CN109740256A - A kind of wire cable layout design optimization method merging equipment Maintainability - Google Patents

A kind of wire cable layout design optimization method merging equipment Maintainability Download PDF

Info

Publication number
CN109740256A
CN109740256A CN201910002077.5A CN201910002077A CN109740256A CN 109740256 A CN109740256 A CN 109740256A CN 201910002077 A CN201910002077 A CN 201910002077A CN 109740256 A CN109740256 A CN 109740256A
Authority
CN
China
Prior art keywords
cable
wire cable
maintainability
point
layout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910002077.5A
Other languages
Chinese (zh)
Inventor
吕川
耿杰
邱标
周栋
金玉雪
郑曰朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beihang University
Original Assignee
Beihang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beihang University filed Critical Beihang University
Priority to CN201910002077.5A priority Critical patent/CN109740256A/en
Publication of CN109740256A publication Critical patent/CN109740256A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The present invention provides a kind of wire cable layout design optimization methods for merging equipment Maintainability, are related to wire cable layout design, which comprises analyze equipment cable repair, determine Maintainability Constraints factor;According to the Maintainability Constraints factor, Maintainability Constraints relationship is established;Equipment wire cable layout design objective is analyzed, determines wire cable layout optimization aim;According to the Maintainability Constraints relationship and the wire cable layout optimization aim, the wire cable layout Optimized model of fusion equipment Maintainability is established;The wire cable layout model is solved, wire cable layout design result is obtained." the wire cable layout design optimization method of fusion equipment Maintainability " provided in an embodiment of the present invention optimizes its wiring path, fixation and ties up mode from the maintainability of cable, so that the wire cable layout of design and form are more reasonable, optimization.

Description

A kind of wire cable layout design optimization method merging equipment Maintainability
Technical field
The present invention relates to wire cable layout design field, in particular to a kind of wire cable layout design for merging equipment Maintainability is excellent Change method, it belongs to equipment Maintainability Design.
Background technique
Cable is widely used in aerospace, ship, automobile and other industries, the normalization and reasonability of layout designs One of an important factor for influencing product quality and reliability is had become, and two existing class main methods are man-machine interactive respectively Layout designs and autoplacement design.
For cable automation layout, Catherine Cerezuela etc. propose wire cable layout design be one repeatedly The process improved and optimizated, and with certain company wiring actually conduct a research, propose a set of wire cable layout aided design system; Ilknur Kabul, Gayle etc. first construct an initial path by sampling to wiring space, then again according to empty Between geometrical constraint, physical property require path is gradually optimized, finally determine an optimal cable trails;Liu Zhenyu, Zhou De It is thrifty et al. by being pre-processed to wiring space after, according to Routing constraints require first determine wiring main-body pathway, so Recycle searching algorithm to determine the optimal wiring routes of cable connectivity port and major trunk roads afterwards, and to wiring result carry out interference and Feasibility verifying, this reduces the complexity of wiring to a certain extent;Hypo et al. is sealed in the processing of wiring space rasterizing Chaos technology is introduced, and layered shaping is carried out to space, to improve the computational efficiency of self routing;Cai Yi, Wang Yanwei et al. To simplify space preprocess method, " pressing face self routing " method is proposed, then pass through " adherent interference adjust automatically " Lai Youhua cloth Interference in line process detects work.
In conclusion the physical property that the research of existing wire cable layout design method has focused largely on cable constrains (i.e. due to line The relational physical properties of cable and the Routing constraints caused, the main mechanically deform for considering cable) and path planning on, for because of line The unreasonable research of wire cable layout caused by the setting of the fixation position of cable, cabling mode and bending radius is unreasonable etc. compared with It is few.
Summary of the invention
The purpose of the present invention is to provide a kind of wire cable layout design optimization methods for merging equipment Maintainability, solve existing Layout designs are due to the unreasonable problem of wire cable layout caused by not fully considering the maintainability in cable later maintenance guarantee.
According to an aspect of the invention, there is provided a kind of wire cable layout design optimization method for merging equipment Maintainability, The described method includes:
Equipment cable repair is analyzed, determines Maintainability Constraints factor;
According to the Maintainability Constraints factor, Maintainability Constraints relationship is established;
Equipment wire cable layout design objective is analyzed, determines wire cable layout optimization aim;
According to the Maintainability Constraints relationship and the wire cable layout optimization aim, the cable of fusion equipment Maintainability is established Layout optimization model;
The wire cable layout model is solved, wire cable layout design result is obtained.
Preferably, described pair of equipment cable repair is analyzed, and determines that Maintainability Constraints factor includes:
According to equipment cable arrangement feature and existing maintainability specification, the maintenance accessi bility of cable is analyzed, wire cable layout is obtained Maintainability Constraints factor, the Maintainability Constraints factor include the constraint of vision accessibility and/or operating space constraint.
Preferably, described according to the Maintainability Constraints factor, establishing Maintainability Constraints relationship includes:
It is constrained according to the vision accessibility, determines the visible area at human eye optimal visibility angle and cable repair point;
According to the visible area at human eye optimal visibility angle and cable repair point, establishing cable repair point vision can Up to property the constraint relationship.
Preferably, the cable repair point vision accessibility the constraint relationship meets formula:
Wherein,It is the upper surface C central point m along the visual tangent plane s of Z axis forward direction to the upper surface A, BabIt is vertical away from From,For point m to point b distance,For the positive angle of visibility of cable repair key point k,For the upper surface C center Point m is along the angle of visibility of Z axis forward direction, and C is the square enclosure box of plane on cable repair key point k, and A, B are the barrier in front of C, Point a, b be respectively from m point do can the cone and barrier A, B point of contact.
Preferably, described according to the Maintainability Constraints factor, establishing Maintainability Constraints relationship includes:
It is constrained according to the operating space, determines manpower operating space, and according to manpower operating space, establish cable repair Point operating space the constraint relationship.
Preferably, cable repair point operating space the constraint relationship meets formula:
Wherein,For the operating space radius for repairing key point k, R is that the radius of a ball, V is inscribed in operating spaceQIt is empty for operation Between inscribed sphere volume.
Preferably, the wire cable layout optimization aim includes that cable trails are most short and/or cable deformation can be minimum, wherein institute State the sum of the distance that cable trails are adjacent wire spatial point, the energy that the cable deformation can generate for cable deformation.
Preferably, described according to the Maintainability Constraints relationship and the wire cable layout optimization aim, establish fusion equipment The wire cable layout Optimized model of maintainability includes:
With cable trails are most short and/or cable deformation can minimum optimization aim, building includes Maintainability Constraints relationship The wire cable layout Optimized model.
Preferably, the wire cable layout Optimized model further include:
Obtained from being analyzed as the design of electrical system demand to the equipment with cable transmission function association Wire cable layout the constraint relationship;
Obtained from being analyzed as wiring space structure to the equipment and environmental quality with cable working environment Associated wire cable layout the constraint relationship;
Obtained from being analyzed as the physical characteristic to cable about with the associated wire cable layout of wire cable layout reasonability Beam relationship.
Preferably, described to solve to the wire cable layout model, obtaining wire cable layout design result includes:
According to the wire cable layout optimization aim, optimizes the solution process of the wire cable layout model, obtain wire cable layout Design result.
Compared with prior art, the beneficial effects of the present invention are:
The wire cable layout design optimization method and device of equipment Maintainability " fusion " provided in an embodiment of the present invention is from cable Maintainability set out, optimize its wiring path, fixation and tie up mode so that design wire cable layout and form more rationally, Optimization.
It is to be understood that above-mentioned general description and following specific embodiments are merely illustrative and illustrative, not It can the limitation range of the invention for asking for opinion.
Detailed description of the invention
Following attached drawing is a part of description of the invention, depicts illustrative examples of the invention, appended attached Figure is used to illustrate the principle of the present invention together with the description of specification.
The functional block diagram that Fig. 1 designs for wire cable layout;
Fig. 2 is maintenace point visible area analysis chart;
Fig. 3 is maintenace point angle of visibility schematic diagram;
Fig. 4 is " the inscribed sphere " in collisionless space;
Fig. 5 is the solution process for merging the wire cable layout design optimization model of equipment Maintainability.
Fig. 6 is a kind of process of wire cable layout design optimization method for merging equipment Maintainability provided in an embodiment of the present invention Schematic diagram.
Specific embodiment
Understand in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to this hair Bright main embodiment is described in detail, and any skilled artisan is in the embodiment for understanding the content of present invention Afterwards, when the content as shown in the present invention, it is subject to modifications and changes, without departing from the range of the content of present invention.Of the invention shows Examples and descriptions thereof are used to explain the present invention for meaning property, but not as a limitation of the invention." packet used herein Containing ", " comprising ", " having ", " containing " etc., be open term, that is, mean include but is not limited to.It is used herein "and/or", including any of the affairs or all combination.
Fig. 6 is a kind of process of wire cable layout design optimization method for merging equipment Maintainability provided in an embodiment of the present invention Schematic diagram, as shown in fig. 6, step includes:
Step S101: equipment cable repair is analyzed, determines Maintainability Constraints factor.
Aircraft equipment is the complication system that a kind of mechanical, electrical, hot, light etc. is highly coupled, and equipment compartment layout is complicated, is filled close Degree is big, and numerous components such as equipment, cable, pipeline, electric connector, ground line are often mingled in limited cabin space;Together When aircraft equipment in number of cables it is more, power is different, frequency range difference is big, it is larger to lead to be routed difficulty, therefore aircraft equipment It is routed more complicated.In conjunction with the problem of the wire cable layout correlation found during investigation, the maintainability in cable later period becomes wiring Need the content of primary study.Therefore, the present embodiment analyzes the dimension of cable according to equipment cable arrangement feature and existing maintainability specification Repair accessibility, obtain the Maintainability Constraints factor of wire cable layout, the Maintainability Constraints factor include the constraint of vision accessibility and/ Or operating space constraint.
Step S102: according to the Maintainability Constraints factor, Maintainability Constraints relationship is established.
Vision accessibility is constrained, is constrained according to the vision accessibility, determines human eye optimal visibility angle and cable dimension Visible area a little is repaired, and according to the visible area at human eye optimal visibility angle and cable repair point, establishes cable dimension A vision accessibility the constraint relationship is repaired, the cable repair point vision accessibility the constraint relationship meets formula:Wherein,For the upper surface C central point m along Z axis forward direction to the upper surface A, B can Depending on tangent plane sabVertical range,For point m to point b distance,For the positive angle of visibility of cable repair key point k,It is the upper surface C central point m along the angle of visibility of Z axis forward direction, C is the square enclosure box of plane on cable repair key point k, A, B be its in front of barrier, point a, b respectively from m point do can the cone and barrier A, B point of contact.
Operating space is constrained, is constrained according to the operating space, determines manpower operating space, and operate according to manpower Cable repair point operating space the constraint relationship is established in space, and cable repair point operating space the constraint relationship meets formula:Wherein,For the operating space radius for repairing key point k, R is to receive in operating space partly Diameter, VQFor the volume of the inscribed sphere of operating space.
Step S103: equipment wire cable layout design objective is analyzed, determines wire cable layout optimization aim.
The wire cable layout optimization aim includes that cable trails are most short and/or cable deformation can be minimum.
Wherein, the cable trails are the sum of the distance of adjacent wire spatial point, and the wiring space point is to equipment Wiring space region carries out the mesh point obtained after gridding processing.
Wherein, the cable deforms the energy that can be generated for cable deformation, and cable deformation mainly cable self weight, cable is curved Caused by bent, cable stretches.
Step S104: according to the Maintainability Constraints relationship and the wire cable layout optimization aim, fusion equipment dimension is established The wire cable layout Optimized model of repairing property.
With cable trails are most short and/or cable deformation can minimum optimization aim, building includes Maintainability Constraints relationship The wire cable layout Optimized model.
The wire cable layout Optimized model further includes the constraint pass of other aspects other than including Maintainability Constraints relationship System, the constraint relationship of the other aspects continues to use previous karyotype studies, such as is needed by the design of electrical system to the equipment Seek the wire cable layout the constraint relationship obtained from being analyzed with cable transmission function association;It is empty by the wiring to the equipment Between structure and environmental quality analyzed obtained from the associated wire cable layout the constraint relationship of cable working environment;By to line The physical characteristic of cable analyzed obtained from the associated wire cable layout the constraint relationship of wire cable layout reasonability.
Step S105: the wire cable layout model is solved, wire cable layout design result is obtained.
According to the wire cable layout optimization aim, optimizes the solution process of the wire cable layout model, obtain wire cable layout Design result.Consider wire cable layout optimization aim substep, reduces calculation amount, prevent calculated result from dissipating.
After obtaining wire cable layout design result, the maintainability analysis tool carried using DELMIA software is to cable cloth Office carries out analysis verifying, to check result.
A kind of wire cable layout design optimization method merging equipment Maintainability provided in an embodiment of the present invention is for equipment line Cable maintainability is analysed in depth, and constructs maintainability from two angles of the angle of visibility of cable attachment point and operating space radius respectively Constraint equation, then propose on the basis of analyzing wire cable layout design objective, deformation most short using cable trails can it is minimum as The optimization aim of entire model, constructs the wire cable layout Optimized model of fusion equipment Maintainability, and process progress is solved to it Optimization, to realize the global optimization of wire cable layout design.Wherein, during carrying out cable repair about beam analysis, synthesis is examined Cable arrangement feature and the existing maintainability for considering equipment are theoretical;In two angles of angle of visibility and operating space radius from cable attachment point During constructing Maintainability Constraints equation, maintenance accessi bility index is comprehensively considered, and combine cable repair actual implementation constraint equation; During determining, deformation energy minimum optimization aim as entire model most short using cable trails, comprehensive various aspects constraint condition, It is to improve the performance reliability of cable, reduce cable designs expense, the space of saving equipment compartment as far as possible and cable weight Target.During establishing wire cable layout Optimized model, comprehensively consider equipment wiring area environment influence, cable physical property constraint with And Maintainability Constraints.During solving process optimization, according to two optimization aims, each constraint condition is considered step by step, and to solution As a result it is verified, to achieve the purpose that reduce the number of iterations optimization wiring result.
Cause to solve existing layout designs due to not fully considering the maintainability in cable later maintenance guarantee The unreasonable problem of wire cable layout, the embodiment of the present invention provide it is a kind of merge equipment Maintainability wire cable layout design optimization side Method includes the following steps: Step 1: being analyzed according to equipment cable arrangement feature its Maintainability Constraints, quantization means cable dimension The Maintainability Constraints of key point are repaired, i.e. concrete analysis equipment cable arrangement feature and maintainability influence factor, determines Maintainability Constraints degree Amount mode, and be indicated in the form of constraint equation.Step 2: analysis cable layout designs task and each constraint.I.e. The mission requirements of concrete analysis equipment wire cable layout design, (need emphasis to consider in conjunction with wiring reality in practical wiring process Constraint), respectively by the electric property of cable, mechanical performance, wiring area environmental quality, cable fixed isolation side Formula, visual and operating space the accessibility of cable attachment point are as layout constraint factor.Step 3: determining wire cable layout optimization Target, building maintenance constraint equation.Wire cable layout demand is made a concrete analysis of, determines optimization aim, and detailed analysis step 2 is true Fixed Routing constraints factor extracts its key variables, constructs constraint equation.Step 4: establishing wire cable layout design mathematic mould Type.That is the optimization aim of the building of combining step three, constraint equation, establish layout optimization mathematical model.Step 5: Optimized model is asked Process is solved, i.e., the Optimized model established for step 4 optimizes its model solution process according to optimization aim, reduces therein change Generation number optimizes final wiring as a result, to realize the process optimization of layout designs work.It is right below with reference to Fig. 1 to Fig. 5 A kind of above-mentioned steps of wire cable layout design optimization method merging equipment Maintainability provided in an embodiment of the present invention are carried out into one Walk explanation.
Step 1: being analyzed according to equipment cable arrangement feature its Maintainability Constraints.
Number of cables is more in facilities cabin, power is different, frequency range difference is big, causes wiring difficulty larger, and locating for it Regional environment it is complex, influence factor in need of consideration also compare it is more;Since the design phase more will not be after cable Phase maintenance is taken into account, and leads to when equipment repair that there are do not see, touched not at part cable connection, especially key node , the problems such as reaching, and than more prominent, therefore the maintainability in cable later period just becomes the content that wiring needs primary study.
When carrying out wire cable layout, for the maintainability for improving cable, it is necessary to ensure that the installation of cable associated components can make to examine It looks into, test, repair and replaces and completed under the smallest aircraft disassembly amount, because when neighbouring structure and aircraft system must be removed When component could be close to wire installation, new pollution, friction and other kinds of damage may be introduced, while will also result in dimension Repair the rising of time and cost.By maintainability basic theory it is found that accessibility, error protection, maintenance safety, testing and diagnosing and Maintenance number suffers from extremely important influence to equipment Maintainability, and should belong to accessibility to cable repair influence is maximum, Therefore the Routing constraints factor of cable repair should be from cable repair accessibility (including vision accessibility, operating space) expansion point Analysis.
Step 2: analysis cable layout designs task and each constraint.
The content that is related to of wire cable layout constraint is very extensive, to guarantee going on smoothly for research, present invention primarily contemplates with The constraint that maintainability is closely related: for the transfer function for completing cable, wire cable layout design need to be with design of electrical system demand Functional restraint;To guarantee that the environment of cable work meets the requirements, using equipment compartment regional environment feature as space constraint;To guarantee line The maintenanceability of cable is constraint with the maintenance accessi bility of cable key position;
It is finally the reasonability for guaranteeing wiring, it need to also be using the physical characteristic of cable as input constraint.Comprehensively considering cable On the basis of above-mentioned constraint condition, equipment, which is typically designed specification, can rebuild wire cable layout design function block diagram, such as Fig. 1 institute To show, the design constraint of the present embodiment further comprises maintenance accessi bility constraint, and the participating department of wire cable layout design, Input model data and the layout result way of output are carried out according to current requirements.
Step 3: determining wire cable layout optimization aim, Maintainability Constraints equation is constructed.
When being laid out design to cable, the constraint condition of mainly comprehensive various aspects, improve cable performance reliability, Space and the cable weight for reducing cable designs expense, saving equipment compartment as far as possible.Since the selection of cable is in layout designs When it has been determined that improve cable performance should shorten its length as far as possible, reduce its deformation, in addition the reduction of design cost It is mainly determined by length of cable, cable weight is also mainly influenced by length at this time.If therefore most short with cable trails, change The minimum optimization aim as entire model of shape energy can meet the requirement of above-mentioned wire cable layout design simultaneously.
If i, j, k, n are the positive integer being not zero, space grating lattice point Qi(x, y, z) is indicated, wiring space point isAnd its weight is Sj, cable repair point useIts angle of visibility, operative radius are respectivelyCable trails point isThen cable trails length Path (Q*) indicate, and the curve after its fitting is used w(u,u*)=0 indicates, wherein u, u*For its parameter.
(1) cable trails length computation
Since cable trails are indicated by path point set here, then the sum of the distance of cable trails length available neighboring point It indicates, then optimization aim can be indicated by formula (1):
In formulaIndicate the distance of consecutive points in cable trails.
(2) cable deformation can calculate
The deformation of cable is usually to be caused by self weight, bending and three aspect of stretching, therefore cable curve model should also express Above-mentioned three classes deform energy out.The smaller curve fold that it is generated of deformation energy is fewer, and slickness is better, is with reference to flexible deformation equation Its energy object function can be expressed by formula (2).
Wherein, α represents drawing coefficient, and β represents bending coefficient, and f represents cable self weight, wu、wuuRespectively its parameter u direction On single order, second order parameter, wherein [0,1] u ∈.
Building for constraint equation, Main Analysis Maintainability Constraints here, and the constraint of other aspects is continued to use forefathers and is ground Study carefully result.According to the analysis result of step 3, its constraint mainly includes two aspect of vision accessibility and operating space.
(1) vision accessibility constrains
General Study visual angle accessibility is mainly using the eyes of people as basic point, research shows that the optimal visibility angle of human eye is 15 °, maximum visual angle is 35 °, it is common can cone method be exactly position and locating visual angle according to maintenance position in the visual field Range is visual to evaluate its, can analyze general cable by the maintenace point visible area analysis chart for constructing as shown in Fig. 2 The visible area of maintenace point, and the maintenace point angle of visibility schematic diagram such as attached drawing 3 is drawn accordingly, it can thus be appreciated that it is in Z axis forward direction Angle of visibilityThe optimal visibility angle of human eye should be met, formula is indicated such as formula 3.
Wherein,It is the upper surface C central point m along the visual tangent plane s of Z axis forward direction to the upper surface A, BabIt is vertical away from From,For point m to point b distance,For repair key point k positive angle of visibility,It is the upper surface C central point m along Z The angle of visibility of axis forward direction, C are the square enclosure box of plane on cable repair key point k, and A, B are the barrier in front of it, point a, b Respectively from m point do can the cone and barrier A, B point of contact.
(2) operating space constrains
According to cable repair feature, the maintenance of cable key point is reduced to naked hand and is operated, according to the human body of 95 percentiles The circle that the rectangle or diameter that the cross section that manpower known to hand sizes standard is clenched fist is 95mm*125mm are 125mm, thus The space that manpower operates can be reduced to the hemisphere that radius is 62.5mm by this, thus the operating space constraint of cable key point maintenance It can simplify and meet radius greater than 62.5mm for " the inscribed sphere " in the collisionless space centered on it.With reference to the accompanying drawings 4 The volume that sphere can be inscribed is expressed as VQAnd operating space radius is indicated with R, then cable repair point operating space radius is about Shu Fangcheng can be expressed as formula 4:
Step 4: establishing wire cable layout design mathematic model.
To sum up the conclusion of step 3 and corresponding physical property, environmental constraint it is found that it is most short with cable routing pathway length, The minimum target of deformation energy, maintainability related request are constraint, can establish wire cable layout Optimized model, see formula (5).
Min Ecurve(u,u*)
Expression formulaFor with cable trails nodeWiring point weight S, radius of curvature R, dimension Repair an angle of visibility MθWith operative radius MrThe cable trails length of expression;EcurveFor with data point u and fixed point u*The cable of expression Deform energy;SjWithRespectively indicate the environmental constraints weight and environmental constraints minimum of j-th of mesh point, Rn(n+1)(n+2)Indicate with The n-th, the cable bend radius that indicates of a path point of (n+1), (n+2), R0Indicate that selected cable allows maximum deflection radius, w () is with i-th of data point uiOr fixed pointThe B-spline curves of expression, ViRefer to i-th of control point, B () be with I-th of data point uiOr fixed pointThe B-spline basic function of expression,For the wiring space point set of Weighted Coefficients, QnFor Wiring space point.
Step 5: Optimized model solves process.
It is the optimization problem of a Bi-objective multiple constraint known to the model that analytical procedure four is established, and solving to it can press General optimization problem is handled.It is contemplated that wire cable layout design work is the process that item optimizes repeatedly, in order to reduce wherein The number of iterations, optimize final wiring as a result, in conjunction with wire cable layout reality, the present invention is to entire layout designs Optimized model It solves process to optimize, specifically, considering environment and Maintainability Constraints, first according to optimization aim with cable trails length For optimization aim, each wiring space point constraint weight and algorithm parameter value are constantly corrected, professional etiquette is clicked through to cable trails and is drawn, then Recycling cubic spline curve is fixed to two-end-point and the cable of known paths point carries out curve fitting, to tentatively obtain cable Path curve;Curvilinear equation establishes energy function equation accordingly again, can be optimization aim with cable deformation, to cable trails curve Local directed complete set is constantly carried out, it is final to realize the energy-optimised of cable.In order to verify the effective and reasonability of path planning, this method Also verified using the maintenance accessi bility that the maintainability analysis function of DELMIA respectively repairs key point to cable, it is defeated if rationally Cable layout designs re-start path planning as a result, modifying relevant parameter if unreasonable out.Its optimum results such as 5 institute of attached drawing Show.
Compared with existing wire cable layout design method, the embodiment of the present invention is had the advantage that
1. equipment Maintainability is dissolved into wire cable layout design rank by the wire cable layout optimization method that the embodiment of the present invention proposes Section so that wire cable layout is more rationally, effectively, while can also effectively improve equipment Safeguard/maintenance efficiency;
2. the model solution flow optimization method that the embodiment of the present invention proposes can greatly improve wire cable layout success rate, drop Low path diameter solves the time;
3. the Maintainability Constraints equation of building of the embodiment of the present invention, with the angle of visibility of cable attachment point and operating space radius It is brief effectively to require to constrain by cable repair for key variables, it ensure that it has while simplifying Optimized model Effect property.
Although describing the invention in detail above, but the invention is not restricted to this, those skilled in the art of the present technique It can be carry out various modifications with principle according to the present invention.Therefore, all to be modified according to made by the principle of the invention, all it should be understood as Fall into protection scope of the present invention.

Claims (10)

1. a kind of wire cable layout design optimization method for merging equipment Maintainability characterized by comprising
Equipment cable repair is analyzed, determines Maintainability Constraints factor;
According to the Maintainability Constraints factor, Maintainability Constraints relationship is established;
Equipment wire cable layout design objective is analyzed, determines wire cable layout optimization aim;
According to the Maintainability Constraints relationship and the wire cable layout optimization aim, the wire cable layout of fusion equipment Maintainability is established Optimized model;
The wire cable layout model is solved, wire cable layout design result is obtained.
2. determining dimension the method according to claim 1, wherein described pair of equipment cable repair is analyzed Repairing property constraint includes:
According to equipment cable arrangement feature and existing maintainability specification, the maintenance accessi bility of cable is analyzed, the maintenance of wire cable layout is obtained Property constraint, the Maintainability Constraints factor include vision accessibility constraint and/or operating space constraint.
3. according to the method described in claim 2, it is characterized in that, described according to the Maintainability Constraints factor, foundation maintenance Property the constraint relationship includes:
It is constrained according to the vision accessibility, determines the visible area at human eye optimal visibility angle and cable repair point;
According to the visible area at human eye optimal visibility angle and cable repair point, cable repair point vision accessibility is established The constraint relationship.
4. according to the method described in claim 3, it is characterized in that, cable repair point vision accessibility the constraint relationship meets Formula:
Wherein,It is the upper surface C central point m along the visual tangent plane s of Z axis forward direction to the upper surface A, BabVertical range,For point m to point b distance,For the positive angle of visibility of cable repair key point k,For the upper surface the C edge central point m The angle of visibility of Z axis forward direction, C are the square enclosure box of plane on cable repair key point k, and A, B are the barrier in front of C, point a, b Respectively from m point do can the cone and barrier A, B point of contact.
5. according to method described in Claims 2 or 3 or 4, which is characterized in that it is described according to the Maintainability Constraints factor, it builds Founding Maintainability Constraints relationship includes:
It is constrained according to the operating space, determines manpower operating space, and according to manpower operating space, establish cable repair point behaviour Make space constraint relationship.
6. according to the method described in claim 5, it is characterized in that, cable repair point operating space the constraint relationship meets public affairs Formula:
Wherein,For the operating space radius for repairing key point k, R is that the radius of a ball, V is inscribed in operating spaceQFor in operating space It receives the volume of body.
7. the method according to claim 1, wherein the wire cable layout optimization aim includes that cable trails are most short And/or cable deformation can be minimum, wherein the cable trails are the sum of the distance of adjacent wire spatial point, the cable deforms energy The energy generated for cable deformation.
8. the method according to the description of claim 7 is characterized in that described according to the Maintainability Constraints relationship and the cable Layout optimization target, the wire cable layout Optimized model for establishing fusion equipment Maintainability include:
With cable trails are most short and/or cable deformation can minimum optimization aim, building includes the described of Maintainability Constraints relationship Wire cable layout Optimized model.
9. according to the method described in claim 8, it is characterized in that, the wire cable layout Optimized model further include:
Cable obtained from being analyzed as the design of electrical system demand to the equipment with cable transmission function association Layout constraint relationship;
It is associated with obtained from being analyzed as wiring space structure to the equipment and environmental quality with cable working environment Wire cable layout the constraint relationship;
It is closed obtained from being analyzed as the physical characteristic to cable with the associated wire cable layout constraint of wire cable layout reasonability System.
10. being obtained the method according to claim 1, wherein described solve the wire cable layout model Wire cable layout design result includes:
According to the wire cable layout optimization aim, optimize the solution process of the wire cable layout model, obtains wire cable layout design As a result.
CN201910002077.5A 2019-01-02 2019-01-02 A kind of wire cable layout design optimization method merging equipment Maintainability Pending CN109740256A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910002077.5A CN109740256A (en) 2019-01-02 2019-01-02 A kind of wire cable layout design optimization method merging equipment Maintainability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910002077.5A CN109740256A (en) 2019-01-02 2019-01-02 A kind of wire cable layout design optimization method merging equipment Maintainability

Publications (1)

Publication Number Publication Date
CN109740256A true CN109740256A (en) 2019-05-10

Family

ID=66363174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910002077.5A Pending CN109740256A (en) 2019-01-02 2019-01-02 A kind of wire cable layout design optimization method merging equipment Maintainability

Country Status (1)

Country Link
CN (1) CN109740256A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113434959A (en) * 2021-06-28 2021-09-24 西北工业大学 Pipeline bending design method in three-dimensional space feasible region
CN114722552A (en) * 2022-06-09 2022-07-08 深圳荣耀智能机器有限公司 Cable length verification method and electronic equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727523A (en) * 2009-12-17 2010-06-09 北京理工大学 Mobile cable modeling and motion simulation method and device based on physical characteristics
CN102323747A (en) * 2011-09-27 2012-01-18 北京理工大学 Method and device for performing assembly simulation on flexible cable
KR20130055781A (en) * 2011-11-21 2013-05-29 다음스틸앤에너지 주식회사 Heating cable layout structure
CN104008256A (en) * 2014-06-13 2014-08-27 北京航空航天大学 DELMIA-based emulational engineering practice method of cable maintenance
CN105160098A (en) * 2015-08-31 2015-12-16 北京航空航天大学 Hybrid modeling method of virtual flexible cable
CN106951635A (en) * 2017-03-20 2017-07-14 南京航空航天大学 A kind of flexible cable path Intelligent planning method for considering gravity constraint rule
CN108829949A (en) * 2018-05-25 2018-11-16 南京航空航天大学 Aircraft secondary distribution system PHM system architecture

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727523A (en) * 2009-12-17 2010-06-09 北京理工大学 Mobile cable modeling and motion simulation method and device based on physical characteristics
CN102323747A (en) * 2011-09-27 2012-01-18 北京理工大学 Method and device for performing assembly simulation on flexible cable
KR20130055781A (en) * 2011-11-21 2013-05-29 다음스틸앤에너지 주식회사 Heating cable layout structure
CN104008256A (en) * 2014-06-13 2014-08-27 北京航空航天大学 DELMIA-based emulational engineering practice method of cable maintenance
CN105160098A (en) * 2015-08-31 2015-12-16 北京航空航天大学 Hybrid modeling method of virtual flexible cable
CN106951635A (en) * 2017-03-20 2017-07-14 南京航空航天大学 A kind of flexible cable path Intelligent planning method for considering gravity constraint rule
CN108829949A (en) * 2018-05-25 2018-11-16 南京航空航天大学 Aircraft secondary distribution system PHM system architecture

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
BIAO QIU 等: "An optimal cable layout method considering maintenance accessibility for aviation equipment", 《2017 SECOND INTERNATIONAL CONFERENCE ON RELIABILITY SYSTEMS ENGINEERING》 *
LONG XUE等: "Research of aircraft equipment cabin layout optimization methods based on virtual maintenance", 《2016 11TH INTERNATIONAL CONFERENCE ON RELIABILITY, MAINTAINABILITY AND SAFETY (ICRMS)》 *
MEIXIA TU 等: "MAINTAINABILITY ANALYSIS AND EVALUATION OF FLEXIBLE CABLES BASED ON DELMIA", 《TRANSACTIONS OF THE CANADIAN SOCIETY FOR MECHANICAL ENGINEERING》 *
WEI WANG 等: "Research on Cable Route Planning Based on Secondary Development of CATIA", 《2018 2ND INTERNATIONAL CONFERENCE ON ENERGY AND POWER ENGINEERING (EPE 2018)》 *
王志斌: "虚拟环境下基于物理属性的线缆布局与装配仿真技术", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113434959A (en) * 2021-06-28 2021-09-24 西北工业大学 Pipeline bending design method in three-dimensional space feasible region
CN113434959B (en) * 2021-06-28 2023-03-03 西北工业大学 Pipeline bending design method in three-dimensional space feasible region
CN114722552A (en) * 2022-06-09 2022-07-08 深圳荣耀智能机器有限公司 Cable length verification method and electronic equipment

Similar Documents

Publication Publication Date Title
CN104598675B (en) A kind of assembly simulation method of the spacecraft parts based on measured data
Lam et al. Bayesian operational modal analysis and Markov chain Monte Carlo-based model updating of a factory building
US8310481B2 (en) Computer aided design method for enhancement of local refinement through T-splines
CN109740256A (en) A kind of wire cable layout design optimization method merging equipment Maintainability
Dirksen et al. On mechanical properties of planar flexure hinges of compliant mechanisms
CN102323747B (en) Method and device for performing assembly simulation on flexible cable
Hermansson et al. Automatic routing of flexible 1D components with functional and manufacturing constraints
CN103680239B (en) 500kV transformer station Three-dimensional Simulation System
CN105160098B (en) A kind of hybrid modeling method of virtual flexible cable
Ma et al. Reliability-based topology optimization framework of two-dimensional phononic crystal band-gap structures based on interval series expansion and mapping conversion method
CN110263493A (en) A kind of room construction area calculation method and device based on REVIT
CN107610165A (en) The 3 D shearing multi-modal medical image sequence fusion methods of wave zone based on multiple features
CN104504175A (en) Simulation system and simulation method for spacecraft assembling
CN107871139A (en) A kind of neighborhood keeps the Method of Data with Adding Windows of embedded innovatory algorithm
Ji et al. Optimization of aero-engine pipeline for avoiding vibration based on length adjustment of straight-line segment
CN102880736B (en) Transformer substation space analysis method based on safe operation
Zhao et al. AI-enabled and multimodal data driven smart health monitoring of wind power systems: A case study
KR102631323B1 (en) Automatic Design Method of Space Layout for Multiple Objects, and Medium Being Recorded with Program for Executing the Method
CN109766641A (en) The multiple physical field CAE modeling method that knowledge based reuses
Vogiatzis et al. Aerothermal modeling for ground-based observatories: present and future
Zhu et al. A hierarchical and process-oriented framework for disassemblability evaluation in product maintainability design
CN108137128A (en) For determining the method and system of connecting element manufacture size
Mao et al. An off-axis flight vision display system design using machine learning
JP4481618B2 (en) Calculation method of linear heating method suitable for machining of large curvature surface
CN103761381B (en) Cap size optimal design method based on compound human factor potential field

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510