CN109740276A - A method of judge for architectural design prioritization scheme - Google Patents

A method of judge for architectural design prioritization scheme Download PDF

Info

Publication number
CN109740276A
CN109740276A CN201910024156.6A CN201910024156A CN109740276A CN 109740276 A CN109740276 A CN 109740276A CN 201910024156 A CN201910024156 A CN 201910024156A CN 109740276 A CN109740276 A CN 109740276A
Authority
CN
China
Prior art keywords
target structures
architectural design
design
standard
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910024156.6A
Other languages
Chinese (zh)
Inventor
高路恒
王斯海
王海鑫
张苏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Textile Vocational Technology College
Original Assignee
Nantong Textile Vocational Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Textile Vocational Technology College filed Critical Nantong Textile Vocational Technology College
Priority to CN201910024156.6A priority Critical patent/CN109740276A/en
Publication of CN109740276A publication Critical patent/CN109740276A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of methods for the judgement of architectural design prioritization scheme, including 13 steps.The present invention, it is not only from the standard width of a room in an old-style house area of construction area, standard width of a room in an old-style house displaying area length and its whether exceed critical area, the inlet and outlet of target structures and parking stall, subway, the inlet and outlet of the distance between bus stop and taxi zone and target structures are located at the standard requirements which layer whether meet architectural design, and whether the specification size of combining target building and its flow of the people on periphery meet the flow of the people of architectural design and standard that specification size matches, the requirement of the progress and speed of Chinese Urbanization development to architectural design is also fully considered simultaneously, it fully takes into account the raising of Chinese national economy level and causes the change of trip mode to the requirement of architectural design, and fully consider requirement of the country to the formulation standard and environmental protection standard of building energy conservation to architectural design.

Description

A method of judge for architectural design prioritization scheme
Technical field
The present invention relates to architectural design technical fields, more specifically, it relates to which a kind of be used for architectural design prioritization scheme The method of judgement.
Background technique
Architectural design refers to building before construction, and designer is according to construction task, work progress and use process In the presence of or the problem of may occur, perform overall imagination in advance, draft the method solved these problems, scheme, It is come out with drawing and document presentation.As stock, construction organization work and each work post in production, work in coordination in construction work association The common foundation made.It is able within the scope of the scheduled size of investment convenient for entire engineering, according to the predetermined scheme of mature consideration, system One step, goes on smoothly, and the building built up is made sufficiently to meet the desired various requirement of user and society and purposes.
Before architectural design scheme formally determines, first have to judge the degree of optimization of architectural design scheme, Judge formally be determined as the architectural design scheme finally implemented after architectural design scheme reaches expected degree of optimization, otherwise Consequence is hardly imaginable.The country has proposed the relevant method for the judgement of architectural design prioritization scheme at present, but it has Certain limitation, only from the standard width of a room in an old-style house area of construction area, standard width of a room in an old-style house displaying area length and its whether beyond critical area, Whether close to elevator, whether close to staircase, whether close to subway, be located at which layer, and combine construction area be which kind of specification The project of size and the size of population on periphery and flow of the people are judged and are optimized architectural design scheme, however set forth above For the method for architectural design prioritization scheme judgement, do not fully consider that the progress of Chinese Urbanization development and speed set building The requirement of meter does not fully take into account the raising of Chinese national economy level yet and causes the change of trip mode to architectural design Requirement, and do not fully consider requirement of the country to the formulation standard and environmental protection standard of building energy conservation to architectural design, A kind of method that can accurately really judge for architectural design prioritization scheme is proposed thus.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide one kind to sentence for architectural design prioritization scheme Disconnected method can accurately really judge the degree of optimization of the architectural design scheme of target structures, not only from The standard width of a room in an old-style house area of construction area, standard width of a room in an old-style house displaying area length and its whether beyond critical area, the inlet and outlet of target structures and stop Which layer is the inlet and outlet of the distance between parking stall, subway, bus stop and taxi zone and target structures be located at The no standard requirements for meeting architectural design, and whether the specification size of combining target building and its flow of the people on periphery meet building The standard that the flow of the people and specification size of design match, while also fully considering the progress and speed pair of Chinese Urbanization development The requirement of architectural design fully takes into account the raising of Chinese national economy level and causes the change of trip mode to architectural design Requirement, and requirement of the country to the formulation standard and environmental protection standard of building energy conservation to architectural design is fully considered, with solution Certainly the problems mentioned above in the background art.
To achieve the above object, the present invention provides the following technical scheme that
A method of judge for architectural design prioritization scheme, comprising the following steps:
Step 1: target structures described in statistical forecast are in fine day using the building in architectural design scheme as target structures Whether the light application time for receiving sunlight meets the light application time standard of architectural design;
Step 2: whether the ventilation situation of target structures described in statistical forecast meets the ventilation standard of architectural design;
Step 3: counting the design quantity on the parking stall of the target structures and counting the day in the target structures location Whether the design position on gas situation and the parking stall meets the design standard on the parking stall of architectural design;
Step 4: whether the specification size of target structures described in statistical forecast and its flow of the people on periphery meet architectural design Flow of the people and the standard that matches of specification size;
Step 5: target structures described in statistical forecast with can consume and whether new energy design utilization power meets and build The use for building design can consume and utilization of new energy resources standard;
Step 6: whether the fire-fighting performance for counting the target structures design meets architectural design fire protection criteria requirement;
Step 7: counting whether the green coverage designed around the target structures meets around the building of architectural design The standard of green coverage;
Step 8: counting indoor temperature adjusting system inside the target structures and its whether meeting the case where adjusting energy consumption The Indoor environment temperature of architectural design adjusts and its energy consumption standard;
Step 9: the kitchen smoke of target structures described in statistical forecast scatters, whether direction and its kitchen smoke discharge meet the target Build the environmental requirement in location;
Step 10: target structures described in statistical forecast, when formally coming into operation, whether the noise generated is to its periphery Crowd have a adverse impact;
Step 11: counting each standard width of a room in an old-style house area and standard width of a room in an old-style house display surface length and whether exceed that the target structures design Critical area;
Step 12: counting the elevator of the target structures design and the inlet and outlet of staircase and target structures design Distance whether meet the standard requirements of architectural design;
Step 13: the construction situation of the means of transportation on the periphery of target structures described in statistical forecast whether with the target The design of building matches;
Reference the statistical result of step 1 to step 13 is compared the architectural design side for judging the target structures Whether case needs to optimize again;
When comparison result all meets statistical result of the step 1 to step 13, illustrate the building of the target structures Design scheme does not need to optimize again;
When comparison result does not meet statistical result of the step 1 to step 13 all, illustrate building for the target structures Design scheme is built to need to redesign;
When it is more than ten kinds of results into the statistical result of step 13 to meet step 1 for comparison result, illustrate the mesh The architectural design scheme of mark building has optimized well;
When comparison result meets step 1 below ten kinds of results into the statistical result of step 13, illustrate the mesh The architectural design scheme of mark building needs further progress to optimize;
Wherein, the target structures are not met when architectural design fire protection criteria requirement occurs not meeting in comparison result or When the environmental requirement in location, the architectural design scheme of the target structures needs further progress to optimize, until meeting building When design fire protection criteria requires and meets the environmental requirement when side in the target structures location to reach architectural design scheme excellent Change good standard.
Further, within the flow of the people on target structures periphery described in the step 4 statistical forecast is with eight kms around it For scope of statistics.
Further, private savings of the design quantity on parking stall described in the step 3 based on the target structures location Designed by vehicle vehicle popularity rate, the design position on the parking stall is based on the weather feelings in 10 years of the target structures location Condition and determine be arranged in the target structures top or the target structures location underground, when the target structures institute When weather flood frequent occurrence in 10 years of ground, preferably the design position on the parking stall is arranged in the target structures Top, it is excellent when the weather in 10 years of the target structures location flood does not occur and when summer temp is higher The underground in the target structures location is arranged in the design position on the parking stall by choosing.
Further, when the wandering direction of the kitchen smoke of target structures described in the step 9 is throughout the year unstable, statistics design The architectural design schemes of the target structures whether have kitchen smoke exhaust gas cleaner, if do not needed again to the target The architectural design scheme of building, which optimizes, is added the kitchen smoke exhaust gas cleaner, to ensure compliance with the target structures place The environmental requirement on ground.
Further, it is also necessary to the inlet and outlet of target structures described in statistical forecast and the parking stall, subway, bus The inlet and outlet of the distance between taxi zone and the target structures of standing are located at which layer whether meet architectural design Standard requirements.
In conclusion the present invention mainly has the advantages that
The present invention can accurately really judge the degree of optimization of the architectural design scheme of target structures, no Only from the standard width of a room in an old-style house area of construction area, standard width of a room in an old-style house displaying area length and its disengaging for whether exceeding critical area, target structures Mouthful with the inlet and outlet of the distance between parking stall, subway, bus stop and taxi zone and target structures positioned at the Several layers of standard requirements for whether meeting architectural design, and whether the specification size of combining target building and its flow of the people on periphery accord with Close the flow of the people and the standard that matches of specification size of architectural design, at the same also fully consider Chinese Urbanization development progress and Requirement of the speed to architectural design fully takes into account the raising of Chinese national economy level and causes the change of trip mode to building The requirement of design is built, and fully considers that country wants the formulation standard and environmental protection standard of building energy conservation to architectural design It asks.
Specific embodiment
The invention discloses a kind of methods for the judgement of architectural design prioritization scheme, comprising the following steps:
Step 1: target structures described in statistical forecast are in fine day using the building in architectural design scheme as target structures Whether the light application time for receiving sunlight meets the light application time standard of architectural design;
Step 2: whether the ventilation situation of target structures described in statistical forecast meets the ventilation standard of architectural design;
Step 3: counting the design quantity on the parking stall of the target structures and counting the day in the target structures location Whether the design position on gas situation and the parking stall meets the design standard on the parking stall of architectural design;
Step 4: whether the specification size of target structures described in statistical forecast and its flow of the people on periphery meet architectural design Flow of the people and the standard that matches of specification size;
Step 5: target structures described in statistical forecast with can consume and whether new energy design utilization power meets and build The use for building design can consume and utilization of new energy resources standard;
Step 6: whether the fire-fighting performance for counting the target structures design meets architectural design fire protection criteria requirement;
Step 7: counting whether the green coverage designed around the target structures meets around the building of architectural design The standard of green coverage;
Step 8: counting indoor temperature adjusting system inside the target structures and its whether meeting the case where adjusting energy consumption The Indoor environment temperature of architectural design adjusts and its energy consumption standard;
Step 9: the kitchen smoke of target structures described in statistical forecast scatters, whether direction and its kitchen smoke discharge meet the target Build the environmental requirement in location;
Step 10: target structures described in statistical forecast, when formally coming into operation, whether the noise generated is to its periphery Crowd have a adverse impact;
Step 11: counting each standard width of a room in an old-style house area and standard width of a room in an old-style house display surface length and whether exceed that the target structures design Critical area;
Step 12: counting the elevator of the target structures design and the inlet and outlet of staircase and target structures design Distance whether meet the standard requirements of architectural design;
Step 13: the construction situation of the means of transportation on the periphery of target structures described in statistical forecast whether with the target The design of building matches;
Reference the statistical result of step 1 to step 13 is compared the architectural design side for judging the target structures Whether case needs to optimize again;
When comparison result all meets statistical result of the step 1 to step 13, illustrate the building of the target structures Design scheme does not need to optimize again;
When comparison result does not meet statistical result of the step 1 to step 13 all, illustrate building for the target structures Design scheme is built to need to redesign;
When it is more than ten kinds of results into the statistical result of step 13 to meet step 1 for comparison result, illustrate the mesh The architectural design scheme of mark building has optimized well;
When comparison result meets step 1 below ten kinds of results into the statistical result of step 13, illustrate the mesh The architectural design scheme of mark building needs further progress to optimize;
Wherein, the target structures are not met when architectural design fire protection criteria requirement occurs not meeting in comparison result or When the environmental requirement in location, the architectural design scheme of the target structures needs further progress to optimize, until meeting building When design fire protection criteria requires and meets the environmental requirement when side in the target structures location to reach architectural design scheme excellent Change good standard.
By using above-mentioned technical proposal, a kind of method for the judgement of architectural design prioritization scheme proposed by the present invention, Whether it is not only from the standard width of a room in an old-style house area of construction area, standard width of a room in an old-style house displaying area length and its beyond critical area, target structures The inlet and outlet position of the distance between inlet and outlet and parking stall, subway, bus stop and taxi zone and target structures Which layer whether to meet the standard requirements of architectural design in, and the specification size of combining target building and its flow of the people on periphery are The standard that the no flow of the people for meeting architectural design and specification size match, at the same also fully consider Chinese Urbanization development into Degree and requirement of the speed to architectural design fully take into account the raising of Chinese national economy level and lead to the change of trip mode Requirement to architectural design, and fully consider country to the formulation standard and environmental protection standard of building energy conservation to architectural design It is required that therefore it is proposed by the present invention it is a kind of for architectural design prioritization scheme judgement method accurately really target can be built The degree of optimization for the architectural design scheme built is judged.
Wherein Chinese Urbanization development progress and speed to architectural design require to include light application time, ventilation situation, The design position on the design quantity on parking stall and parking stall, fire-fighting performance, the construction of green coverage and means of transportation are mating It is required that;
Wherein the raising of Chinese national economy level and cause the change of trip mode to multiply requiring to include for architectural design With private car, bus, subway and taxi and shared bicycle;
Wherein country to the formulation standard of building energy conservation and environmental protection standard to architectural design require to include environmental requirement, Noise requirements, indoor temperature adjusting system and its adjusting energy consumption power conservation requirement.
Preferably, the flow of the people on target structures periphery described in the step 4 statistical forecast to be within eight kms around it Scope of statistics.
By using above-mentioned technical proposal, with the development of economy, traffic is more and more convenient, and the scope of activities of people is Increase, the flow of the people on target structures periphery is to be that scope of statistics is more scientific within eight kms around it, so that of the invention It is more accurate true to the result of the degree of optimization judgement of the architectural design scheme of target structures.
Preferably, private car of the design quantity on parking stall described in the step 3 based on the target structures location Designed by vehicle popularity rate, the design position on the parking stall is based on the weather condition in 10 years of the target structures location And determine the underground at top or the target structures location that the target structures are set, where the target structures Weather in 10 years of ground frequent occurrence flood when, the target structures preferably are arranged in the design position on the parking stall Top, when the weather in 10 years of the target structures location flood does not occur and when summer temp is higher, preferably The design position on the parking stall is arranged in the underground in the target structures location.
By using above-mentioned technical proposal, the economic level and natural weather feelings in target structures location are fully considered Condition targetedly advanced optimizes the degree of optimization judging result of the architectural design scheme of target structures with having.
When direction is throughout the year unstable preferably, the kitchen smoke of target structures described in the step 9 scatters, design is counted Whether the architectural design scheme of the target structures has kitchen smoke exhaust gas cleaner, if not needing again to build the target The architectural design scheme built, which optimizes, is added the kitchen smoke exhaust gas cleaner, to ensure compliance with the target structures location Environmental requirement.
By using above-mentioned technical proposal, it is ensured that the architectural design scheme of target structures can meet target structures institute Environmental requirement on ground, to guarantee the normal operation of succeeding target building.
Preferably, it is also necessary to the inlet and outlet of target structures described in statistical forecast and the parking stall, subway, bus stop The inlet and outlet of the distance between taxi zone and the target structures are located at which layer whether meet architectural design Standard requirements.
By using above-mentioned technical proposal, the people that can effectively shorten pass in and out the time of target structures, to effectively improve mesh The working of mark building surrounding and its internal people or working efficiency.
In summary: the method proposed by the present invention for the judgement of architectural design prioritization scheme, not only from building area The standard width of a room in an old-style house area in domain, standard width of a room in an old-style house displaying area length and its whether beyond critical area, the inlet and outlet of target structures and parking stall, Whether which layer is the inlet and outlet of the distance between iron mouth, bus stop and taxi zone and target structures be located at, which meets, is built The standard requirements of design are built, and whether the specification size of combining target building and its flow of the people on periphery meet the people of architectural design The standard that flow and specification size match, while the progress and speed that also fully consider Chinese Urbanization development are to architectural design Requirement, fully take into account the raising of Chinese national economy level and cause the change of trip mode to the requirement of architectural design, And fully consider requirement of the country to the formulation standard and environmental protection standard of building energy conservation to architectural design, therefore the present invention mentions A kind of method for the judgement of architectural design prioritization scheme out can be accurately really to the architectural design scheme of target structures Degree of optimization judged.
Part is not directed in the present invention to be the same as those in the prior art or can be realized by using the prior art.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (5)

1. a kind of method for the judgement of architectural design prioritization scheme, it is characterised in that: the following steps are included:
Step 1: target structures described in statistical forecast are received in fine day using the building in architectural design scheme as target structures Whether the light application time of sunlight meets the light application time standard of architectural design;
Step 2: whether the ventilation situation of target structures described in statistical forecast meets the ventilation standard of architectural design;
Step 3: counting the design quantity on the parking stall of the target structures and counting the weather feelings in the target structures location Whether the design position on condition and the parking stall meets the design standard on the parking stall of architectural design;
Step 4: whether the specification size of target structures described in statistical forecast and its flow of the people on periphery meet the people of architectural design The standard that flow and specification size match;
Step 5: target structures described in statistical forecast with can consume and whether new energy design utilization power meets building and set The use of meter can consume and utilization of new energy resources standard;
Step 6: whether the fire-fighting performance for counting the target structures design meets architectural design fire protection criteria requirement;
It is afforested Step 7: counting the green coverage designed around the target structures and whether meeting around the building of architectural design The standard of area;
Step 8: counting indoor temperature adjusting system inside the target structures and its whether meeting building the case where adjusting energy consumption The Indoor environment temperature of design adjusts and its energy consumption standard;
Step 9: the kitchen smoke of target structures described in statistical forecast scatters, whether direction and its kitchen smoke discharge meet the target structures The environmental requirement in location;
Step 10: whether the noise that target structures described in statistical forecast when formally coming into operation, generate is to the people on its periphery Group has a adverse impact;
Step 11: counting each standard width of a room in an old-style house area and standard width of a room in an old-style house display surface length and whether exceed critical that the target structures design Area;
Step 12: count target structures design elevator and staircase and the inlet and outlet of target structures design away from From whether meeting the standard requirements of architectural design;
Step 13: the construction situation of the means of transportation on the periphery of target structures described in statistical forecast whether with the target structures Design match;
It is referring to the statistical result of step 1 to step 13 being compared the architectural design scheme for judging the target structures It is no to need to optimize again;
When comparison result all meets statistical result of the step 1 to step 13, illustrate the architectural design of the target structures Scheme does not need to optimize again;
When comparison result does not meet statistical result of the step 1 to step 13 all, illustrate that the building of the target structures is set Meter scheme needs to redesign;
When it is more than ten kinds of results into the statistical result of step 13 to meet step 1 for comparison result, illustrate that the target is built The architectural design scheme built has optimized well;
When comparison result meets step 1 below ten kinds of results into the statistical result of step 13, illustrate that the target is built The architectural design scheme built needs further progress to optimize;
Wherein, when there is not meeting architectural design fire protection criteria requirement in comparison result or where not meeting the target structures When the environmental requirement on ground, the architectural design scheme of the target structures needs further progress to optimize, until meeting architectural design Fire protection criteria require when and meet the target structures location environmental requirement when side reach architectural design scheme optimized it is good Good standard.
2. a kind of method for the judgement of architectural design prioritization scheme according to claim 1, it is characterised in that: the step The flow of the people on target structures periphery described in rapid four statistical forecast within eight kms around it for scope of statistics.
3. a kind of method for the judgement of architectural design prioritization scheme according to claim 1, it is characterised in that: the step It is described designed by private car vehicle popularity rate of the design quantity on parking stall described in rapid three based on the target structures location The design position on parking stall is determined based on the weather condition in 10 years of the target structures location to be arranged in the target The underground in the top of building or the target structures location, when the weather in 10 years of the target structures location is frequent When flood occurs, the design position on the parking stall is preferably arranged in the top of the target structures, when the target structures When flood does not occur in weather in 10 years of location and when summer temp is higher, preferably by the design position on the parking stall Install the underground in the target structures location.
4. a kind of method for the judgement of architectural design prioritization scheme according to claim 1, it is characterised in that: the step When the wandering direction of the kitchen smoke of target structures described in rapid nine is throughout the year unstable, the architectural design of the target structures of design is counted Whether scheme has kitchen smoke exhaust gas cleaner, if not needing again to carry out the architectural design scheme of the target structures excellent Change and the kitchen smoke exhaust gas cleaner is added, to ensure compliance with the environmental requirement in the target structures location.
5. a kind of method for the judgement of architectural design prioritization scheme according to claim 1, it is characterised in that: also need Between the inlet and outlet and the parking stall, subway, bus stop and taxi zone of target structures described in statistical forecast Distance and the inlet and outlet of the target structures are located at the standard requirements which layer whether meet architectural design.
CN201910024156.6A 2019-01-10 2019-01-10 A method of judge for architectural design prioritization scheme Pending CN109740276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910024156.6A CN109740276A (en) 2019-01-10 2019-01-10 A method of judge for architectural design prioritization scheme

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910024156.6A CN109740276A (en) 2019-01-10 2019-01-10 A method of judge for architectural design prioritization scheme

Publications (1)

Publication Number Publication Date
CN109740276A true CN109740276A (en) 2019-05-10

Family

ID=66364359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910024156.6A Pending CN109740276A (en) 2019-01-10 2019-01-10 A method of judge for architectural design prioritization scheme

Country Status (1)

Country Link
CN (1) CN109740276A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111723419A (en) * 2020-04-26 2020-09-29 清华大学 Method and system for determining residential building design

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104021428A (en) * 2014-06-12 2014-09-03 上海天华建筑设计有限公司 Method for judging building design optimization scheme
CN104680004A (en) * 2015-02-11 2015-06-03 西安建筑科技大学 Building energy-saving rate calculation method
CN106295029A (en) * 2016-08-16 2017-01-04 重庆大学 A kind of building multi-objective optimization design of power method guided based on performance
CN108241907A (en) * 2018-01-12 2018-07-03 上海城乡建筑设计院有限公司 It is a kind of to evaluate the whether economic method of underground garage
CN108804802A (en) * 2018-06-05 2018-11-13 西安建筑科技大学 A kind of Office Buliding Space energy-saving design method controlled with summer air-conditioning energy consumption for cooling as target

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104021428A (en) * 2014-06-12 2014-09-03 上海天华建筑设计有限公司 Method for judging building design optimization scheme
CN104680004A (en) * 2015-02-11 2015-06-03 西安建筑科技大学 Building energy-saving rate calculation method
CN106295029A (en) * 2016-08-16 2017-01-04 重庆大学 A kind of building multi-objective optimization design of power method guided based on performance
CN108241907A (en) * 2018-01-12 2018-07-03 上海城乡建筑设计院有限公司 It is a kind of to evaluate the whether economic method of underground garage
CN108804802A (en) * 2018-06-05 2018-11-13 西安建筑科技大学 A kind of Office Buliding Space energy-saving design method controlled with summer air-conditioning energy consumption for cooling as target

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111723419A (en) * 2020-04-26 2020-09-29 清华大学 Method and system for determining residential building design

Similar Documents

Publication Publication Date Title
CN103593530B (en) A kind of integrated approach that adopts digital simulation to carry out energy saving building design
Futcher et al. The role of urban form as an energy management parameter
CN108804802A (en) A kind of Office Buliding Space energy-saving design method controlled with summer air-conditioning energy consumption for cooling as target
CN114580772A (en) Comprehensive method and system for energy-saving building design by adopting digital simulation
CN109740276A (en) A method of judge for architectural design prioritization scheme
Leonidaki et al. Thermal performance of office building envelopes: the role of window-to-wall ratio and thermal mass in Mediterranean and Oceanic climates.
Zhang et al. Optimization of daylighting, ventilation, and cooling load performance of apartment in tropical ocean area based on parametric design
CN110004976B (en) Underground station wind shaft and fire-fighting evacuation stairwell combined construction structure
Ferrante et al. IEQ and energy improvement of existing buildings by prefabricated facade additions: The case of a student house in Athens
CN203213359U (en) Air inlet and air outlet staggered type natural ventilation double-layered glass curtain wall system
Hong et al. Climate adaptation of design scheme for energy-conserving high-rise buildings—Comparative study of achieving building sustainability in different climate scenarios
Cui et al. Impact of Industry 4.0 on green decoration materials in public architectural engineering for application of energy conservation and environmental protection
Romaní et al. Performance of prototype tandem UV filter and organic transparent photovoltaic windows
Qingqin et al. Introduction of the standard for energy efficient building evaluation
Wu Simulation analysis of optimization design strategy of natural lighting in office buildings
CN101839076A (en) 15m big-depth land-saving house with good ventilation and lighting and energy conservation
He et al. Analysis on the influencing factors and definition of typical model of commercial buildings in the Pearl River Delta
Yi et al. Building as Major Energy Consumer
CN202117347U (en) Energy-conservation house utilizing underground facilities to adjust temperature
CN216481414U (en) Arrangement structure of combined building smoke exhaust machine room at entrance and exit of subway station
Jilong Discussion on Application of Building Energy Efficiency and Green Building Technology
Yang et al. Elementary introduction to the relevant elements and measures of green building design
CN203097018U (en) Intelligent window wall body
Oldfield et al. Five energy generations of tall buildings
Oldfield The sustainable impact of height

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510

RJ01 Rejection of invention patent application after publication