CN109736816A - 一种开拓地下采空区或破坏区巷道内矿山资源的施工方式 - Google Patents
一种开拓地下采空区或破坏区巷道内矿山资源的施工方式 Download PDFInfo
- Publication number
- CN109736816A CN109736816A CN201910145948.9A CN201910145948A CN109736816A CN 109736816 A CN109736816 A CN 109736816A CN 201910145948 A CN201910145948 A CN 201910145948A CN 109736816 A CN109736816 A CN 109736816A
- Authority
- CN
- China
- Prior art keywords
- goaf
- area
- tunnel
- punching
- development work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明涉及一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,包括以下步骤:(1)设定路线;(2)钻探打孔;(4)注浆填充;(5)再钻探打孔;(6)再注浆填充;(7)循环操作。步骤(1)中在设定路线时,待开拓巷道与已开拓巷道的相对位置设为若干个。步骤(2)中在进行打孔时,打孔的方向为多个。步骤(3)中的注浆管路设为多路。通过使用本发明提供的施工方式,不但能在采空区或破坏区安全高效布置开拓巷道,而且施工的安全性高,可操作性强,可广泛应用在矿产资源的采空区或破坏区随意布置开拓巷道上,进而应用到地下矿产资源开发技术领域。
Description
技术领域
本发明涉及矿山资源开采技术领域,具体是指一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,具体地,提供了一种可以把地下采空区或破坏区的矿山资源安全挖掘的施工方案。
背景技术
矿山资源日益紧缺不可再生,过去的矿山采掘方式遗留下的采空区或破坏区,还有30%至70%的矿山资源,经过时间的推移,这部分区域严重自然破坏不可恢复,且随着工业的飞速发展,矿产资源逐渐枯竭。在这种情况下,通过合理布置巷道,并保证确切落实国家的相关政策,还要保证在施工过程中的可行性和安全性的施工技术尤为重要。
目前,我国提倡建设绿色环保矿山,并且矿区地面实现了无生活垃圾及无矸石山堆存。矿山资源是不可再生的,矿山企业既要切实落实国家的相关政策,还要保证施工的可行性和安全性。近些年来,传统的矿山开拓巷道技术不仅在开采效率方面不够理想,而且由开采资源所带来的安全隐患着实令人担忧。开拓采空区和破坏区资源巷道的掘进式技术方兴未艾,历经一段时期的探索和调整,在技术工艺和设备的构造水平上已经取代传统的开拓煤矿巷道方法。但在实际应用过程中,依然存在一些制约因素,严重影响安全掘进技术的实施,诸如采空区和破坏区掘进施工过程中增加了安全隐患和实施难度,开拓采空区或破坏区一旦施工就会加大冒顶和坍塌的安全隐患。随着发展,资源极度短缺,现如今矿山的施工方式大多比较落后,安全系数也极低,落后的施工方式使得开采资源浪费严重。
现在的矿山资源行业急切的需要一种可行性高、施工简单、安全性高、资源开采率高的施工方式。
发明内容
为解决上述技术问题,本发明提供的技术方案为:
一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,包括以下步骤:
(1)设定路线:选定好已开拓巷道,选择途径原先开采巷道或不可利用的废旧巷道作为待开拓巷道;
(2)钻探打孔:从已开拓巷道的内部向待开拓巷道的方向打孔,且钻探的方向包括平行与待开拓巷道延伸反向的双线钻孔方向(A)、与双线钻孔方向(A)成一定夹角的双线钻孔方向(B)、双线钻孔方向(C);
(3)铺设管路:利用打孔钻探留下的钻孔对发现的采空区或破坏区铺设注浆管路;
(4)注浆填充:将开拓巷道时产生出的物料、工业垃圾或生活垃圾进行破碎,并向破碎后的混合物添加适当的胶结材料进行混合搅拌形成注浆物,将混合后的注浆物送入到注浆管路中充填加固;
(5)再钻探打孔:按照步骤(2)的操作继续沿着待开拓方向进行打孔;
(6)再注浆填充:在打孔钻探且未发现采空区或破坏区时,正常开拓掘进;当发现采空区或破坏区时,再次利用开拓巷道时产生出的物料、工业垃圾或生活垃圾进行破碎,并向破碎后的混合物中添加适当的胶结材料后进行注浆充填加固;
(7)循环操作:继续按照步骤(1)~(6)进行巷道的开拓,直至完成此巷道的掘进工作。
优选地,步骤(1)中在设定路线时,待开拓巷道与已开拓巷道的相对位置设为若干个。
优选地,步骤(2)中在进行打孔时,打孔的方向为多个。
优选地,步骤(3)中的注浆管路设为多路。
采用以上方法后,本发明具有如下优点:
本施工方案操作安全简单、施工成本低廉,可安全开拓掘进过去开采中形成的矿山资源采空区或破坏区,在一定程度上加大了我国的矿山资源储备量;且本施工方式安全性高和可行性高,具有广泛的推广价值。
附图说明
图1是一种开拓地下采空区或破坏区巷道内矿山资源的施工方式中实施方案的总体示意图;
图2是一种开拓地下采空区或破坏区巷道内矿山资源的施工方式中待开拓巷道的示意图;
图3是一种开拓地下采空区或破坏区巷道内矿山资源的施工方式中注孔方向的示意图;
图4是一种开拓地下采空区或破坏区巷道内矿山资源的施工方式中注浆管路的布置示意图;
图5是一种开拓地下采空区或破坏区巷道内矿山资源的施工方式中再掘进的示意图。
具体实施方式
下面将对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。
结合附图1~5,一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,包括以下步骤:
(1)设定路线:选定好已开拓巷道(D),选择途径原先开采巷道或不可利用的废旧巷道作为待开拓巷道(E);
(2)钻探打孔:从已开拓巷道(D)的内部向待开拓巷道(E)的方向打孔,且钻探的方向包括平行与待开拓巷道延伸反向的双线钻孔方向(A)、与双线钻孔方向(A)成一定夹角的双线钻孔方向(B)、双线钻孔方向(C);
(3)铺设管路:利用打孔钻探留下的钻孔对发现的采空区或破坏区铺设注浆管路(F);
(4)注浆填充:将开拓巷道时产生出的物料、工业垃圾或生活垃圾进行破碎,并向破碎后的混合物添加适当的胶结材料进行混合搅拌形成注浆物,将混合后的注浆物送入到注浆管路中充填加固;
(5)再钻探打孔:按照步骤(2)的操作继续沿着待开拓方向进行打孔;
(6)再注浆填充:在打孔钻探且未发现采空区或破坏区时,正常开拓掘进;当发现采空区或破坏区时,再次利用开拓巷道时产生出的物料、工业垃圾或生活垃圾进行破碎,并向破碎后的混合物中添加适当的胶结材料后进行注浆充填加固;
(7)循环操作:继续按照步骤(1)~(6)进行巷道的开拓,其中,(G)为巷道掘进处,直至完成此巷道的掘进工作。
步骤(1)中在设定路线时,待开拓巷道与已开拓巷道的相对位置设为若干个。
步骤(2)中在进行打孔时,打孔的方向为多个。
步骤(3)中的注浆管路设为多路。
根据图1可知:先选定过去的巷道所在区域(1-1),并拟设定待开拓的采空区或破坏区(1-2),选定计划开拓的巷道(1-3),并开始沿着一定的方向钻孔,且在计划开拓的巷道(1-3)上设置钻孔的观察孔(1-4),利用钻探设施(1-5)进行钻孔操作;在选定注浆区域(1-6)后利用观察孔(1-4)铺设填充注浆管路(1-7),完成注浆操作。
在将物料充填到管道内时,必须保证充填的物料达到设计强度。
Claims (4)
1.一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,其特征在于,包括以下步骤:
(1)设定路线:选定好已开拓巷道,选择途径原先开采巷道或不可利用的废旧巷道作为待开拓巷道;
(2)钻探打孔:从已开拓巷道的内部向待开拓巷道的方向打孔,且钻探的方向包括平行与待开拓巷道延伸反向的双线钻孔方向(A)、与双线钻孔方向(A)成一定夹角的双线钻孔方向(B)、双线钻孔方向(C);
(3)铺设管路:利用打孔钻探留下的钻孔对发现的采空区或破坏区铺设注浆管路;
(4)注浆填充:将开拓巷道时产生出的物料、工业垃圾或生活垃圾进行破碎,并向破碎后的混合物添加适当的胶结材料进行混合搅拌形成注浆物,将混合后的注浆物经注浆管路送入到采空区或破坏区中充填加固;
(5)再钻探打孔:按照步骤(2)的操作继续沿着待开拓方向进行打孔;
(6)再注浆填充:在打孔钻探且未发现采空区或破坏区时,正常开拓掘进;当发现采空区或破坏区时,再次利用开拓巷道时产生出的物料、工业垃圾或生活垃圾进行破碎,并向破碎后的混合物中添加适当的胶结材料后进行注浆充填加固;
(7)循环操作:继续按照步骤(1)~(6)进行巷道的开拓,直至完成此巷道的掘进工作。
2.根据权利要求1所述的一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,其特征在于,步骤(1)中在设定路线时,待开拓巷道与已开拓巷道的相对位置设为若干个。
3.根据权利要求1所述的一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,其特征在于,步骤(2)中在进行打孔时,打孔的方向为多个。
4.根据权利要求1所述的一种开拓地下采空区或破坏区巷道内矿山资源的施工方式,其特征在于,步骤(3)中的注浆管路设为多路。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910145948.9A CN109736816B (zh) | 2019-02-27 | 2019-02-27 | 一种开拓地下采空区或破坏区巷道内矿山资源的施工方式 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910145948.9A CN109736816B (zh) | 2019-02-27 | 2019-02-27 | 一种开拓地下采空区或破坏区巷道内矿山资源的施工方式 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109736816A true CN109736816A (zh) | 2019-05-10 |
CN109736816B CN109736816B (zh) | 2021-01-26 |
Family
ID=66368669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910145948.9A Active CN109736816B (zh) | 2019-02-27 | 2019-02-27 | 一种开拓地下采空区或破坏区巷道内矿山资源的施工方式 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109736816B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09256776A (ja) * | 1996-03-25 | 1997-09-30 | Shimizu Corp | 大断面トンネルとその構築方法及びシールド機 |
US5803665A (en) * | 1995-06-07 | 1998-09-08 | Stephens; Patrick J. | Method and apparatus for continuous production of quick-setting foamed cement grout with selectively adjustable proportions |
CN101117888A (zh) * | 2007-09-19 | 2008-02-06 | 北京科技大学 | 一种地下矿山主溜井的加固方法 |
CN101139911A (zh) * | 2006-09-08 | 2008-03-12 | 西南石油大学 | 注气稳压钻井方法 |
-
2019
- 2019-02-27 CN CN201910145948.9A patent/CN109736816B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5803665A (en) * | 1995-06-07 | 1998-09-08 | Stephens; Patrick J. | Method and apparatus for continuous production of quick-setting foamed cement grout with selectively adjustable proportions |
JPH09256776A (ja) * | 1996-03-25 | 1997-09-30 | Shimizu Corp | 大断面トンネルとその構築方法及びシールド機 |
CN101139911A (zh) * | 2006-09-08 | 2008-03-12 | 西南石油大学 | 注气稳压钻井方法 |
CN101117888A (zh) * | 2007-09-19 | 2008-02-06 | 北京科技大学 | 一种地下矿山主溜井的加固方法 |
Non-Patent Citations (1)
Title |
---|
齐光辉: "小窑破坏区资源复采利用技术实践", 《煤炭工程》 * |
Also Published As
Publication number | Publication date |
---|---|
CN109736816B (zh) | 2021-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107339104B (zh) | 保安隔离矿柱回收方法 | |
CN111636870B (zh) | 一种切顶留巷无煤柱开采方法 | |
US20240102343A1 (en) | Isolated overburden grouting filling method for coal gangue underground emission reduction | |
CN106223998B (zh) | 一种近距离坚硬顶板下岩石保护层工作面瓦斯治理方法 | |
CN106121643B (zh) | 预留护壁矿两步骤嵌套组合充填采矿法 | |
CN109083674B (zh) | 一种适用于切顶卸压110工法开采工作面的安全洁净通风系统 | |
CN107740677A (zh) | 一种横穿工作面的碎软煤层顺层定向长钻孔瓦斯抽采方法 | |
CN103628877A (zh) | 一种多层缓倾斜薄-中厚矿床充填采矿方法 | |
CN1052525C (zh) | 一种露天高台阶采矿方法 | |
CN101725350A (zh) | 下盘沿脉凿岩穿脉进路出矿式崩落采矿法 | |
CN110374601A (zh) | 一种急倾斜双层矿体安全高效采矿法 | |
CN109339783A (zh) | 缓倾斜中厚矿体的进路空场嗣后充填采矿法 | |
CN112253115B (zh) | 近水平煤层巷式胶结充填开采方法 | |
CN102425418A (zh) | 煤矿构造区域人造缺陷体防治冲击地压的方法 | |
CN113236360A (zh) | 开拓巷道群冲击地压防治方法 | |
CN111058847B (zh) | 一种厚大矿体连续大孔径深孔爆破机械化开采方法 | |
CN111364997A (zh) | 上向进路-崩落联合采矿法 | |
CN103411493A (zh) | 一种穿采空区深孔预裂爆破钻孔装药方法 | |
CN109681269A (zh) | 软岩条件下水-沙混合突涌防治技术方法 | |
CN113653492A (zh) | 一种充填开采防治冲击地压方法 | |
CN115749776A (zh) | 一种基于断层注浆改造的煤柱回收方法 | |
CN109539915B (zh) | 切割天井爆破施工方法 | |
CN107152309A (zh) | 一种煤层为主含水层的高水高排水害防治方法 | |
CN111364994B (zh) | 一种综采转充填连续推进协同开采方法 | |
CN112627723A (zh) | 一种用于煤矿采空区煤层气开发的地面钻井方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 048313 Yang Cun Zhen Yang Cun Cun, Lingchuan County, Jincheng City, Shanxi Province Patentee after: Shanxi Hongtai Xufei Construction Co.,Ltd. Address before: No.9, Yangcun new street, Yangcun Town, Lingchuan County, Jincheng City, Shanxi Province 048300 Patentee before: SHANXI HONGTAI XUFEI ENERGY TECHNOLOGY CO.,LTD. |
|
CP03 | Change of name, title or address |