CN109736482A - Overlapped shear wall and its pre-buried production method - Google Patents

Overlapped shear wall and its pre-buried production method Download PDF

Info

Publication number
CN109736482A
CN109736482A CN201910145272.3A CN201910145272A CN109736482A CN 109736482 A CN109736482 A CN 109736482A CN 201910145272 A CN201910145272 A CN 201910145272A CN 109736482 A CN109736482 A CN 109736482A
Authority
CN
China
Prior art keywords
wall
built
fitting
compressible member
mating surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910145272.3A
Other languages
Chinese (zh)
Other versions
CN109736482B (en
Inventor
张猛
马云飞
杨逸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Construction Industry Co Ltd
Original Assignee
Sany Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Construction Industry Co Ltd filed Critical Sany Construction Industry Co Ltd
Priority to CN201910145272.3A priority Critical patent/CN109736482B/en
Publication of CN109736482A publication Critical patent/CN109736482A/en
Application granted granted Critical
Publication of CN109736482B publication Critical patent/CN109736482B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The present invention provides a kind of overlapped shear wall and its production methods, are related to construction engineering technical field, and overlapped shear wall provided by the invention includes: the first wall and the second wall, and the first wall has the first mating surface, and the second wall has the second mating surface;First mating surface is equipped with built-in fitting, and the second wall is embedded with compressible member, and compressible member runs through the second mating surface, and opposite with built-in fitting position.Overlapped shear wall provided by the invention alleviates complicated for operation in overlapped shear wall production process in the related technology, the lower technical problem of production efficiency.

Description

Overlapped shear wall and its pre-buried production method
Technical field
The present invention relates to construction engineering technical fields, more particularly, to a kind of overlapped shear wall and its pre-buried production method.
Background technique
In recent years, assembled architecture development in China's is swift and violent, and a hundred flowers blossom for various new structural systens, mostly with solid prefabricated Based on structure, but problems are found in practice process, as prefabricated components side goes out component production automation journey caused by muscle Spend low, the control of quality caused by live reinforcing bar connects is difficult, and member dead weight leads to greatly that tower crane model is big, on-site hoisting is difficult and fortune Defeated inconvenience, template caused by post-cast strip connects and reinforcing bar workload are big, and artificial demand is big etc..In this background, it assembles whole Body formula overlapped shear wall structure is come into being.
Due to the special construction of overlapped shear wall and production technology is overturn, built-in fitting pre-buried difficulty in the second face wall body, It will appear following several situations in wall production process at this stage: 1, the second face wall body being squeezed by built-in fitting, built-in fitting is buried Enter the second face wall body, the coarse aggregate in pre-buried second face wall body concrete in the process withstands built-in fitting, influences the pressure of built-in fitting Enter;2, side form is preset in the second face wall pre-embedded position, stops the concrete in the second face wall body in advance, realization is pre-buried, but side Mould area occupied is big, and required precision is high, operating difficulties when pre-buried intensive, and pre-buried periphery will form metope gap, increases existing The cost of field construction.Therefore, complicated for operation in overlapped shear wall production process in the related technology, production efficiency is lower.
Summary of the invention
First aspect present invention provides a kind of overlapped shear wall, to alleviate in overlapped shear wall production process in the related technology It is complicated for operation, the lower technical problem of production efficiency.
Overlapped shear wall provided by the invention includes: the first wall and the second wall, and the first wall has the first mating surface, Second wall has the second mating surface;
First mating surface is equipped with built-in fitting, and second wall is embedded with compressible member, and the compressible member runs through Second mating surface, and it is corresponding with the built-in fitting position.
Further, the compressible member includes sponge, and the sponge is embedded at second wall.
Further, the surface opposite with second wall of the sponge is equipped with waterproof layer.
Further, the waterproof layer includes waterproof adhesive tape layer or waterproof coating layer.
Further, the built-in fitting is installed on first wall by fixing piece.
Further, the fixing piece includes expansion bolt, the expansion bolt respectively with the built-in fitting and described One wall connecting.
Further, gasket is equipped between the built-in fitting and first mating surface, the gasket is described for adjusting The distance between built-in fitting and first mating surface.
Further, the gasket includes insulation board, and insulation board is set between the built-in fitting and first mating surface, And it is connect with the fixing piece.
Second aspect of the present invention provides a kind of pre-buried production method of overlapped shear wall, to alleviate overlapping shearing in the related technology It is complicated for operation in wall production process, the lower technical problem of production efficiency.
The pre-buried production method of overlapped shear wall provided by the invention includes:
It is poured the first wall in the side of steel reinforcement cage, built-in fitting is fixedly mounted on the first wall;
Compressible member is fixed in the die station of the second wall, keeps the position of compressible member opposite with the position of built-in fitting;
In the die station upper concrete of the second wall, the compressible member stops concrete, forms the second wall;
First wall is overturn, the steel reinforcement cage is pressed into second walls concrete, squeezes the built-in fitting The compressible member is pressed, the built-in fitting is embedded in second wall in advance.
Further, before the die station upper concrete of second wall, in the side of the compressible member, envelope is set Waterproof layer.
Overlapped shear wall provided by the invention and its production method, overlapped shear wall include: the first wall and the second wall, First wall has the first mating surface cooperated with the second wall, and the second wall has the second cooperation cooperated with the first wall Face;First mating surface is equipped with built-in fitting, and the second wall is embedded with compressible member, and compressible member runs through the second mating surface, and with it is pre- Embedded part position is corresponding.When first wall and the second wall are combined, the first mating surface and the second mating surface phase Right, built-in fitting squeezes compressible member, and built-in fitting occupies the intracorporal space of the second wall that compressible member original occupies, avoids the second wall Coarse aggregate in concrete withstands built-in fitting, to realize that built-in fitting is intracorporal pre-buried in the second wall.
Compared with the relevant technologies, it is built-in fitting that the second wall in overlapped shear wall provided by the invention, which passes through compressible member, Pre-buried space is reserved, it is easy to operate in production process without using side form, to improve production efficiency.
Detailed description of the invention
Technical solution in order to illustrate more clearly of the specific embodiment of the invention or in the related technology, below will be to specific Attached drawing needed in embodiment or description of Related Art is briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of overlapped shear wall provided in an embodiment of the present invention;
Fig. 2 is the decomposition diagram of overlapped shear wall provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the first wall of overlapped shear wall provided in an embodiment of the present invention;
Fig. 4 is the structural schematic diagram of the second wall of overlapped shear wall provided in an embodiment of the present invention.
Icon: the first wall of 100-;The first mating surface of 110-;120- fixing piece;130- gasket;The second wall of 200- Body;The second mating surface of 210-;300- built-in fitting;400- compressible member;500- steel reinforcement cage.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, it includes: the first wall 100 and that the embodiment of the present invention, which provides overlapped shear wall, Two walls 200, the first wall 100 have the first mating surface 110, and the second wall 200 has the second mating surface 210;
First mating surface 110 is equipped with built-in fitting 300, and the second wall 200 is embedded with compressible member 400, and compressible member 400 passes through The second mating surface 210 is worn, and corresponding with 300 position of built-in fitting.
As shown in Figure 1, overlapped shear wall includes steel reinforcement cage 500, the casting of the first wall 100 is formed in the one of steel reinforcement cage 500 Side.The upper surface shown in Fig. 3 of first wall 100 is the first mating surface 110, and built-in fitting 300 is fixedly installed in the first wall 100, and be located in the region that steel reinforcement cage 500 surrounds.The upper surface shown in Fig. 4 of second wall 200 is the second mating surface 210, Compressible member 400 is set to the second mating surface 210, and is embedded at downwards in the second wall 200, specifically, compressible member 400 is transversal The size in face is equal sized with 300 cross section of built-in fitting, or the size of the cross section slightly larger than built-in fitting 300, compressible member 400 along the second wall 200 thickness direction run through the second wall 200.It combines the first wall 100 one with the second wall 200 When rising, built-in fitting 300 squeezes compressible member 400, and built-in fitting 300 occupies in former the second wall 200 occupied of compressible member 400 Space, to realize that built-in fitting 300 is pre-buried in the second wall 200.The size and built-in fitting of the cross section of compressible member 400 The size of 300 cross section is adapted, thus the cross-sectional area and built-in fitting of the placement space formed in the second wall 200 300 cross-sectional area is adapted, and after built-in fitting 300 is placed in the second wall 200, reduces the side of built-in fitting 300 and placement space Gap between wall.
In some embodiments, compressible member 400 includes space wadding and receiving band.Specifically, the shape of bag container is in length Cube shape, and be made of waterproof material, for example, plastic film or rubber membrane etc., space wadding is filled in bag container.Casting second When wall 200, the solid bag container in the die station of the second wall 200, and make the position of bag container with it is pre-buried on the first wall 100 The position of part 300 is corresponding, and bag container can stop concrete, when combining the first wall 100 and the second wall 200, built-in fitting 300 compressible space waddings occupy the space in former the second wall 200 occupied of compressible member 400, realize built-in fitting 300 the It is pre-buried in two walls 200.
In another embodiment, compressible member 400 includes sponge, and sponge is embedded at the second wall 200.
Specifically, sponge is in a rectangular parallelepiped shape, the size of the cross section of sponge is mutually fitted with the size of the cross section of built-in fitting 300 Match.When being poured the second wall 200, the solid bag container in the die station of the second wall 200, and make position and the first wall of bag container The position of built-in fitting 300 on 100 is corresponding, and bag container can stop concrete, combines the first wall 100 and the second wall When 200, the compressible space wadding of built-in fitting 300 occupies the space in former the second wall 200 occupied of compressible member 400, realizes pre- Embedded part 300 is pre-buried in the second wall 200.Compressible member 400 includes sponge, facilitates the ruler according to 300 cross section of built-in fitting The size of very little setting sponge cross section.
Further, the surface opposite with the second wall 200 of sponge is equipped with waterproof layer.It is poured concrete and forms the second wall When body 200, waterproof layer prevents the moisture in concrete from penetrating into sponge, and the compression to sponge is influenced after solidifying in sponge.
Further, waterproof layer includes waterproof adhesive tape layer or waterproof coating layer.
When waterproof layer includes waterproof adhesive tape layer, waterproof adhesive tape along the circumferentially wound side in sponge of the cross section of sponge, Waterproof adhesive tape layer is formed in four sides of sponge.When waterproof layer includes waterproof coating layer, water-repellent paint is sprayed at the four of sponge A side forms waterproof coating layer in the side of sponge.When being poured concrete the second wall 200 of formation, waterproof adhesive tape layer or anti- Water paint layer prevents the moisture in concrete from penetrating into sponge, and the compression to sponge is influenced after solidifying in sponge.
In some embodiments, built-in fitting 300 is embedded in the first wall 100, and protrudes from the first mating surface 110, the When one mating surface 110 is opposite with the second mating surface 210, built-in fitting 300 is located in the former the space occupied of compressible member 400.
In other embodiments, built-in fitting 300 is installed on the first wall 100 by fixing piece 120.
Built-in fitting 300 and fixing piece 120 are oppositely arranged with the first mating surface 110, fixing piece 120 respectively with built-in fitting 300 and first wall 100 connect, so that built-in fitting 300 is installed on the first wall 100.By fixing piece 120 by built-in fitting 300 are installed on the first wall 100, facilitate the installation of built-in fitting 300.
In some embodiments, fixing piece 120 includes screw rod and nut, and screw rod is fixedly installed in the first wall 100, and long It is vertical with the first mating surface 110 to spend direction.Built-in fitting 300 is equipped with the through-hole passed through for screw rod.It is poured the first wall 100 When, according to the installation site of built-in fitting 300, screw rod is defaulted in the first wall 100.When installing built-in fitting 300, screw rod is passed through The end thread far from the first wall 100 of through-hole on built-in fitting 300, nut and screw rod cooperates, so that built-in fitting 300 be pacified Loaded on the first wall 100.
In other embodiments, fixing piece 120 include expansion bolt, expansion bolt respectively with built-in fitting 300 and first Wall 100 connects.
Expansion bolt is fixedly installed in the first wall 100, and length direction is vertical with the first mating surface 110.Built-in fitting 300 It is equipped with the through-hole passed through for expansion bolt.When installing built-in fitting 300, the position that need to be installed according to built-in fitting 300 will expand Bolt is installed on the first wall 100, and expansion bolt passes through the through-hole on built-in fitting 300, nut and expansion bolt far from the The end thread of one wall 100 cooperates, so that built-in fitting 300 is installed on the first wall 100.By expansion bolt by built-in fitting 300 are installed on the first wall 100, can first be poured after forming the first wall 100, are installed according to the position that built-in fitting 300 need to be installed Expansion bolt keeps the installation site of built-in fitting 300 flexible.
Further, gasket 130 is equipped between built-in fitting 300 and the first mating surface 110, gasket 130 is pre-buried for adjusting The distance between part 300 and the first mating surface 110.
As shown in figure 3, gasket 130, between the first mating surface 110 and built-in fitting 300, gasket 130 is equipped with for swollen The upper end of the through-hole that swollen bolt passes through, expansion bolt passes through the through-hole on gasket 130 and through-hole and nut on built-in fitting 300 Cooperation.In built-in fitting 300 and first with gasket 130 is arranged between face, by selecting the gasket 130 of suitable thickness to adjust built-in fitting The distance between 300 upper surface and the first mating surface 110, that is, after adjusting the first wall 100 of combination and the second wall 200, in advance The distance between the surface away from the second mating surface 210 of the upper surface of embedded part 300 and the second wall 200, makes built-in fitting 300 The flush away from the second mating surface 210 of upper surface and the second wall 200.
Further, gasket 130 includes insulation board, and insulation board is set between built-in fitting 300 and the first mating surface 110, and It is connect with fixing piece 120.
Specifically, insulation board, between the first mating surface 110 and built-in fitting 300, insulation board, which is equipped with, is used for expanding screw The through-hole that bolt passes through, the upper end of expansion bolt pass through through-hole and nut cooperation on through-hole and built-in fitting 300 on insulation board, Insulation board and built-in fitting 300 are installed on the first wall 100.The upper end of built-in fitting 300 is adjusted by the insulation board of different-thickness The distance between face and the first mating surface 110.Gasket 130 includes insulation board, realizes and adjusts built-in fitting 300 and the first mating surface Between 110 apart from while, improve the first wall 100 heat insulation effect.
Second aspect of the embodiment of the present invention provides a kind of pre-buried production method of overlapped shear wall, is folded in the related technology with alleviating It is complicated for operation in combination shearing wall production process, the lower technical problem of production efficiency.
The pre-buried production method of overlapped shear wall provided in an embodiment of the present invention includes:
It is poured the first wall 100 in the side of steel reinforcement cage 500, built-in fitting 300 is fixedly mounted on the first wall 100;
Compressible member 400 is fixed in the die station of the second wall 200, makes the position of compressible member 400 and built-in fitting 300 Position is opposite;
In the die station upper concrete of the second wall 200, compressible member 400 stops concrete, forms the second wall 200;
The first wall 100 is overturn, steel reinforcement cage 500 is pressed into 200 concrete of the second wall, makes the extruding of built-in fitting 300 can Built-in fitting 300 is embedded in the second wall 200 by compression piece 400 in advance.
Further, before the die station upper concrete of the second wall 200, in the side of compressible member 400, envelope is set up defences Water layer.
Specifically, first making the steel reinforcement cage 500 of wall, in the side of steel reinforcement cage 500, casting concrete forms the first wall 100, after the concrete of the first wall 100 of maintenance reaches preset strength, built-in fitting 300 and gasket 130 are pacified by fixing piece 120 Loaded on the first wall 100, fixedly connected part includes expansion bolt or screw rod etc..Gasket 130 can be insulation board or other materials system At plate, the adjusting elevation by way of padding gasket 130, it is ensured that built-in fitting 300 top surface overturning after with the second wall 200 Die station face is concordant.When selecting sponge, waterproof layer is set in sponge side, waterproof layer includes waterproof adhesive tape layer or waterproof coating layer, The casting concrete in the die station of the second wall 200, compressible member 400 can stop concrete.When overturning wall, the first wall On 100 concrete fixed built-in fitting 300 by compressible member 400 squeeze it is flat to make built-in fitting 300 as close as possible to 200 mould of the second wall Table top realizes that built-in fitting 300 is pre-buried in 200 concrete of the second wall.The concrete arrival for conserving the second wall 200 again is set After determining intensity, demoulding lifting, the overlapped shear wall with built-in fitting 300 completes.
Overlapped shear wall provided in an embodiment of the present invention and its production method, overlapped shear wall include: 100 He of the first wall Second wall 200, the first wall 100 have the first mating surface 110, and the second wall 200 has the second mating surface 210;First matches Conjunction face 110 is equipped with built-in fitting 300, and the second wall 200 is embedded with compressible member 400, and compressible member 400 runs through the second mating surface 210, and it is corresponding with 300 position of built-in fitting.When first wall 100 and the second wall 200 are combined, first matches Conjunction face 110 and the second mating surface 210 are opposite, and built-in fitting 300 squeezes compressible member 400, and built-in fitting 300 occupies compressible member 400 The space in the second wall 200 that original occupies, avoids the coarse aggregate in 200 concrete of the second wall from withstanding built-in fitting 300, thus Realize that built-in fitting 300 is pre-buried in the second wall 200.
Compared with the relevant technologies, the second wall 200 in overlapped shear wall provided in an embodiment of the present invention passes through compressible Part 400 is that built-in fitting 300 reserves pre-buried space, easy to operate in production process without using side form, to improve production effect Rate.When reserving the pre-buried space of identical size, 400 the space occupied of compressible member is smaller, can be set according to the size of built-in fitting 300 Set the size of compressible member 400, realize arbitrary dimension, any position it is pre-buried.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of overlapped shear wall characterized by comprising the first wall and the second wall, the first wall have the first cooperation Face, second wall have the second mating surface;
First mating surface is equipped with built-in fitting, and second wall is embedded with compressible member, and the compressible member is through described Second mating surface, and it is corresponding with the built-in fitting position.
2. overlapped shear wall according to claim 1, which is characterized in that the compressible member includes sponge, the sponge It is embedded at second wall.
3. overlapped shear wall according to claim 2, which is characterized in that the sponge table opposite with second wall Face is equipped with waterproof layer.
4. overlapped shear wall according to claim 3, which is characterized in that the waterproof layer includes waterproof adhesive tape layer or waterproof Dope layer.
5. overlapped shear wall according to claim 1, which is characterized in that the built-in fitting is installed on described by fixing piece First wall.
6. overlapped shear wall according to claim 5, which is characterized in that the fixing piece includes expansion bolt, described swollen Swollen bolt respectively with the built-in fitting and first wall connecting.
7. overlapped shear wall according to claim 5 or 6, which is characterized in that the built-in fitting and first mating surface Between be equipped with gasket, the gasket is for adjusting the distance between the built-in fitting and first mating surface.
8. overlapped shear wall according to claim 7, which is characterized in that the gasket includes insulation board, the insulation board It is connect between the built-in fitting and first mating surface, and with the fixing piece.
9. a kind of pre-buried production method of overlapped shear wall characterized by comprising
It is poured the first wall in the side of steel reinforcement cage, built-in fitting is fixedly mounted on the first wall;
Compressible member is fixed in the die station of the second wall, keeps the position of compressible member opposite with the position of built-in fitting;
In the die station upper concrete of the second wall, the compressible member stops concrete, forms the second wall;
First wall is overturn, the steel reinforcement cage is pressed into second walls concrete, the built-in fitting is made to squeeze institute Compressible member is stated, the built-in fitting is embedded in second wall in advance.
10. the pre-buried production method of overlapped shear wall according to claim 9, which is characterized in that in second wall Before die station upper concrete, water layer of setting up defences is sealed in the side of the compressible member.
CN201910145272.3A 2019-02-26 2019-02-26 Superimposed shear wall and embedded production method thereof Active CN109736482B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910145272.3A CN109736482B (en) 2019-02-26 2019-02-26 Superimposed shear wall and embedded production method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910145272.3A CN109736482B (en) 2019-02-26 2019-02-26 Superimposed shear wall and embedded production method thereof

Publications (2)

Publication Number Publication Date
CN109736482A true CN109736482A (en) 2019-05-10
CN109736482B CN109736482B (en) 2024-03-29

Family

ID=66368638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910145272.3A Active CN109736482B (en) 2019-02-26 2019-02-26 Superimposed shear wall and embedded production method thereof

Country Status (1)

Country Link
CN (1) CN109736482B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648488A (en) * 2020-04-26 2020-09-11 台州市金天地建设工程有限公司 Building wallboard and construction process thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205421555U (en) * 2016-03-01 2016-08-03 中建五局第三建设有限公司 Super high-rise floor bearing plate steel bar reservation pre-buried structure
KR101740919B1 (en) * 2016-08-18 2017-05-29 동서 피, 씨, 씨 주식회사 Precast concrete wall and manufacturing method of the wall
CN206328893U (en) * 2016-12-30 2017-07-14 周建 A kind of new vertical piece dry type connection shear wall
WO2017206412A1 (en) * 2016-06-03 2017-12-07 长沙远大住宅工业集团股份有限公司 Superimposed assembly-type underground pipe gallery system and construction and manufacturing process
CN209924178U (en) * 2019-02-26 2020-01-10 三一筑工科技有限公司 Superimposed shear wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205421555U (en) * 2016-03-01 2016-08-03 中建五局第三建设有限公司 Super high-rise floor bearing plate steel bar reservation pre-buried structure
WO2017206412A1 (en) * 2016-06-03 2017-12-07 长沙远大住宅工业集团股份有限公司 Superimposed assembly-type underground pipe gallery system and construction and manufacturing process
KR101740919B1 (en) * 2016-08-18 2017-05-29 동서 피, 씨, 씨 주식회사 Precast concrete wall and manufacturing method of the wall
CN206328893U (en) * 2016-12-30 2017-07-14 周建 A kind of new vertical piece dry type connection shear wall
CN209924178U (en) * 2019-02-26 2020-01-10 三一筑工科技有限公司 Superimposed shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648488A (en) * 2020-04-26 2020-09-11 台州市金天地建设工程有限公司 Building wallboard and construction process thereof
CN111648488B (en) * 2020-04-26 2022-03-25 浙江晶天建设有限公司 Building wallboard and construction process thereof

Also Published As

Publication number Publication date
CN109736482B (en) 2024-03-29

Similar Documents

Publication Publication Date Title
CN105239709B (en) A kind of permeability type combination filling box of use metal sheet
CN109736482A (en) Overlapped shear wall and its pre-buried production method
CN204001721U (en) The mould of architectural reserved spool mounting groove
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN108755972A (en) Prefabricated component feet and its application method
CN209040418U (en) A kind of external wall is cast-in-place with prefabricated thermal insulation integral system
CN106567538B (en) A kind of positioning mold of toilet concrete flanging
CN207630235U (en) Mold for building sandwich structure prefabricated panel
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN109208816A (en) A kind of external wall is cast-in-place with prefabricated thermal insulation integral system
CN107237448B (en) The prefabricated interior fill concrete wallboard of one kind and its manufacturing method
CN211221215U (en) Prefabricated mould of house luffer boards
CN204136202U (en) Self-heat conserving non-bearing wall body building block mould for building
CN106476125A (en) A kind of method for producing at a high speed the no model of tiny fragments of stone, coal, etc. railway switch tie and its production switch tie
CN207672830U (en) A kind of concrete floor having foam concrete
CN207160360U (en) Combine floor support plate and building structure
CN209924178U (en) Superimposed shear wall
CN108202388A (en) A kind of can be used for inside and outside wall board production mold of Parameter adjustable and application thereof
CN207244838U (en) Bean column node connects system and assembled wallboard
CN208309796U (en) Premade closure balcony
CN106436973B (en) Steel column arranged in post-cast section of steel shear structure and casting method of steel column
CN109591155A (en) A kind of production method of passive type super low energy consumption outer wall structure of building heat-insulation wall plate
CN204238244U (en) Deep foundation pit construction structure
CN208529368U (en) A kind of production mould for the prefabricated girder of armored concrete
CN217711691U (en) Reinforcing apparatus for unilateral formwork system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 102200 1st floor, building 6, No.8 Beiqing Road, Huilongguan town, Changping District, Beijing

Applicant after: Sany Construction Technology Co.,Ltd.

Address before: 410000 Sany industrial city, Sany Road, Changsha Economic and Technological Development Zone, Hunan Province

Applicant before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant