CN109722269A - A kind of delayed coking coke drum mechanical steam recompression pre-heating technique - Google Patents

A kind of delayed coking coke drum mechanical steam recompression pre-heating technique Download PDF

Info

Publication number
CN109722269A
CN109722269A CN201910040957.1A CN201910040957A CN109722269A CN 109722269 A CN109722269 A CN 109722269A CN 201910040957 A CN201910040957 A CN 201910040957A CN 109722269 A CN109722269 A CN 109722269A
Authority
CN
China
Prior art keywords
coke drum
delayed coking
heating
compression machine
vapour compression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910040957.1A
Other languages
Chinese (zh)
Inventor
林永波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910040957.1A priority Critical patent/CN109722269A/en
Publication of CN109722269A publication Critical patent/CN109722269A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of delayed coking coke drum mechanical steam recompression pre-heating techniques, including two coke drums, heating equipment, vapour compression machine, automatic control adjustable valve and combustible gas alarming instrument, it is characterized in that, two coke drum tops and automatic control adjustable valve, combustible gas alarming instrument, vapour compression machine and heating equipment are connected to two coke drum lower parts with pipeline, form close loop;Overheated steam is full of in close loop, the mechanical energy of the vapour compression machine will enter heating equipment after the next steam adherence pressure of coke drum top, promotion temperature and reheat, preheats subsequently into coke drum bottom to coke drum;The present invention uses mechanical steam recompression technology, the vapor of conveying process conditions harshness can be stablized as heating meson, it is preheated to coke drum, energy-saving and emission-reduction, the steady material balance and heat balance of apparatus system, reduce the cyclic swing of device, the liquid for improving device is received, product quality is improved, coke drum preheating time is shortened, avoids and gets rid of oily formation.

Description

A kind of delayed coking coke drum mechanical steam recompression pre-heating technique
Technical field
The present invention relates to technical field of petrochemical industry, and in particular to Coking Tower for Delayed Coking Unit mechanical steam recompression Pre-heating technique.
Background technique
The delayed coking unit of petrochemical industry at present, the process of the preheating of coke drum are to open the ball collar of new column overhead Valve produces after the high-temperature oil gas of tower flows to tower bottom heat exchange liquefaction from the tower top of new tower, into getting rid of oil tank to give the preheating of new tower tower wall To 330 DEG C or so.
The stifled burnt valve coke drum pre-heating technique of this nothing, generally needs 6 hours, new tower is preheated with the high-temperature oil gas of production tower To 330 DEG C or so, and when cutting tower, feeding temperature is 487 DEG C, 150 DEG C of difference variation of moment can STRENGTH ON COKE tower damage, subtract The service life of few coke drum;Meanwhile new 330 DEG C of tower or so of environment temperature, it can not meet required absorption when residual oil thermal cracking Heat, residual oil heat scission reaction is insufficient;So the material balance of whole system and heat are flat before and after causing coke drum to cut tower Weighing apparatus destroys, and causes the cyclic fluctuation of apparatus system, increases the operation difficulty of device, reduces liquid receipts, reduces product matter The control precision of amount, and cause the unnecessary loss of heat.
Summary of the invention
Present invention aims to overcome that the defect of the prior art, the material balance and heat of a kind of ballast system provided are flat Weighing apparatus improves product quality, is energy-saving, improving liquid receipts, optimization apparatus system technological operation, shortens coke drum preheating time, Avoid the delayed coking coke drum pre-heating technique for getting rid of oil formation.
To achieve the above object, the present invention includes two coke drums, heating equipment, vapour compression machine, automatic control adjustable valve and can Fire gas alarm instrument, which is characterized in that two coke drum tops and automatic control adjustable valve, combustible gas alarming instrument, steam Compressor and heating equipment are connected to two coke drum lower parts with pipeline, form close loop;Superheated water is full of in close loop The mechanical energy of steam, the vapour compression machine will enter heating after the next steam adherence pressure of coke drum top, promotion temperature Equipment reheats, and preheats subsequently into coke drum bottom to coke drum, so recycles, the temperature of coke drum is gradually increased, until Coke drum is preheating to the temperature of needs.
The operating temperature of the vapour compression machine is variation, and range is 80 DEG C -350 DEG C.
The range of the vapour compression machine adherence pressure is 0.03MPa-0.5MPa.
The range that the vapour compression machine promotes temperature is 5 DEG C -150 DEG C.
The range that the heating equipment is heated to steam is 330 DEG C -550 DEG C.
Temperature range after the delayed coking coke drum lower part preheating is 330 DEG C -550 DEG C.
The delayed coking coke drum mechanical steam recompression pre-heating technique operation is intermittent operation mode.
The present invention compared with the pre- thermal flow process of coke drum compare, using mechanical steam recompression technology, can stablize defeated It send the vapor of process conditions harshness as heating meson, and promotes the pressure and temperature of steam, the preheating of coke drum safety To suitable operation temperature, energy-saving and emission-reduction, the steady material balance and heat balance of apparatus system reduces the period of device Fluctuation, the liquid for improving device are received, improve product quality, shorten coke drum preheating time, avoid and get rid of oily formation.
Detailed description of the invention
A kind of delayed coking coke drum mechanical steam recompression pre-heating technique provided in an embodiment of the present invention shown in Fig. 1 Schematic diagram;
Referring to Fig. 1,1 is coke drum;2 be heating equipment;3 be vapour compression machine;4 be flammable gas alarm;5,6,7 be automatic control Regulating valve;8 be thermocouple.
Specific embodiment
In order to which the objects, technical solutions and advantages of invention are more clearly understood, below in conjunction with attached drawing, the present invention is carried out It is further described.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to limit The present invention.
As shown in Figure 1, as an embodiment, a kind of delayed coking coke drum mechanical steam recompression pre-heating technique, two A coke drum 1, top and automatic control adjustable valve 5,6,7, flammable gas alarm 4, vapour compression machine 3, heating equipment 2 are connected with pipeline Two coke drum lower parts are connected to, close loop is formed;In the new tower of coke drum, normally pre- thermal flow process, steam catch up with air, and pressure testing is run Gas, after being dehydrated link, at this moment the pressure of the new tower of coke drum is 0.2Mpa or so;Automatic control adjustable valve 5 is closed, 6 is opened, 7 open, with coke Charcoal tower 1, steam perforation flammable gas alarm 4, vapour compression machine 3, heating equipment 2, place's circulation line, steam is from from control It saves valve 7 to be discharged, allows entire close loop to fill interior full steam, and drain in lower, establish close loop process.Start steam compressed Steam adherence pressure that machine comes to coke drum top promotes temperature, and heating equipment is entered after both vapor compression and is reheated and closed It is recycled in loop, to the new tower safe prewarming of coke drum to the temperature needed;It is severe that vapour compression machine can stablize conveying process conditions For the vapor at quarter as heating meson, the range that heating equipment is heated to steam is 300 DEG C -550 DEG C, is giving the new tower of coke drum During preheating, controls the steam pressure in close loop and be no more than Coke Drum Design permission pressure, highest preheating temperature is not Allow temperature more than Coke Drum Design, after the new tower of coke drum is preheating to the temperature of needs, steam run by pressure-control valve 7, The steam in the new tower of coke drum is exhausted as far as possible according to the temperature change of thermocouple 8, reduces the vapor volume for entering fractionating system, in order to avoid The unnecessary load of increase system.
The above coke drum of the present invention preheats embodiment, and the quality of the steam meets Pistonless compressor and heating equipment Technique requirement.

Claims (7)

1. a kind of delayed coking coke drum mechanical steam recompression pre-heating technique, including two coke drums, heating equipment, vapour pressure Contracting machine, automatic control adjustable valve and flammable gas alarm, which is characterized in that two coke drum tops and automatic control adjustable valve, Flammable gas alarm, vapour compression machine and heating equipment are connected to two coke drum lower parts with pipeline, form close loop;It is close The interior steam adherence pressure that full of overheated steam, the mechanical energy of the vapour compression machine carrys out coke drum top of closed-loop, Enter heating equipment reheating after promoting temperature, gives coke drum to preheat subsequently into coke drum bottom, so recycle, be gradually increased The temperature of coke drum, the temperature until coke drum being preheating to needs.
2. a kind of delayed coking coke drum mechanical steam recompression pre-heating technique according to claim 1, feature exist In the operating temperature of the vapour compression machine is variation, and range is 80 DEG C -350 DEG C.
3. a kind of delayed coking coke drum mechanical steam recompression pre-heating technique according to claim 1, feature exist In the range of the vapour compression machine adherence pressure is 0.03MPa-0.5MPa.
4. a kind of delayed coking coke drum mechanical steam recompression pre-heating technique according to claim 1, feature exist In the range that the vapour compression machine promotes temperature is 5 DEG C -150 DEG C.
5. a kind of delayed coking coke drum mechanical steam recompression pre-heating technique according to claim 1, feature exist In the range that the heating equipment is heated to steam is 330 DEG C -550 DEG C.
6. a kind of delayed coking coke drum mechanical steam recompression pre-heating technique according to claim 1, feature exist In the temperature range after the delayed coking coke drum lower part preheating is 330 DEG C -550 DEG C.
7. a kind of delayed coking coke drum mechanical steam recompression pre-heating technique according to claim 1, feature exist In the technological operation is intermittent operation mode.
CN201910040957.1A 2019-01-16 2019-01-16 A kind of delayed coking coke drum mechanical steam recompression pre-heating technique Pending CN109722269A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910040957.1A CN109722269A (en) 2019-01-16 2019-01-16 A kind of delayed coking coke drum mechanical steam recompression pre-heating technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910040957.1A CN109722269A (en) 2019-01-16 2019-01-16 A kind of delayed coking coke drum mechanical steam recompression pre-heating technique

Publications (1)

Publication Number Publication Date
CN109722269A true CN109722269A (en) 2019-05-07

Family

ID=66298302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910040957.1A Pending CN109722269A (en) 2019-01-16 2019-01-16 A kind of delayed coking coke drum mechanical steam recompression pre-heating technique

Country Status (1)

Country Link
CN (1) CN109722269A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110527548A (en) * 2019-09-06 2019-12-03 林永波 A kind of delayed coking coke drum conduction oil circulation preheating device and technique

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4797197A (en) * 1985-02-07 1989-01-10 Mallari Renato M Delayed coking process
CN104232145A (en) * 2014-05-28 2014-12-24 林永波 Gas circular preheating device and process for delayed coking coke tower
CN204111680U (en) * 2014-07-31 2015-01-21 天津市瑞德赛恩新材料开发有限公司 A kind of delayed coking reaction device
CN104974782A (en) * 2015-06-26 2015-10-14 林永波 Delayed-coking coke tower outside-system heating and preheating device and technology
CN107510949A (en) * 2017-09-26 2017-12-26 深圳市蓝石环保科技有限公司 A kind of MVR vapo(u)rization systems
CN108102688A (en) * 2017-12-28 2018-06-01 林永波 A kind of delayed coking coke drum heat control technique
CN108159719A (en) * 2018-01-08 2018-06-15 南京工业大学 A kind of energy-efficient MVR evaporation concentration systems

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4797197A (en) * 1985-02-07 1989-01-10 Mallari Renato M Delayed coking process
CN104232145A (en) * 2014-05-28 2014-12-24 林永波 Gas circular preheating device and process for delayed coking coke tower
CN204111680U (en) * 2014-07-31 2015-01-21 天津市瑞德赛恩新材料开发有限公司 A kind of delayed coking reaction device
CN104974782A (en) * 2015-06-26 2015-10-14 林永波 Delayed-coking coke tower outside-system heating and preheating device and technology
CN107510949A (en) * 2017-09-26 2017-12-26 深圳市蓝石环保科技有限公司 A kind of MVR vapo(u)rization systems
CN108102688A (en) * 2017-12-28 2018-06-01 林永波 A kind of delayed coking coke drum heat control technique
CN108159719A (en) * 2018-01-08 2018-06-15 南京工业大学 A kind of energy-efficient MVR evaporation concentration systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵家荣 等主编: "《十二五重点节能工程研究报告》", vol. 2013, 中国经济出版社, pages: 217 - 219 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110527548A (en) * 2019-09-06 2019-12-03 林永波 A kind of delayed coking coke drum conduction oil circulation preheating device and technique

Similar Documents

Publication Publication Date Title
CN104232145B (en) A kind of delayed coking coke drum gas circulation primary heater unit and technique
CN102389758B (en) A kind of glass-lined reactor and manufacture method thereof
US20080109107A1 (en) Method of performing a decoking cycle
CN109722269A (en) A kind of delayed coking coke drum mechanical steam recompression pre-heating technique
CN101020827A (en) Bamboo charing heating furnace, kettle, system and process
CN108102688A (en) A kind of delayed coking coke drum heat control technique
CN104896926B (en) The heating furnace of a kind of multiple hearth structure and method for designing thereof and purposes
CN101638585A (en) Delayed coking method
CN104974782A (en) Delayed-coking coke tower outside-system heating and preheating device and technology
CN204251558U (en) A kind of delayed coking coke drum gas circulation primary heater unit
US20190100700A1 (en) Industrial process using a forced-exhaust metal furnace and mechanisms developed for simultaneously producing coal, fuel gas, pyroligneous extract and tar
CN101724740B (en) Method for heat treatment of P92 steel
CN201077829Y (en) Coke tower bottom feeder
CN204874413U (en) Heat supply preheating device outside delayed coking coke drum system
CN110527548A (en) A kind of delayed coking coke drum conduction oil circulation preheating device and technique
CN210001826U (en) mechanical vapor recompression preheating device for delayed coking coke drum
CN203487100U (en) Coke tower preheating device
CN103059887B (en) Horizontal reaction kettle delayed coking equipment and process thereof
CN207002646U (en) A kind of delayed coking unit with multistage pre- hot function
CN214654670U (en) Delayed coking coke tower heat control device
CN206385090U (en) A kind of coke drum preheating device
CN103062888B (en) Heating furnace for processing aromatic hydrocarbon oils from heavy components of petroleum
US4432726A (en) Centralized ladle heating and drying system
CN104152616A (en) Top pressure increasing baking method of blast furnace
CN203148008U (en) Heating furnace for aromatic hydrocarbon processed from oil heavy components

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination