, State Grid Shaanxi Electric Power Co Ltd filed Critical Integrated Electronic Systems Lab Co Ltd
Priority to CN201910022089.4A priority Critical patent/CN109741592B/en
Publication of CN109741592A publication Critical patent/CN109741592A/en
Application granted granted Critical
Publication of CN109741592B publication Critical patent/CN109741592B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The present invention relates to a kind of automatic data collection implementation methods of plant stand electric energy acquisition terminal, and addition needs to acquire the electric energy meter of data first in plant stand electric energy acquisition terminal, are managed as unit of the meter reading channel of electric energy meter access acquisition terminal;Then electric energy meter data acquisition is initiated in plant stand electric energy acquisition terminal as unit of meter reading channel and handles task, judges whether that the data of acquisition in need, judgment basis are preset automatic data collection time interval every second;When meeting the requirements the time of Timing Data Acquisition, the acquisition operation of the corresponding data of electric energy meter in meter reading channel is just carried out.Invention increases the flexibility of application and scalabilities, ensure that the accuracy and real-time at automatic collection interval, make interface and realize the acquisition realization program for separating and efficiently managing a variety of electric energy meters, have reached the high cohesion lower coupling between program module.

Description

The automatic data collection implementation method of plant stand electric energy acquisition terminal
Technical field
The invention belongs to power system of data acquisition technical fields, and in particular to a kind of number of plant stand electric energy acquisition terminal According to automatic collection implementation method.
Background technique
With Automation of Electric Systems, the progress of intellectualized technology, the automation of data acquisition is required also more and more general Time.Power supply company has also reached the acquisition of the Various types of data of plant stand side the situation of automatic collection increasingly, realizes substantially each The systematization automatic collection of class data and analysis.The acquisition equipment of plant stand side is mostly that the intelligent terminal based on embedded system is set Standby, plant stand electric energy acquisition terminal is also to belong to this kind of embedded system devices, will be periodically in electric energy acquisition terminal The acquisition of all electric energy meter data in substation is completed on ground, and collected data are handled, and is converted into uniform requirement Format is put into buffer area, waits and is written into the automatic collection work that disk completes data in the store tasks below.
Plant stand electric energy acquisition terminal mainly acquires the data of all kinds of electric energy meters in substation, due to electric energy meter device category Many and diverse, large number of, manual metering is time-consuming and laborious, acquisition interval has error, data accuracy is low, based on this reality, needs one The automatic data collection method of kind of plant stand electric energy acquisition terminal, to guarantee the multi-compartment curve data of all kinds of electric energy meter data Automatic collection.
Summary of the invention
In order to solve the above technical problems, the invention proposes a kind of automatic data collection of plant stand electric energy acquisition terminal realities Existing method solves the problems, such as the more equipment of electric energy meter in substation, multiple types, the processing of the automatic data collection at more time points, can protect The efficiently and accurately automation collection for demonstrate,proving data, reaches higher operational efficiency and economic benefit.The technology used in the present invention side Case is as follows:
The automatic data collection implementation method of plant stand electric energy acquisition terminal, comprising the following steps:
Step 1, addition needs to acquire the electric energy meter of data in plant stand electric energy acquisition terminal, is accessed and is acquired with electric energy meter The meter reading channel of terminal is managed for unit, there is a unique corresponding meter reading channel number in each meter reading channel;
The Parameters data structure of each electric energy meter in one meter reading channel, is managed, needle by meter reading channel design chained list A structure chained list is provided to each meter reading channel, the argument structure of the electric energy meter of addition is added to the meter reading that it is accessed and is led to Behind the structure chained list in road;
Electric energy meter data acquisition is initiated in step 2, plant stand electric energy acquisition terminal as unit of meter reading channel and handles task, Judge whether that the data of acquisition in need, judgment basis are preset automatic data collection time interval every second;
Step 3, when meeting the requirements the time of Timing Data Acquisition, just carry out meter reading channel in electric energy meter corresponding data Acquisition operation.
Beneficial effects of the present invention:
1) plant stand electric energy acquisition terminal presses the list structure of meter reading channel management electric energy meter equipment, it is easier to electric energy meter Addition and deletion, increase the flexibility and scalability of application.
2) the binary signal amount of the interrupt processing timing provided using real-time clock, ensure that the standard at automatic collection interval True property and real-time.
3) acquisition process function is defined using function pointer in plant stand electric energy acquisition terminal acquisition function structure body.? The advantages of data are acquired function assignment when installing and give acquisition process function pointer by specific acquisition specification, this design is exactly to make to connect Mouth is separated with realization, and program is realized in the acquisition for efficiently managing a variety of electric energy meters, and pointer function is passed to as parameter to be had The data acquisition module of certain general utility functions, and it is packaged into interface to improve the convenience of flexibility and the later maintenance of code, It is more clear system structure, is abstracted convenient for hierarchical design, conducive to system, reached the high cohesion lower coupling between program module Property.
Detailed description of the invention
Fig. 1 is the logical procedure diagram of meter reading channel data acquisition tasks of the invention.
Specific embodiment
With reference to the accompanying drawing, embodiments of the present invention are illustrated.The data of plant stand electric energy acquisition terminal are adopted automatically Collect implementation method, comprising the following steps:
Step 1, addition needs to acquire the electric energy meter of data in plant stand electric energy acquisition terminal, since plant stand electric flux is adopted The type and quantity for the electric energy meter that collection terminal is managed may be relatively more, in order not to allow the parameter of these electric energy meters excessively to disperse, It is not to be managed as unit of electric energy meter, but managed as unit of the meter reading channel of electric energy meter access acquisition terminal , there is a unique corresponding meter reading channel number in each meter reading channel.The parameter of each electric energy meter in one meter reading channel Data structure is managed by meter reading channel design chained list again.In order to search out the electric energy meter in the meter reading channel Parameter, we provide a structure chained list for each meter reading channel, the argument structure of the electric energy meter of addition are added to its institute Behind the structure chained list in the meter reading channel of access.Meter reading channel design chained list establishes meter reading channel catalogue while foundation, use In the storage file catalogue of subsequent acquisition data.After being updated based on the structure chained list that meter reading channel is unit, plant stand electric energy The electric energy meter accessed in amount acquisition terminal is installed.
Carry out the peace of meter specification when electric energy meter is installed according to the meter specification parameter in parameters of electric energy meter structural body first Dress calls meter specification to install function, to the acquisition process letter in parameters of electric energy meter structural body in meter specification installation function Number pointer carries out assignment.
According to meter reading channel number parameter decision meter reading channel in parameters of electric energy meter structural body in electric energy meter installation process It is whether enabled, if meter reading channel is to enable for the first time, opens meter reading channel and create meter reading channel binary signal Amount.If meter reading channel is enabled, last meter parameter is updated to current parameters of electric energy meter in meter reading channel design chained list And the electric energy meter quantity in meter reading channel adds one;Current electric energy meter is updated to meter reading channel design in parameters of electric energy meter structural body Last electric energy meter in chained list, next electric energy meter is sky, current electricity in parameters of electric energy meter structural body in parameters of electric energy meter structural body Next electric energy meter in energy table structure is updated to current electric energy meter.
Meter reading channel binary semaphore creates when meter reading channel enables for the first time in electric energy meter installation process, in meter reading This semaphore is successfully obtained in the acquisition tasks of channel indicates the enabled success of meter reading channel, can carry out subsequent electric energy meter number According to timing acquiring operation processing.
Electric energy meter data acquisition is initiated in step 2, plant stand electric energy acquisition terminal as unit of meter reading channel and handles task, Electric energy meter data acquisition processing task will not exit after initiating for the first time, this task is by memory-resident, until in the meter reading channel All electric energy meters are deleted and finish backed off after random.
It in electric energy meter data acquisition processing task, can all judge whether the data of acquisition in need every second, judge Foundation is preset automatic data collection time interval.The interval of this second is by distributing for each meter reading channel The control of one binary signal amount, in the second that real-time clock provides interrupts, the primary semaphore can be discharged each second, and The binary signal amount that can be provided by system in data acquisition process task obtains function and directly acquires the semaphore.Also Say in plain data acquisition process task it is to hang up, only when real-time clock interrupt service routine discharges binary signal Amount, just will do it the acquisition and processing of electric energy meter data.So the acquisition interval time of timing acquiring can set since one second It sets.
Step 3, when meeting the requirements the time of Timing Data Acquisition, just carry out meter reading channel in electric energy meter corresponding data Acquisition operation.The data element in parameters of electric energy meter structural body is called, data type is structural body, defines letter in structural body Number pointer.It is realized in module in specification, defines acquisition function and by acquisition function assignment in parameters of electric energy meter structural body Acquire function data element.It acquires and calls universal data collection function in function, this acquisition function is a structural body.
The acquisition power function structural body of definition is passed in the form of parameter in universal data collection function, in this acquisition Appearance is divided into six parts: generated energy acquisition, requirement/time of origin acquisition, instantaneous flow acquisition, rate of qualified voltage acquisition, logout Acquisition, state alarm collection, this six part provide an acquisition function by electric energy meter specification respectively.More convenient pair of difference in this way The equipment of specification is called from stipulations storehouse, and carries out the initialization in meter reading channel to acquisition meter reading channel according to device parameter Operation.Data conversion collected from electric energy meter at the format of Uniform provisions, it is put into buffer area, so as in store tasks It saves.
As shown in Figure 1, being the logical procedure diagram of meter reading channel data acquisition tasks of the invention, comprising the following steps:
2.1, judge whether electric energy meter quantity is greater than 0 in meter reading channel, if it is, turn in next step, if not, turn 2.10;
2.2, judge whether successfully to obtain meter reading channel binary semaphore, if it is, turn in next step, if not, turn 2.10;
2.3, judge whether first electric energy meter pointer parameter effective in meter reading channel, if it is, turn in next step, if It is no, turn 2.8;
2.4, judge whether current time arrives the automatic data collection time, if it is, turn in next step, if not, turn 2.7;
2.5, electric energy meter device parameter is obtained, meter reading channel is initialized and obtains copy reading data information;
2.6, data acquisition process, data acquisition after according in parameters of electric energy meter structure to the decimal digits of data and unit Be set for the processing of data, and be put into appointed buffer;
2.7, read chained list in next parameters of electric energy meter pointer, determine whether effectively, if it is, turn in next step, if It is no, turn 2.5;
2.8, judge whether initiate store tasks, if it is, turn in next step, if not, turn 2.1;
2.9, judge initiate deposit whether several tasks succeed, if not, turn in next step, if it is, turn 2.1;
2.10, terminate meter reading channel data acquisition tasks and exit.
Wherein, meter reading channel parameters, parameters of electric energy meter, acquisition function are defined as follows based on implementation method above:
Meter reading channel parameters structure:
Parameters of electric energy meter structure:
Acquire function:
General acquisition process function structure:
Meter specification realizes definition acquisition function structure body in module:
Correlation function in above-mentioned definition can be realized by C/C++ language etc..

Claims (9)

1. the automatic data collection implementation method of plant stand electric energy acquisition terminal, which comprises the following steps:
Step 1, addition needs to acquire the electric energy meter of data in plant stand electric energy acquisition terminal, accesses acquisition terminal with electric energy meter Meter reading channel be managed for unit, there is a unique corresponding meter reading channel number in each meter reading channel;
The Parameters data structure of each electric energy meter in one meter reading channel, is managed by meter reading channel design chained list, for every A meter reading channel provides a structure chained list, and the argument structure of the electric energy meter of addition is added to the meter reading channel that it is accessed Behind structure chained list;
Electric energy meter data acquisition is initiated in step 2, plant stand electric energy acquisition terminal as unit of meter reading channel and handles task, it is each Second judge whether that the data of acquisition in need, judgment basis are preset automatic data collection time interval;
Step 3, when meeting the requirements the time of Timing Data Acquisition, the corresponding data for just carrying out electric energy meter in meter reading channel is adopted Collection operation.
2. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 1, which is characterized in that The method of the acquisition operation of the corresponding data of electric energy meter is in progress meter reading channel described in step 3:
The data element in parameters of electric energy meter structural body is called, data type is structural body, defines function pointer in structural body; It is realized in module in specification, defines acquisition function and by acquisition function assignment to the acquisition letter in parameters of electric energy meter structural body Number data element;It acquires and calls universal data collection function in function, this acquisition function is a structural body.
3. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 2, which is characterized in that The acquisition power function structural body of definition is passed in the form of parameter in universal data collection function, this acquisition content is divided into six Part: generated energy acquisition, requirement/time of origin acquisition, instantaneous flow acquisition, rate of qualified voltage acquisition, logout acquisition, state Alarm collection, this six part provide an acquisition function by electric energy meter specification respectively;Data collected from electric energy meter are turned The format for changing Uniform provisions into, is put into buffer area.
4. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 3, which is characterized in that Described in step 3 progress meter reading channel in electric energy meter corresponding data acquisition operation the following steps are included:
2.1, judge whether electric energy meter quantity is greater than 0 in meter reading channel, if it is, turn in next step, if not, turn 2.10;
2.2, judge whether successfully to obtain meter reading channel binary semaphore, if it is, turn in next step, if not, turn 2.10;
2.3, judge whether first electric energy meter pointer parameter effective in meter reading channel, if it is, turn in next step, if not, turn 2.8;
2.4, judge whether current time arrives the automatic data collection time, if it is, turn in next step, if not, turn 2.7;
2.5, electric energy meter device parameter is obtained, meter reading channel is initialized and obtains copy reading data information;
2.6, data acquisition process, according to setting to the decimal digits of data and unit in parameters of electric energy meter structure after data acquisition Surely the processing of data is carried out, and is put into appointed buffer;
2.7, read chained list in next parameters of electric energy meter pointer, determine whether effectively, if it is, turn in next step, if not, turn 2.5;
2.8, judge whether initiate store tasks, if it is, turn in next step, if not, turn 2.1;
2.9, judge initiate deposit whether several tasks succeed, if not, turn in next step, if it is, turn 2.1;
2.10, terminate meter reading channel data acquisition tasks and exit.
5. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 1-4, It is characterized in that, meter reading channel design chained list establishes meter reading channel catalogue while foundation, the storage text for subsequent acquisition data Part catalogue.
6. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 5, which is characterized in that The installation of meter specification is carried out according to the meter specification parameter in parameters of electric energy meter structural body, calls meter specification that function is installed, Assignment is carried out to the acquisition process function pointer in parameters of electric energy meter structural body in meter specification installation function.
7. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 6, which is characterized in that In electric energy meter installation process whether according to meter reading channel number parameter decision meter reading channel in parameters of electric energy meter structural body It enables, if meter reading channel is to enable for the first time, opens meter reading channel and create meter reading channel binary semaphore;If copied Table channel is enabled, then last meter parameter is updated to current parameters of electric energy meter in meter reading channel design chained list and meter reading is logical Electric energy meter quantity in road adds one;Current electric energy meter is updated in meter reading channel design chained list finally in parameters of electric energy meter structural body Electric energy meter, next electric energy meter is sky in parameters of electric energy meter structural body, in parameters of electric energy meter structural body in current electric energy meter structure Next electric energy meter be updated to current electric energy meter.
8. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 7, which is characterized in that Electric energy meter data acquisition processing task will not exit after initiating for the first time, this task is by memory-resident, until in the meter reading channel All electric energy meters are deleted and finish backed off after random.
9. the automatic data collection implementation method of plant stand electric energy acquisition terminal according to claim 8, which is characterized in that One second interval is controlled by the binary signal amount distributed for each meter reading channel, is provided in real-time clock In interruption, the primary binary signal amount can be discharged each second, and binary system letter can be obtained in data acquisition process task Number amount;
It is to hang up in plain data acquisition process task, only when real-time clock interrupt service routine discharges binary signal Amount, just will do it the acquisition and processing of electric energy meter data.
CN201910022089.4A 2019-01-10 2019-01-10 Automatic data acquisition implementation method for station electric energy acquisition terminal Expired - Fee Related CN109741592B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910022089.4A CN109741592B (en) 2019-01-10 2019-01-10 Automatic data acquisition implementation method for station electric energy acquisition terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910022089.4A CN109741592B (en) 2019-01-10 2019-01-10 Automatic data acquisition implementation method for station electric energy acquisition terminal

Publications (2)

Publication Number Publication Date
CN109741592A true CN109741592A (en) 2019-05-10
CN109741592B CN109741592B (en) 2020-12-08

Family

ID=66364259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910022089.4A Expired - Fee Related CN109741592B (en) 2019-01-10 2019-01-10 Automatic data acquisition implementation method for station electric energy acquisition terminal

Country Status (1)

Country Link
CN (1) CN109741592B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112614331A (en) * 2020-12-14 2021-04-06 杭州海兴电力科技股份有限公司 Method for reading electric energy meter event and electric energy meter event reading system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050035877A1 (en) * 2003-08-11 2005-02-17 Duk-Soo Kim Automatic meter reading system and method for transmitting meter reading data in the same
CN2906782Y (en) * 2005-07-13 2007-05-30 浙江大学 Embedded processor-based automatic remote electricity metering terminal
CN201097378Y (en) * 2007-07-06 2008-08-06 国电龙源电气有限公司 Carrier power energy collection terminal
CN101707399A (en) * 2009-11-20 2010-05-12 深圳市科陆电子科技股份有限公司 Method and system for acquiring electric energy information
CN102014118A (en) * 2010-08-13 2011-04-13 深圳市科陆电子科技股份有限公司 Method for reading multiple electric energy meters generally
CN202948266U (en) * 2012-11-23 2013-05-22 深圳市航天泰瑞捷电子有限公司 Electricity acquisition embedded soft system and terminal device
CN203192219U (en) * 2013-03-26 2013-09-11 沈阳时尚实业有限公司 Electric energy meter collector with rapid reading function
CN105959288A (en) * 2016-05-27 2016-09-21 姹や寒 Network protocol conversion method for power grid system and intercommunication method of power grid system
US9792812B1 (en) * 2016-02-12 2017-10-17 King Fahd University Of Petroleum And Minerals Method for correcting electricity meter readings
CN108108236A (en) * 2017-12-19 2018-06-01 宁波三星医疗电气股份有限公司 A kind of efficient meter register method for electric power acquisition terminal

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050035877A1 (en) * 2003-08-11 2005-02-17 Duk-Soo Kim Automatic meter reading system and method for transmitting meter reading data in the same
CN2906782Y (en) * 2005-07-13 2007-05-30 浙江大学 Embedded processor-based automatic remote electricity metering terminal
CN201097378Y (en) * 2007-07-06 2008-08-06 国电龙源电气有限公司 Carrier power energy collection terminal
CN101707399A (en) * 2009-11-20 2010-05-12 深圳市科陆电子科技股份有限公司 Method and system for acquiring electric energy information
CN102014118A (en) * 2010-08-13 2011-04-13 深圳市科陆电子科技股份有限公司 Method for reading multiple electric energy meters generally
CN202948266U (en) * 2012-11-23 2013-05-22 深圳市航天泰瑞捷电子有限公司 Electricity acquisition embedded soft system and terminal device
CN203192219U (en) * 2013-03-26 2013-09-11 沈阳时尚实业有限公司 Electric energy meter collector with rapid reading function
US9792812B1 (en) * 2016-02-12 2017-10-17 King Fahd University Of Petroleum And Minerals Method for correcting electricity meter readings
CN105959288A (en) * 2016-05-27 2016-09-21 姹や寒 Network protocol conversion method for power grid system and intercommunication method of power grid system
CN108108236A (en) * 2017-12-19 2018-06-01 宁波三星医疗电气股份有限公司 A kind of efficient meter register method for electric power acquisition terminal

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱宪伟: "江苏电力用户用电信息采集终端设计与实现", 《中国优秀硕士学位论文全文数据库》 *
郑宇斌: "基于嵌入式网络通信的电能量遥测系统", 《中国优秀硕士学位论文全文数据库》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112614331A (en) * 2020-12-14 2021-04-06 杭州海兴电力科技股份有限公司 Method for reading electric energy meter event and electric energy meter event reading system

Also Published As

Publication number Publication date
CN109741592B (en) 2020-12-08

Similar Documents

Publication Publication Date Title
CN102855293B (en) Mass data processing method of electric vehicle and charging/battery swap facility system
CN107992367B (en) Modbus serial port data processing method
CN105939376A (en) Smart electric meter management system and method based on cloud computing
CN103366311A (en) Data fusion processing method based on transformer substation multi-system
CN201859537U (en) Multifunctional bandwidth power carrier concentrator
CN109101685B (en) Multi-medium energy equipment modeling method suitable for comprehensive energy management and control system
CN103632224A (en) Automatic management system of electric power meter
CN202837399U (en) Synchronized phasor measurement apparatus
CN205384728U (en) Intelligence concentrator data acquisition device
Lv et al. Design of cloud data warehouse and its application in smart grid
CN102169343B (en) Programmed remote operation system and method of grid centralized monitoring center
CN204066111U (en) A kind of quick retrieval system of magnanimity electric-power metering data
CN109741592A (en) The automatic data collection implementation method of plant stand electric energy acquisition terminal
CN108228749A (en) A kind of quick migration method of general time series data
CN110636107A (en) Power grid data interaction system based on 5g communication and interaction method thereof
CN109271566A (en) A kind of computer data processing system
CN102707174B (en) Detection system and method of operation state of resistor type superconductive current limiter
CN110262351A (en) A kind of configuration method
CN203504578U (en) Automatic meter-reading device
CN110910276A (en) Power dispatching data integration system
CN105825332A (en) Cloud computing based electric energy metering monitoring platform and method thereof
CN202383198U (en) Multi-channel alternating current electric quantity metering device
CN202059410U (en) Electrical network concentrator
Huang et al. Research on key technologies of electricity trading platform of next generation
CN102495279A (en) Metering device for multipath alternating current electric quantities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208

Termination date: 20220110