CN109707446A - Tunnel center gutter template component, gutter structure and its construction method - Google Patents

Tunnel center gutter template component, gutter structure and its construction method Download PDF

Info

Publication number
CN109707446A
CN109707446A CN201910092230.8A CN201910092230A CN109707446A CN 109707446 A CN109707446 A CN 109707446A CN 201910092230 A CN201910092230 A CN 201910092230A CN 109707446 A CN109707446 A CN 109707446A
Authority
CN
China
Prior art keywords
gutter
space
tunnel
template
principal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910092230.8A
Other languages
Chinese (zh)
Inventor
韦州骞
潘彦邑
秦智成
李轰
陈永康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201910092230.8A priority Critical patent/CN109707446A/en
Publication of CN109707446A publication Critical patent/CN109707446A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of tunnel center gutter template component, gutter structure and its construction methods, it include: that the exterior sheathing being placed in tunnel substrate casting space to form gutter construction space to pour, and is formed by the side spaces that gutter construction space includes principal space and is connected with principal space;The inner template being placed in the principal space separates principal space and side spaces by the inner template, in pouring to form main structure in principal space, gutter is formed inside the main structure, which can pour to form permeable structure;And it is placed in the preset diversion pipe in main body casting space, to form the drainage hole of connection permeable structure and gutter.Bill of materials one is poured present invention efficiently solves gutter and gutter interface is easy the problem of leaking, so that part made of the different materials of gutter has different performances, the water of interface leakage is imported in gutter by permeable structure, meets the tunnel drainage requirement of complex condition.

Description

Tunnel center gutter template component, gutter structure and its construction method
Technical field
The present invention relates to constructing tunnel field, refer in particular to a kind of tunnel center gutter template component, gutter structure and its Construction method.
Background technique
Since Tunnel Engineering is built in subterranean strata mostly, entire tunnel structure be likely to be at underground water encirclement it In, and underground water is all-pervasive, often because each link such as deficiency, design and construction for early period address explore work less than Position causes tunnel waterproof and water drainage system to generate defect, and so as to cause tunnel, there is a phenomenon where percolating waters, and percolating water has become shadow One of the main problem for ringing highway in China tunnel is an important factor for influencing vcehicular tunnel normal operation and service life.
Whole tunnel is longitudinally run through in vcehicular tunnel center gutter, be whole tunnel catchment, the key link of drainage system, Infiltration except tunnel structure in stratum, it is blind by transverse drainage by the catchmenting of circle draining blind pipe, the convergence of longitudinal drainage pipe Pipe is final to import center gutter, and is discharged into drainage system outside tunnel by center gutter.
Current gutter mostly uses greatly a template pouring molding, and this method can only use a kind of material to gutter Ditch body is poured, so that the performance that gutter has is more single, and when transverse drainage blind pipe is drained to center gutter, Interface might have leakage, and currently used technology is to carry out water-proofing treatment in interface, but the durability degree of waterproof construction is not Height, what the water leaked after waterproof construction failure can not be successfully is discharged into Central drain.
Summary of the invention
It is an object of the invention to overcome the deficiencies of existing technologies, a kind of tunnel center gutter template component, row are provided Ditch structure and its construction method solve the problems, such as that gutter interface is easy leakage, to arrange using the method for placement layer by layer The ditch body in ditch is made of two kinds of different materials, so that part made of the different materials of gutter has different performances, is met The tunnel drainage requirement of complex condition, promotes integral construction efficiency, and meet the high construction requirement of short time limit, quality.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides tunnel center gutter template components, comprising:
The exterior sheathing being placed in tunnel substrate casting space, two sides are equipped with side portion structure, by the exterior sheathing in tunnel base Gutter construction space is formed on plate, and the gutter construction space of the formation includes principal space and is connected with the principal space Logical side spaces;
The inner template being placed in principal space, the inner template separate principal space and side spaces, and in principal space It forms main body casting space to form main structure to pour, forms gutter inside the main structure, which can pour Form permeable structure;And
It is placed in the preset diversion pipe of in main body casting space and respective sides space setting, the preset diversion pipe and inner template Connection, by the preset diversion pipe in the drainage hole for forming connection permeable structure and gutter in main structure.
The present invention uses tunnel center gutter template component pair, pours sky by the way that exterior sheathing is first placed in tunnel substrate In and poured so that gutter identical with an exterior sheathing profile construction space is formed on tunnel inverted arch, and then at this Inner template is placed in the construction space of gutter with the principal space and side spaces of compartment drainage ditch construction space, thus in main body Main body casting space is formed in space, by the preset diversion pipe in position in main body casting space respective sides space and to main body Casting space is poured, to obtain the main structure that side has drainage hole, and then counter-lateral quadrents space pour and shape At permeable structure, drainage hole is connected to permeable structure and main structure, and the method using placement layer by layer is to making gutter difference material Part made of expecting has different performances, and transverse drain ditch and the water of the interface leakage in center gutter flow into center draining It is imported in the gutter of center in the permeable structure of ditch two sides and by drainage hole, to solve the problems, such as that gutter interface leaks.
Tunnel center of the present invention gutter template component further improvement lies in that, which includes two be oppositely arranged A first block piece and drawknot are connected between two the first block pieces and spaced first screw rod, by adjusting the first screw rod Length to change the distance between two first block pieces.
Tunnel center of the present invention gutter template component further improvement lies in that, which includes:
The first transverse slat being placed in tunnel substrate casting space;
It is vertically connected at the starting stave of end of first transverse slat far from another first block piece, the starting stave and first The corresponding end of bar is fixedly connected;
It is fixedly arranged on first enclosing of the starting stave far from another first block piece side, the section of first enclosing is at right angles terraced The upper plane of shape, first enclosing is concordant with the top of starting stave;And
It is fixedly arranged on first hanging ring of the starting stave far from the first transverse slat end.
Tunnel center of the present invention gutter template component further improvement lies in that, which includes two be oppositely arranged A second stopper and drawknot are connected between two second stoppers and spaced second screw rod, by adjusting the second screw rod Length to change the distance between two second stoppers.
Tunnel center of the present invention gutter template component further improvement lies in that, which includes:
The second transverse slat being placed in the construction space of gutter;
It is vertically connected at the second riser of end of second transverse slat far from another second stopper, second riser and second The corresponding end of bar is fixedly connected;
It is fixedly arranged at the top of the second riser and is located at second enclosing of second riser far from another second stopper side, this second The rectangular in cross-section of enclosing, the width of second enclosing are greater than the thickness of the second riser;And
It is fixedly arranged on the second hanging ring of end of second riser far from the second transverse slat.
The present invention provides the gutter structures that a kind of tunnel center gutter template component is formed, comprising:
On tunnel substrate and it is formed in the main structure in principal space, which is in " Qian " font, and interior Portion is formed with gutter;
Positioned at main structure two sides and it is formed in the permeable structure in side spaces, the permeable structure is in a rectangular trapezoid, and The upper plane length of the permeable structure is greater than lower plane length;
Drainage hole set on main structure side, the drainage hole are connected to permeable structure and gutter;And
The cover board being covered on gutter.
Tunnel center of the present invention gutter template component formed gutter structure further improvement lies in that, main structure Part at the top of two sidewalls close to gutter to lower recess and forms the support face placed for cover board, and the support face and main body knot The distance between structure top side wall is equal to the thickness of cover board;
Road structure is equipped on permeable structure, and the top of the road structure is concordant with the top of main structure, it should The thickness of road structure is equal to the thickness of cover board.
Tunnel center of the present invention gutter template component formed gutter structure further improvement lies in that, the permeable knot Structure is formed by sand-free coarse porous concrete concreting, which is formed by C20 concreting, which is mixed by C25 element Solidifying soil pours.
The present invention provides a kind of construction methods of tunnel center gutter template component, include the following steps:
S11., exterior sheathing is provided, exterior sheathing is placed in tunnel substrate casting space and tunnel substrate casting space is carried out It pours to form tunnel substrate, and is formed with the gutter construction space to match with exterior sheathing, the draining on the tunnel substrate Ditch construction space includes principal space and the side spaces that are connected with principal space;
S12. exterior sheathing is removed, and is put into frame body in principal space, is erect between the side spaces and principal space Demarcation plate is to separate side spaces and principal space, and the demarcation plate is connected close to the side of principal space with one end of diversion pipe It connects;
S13., inner template is provided, inner template is placed on frame body, and the other end of the side of the inner template and diversion pipe It offsets, and in formation main body casting space in principal space and is poured to form main structure, the inside of the main structure Gutter is formed, and the main structure side corresponds to the drainage hole of position formation the communicated drainage ditch and side spaces of diversion pipe;
S14. demarcation plate and diversion pipe are removed from side spaces, so counter-lateral quadrents space poured it is permeable to be formed Structure, and inner template is removed.
The construction method of tunnel center of the present invention gutter template component further improvement lies in that, the main structure two sides Part at the top of wall close to gutter to lower recess and forms the support face placed for cover board, and cover board is placed on support face;
The laying depth road structure identical with cover sheet thickness on permeable structure, and the top of the road structure and main body The top of structure is concordant.
Detailed description of the invention
Fig. 1 is the gutter part of tunnel center of the present invention gutter template component, gutter structure and its construction method Structural schematic diagram.
Fig. 2 is the exterior sheathing part of tunnel center of the present invention gutter template component, gutter structure and its construction method Front view.
Fig. 3 is the exterior sheathing part of tunnel center of the present invention gutter template component, gutter structure and its construction method Top view.
Fig. 4 is the inner template part of tunnel center of the present invention gutter template component, gutter structure and its construction method Front view.
Fig. 5 is the inner template part of tunnel center of the present invention gutter template component, gutter structure and its construction method Top view.
Fig. 6 is that the gutter of tunnel center of the present invention gutter template component, gutter structure and its construction method is constructed Space segment structural schematic diagram.
Fig. 7 is the process for using figure of tunnel center of the present invention gutter template component, gutter structure and its construction method.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
Refering to fig. 1, the present invention provides a kind of tunnel center gutter template components, by the way that exterior sheathing is first placed in tunnel It in road substrate casting space and is poured, so that it is empty to form a gutter construction identical with exterior sheathing profile on tunnel inverted arch Between, and then inner template is placed in the gutter construction space with the principal space of compartment drainage ditch construction space and side sky Between, so that main body casting space is formed in principal space, it is preset by the position in main body casting space respective sides space Diversion pipe simultaneously pours main body casting space, to obtain the main structure that side has drainage hole, and then counter-lateral quadrents are empty Between poured and formed permeable structure, drainage hole is connected to permeable structure and main structure, and the method using placement layer by layer is to making Obtaining part made of the different materials of gutter has different performances, transverse drain ditch and the interface leakage in center gutter Water is flowed into the permeable structure of center gutter two sides and is imported in the gutter of center by drainage hole, to solve gutter interface The problem of place's leakage.Tunnel center of the present invention gutter template component is illustrated with reference to the accompanying drawing.
Refering to fig. 1, Fig. 1 is the row of tunnel center of the present invention gutter template component, gutter structure and its construction method The structural schematic diagram of ditch part.Below with reference to Fig. 1, tunnel center of the present invention gutter template component is illustrated.
As shown in figures 1 to 6, tunnel center of the present invention gutter template component, comprising:
The exterior sheathing 11 being placed in tunnel substrate casting space, two sides are equipped with side portion structure, by the exterior sheathing 11 in tunnel Gutter construction space 211 is formed on road substrate, and the gutter construction space 211 being formed by includes 2111 He of principal space The side spaces 2112 being connected with principal space 2111;
The inner template 12 being placed in principal space 2111, the inner template 12 separate principal space 2111 and side spaces 2112, and main structure 2113 is formed to pour in forming main body casting space in principal space 2111, the main structure 2113 Inside forms gutter 212, which can pour to form permeable structure 2116;And
Be placed in the preset diversion pipe that in main body casting space and respective sides space 2112 is arranged, the preset diversion pipe with it is interior Template 12 connects, by preset diversion pipe in the row for forming connection permeable structure 2116 and gutter 212 in main structure 2113 Water hole 2114.
As a better embodiment of the invention, as shown in connection with fig. 2, which includes be oppositely arranged two the One block piece 111 and drawknot are connected to the first screw rod 112 between two the first block pieces 111, by adjusting the first screw rod 112 Length is to change the distance between two first block pieces 111.
Further, as shown in connection with fig. 3, which includes:
The first transverse slat 1111 being placed in tunnel substrate casting space;
It is vertically connected at the starting stave 1112 of end of first transverse slat 1111 far from another first block piece 111;And
It is fixedly arranged on first enclosing 1113 of the starting stave 1112 far from another first block piece, 111 side, first enclosing 1113 section is in a rectangular trapezoid, and the upper plane length of first enclosing 1113 is greater than the lower plane length of the first enclosing 1113, And first enclosing 1113 upper plane it is concordant with the top of starting stave 1112.
Specifically, the end of first screw rod 112 be fixedly connected on two opposite the first block pieces 111 respectively it is first perpendicular On plate 1112, which is spaced along the first block piece 111 is arranged, and the starting stave 1112 is far from the first transverse slat 1111 End is additionally provided with the first hanging ring 1114.
Preferably, first block piece 111 is made using angle steel and channel steel.
As another better embodiment of the invention, as shown in connection with fig. 4, which includes two be oppositely arranged Second stopper 121 and drawknot are connected to the second screw rod 122 between two second stoppers 121, by adjusting the second screw rod 122 Length to change the distance between two second stoppers 121.
Further, as shown in connection with fig. 5, which includes:
The second transverse slat 1211 being placed in gutter construction space 211;
It is vertically connected at the second riser 1212 of end of second transverse slat 1211 far from another second stopper 121;And
It is fixedly arranged on 1212 top of the second riser and is located at second of the second riser 1212 far from another 121 side of second stopper Enclosing 1213, the rectangular in cross-section of second enclosing 1213, and the width of second enclosing 1213 are greater than the second riser 1212 Thickness.
Specifically, the end of second screw rod 122 be fixedly connected on two second stoppers 121 being oppositely arranged it is second perpendicular Plate 1212, which is spaced along second stopper 121 is arranged, end of second riser 1212 far from the second transverse slat 1211 Portion is additionally provided with the second hanging ring 1214.
Preferably, the second stopper 121 is made of angle steel and channel steel.
As shown in Figure 1, the gutter structure that tunnel center of the present invention gutter template component is formed, comprising:
In tunnel inverted arch and the main structure 2113 that is formed in principal space 2111, the main structure 2113 are in " Qian " font, and inside is formed with gutter 212;
Positioned at 2113 two sides of main structure and the permeable structure 2116 that is formed in side spaces 2112, the permeable knot Structure 2116 is in a rectangular trapezoid, and the upper plane length of the permeable structure 2116 is greater than lower plane length;
Drainage hole 2114 in main structure 2113, the drainage hole 2114 are connected to permeable structure 2116 and gutter 212;And
The cover board 213 being covered on gutter 212.
As a better embodiment of the invention, as shown in connection with fig. 1, close to row at the top of 2113 two sidewalls of main structure The part in ditch 212 is to lower recess and forms the support face placed for cover board 213, and the support face and 2113 side wall of main structure The distance between top is equal to the thickness of cover board 213;
Road structure 2115, and the top of the road structure 2115 and main structure are equipped on the permeable structure 2116 2113 top is concordant, and the thickness of the road structure 2115 is equal to the thickness of cover board 213.
Specifically, the permeable structure 2116 is formed by sand-free coarse porous concrete concreting, road structure 2115 is by C20 concrete It pours, which is poured by C25 plain concrete.
A specific embodiment of the invention is as follows:
Exterior sheathing 11 is placed on the center line of tunnel substrate casting space, and exterior sheathing 11 is poured, so that tunnel Gutter identical with 11 cross sectional shape of exterior sheathing construction space 211 is formed on the inverted arch in road;
The length of the first screw rod 112 is adjusted to reduce opposite the distance between two the first block pieces 111, thus by external mold Plate 11 in gutter construction space 211 by taking out;
After the condensation of gutter construction space 211, in gutter, 211 inside bottom of construction space is put into frame body, the frame body Height be equal to 211 bottom of 212 bottom of gutter and gutter construction space between designed distance, inner template 12 is placed in On the frame body, and side spaces 2112 close to principal space 2111 position place demarcation plate with separate principal space 2111 with Side spaces 2112, concrete flows into side spaces 2112 when preventing from pouring inner template;
The demarcation plate is fixedly welded with pvc pipe close to the side of inner template 12, which, which dips down, is tiltedly fixed on template On;
The casting concrete into the main body casting space between demarcation plate, gutter construction space 211 and inner template 12, with It forms main structure 2113 and forms gutter 212 identical with 12 shape of inner template, and main body inside main structure 2113 There are the drainage holes 2114 tilted down that pvc pipe is formed in structure 2113, and it is opposite to reduce to adjust the length of the second screw rod 122 The distance between two second stoppers 121, thus by inner template 12 by being taken out in gutter 212, and by demarcation plate from side It is taken out in space 2112, related extraction pvc pipe;
In label height on the side wall of side spaces 2112, and counter-lateral quadrents space 2112 pours the height to the label with shape At permeable structure, so that there are identical as 213 thickness of cover board and for formation road structure 2115 on the top of side spaces 2112 Space, can be used end-enclosed during pouring permeable structure 2116 and the rod piece to match with drainage hole 2114 is plugged in To avoid the clogging drainage hole 2114 of material for pouring side spaces 2112 in drainage hole 2114;
Pavement concrete is poured within this space and forms road structure 2115, completes pouring to entire center gutter 21 It builds, finally the upper cover plate 213;
Underground water is delivered at center gutter 21 by transverse drain ditch, and transverse drain ditch is connected with center gutter 21 The case where position connect is likely to occur leak, the water flow of leakage flow into the sand-free coarse porous concrete concrete in side spaces 2112, in turn It is imported in center gutter 21 by drainage hole 2114.
As shown in fig. 7, the construction method of tunnel center of the present invention gutter template component, includes the following steps:
It executes step S11. and exterior sheathing 11 is provided, exterior sheathing 11 is placed on the center line of tunnel substrate casting space, Tunnel substrate casting space is poured to form tunnel substrate, and is formed on the tunnel substrate and matches with exterior sheathing 11 Gutter construction space 211, which includes principal space 2111 and being connected with principal space 2111 Side spaces 2112;Then step S12 is executed
It executes step S12. and removes exterior sheathing 11, and be put into frame body in the principal space 2111, in side spaces 2112 Demarcation plate is erect between principal space 2111 to separate side spaces 2112 and principal space 2111, and the demarcation plate is close to main The side in body space 2111 is connected with one end of diversion pipe;Then step S13 is executed
Execute step S13. provide inner template 12, inner template 12 is placed on frame body, and the side of the inner template 12 with The other end of diversion pipe offsets, and in formation main body casting space in principal space 2111 and is poured to form main structure 2113, the inside of the main structure 2113 forms gutter 212, and 2113 side of main structure corresponds to the position shape of diversion pipe At the drainage hole 2114 of communicated drainage ditch 212 and side spaces 2112;Then step S14 is executed
Execute step S14. demarcation plate and diversion pipe are removed from side spaces 2112, and then counter-lateral quadrents space 2112 into Row is poured to form permeable structure 2116, and inner template 12 is removed.
Further, the part at the top of 2113 two sidewalls of main structure close to gutter 212 to lower recess and forms confession The support face that cover board 213 is placed, cover board 213 is placed on the support face;
The laying depth road structure 2115 identical with 213 thickness of cover board on permeable structure 2116, and the road structure 2115 top is concordant with the top of main structure 2113.
Concrete construction method of the invention is as follows:
Exterior sheathing 11 is placed in tunnel substrate casting space by the first hanging ring 1114 hung on exterior sheathing 11 On heart line, to the tunnel, substrate casting space is poured, and is formed with forming the center of tunnel substrate and the tunnel substrate Gutter construction space 211, the gutter construction space 211 have in rectangle principal space 2111 and with the first enclosing 1113 The side spaces 2112 to match;
Frame body is placed in the bottom of principal space 2111, and erects demarcation plate on the lower plane of side spaces 2112, it should Demarcation plate is welded with several diversion pipes tilted down close to the side of main structure 2111;
Inner template 12 is placed on frame body by the second hanging ring 1214 hung in inner template 12, and the side of inner template 12 Wall offsets with diversion pipe, to form main body casting space, pours to main body casting space, to form the master for being in " Qian " font Body structure 2113, and the side of main structure 2113 has the drainage hole 2114 tilted down;
Diversion pipe on demarcation plate and demarcation plate is extracted out from side spaces 2112,2112 make absolute altitude in side spaces So that absolute altitude is equal to the thickness of cover board 213 to the distance of tunnel substrate, side spaces 2112 are poured to absolute altitude using seepy material Position removes inner template 12 after forming permeable structure 2116, in 212 upper cover upper cover plate 213 of gutter;
Inner template 12 can also be first removed, is filled in using the closed rod piece to match with diversion pipe from 212 side of gutter Enter in drainage hole 2114, and then counter-lateral quadrents space 2112 is poured to elevation location, is formed rod piece after permeable structure 2116 from row 212 side of ditch is taken out, in 212 upper cover upper cover plate 213 of gutter;
Road structure 2115 is laid on permeable structure 2116, so that road structure 2115 is concordant with cover board 213, completion pair Center gutter 21 pours.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (10)

1. a kind of tunnel center gutter template component characterized by comprising
The exterior sheathing being placed in tunnel substrate casting space, two sides are equipped with side portion structure, by the exterior sheathing in tunnel substrate Upper formation gutter construction space, and be formed by gutter construction space and include principal space and be connected with principal space Side spaces;
The inner template being placed in the principal space, the inner template separation principal space and the side spaces, and in Main body casting space is formed in the principal space to form main structure to pour, and gutter is formed inside the main structure, The side spaces can pour to form permeable structure;And
Be placed in the main body casting space and the preset diversion pipe of the corresponding side spaces setting, the preset diversion pipe with The inner template connection is connected to the permeable structure and the row in formation in the main structure by the preset diversion pipe The drainage hole in ditch.
2. tunnel center as described in claim 1 gutter template component, which is characterized in that the exterior sheathing includes opposite sets Two the first block pieces and drawknot set are connected between two first block pieces and spaced first screw rod, pass through tune The length of first screw rod is saved to change the distance between two described first block pieces.
3. tunnel center as claimed in claim 2 gutter template component, which is characterized in that first block piece includes:
The first transverse slat being placed in the tunnel substrate casting space;
Be vertically connected at the starting stave of end of first transverse slat far from another first block piece, the starting stave with it is described The corresponding end of first screw rod is fixedly connected;
It is fixedly arranged on first enclosing of the starting stave far from another first block piece side, the section of first enclosing is rectangular Trapezoidal, the upper plane length of first enclosing is greater than the lower plane length of first enclosing, and first enclosing is upper Plane is concordant with the top of the starting stave;And
It is fixedly arranged on first hanging ring of the starting stave far from first transverse slat end.
4. tunnel center as described in claim 1 gutter template component, which is characterized in that the inner template includes opposite sets Two second stoppers and drawknot set are connected between two second stoppers and spaced second screw rod, pass through tune The length of second screw rod is saved to change the distance between two described second stoppers.
5. tunnel center as claimed in claim 4 gutter template component, which is characterized in that the second stopper includes:
The second transverse slat being placed in the gutter construction space;
Be vertically connected at the second riser of the end of second transverse slat far from another second stopper, second riser with it is described The corresponding end of second screw rod is fixedly connected;
It is fixedly arranged at the top of second riser and is located at second enclosing of second riser far from another second stopper side, institute The rectangular in cross-section of the second enclosing is stated, the width of second enclosing is greater than the thickness of second riser;And
It is fixedly arranged on the second hanging ring of end of second riser far from second transverse slat.
6. a kind of gutter structure formed using tunnel center as described in claim 1 gutter template component, feature It is, comprising:
On the tunnel substrate and the main structure that is formed in the principal space, the main structure are in " Qian " word Shape, and inside is formed with gutter;
Positioned at the main structure two sides and the permeable structure that is formed in the side spaces, the permeable structure is at right angles terraced Shape, and the upper plane length of the permeable structure is greater than lower plane length;
Drainage hole set on the main structure side, the drainage hole are connected to the permeable structure and the gutter;And
The cover board being covered on the gutter.
7. the gutter structure that tunnel center as claimed in claim 6 gutter template component is formed, which is characterized in that
Part at the top of the main structure two sidewalls close to the gutter to lower recess and is formed for cover board placement Support face, and the distance between the support face and the main structure top side wall are equal to the thickness of the cover board;
Road structure, and the top horizontal at the top of the road structure and the main structure are equipped on the permeable structure Together, the thickness of the road structure is equal to the thickness of the cover board.
8. the gutter structure that tunnel center as claimed in claim 7 gutter template component is formed, which is characterized in that described Permeable structure is formed by sand-free coarse porous concrete concreting, and the road structure is formed by C20 concreting, the main body knot Structure is poured by C25 plain concrete.
9. a kind of construction method of tunnel center as described in claim 1 gutter template component, which is characterized in that including such as Lower step:
S11., exterior sheathing is provided, the exterior sheathing is placed on tunnel substrate casting space and sky is poured to the tunnel substrate Between poured to form tunnel substrate, and be formed with the gutter to match with the exterior sheathing on the tunnel substrate and construct Space, the gutter construction space include principal space and the side spaces that are connected with principal space;
S12. the exterior sheathing is removed, and is put into frame body in the principal space, it is empty in the side spaces and the main body Between between erect demarcation plate to separate the side spaces and the principal space, and the demarcation plate is close to the principal space Side be connected with one end of the diversion pipe;
S13., inner template is provided, the inner template is placed on the frame body, and the side of the inner template and the water conservancy diversion The other end of pipe offsets, and in formation main body casting space in the principal space and is poured to form main structure, institute The inside for stating main structure forms gutter, and the main structure side corresponds to described in the position formation connection of the diversion pipe The drainage hole in gutter and the side spaces;
S14. the demarcation plate and the diversion pipe are removed from the side spaces, so counter-lateral quadrents space poured with Permeable structure is formed, and the inner template is removed.
10. the construction method of tunnel center as claimed in claim 9 gutter template component, which is characterized in that the main body Part at the top of structure two sidewalls close to the gutter to lower recess and forms the support face placed for cover board, by the cover board It is placed on the support face;
The laying depth road structure identical with the cover sheet thickness on the permeable structure, and the top of the road structure It is concordant with the top of the main structure.
CN201910092230.8A 2019-01-30 2019-01-30 Tunnel center gutter template component, gutter structure and its construction method Pending CN109707446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910092230.8A CN109707446A (en) 2019-01-30 2019-01-30 Tunnel center gutter template component, gutter structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910092230.8A CN109707446A (en) 2019-01-30 2019-01-30 Tunnel center gutter template component, gutter structure and its construction method

Publications (1)

Publication Number Publication Date
CN109707446A true CN109707446A (en) 2019-05-03

Family

ID=66263326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910092230.8A Pending CN109707446A (en) 2019-01-30 2019-01-30 Tunnel center gutter template component, gutter structure and its construction method

Country Status (1)

Country Link
CN (1) CN109707446A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110214752A (en) * 2019-07-23 2019-09-10 公保 A kind of ecological, environmental protective protection against rodents animal cave

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101392544A (en) * 2007-09-19 2009-03-25 北京泰宁科创科技有限公司 Gap catchment infiltration type drainage ditch
US20150125215A1 (en) * 2011-06-21 2015-05-07 Stabinor As Method for constructing a tunnel course, and structural element for use by the method
CN205529791U (en) * 2016-04-13 2016-08-31 重庆华宇园林有限公司 Concrete ecological garden road permeates water
CN207278299U (en) * 2017-08-10 2018-04-27 中交一公局第三工程有限公司 A kind of ditch template
CN207526507U (en) * 2017-12-08 2018-06-22 中铁二局集团有限公司 A kind of mobile formwork for being used to pour into a mould tunnel Central drain
CN108301440A (en) * 2018-03-29 2018-07-20 沈阳建筑大学 With waterproof, the underground pipe gallery construction method of drain function
CN209654079U (en) * 2019-01-30 2019-11-19 中国建筑第八工程局有限公司 Tunnel center gutter template component and its gutter structure of formation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101392544A (en) * 2007-09-19 2009-03-25 北京泰宁科创科技有限公司 Gap catchment infiltration type drainage ditch
US20150125215A1 (en) * 2011-06-21 2015-05-07 Stabinor As Method for constructing a tunnel course, and structural element for use by the method
CN205529791U (en) * 2016-04-13 2016-08-31 重庆华宇园林有限公司 Concrete ecological garden road permeates water
CN207278299U (en) * 2017-08-10 2018-04-27 中交一公局第三工程有限公司 A kind of ditch template
CN207526507U (en) * 2017-12-08 2018-06-22 中铁二局集团有限公司 A kind of mobile formwork for being used to pour into a mould tunnel Central drain
CN108301440A (en) * 2018-03-29 2018-07-20 沈阳建筑大学 With waterproof, the underground pipe gallery construction method of drain function
CN209654079U (en) * 2019-01-30 2019-11-19 中国建筑第八工程局有限公司 Tunnel center gutter template component and its gutter structure of formation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110214752A (en) * 2019-07-23 2019-09-10 公保 A kind of ecological, environmental protective protection against rodents animal cave

Similar Documents

Publication Publication Date Title
CN207512745U (en) A kind of caisson device and its foundation pit structure
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN105970994A (en) Pouring jacket cofferdam pile cap structure and construction method
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN109707446A (en) Tunnel center gutter template component, gutter structure and its construction method
CN209654079U (en) Tunnel center gutter template component and its gutter structure of formation
CN215106098U (en) Prefabricated post connection structure
CN207327274U (en) A kind of water channel engineering system
CN105756100A (en) Basement post-pouring belt system and making method thereof
CN210596882U (en) Pedestrian road
CN106400838B (en) A kind of city integrated Pipe rack of prefabricated assembled concrete and construction method
CN208363508U (en) The underground space can white-out infiltration ground structure
CN107190781A (en) Horizontal joint waterproofing construction method is set up in large space basement roof post-cast strip
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN107447779B (en) A kind of assembling structure of concrete stacked plate type piping lane
CN109083176A (en) A kind of design has the local Yield rainfall relation system of auxiliary slip casting function
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN212454452U (en) Multifunctional observation hole for controlling concrete pouring of tunnel secondary lining vault
CN110424439B (en) Prefabricated ceramsite concrete hollow slab shaping tire membrane and construction method thereof
CN203756235U (en) Lateral drainage device of tunnel
CN107152111A (en) The lenticular plain concrete construction of guide wall technique used between many boiled water rooms
CN208604973U (en) A kind of underground space ground pavement infiltration white-out structure
CN214401732U (en) Novel water drainage hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination