CN109723176A - The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method - Google Patents

The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method Download PDF

Info

Publication number
CN109723176A
CN109723176A CN201811556157.7A CN201811556157A CN109723176A CN 109723176 A CN109723176 A CN 109723176A CN 201811556157 A CN201811556157 A CN 201811556157A CN 109723176 A CN109723176 A CN 109723176A
Authority
CN
China
Prior art keywords
truss bars
prefabricated panel
piece
external prestressing
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811556157.7A
Other languages
Chinese (zh)
Inventor
高峰
李珂
张少红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Jinan
Original Assignee
University of Jinan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Jinan filed Critical University of Jinan
Priority to CN201811556157.7A priority Critical patent/CN109723176A/en
Publication of CN109723176A publication Critical patent/CN109723176A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of large-span prestressed more piece truss bars superimposed sheets and its construction methods, comprising: (1) mode standard truss bars prefabricated panel selects suitable modular dimension batch production to make;(2) splicing of truss bars prefabricated panel;(3) additional bar is set above close edge joint position;(4) in close jigsaw presstressed reinforcing steel punch position reserving hole;(5) cast-in-place overlapping board concrete;(6) external prestressing steels are worn, are anchored in perimeter support girder tensioning, presstressed reinforcing steel is according to the uniformly distributed arrangement of design.Proposed adoption external prestressing technique of the present invention, apply external prestressing technique when can pass through in-site installation, to reach similar with common truss superimposed sheet production process and construction when component plant produced, when assembled in situ is installed, by the application of external prestressing, superimposed sheet is constrained, realizes effective connection with perimeter support beam, beam bar anchorage capacity destruction and the concrete fracture for preventing splicing position, realize Design and Build.

Description

The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method
Technical field
The invention belongs to technical field of civil engineering, more particularly to a kind of large-span prestressed more piece truss bars overlappings Plate and construction method.
Background technique
According to " notice of green building action scheme " (country's in January, 2013 publication), " built about assembled is greatly developed The instruction built " (2016 Nian9Yue State Council formally issue), " " 13 " assembled architecture action scheme " (firmly the portion of building prints Hair), assembled architecture becomes the industrialized developing direction of building trade, add establish promote the design of building industrialization, construction, The type of standard component is enriched in the standards system of the links such as component production, the standardization of pushing structure part, component, component, is improved logical With property and substitutability, the fabricated construction system for being suitble to industrialized production is promoted, accelerates development the prefabricated of construction project and dress With technology, improving building industrialization Integration ofTechnology level becomes a urgent task of assembled architecture development.
Superimposed sheet is structural elements important in fabricated construction, and it is by one layer that it, which is by prefabricated in conjunction with cast in place process, Cast-in-place concrete is cast in oneself through on prefabricated prefabricated panel, to be fabricated to prefabricated plus cast-in-place laminated floor slab, truss Reinforcing bar prefabricated board is current domestic superimposed sheet prefabricated panel the most popular, and mainly uses the prefabricated panel with protruding bar, But there is unsuitable cast-in-place concrete in component production, construction site installation and need to prop up in the prefabricated panel with protruding bar The problems such as mould, wet construction amount are big and quality cannot be guaranteed.And the biggish unidirectional and bidirectional laminated slab of span is due to by it The demand of size limitation in transit and factory's modularization production is not suitable for carrying out batch Prefabrication in factory, therefore needs The biggish unidirectional and bidirectional laminated slab of span is divided into several plates, by the connection of piece, plate is spliced into and meets work The biggish close piece of span that journey needs is unidirectional and bidirectional laminated slab.But due to the presence of piece, cause concrete discontinuous, Crack-resistant performance of concrete cannot be played, more early so as to cause component, structure crack, and piece position concrete stress is more It concentrates, if concrete cannot be constrained well, concrete is easily caused to be crushed in advance, to influence the bearing capacity and deformation energy of plate Power.Proposed adoption external prestressing technique of the present invention solves the mechanical deficiencies of joggle truss superimposed sheet.
Summary of the invention
In order to solve the above technical problem, the present invention provides a kind of large-span prestressed more piece truss bars superimposed sheets and Construction method.Proposed adoption external prestressing technique of the present invention, it applies external prestressing technique when can pass through in-site installation, from And reach similar with common truss superimposed sheet production process and construction when component plant produced, meet the production of building industrialization component The requirement of mechanization when assembled in situ is installed, by the application of external prestressing, constrains superimposed sheet, realizes and perimeter support beam Effective connection, prevent splicing position beam bar anchorage capacity destroy and concrete fracture, realize Design and Build.
The present invention is achieved through the following technical solutions, and one aspect of the present invention provides a kind of large-span prestressed more pieces The construction method of truss bars superimposed sheet, comprising the following steps:
(1) mode standard truss bars prefabricated panel, this bottom plate can choose suitable modular dimension batch production production;
(2) splicing of truss bars prefabricated panel: prefabricated panel is supported by bottom periphery supporting beam, is laid on floor beam lattice It is interior, bracket is set on perimeter support beam and shelves close jigsaw;
(3) additional bar is set above close edge joint position;
(4) in close jigsaw presstressed reinforcing steel punch position reserving hole;
(5) cast-in-place overlapping board concrete;
(6) external prestressing steels are worn, are anchored in perimeter support girder tensioning, presstressed reinforcing steel is according to the uniformly distributed arrangement of design.
Preferably, the mode standard truss bars prefabricated panel splices in perimeter support beam lattice, piece quantity Take 1-4.
Preferably, prefabricated panel designs truss bars, for can be with compared with large span and the demanding engineering of anti-seismic performance Prefabricated panel with ribbing is taken to add truss bars mode.
Preferably, additional bar is arranged in splicing bottom plate seam crossing;It is reserved that external prestressing steels position is worn in superimposed sheet Then hole pours overlapping layers cast-in-place concrete.
Preferably, wearing external prestressing steels and anchoring in perimeter support girder tensioning, presstressed reinforcing steel can be according to floor beam Lattice size is continuously arranged, when longest floor structure is no more than 50 meters, uninterruptedly can continuously arrange both ends tensioning.
(1) conquassation that fractures of seam crossing concrete can be prevented.
According to prestressed concrete present principles, prestressing force can be equivalent to the even distributed force opposite with presstressed reinforcing steel curvature, Prestressing force will have a rest effect to splice plate in this way, to prevent, seam crossing additional bar is slid and splice plate does not connect It fractures and is crushed as shown in Figure 1 caused by continuous.
(2) recoverability after the whole anti-seismic performance of floor system can be increased and shaken.
The use of stress technique can make structure under routine use or small shake effect, by the effect of connection between component Structure can be made to keep globality;When structure earthquake higher by earthquake intensity, while structural elements does not damage substantially, even It connects region itself and generates moderate finite deformation with dissipation energy, thus achieve the purpose that increase structure ductility, if can reasonably optimize company Construction is connect, post-seismic deformation can also be made to disappear and reduce residual deformation, it might even be possible to replace component after earthquake, completely recovery structure Function, therefore, prestressing force pc structure can be more convenient, and be repaired after economically realizing shake.
(3) high efficiency and green economizing type type of construction may be implemented.
Truss bars prefabricated board is current domestic superimposed sheet prefabricated panel the most popular, and mainly using protruding bar Prefabricated panel, but the prefabricated panel with protruding bar needs cast-in-place concrete periphery, and construction is caused to need formwork, wet construction The problems such as amount is big and the main force part quality in periphery cannot be guaranteed.The close jigsaw of the present invention directly rests on perimeter support beam ox On leg, reduce wet construction amount, improve construction efficiency, saves formwork, while reducing the influence to environment.
(4) meet the needs of industrialized production
Mode standardization design splice plate size and protruding bar removal, may be implemented reduce plant produced mold type from And reach millwork, intelligent production and the standardization and reusability of on-site hoisting frame, meet construction industry work Industry metaplasia, which produces, to be needed.
(5) meet the requirement of construction industry future developing trend.
Fabricated construction is currently in initial stage, due to not solving there are also many technical problems, currently mainly across Degree is smaller, uses in the more intensive residential housing of vertical supporting member.But with the disappearance of China human mortality bonus, building trade Generalling use prefabricated assembled is an irreversible trend, and assembled architecture system is following inevitable to big across, heavy duty greatly The development of type public building, then the ten big technologies that prestressing technique promotes and applies always as the Ministry of Construction first is that being suitble to the development The indispensable technology type of trend.
A kind of large-span prestressed more piece truss bars superimposed sheets obtained according to above-mentioned construction method.
The invention has the benefit that
(1) proposed adoption external prestressing technique of the present invention, it applies external prestressing technique when can pass through in-site installation, thus Reach similar with common truss superimposed sheet production process and construction when component plant produced, meets building industrialization component manufacturing machine The requirement of tool when assembled in situ is installed, by the application of external prestressing, constrains superimposed sheet, realizes and perimeter support beam Effectively connection prevents beam bar anchorage capacity destruction and the concrete fracture at splicing position, realizes Design and Build.
(2) the piece quantity of the more piece superimposed sheet floorings of the present invention can realize 1-4, and external prestressing connection piece is formed The external prestressing steels arrangement form of whole more piece laminated floor slabs;Water in the floorboard plane of bracket is arranged in perimeter support beam Flat constraint construction.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is close stacked plywood prestress application schematic diagram;
Fig. 2 is the top view of large-span prestressed more piece truss bars superimposed sheets;
Fig. 3 is the main view of large-span prestressed more piece truss bars superimposed sheets;
Fig. 4 is the schematic diagram at the splicing seams of large-span prestressed more piece truss bars superimposed sheets;
Fig. 5 is the schematic diagram at the splicing seams of large-span prestressed more piece truss bars superimposed sheets.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
With reference to the accompanying drawing and specific embodiment is further described application principle of the invention.
Embodiment 1, a kind of construction method of large-span prestressed more piece truss bars superimposed sheets, comprising the following steps:
(1) mode standard truss bars prefabricated panel, this bottom plate can choose suitable modular dimension batch production production;
(2) splicing of truss bars prefabricated panel: prefabricated panel is supported by bottom periphery supporting beam, is laid on floor beam lattice It is interior, bracket is set on perimeter support beam and shelves close jigsaw;
(3) additional bar is set above close edge joint position;
(4) in close jigsaw presstressed reinforcing steel punch position reserving hole;
(5) cast-in-place overlapping board concrete;
(6) external prestressing steels are worn, are anchored in perimeter support girder tensioning, presstressed reinforcing steel is according to the uniformly distributed arrangement of design.
In the present embodiment, the mode standard truss bars prefabricated panel splices in perimeter support beam lattice, piece number Measure 1-4.
In the present embodiment, prefabricated panel designs truss bars, for can compared with large span and the demanding engineering of anti-seismic performance To take prefabricated panel with ribbing to add truss bars mode.
In the present embodiment, additional bar is set in splicing bottom plate seam crossing;It is pre- that external prestressing steels position is worn in superimposed sheet It boxes out hole, then pours overlapping layers cast-in-place concrete.
In the present embodiment, wears external prestressing steels and anchored in perimeter support girder tensioning, presstressed reinforcing steel can be according to flooring Beam lattice size is continuously arranged, when longest floor structure is no more than 50 meters, uninterruptedly can continuously arrange both ends tensioning.
(1) conquassation that fractures of seam crossing concrete can be prevented.
According to prestressed concrete present principles, prestressing force can be equivalent to the even distributed force opposite with presstressed reinforcing steel curvature, Prestressing force will have a rest effect to splice plate in this way, to prevent, seam crossing additional bar is slid and splice plate does not connect It fractures and is crushed as shown in Figure 1 caused by continuous.
(2) recoverability after the whole anti-seismic performance of floor system can be increased and shaken.
The use of stress technique can make structure under routine use or small shake effect, by the effect of connection between component Structure can be made to keep globality;When structure earthquake higher by earthquake intensity, while structural elements does not damage substantially, even It connects region itself and generates moderate finite deformation with dissipation energy, thus achieve the purpose that increase structure ductility, if can reasonably optimize company Construction is connect, post-seismic deformation can also be made to disappear and reduce residual deformation, it might even be possible to replace component after earthquake, completely recovery structure Function, therefore, prestressing force pc structure can be more convenient, and be repaired after economically realizing shake.
(3) high efficiency and green economizing type of construction may be implemented.
Truss bars prefabricated board is current domestic superimposed sheet prefabricated panel the most popular, and mainly using protruding bar Prefabricated panel, but the prefabricated panel with protruding bar needs cast-in-place concrete periphery, and construction is caused to need formwork, wet construction The problems such as amount is big and the main force part quality in periphery cannot be guaranteed.The close jigsaw of the present invention directly rests on perimeter support beam ox On leg, reduce wet construction amount, improve construction efficiency, saves formwork, while reducing the influence to environment.
(4) meet the needs of industrialized production
Mode standardization design splice plate size and protruding bar removal, may be implemented reduce plant produced mold type from And reach millwork, intelligent production and the standardization and reusability of on-site hoisting frame, meet construction industry work Industry metaplasia, which produces, to be needed.
(5) meet the requirement of construction industry future developing trend.
Fabricated construction is currently in initial stage, due to not solving there are also many technical problems, currently mainly across Degree is smaller, uses in the more intensive residential housing of vertical supporting member.But with the disappearance of China human mortality bonus, building trade Generalling use prefabricated assembled is an irreversible trend, and assembled architecture system is following inevitable to big across, heavy duty greatly The development of type public building, then the ten big technologies that prestressing technique promotes and applies always as the Ministry of Construction first is that being suitble to the development The indispensable technology type of trend.
A kind of large-span prestressed more piece truss bars superimposed sheets obtained according to above-mentioned construction method.
Proposed adoption external prestressing technique of the present invention, it applies external prestressing technique when can pass through in-site installation, from And reach similar with common truss superimposed sheet production process and construction when component plant produced, meet the production of building industrialization component The requirement of mechanization realizes that Design and Build, prestressed application construction are as shown in Figure 2-5.
Certainly, above description is also not limited to the example above, technical characteristic of the present invention without description can by or It is realized using the prior art, details are not described herein;Above embodiments and attached drawing are only used to illustrate the technical scheme of the present invention not It is limitation of the present invention, is described the invention in detail referring to preferred embodiment, the ordinary skill people of this field Member is it should be appreciated that variation, remodeling, the addition that those skilled in the art are made within the essential scope of the present invention Or replacement also should belong to claims of the invention without departure from spirit of the invention.

Claims (6)

1. a kind of construction method of large-span prestressed more piece truss bars superimposed sheets, it is characterised in that: the following steps are included:
Mode standard truss bars prefabricated panel, this bottom plate can choose suitable modular dimension batch production production;
The splicing of truss bars prefabricated panel: prefabricated panel being supported by bottom periphery supporting beam, is laid in floor beam lattice, Bracket is set on perimeter support beam and shelves close jigsaw;
Additional bar is set above close edge joint position;
In close jigsaw presstressed reinforcing steel punch position reserving hole;
Cast-in-place overlapping board concrete;
External prestressing steels are worn, are anchored in perimeter support girder tensioning, presstressed reinforcing steel is according to the uniformly distributed arrangement of design.
2. the construction method of the large-span prestressed more piece truss bars superimposed sheets of one kind according to claim 1, special Sign is: the mode standard truss bars prefabricated panel splices in perimeter support beam lattice, and piece quantity takes 1-4.
3. the construction method of the large-span prestressed more piece truss bars superimposed sheets of one kind according to claim 1, special Sign is: prefabricated panel designs truss bars, with ribbing pre- for that can take compared with large span and the demanding engineering of anti-seismic performance Bottom plate processed adds truss bars.
4. the construction method of the large-span prestressed more piece truss bars superimposed sheets of one kind according to claim 1, special Sign is: additional bar is arranged in splicing bottom plate seam crossing;External prestressing steels position reserving hole is worn in superimposed sheet, is then poured Build overlapping layers cast-in-place concrete.
5. the construction method of the large-span prestressed more piece truss bars superimposed sheets of one kind according to claim 1, special Sign is: wearing external prestressing steels and anchors in perimeter support girder tensioning, presstressed reinforcing steel can be continuous according to floor beam lattice size Arrangement uninterruptedly can continuously arrange both ends tensioning when longest floor structure is no more than 50 meters.
6. a kind of large-span prestressed more piece truss bars superimposed sheets described in any item according to claim 1~5.
CN201811556157.7A 2018-12-19 2018-12-19 The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method Pending CN109723176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811556157.7A CN109723176A (en) 2018-12-19 2018-12-19 The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811556157.7A CN109723176A (en) 2018-12-19 2018-12-19 The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method

Publications (1)

Publication Number Publication Date
CN109723176A true CN109723176A (en) 2019-05-07

Family

ID=66297652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811556157.7A Pending CN109723176A (en) 2018-12-19 2018-12-19 The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method

Country Status (1)

Country Link
CN (1) CN109723176A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457948A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Splicing seam structure of prefabricated bottom plate of bidirectional laminated slab and construction method of splicing seam structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1544773A (en) * 2003-11-14 2004-11-10 建研科技股份有限公司 Secondary prestress assembly integral concrete slab and construction process
CN2752360Y (en) * 2004-09-23 2006-01-18 昆明理工大学 Prefabricated floor slab with boundary beam
CN106639093A (en) * 2017-01-17 2017-05-10 沈阳建筑大学 Close splicing seam-type laminated slab
CN106639094A (en) * 2017-02-21 2017-05-10 哈尔滨达城绿色建筑技术开发股份有限公司 Assembling type post-tensioned pre-stressing steel reinforced concrete bidirectional laminated board for aggregate building
CN207582764U (en) * 2017-12-04 2018-07-06 浙江大学 A kind of close spelling laminated floor slab connecting joint structure of end fluting
CN208088615U (en) * 2017-11-24 2018-11-13 中民筑友科技投资有限公司 A kind of prefabricated board and hollow laminated floor slab

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1544773A (en) * 2003-11-14 2004-11-10 建研科技股份有限公司 Secondary prestress assembly integral concrete slab and construction process
CN2752360Y (en) * 2004-09-23 2006-01-18 昆明理工大学 Prefabricated floor slab with boundary beam
CN106639093A (en) * 2017-01-17 2017-05-10 沈阳建筑大学 Close splicing seam-type laminated slab
CN106639094A (en) * 2017-02-21 2017-05-10 哈尔滨达城绿色建筑技术开发股份有限公司 Assembling type post-tensioned pre-stressing steel reinforced concrete bidirectional laminated board for aggregate building
CN208088615U (en) * 2017-11-24 2018-11-13 中民筑友科技投资有限公司 A kind of prefabricated board and hollow laminated floor slab
CN207582764U (en) * 2017-12-04 2018-07-06 浙江大学 A kind of close spelling laminated floor slab connecting joint structure of end fluting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457948A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Splicing seam structure of prefabricated bottom plate of bidirectional laminated slab and construction method of splicing seam structure

Similar Documents

Publication Publication Date Title
WO2019056717A1 (en) Post-tensioned prestressed assembly-style system of concrete framework and shock-resistant and energy-dissipating components, and construction method
EA029731B1 (en) Method of casting in-situ steel wire mesh cement slab with spliced rack and suspended formwork
CN103510639A (en) Overlapped plate type shear wall with restorability and constructing method thereof
CN110846996A (en) Construction method of continuous composite beam bridge and continuous composite beam bridge
CN109811948A (en) A kind of dual-prestressed composite frame of large span and floor system and construction method
CN113653235A (en) Laminated slab, connecting structure of laminated slab and combination beam and construction method
CN108104345B (en) Large-span prestressed lightweight aggregate concrete superimposed sheet
CN203640084U (en) Superimposed slab shear wall with restorable function
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
KR101243777B1 (en) Rahmen bridge using composite structure of corrugated steel web and concrete member and constructing method thereof
CN109723176A (en) The large-span prestressed more piece truss bars superimposed sheets of one kind and construction method
KR100978463B1 (en) Method making a prestressed girder added prestress to the steel plate
CN108412099A (en) Bar connecting formula concrete prefabricated board and connection method are buried after through thickness
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN113356428B (en) Prestress superposed integral floor system applied to fabricated building and construction method
CN113123506B (en) Prefabricated die-removal-free steel bar truss floor bearing plate based on uhpc and using method
CN210369316U (en) Steel construction adds armpit combination beam module
CN112900949A (en) Assembled reinforced concrete one-way multi-ribbed laminated slab floor and construction method thereof
CN113152761A (en) Assembled reinforced concrete bidirectional ribbed laminated slab floor and construction method thereof
CN111576709A (en) Prefabricated local coincide floor
CN220451082U (en) UHPC (ultra high Performance) connected precast concrete frame structure system
CN216766438U (en) Detachable steel beam assembly type structure
CN215054413U (en) Assembled reinforced concrete bidirectional dense rib laminated slab floor
CN212099911U (en) Backing plate for transporting irregular prefabricated building panels
CN218714067U (en) Sectional post-tensioned prestressed splicing node of assembled self-resetting concrete member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507

RJ01 Rejection of invention patent application after publication