CN109707432A - The method of the major-minor fan automatic conversion multi fan station ventilation system in underground - Google Patents

The method of the major-minor fan automatic conversion multi fan station ventilation system in underground Download PDF

Info

Publication number
CN109707432A
CN109707432A CN201910151403.9A CN201910151403A CN109707432A CN 109707432 A CN109707432 A CN 109707432A CN 201910151403 A CN201910151403 A CN 201910151403A CN 109707432 A CN109707432 A CN 109707432A
Authority
CN
China
Prior art keywords
ventilation
period
fan
easy
mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910151403.9A
Other languages
Chinese (zh)
Other versions
CN109707432B (en
Inventor
尤祎
陈建双
葛文杰
郑杰
孙德胜
程正南
曹云志
姚逸飞
尹礼华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei - Ltd By Share Ltd
CINF Engineering Corp Ltd
Original Assignee
Hubei - Ltd By Share Ltd
CINF Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei - Ltd By Share Ltd, CINF Engineering Corp Ltd filed Critical Hubei - Ltd By Share Ltd
Priority to CN201910151403.9A priority Critical patent/CN109707432B/en
Publication of CN109707432A publication Critical patent/CN109707432A/en
Application granted granted Critical
Publication of CN109707432B publication Critical patent/CN109707432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The invention discloses a kind of methods of the major-minor fan automatic conversion multi fan station ventilation system in underground, comprising the following steps: S1, entire production period is divided into ventilation and is easy period, ventilation two stages of hard time in conjunction with mining depth according to mine capacity planning;S2, respectively to mine ventilation be easy period, divulge information hard time ventilation network carry out simulation resolving;S3, divulging information, the period of being easy establishes Ventilation by main and auxiliary fans system;S4, multi fan station ventilation system is established in ventilation hard time.The present invention sufficiently combines Ventilation by main and auxiliary fans management simply and Multi-stage station ventilation the advantages of low energy consumption, the period of being easy of divulging information use underground Ventilation by main and auxiliary fans, and engineering and Fan Equipment are with low investment, without taking over the land for use, facilitate ventilating management;Hard time of divulging information is easy period main fan as II grade of machine station blower using ventilation and carries out relay, and cost of management is low, and energy-saving effect is significant;Overcome the big problem of mine ventilation system front and back phase wind pressure difference.

Description

The method of the major-minor fan automatic conversion multi fan station ventilation system in underground
Technical field
The invention belongs to the major-minor fans of underground metalliferous mine and non-metal mine aeration technology field more particularly to a kind of underground certainly The method that turn changes multi fan station ventilation system.
Background technique
Underground metalliferous mine and nonmetallic ore exploitation in, with mineral resources exploitation consume, force most of mines by Superficial part is transferred to deep mining, and mine ventilation system is also transferred to ventilation hard time by the period of being easy of divulging information therewith.When ventilation is difficult Phase sharply lengthens compared to the period of being easy of divulging information, system into, return air route, and ventilating system wind pressure increased dramatically, and ventilation is caused to be easy Period and ventilation hard time wind pressure difference are big.
Currently, underground metalliferous mine and nonmetallic ore are all made of single Ventilation by main and auxiliary fans in the entire length of service of mine System or multi fan station ventilation system.According to single Ventilation by main and auxiliary fans, then main pectinid need to be carried out according to hard time operating condition The type selecting and setting of machine, cause easy period main fan low efficiency of divulging information, and energy consumption is high;It is logical according to single Multi stages ventilation Wind, then the machine station blower quantity that will lead to the period of being easy of divulging information is more, and management is difficult, and the machine station blower that the period of being easy of divulging information is installed It is unable to satisfy ventilation hard time operating condition, can not be continued in hard time, blower needs overlapping investment.
Authorization Notice No. is the Chinese patent of CN203145985U, discloses a kind of ventilation of down-hole multilevel machine station concentration of local Ventilating system is divided into mutually independent one or more concentration of local air inlet-concentration of local return air by structure, the aeration structure And/or Topical Dispersion air inlet-concentration of local air return structure, for solving deep mining, Multi-stage station ventilation less effective and lead The problem of ventilating system of cause distinguished and admirable disorder.But the aeration structure is both needed to setting return fan station, blower number in each tailgate Amount is more, investment is high, management is difficult, and ventilation is easy period and the wind net processing mode of hard time is identical, is not suitable for ventilation and is easy Period and the big mine of hard time wind pressure difference of divulging information.
Summary of the invention
The purpose of the present invention is to solve the shortcomings of the prior art place, it is easy by divulging information to provide a kind of mine ventilation system Period be transferred to ventilation hard time wind pressure difference it is small, ventilation low energy consumption, blower quantity is few, invest it is low, manageable underground is major-minor The method for fanning automatic conversion multi fan station ventilation system.
The method of the major-minor fan automatic conversion multi fan station ventilation system in this underground provided by the invention, including following step It is rapid:
S1, entire production period is divided into ventilation and is easy period, ventilation in conjunction with mining depth according to mine capacity planning Two stages of hard time
Using the middle section back production period for being located at mine superficial part as the period of being easy of divulging information, the middle section back production of mine deep part will be located at Period is as ventilation hard time;Pass through total windstone gate and returnairshaft and the ventilating shaft of falling section phase positioned at the uppermost middle section of superficial part It is logical, pass through middle section windstone gate and the ventilating shaft of falling section phase positioned at other middle sections of mine superficial part and positioned at the middle section of mine deep part It is logical;
S2, respectively to mine ventilation be easy period, divulge information hard time ventilation network carry out simulation resolving
Divulge information the period of being easy, resolved by simulation determine the air quantity of main fan installation point and wind pressure at total windstone gate, The air quantity of remote auto damper installation point at the windstone gate of middle section;When hard time simulation of divulging information resolves, keeping divulging information On the basis of easy period main fan duty parameter is constant, I grade of machine station blower dress at the windstone gate of mine deep part middle section is determined The air quantity and wind pressure of machine point;
S3, divulging information, the period of being easy establishes Ventilation by main and auxiliary fans system
Determining duty parameter is resolved to main fan type selecting according to simulation, and main fan is mounted in total windstone gate At the installation point of setting;Remote auto damper is mounted at the installation point set in each middle section windstone gate, remotely certainly Dynamic damper resolves determining duty parameter according to simulation and each middle section air quantity is adjusted, by main fan and it is each it is long-range from Dynamic damper co-operation constitutes the underground Ventilation by main and auxiliary fans system in the period of being easy of divulging information;
S4, multi fan station ventilation system is established in ventilation hard time
Determining duty parameter is resolved to I grade of machine station Fan Selection, by I grade of machine station assembling in mine depth according to simulation At the installation point set in the windstone gate of portion middle section, on the basis of keeping mounted main fan operating point constant, it will lead Ventilating fan carries out co-operation as II grade of machine station blower and I grade of machine station blower, constitutes the down-hole multilevel machine of ventilation hard time It stands ventilating system.
Further, in above-mentioned steps S2, simulation solution is carried out to ventilation network using mine three-dimensional ventilation simulation system It calculates.
Compared with prior art, the invention has the following advantages that
1, it divulges information the period of being easy in mine superficial part back production, is transported using main fan and remote auto damper co-operation The mode of work forms Ventilation by main and auxiliary fans system, is easy period system wind pressure to overcome to divulge information, meets the period of being easy ventilation of divulging information It is required that;In mine deep part back production ventilation hard time, by the way that I grade of machine station blower is arranged at the windstone gate of deep middle section, simultaneously Relay is carried out as II grade of machine station blower using the main fan in the period of being easy of divulging information, major-minor fan is automatically converted to Multi stages ventilation Ventilating system, to overcome ventilation hard time system wind pressure, meet ventilation hard time air-conditioning requirement, thus meet mine by Ventilation is easy the change of divergence for being transferred to ventilation hard time wind pressure in period.
2, in the period of being easy of divulging information, main fan is only set and remote auto damper forms underground Ventilation by main and auxiliary fans; In ventilation hard time, I grade of machine station blower is only set at the windstone gate of deep middle section, while being easy period main fan using former divulge information Blower is automatically converted to Multi stages ventilation as II grade of machine station blower relay, by major-minor fan, equal compared in the entire length of service of mine Using single multi fan station ventilation system, divulging information, easy period blower quantity is few, and ventilation hard time Fan Equipment is without repeating Investment, and it is not necessary that machine station blower is arranged in each middle section air return lane in underground, to greatly reduce blower quantity and corresponding cave Room construction investment, facilitates ventilating management.
3, by the way that main fan, remote auto damper and I grade of machine station blower are located at underground, earth's surface, nothing are not located at It needs to take over the land for use.
4, ventilation easy period uses the underground Ventilation by main and auxiliary fans to match with operating conditions such as stage system air quantity, the wind pressure, Compared to the system for being all made of single Ventilation by main and auxiliary fans in the entire length of service of mine, easy period installed power of divulging information is smaller, energy It consumes lower.
5, all blowers are installed in underground, avoid influence of the fan noise to shaft mouth operation personnel.
The present invention sufficiently combines Ventilation by main and auxiliary fans management simply and Multi-stage station ventilation the advantages of low energy consumption, ventilation are easy Period uses underground Ventilation by main and auxiliary fans, and engineering and Fan Equipment are with low investment, without expropriation of land, facilitates ventilating management;When ventilation is difficult Phase carries out relay as II grade of machine station blower using the period of being easy of divulging information main fan, and cost of management is low, and energy-saving effect is significant;Overcome mine Phase wind pressure difference is big before and after well ventilating system, and single Ventilation by main and auxiliary fans energy consumption is high, and single Multi stages ventilation blower quantity is more, invests Problem high, management is difficult, especially suitable for being transferred to deep mining by superficial part, the divulge information period of being easy and ventilation hard time leeway Different big mine ventilation.
Detailed description of the invention
Fig. 1 is that present invention ventilation is easy period ventilating system schematic diagram.
Fig. 2 is present invention ventilation hard time ventilating system schematic diagram.
Label and corresponding component name shown in figure are as follows:
1, downcast;2, superficial part middle section air inlet;3, deep middle section air inlet;4, Chuan Mai;5, stope return air raise;6, on Disk air return lane;7, middle section windstone gate;8, remote auto damper;9, total windstone gate;10, the ventilating shaft of falling section;11, return air Well;12, main fan;13, I grade of machine station blower.
Specific embodiment
It can be seen that the side of the major-minor fan automatic conversion multi fan station ventilation system in this underground of the present invention from Fig. 1 and Fig. 2 Method, comprising the following steps:
S1, entire production period is divided into ventilation and is easy period, ventilation in conjunction with mining depth according to mine capacity planning Two stages of hard time
It is equipped with downcast 1, middle section air inlet in mine, wears arteries and veins 4, stope return air raise 5, upper disk air return lane 6, middle section go back to The air intake of wind crossdrift 7, total windstone gate 9, the ventilating shaft of falling section 10 and returnairshaft 11, middle section air inlet is connected to downcast 1, upper disk Air return lane 6 is one-to-one to be arranged above each middle section air inlet, and upper disk air return lane 6 and middle section that arteries and veins 4 is connected to corresponding arrangement are worn Air inlet, what stope return air raise 5 was connected to neighbouring arrangement wears arteries and veins 4,
Using the one or more middle section back production periods for being located at mine superficial part as the period of being easy of divulging information, ventilation will be located at and be easy The middle section air inlet in period is as superficial part middle section air inlet 2;The one or more middle section back production periods for being located at mine deep part are made It is located at mine superficial part using the middle section air inlet for being located at ventilation hard time as deep middle section air inlet 3 for hard time of divulging information The outlet air end of uppermost superficial part middle section air inlet 2, the outlet air end of the ventilating shaft of falling section 10 pass through total windstone gate 9 and returnairshaft 11 Connection, positioned at mine superficial part other superficial part middle section air inlets 2 and deep middle section air inlet 3 by middle section windstone gate 7 with The ventilating shaft of falling section 10 communicates;
S2, period, ventilation hard time are easy to mine ventilation respectively using mine three-dimensional ventilation simulation system Ventsim Ventilation network carry out simulation resolving
S21, it divulges information the period of being easy, main fan installation point is preset in total windstone gate 9, in each middle section windstone gate 7 In preset remote auto damper and install point, using mine three-dimensional ventilation simulation system Ventsim to the period of being easy of divulging information Ventilation network carries out simulation resolving, determines that the air quantity of main fan installation point and wind pressure, the installation of remote auto damper are put Air quantity;
S22, ventilation hard time preset I grade of machine station blower installation point in the middle section windstone gate 7 of mine deep part, On the basis of keeping easy 12 duty parameter of period main fan of ventilation constant, using mine three-dimensional ventilation simulation system Ventsim carries out simulation resolving to the ventilation network of ventilation hard time, determines the air quantity and wind of I grade of machine station blower installation point Pressure;
S3, divulging information, the period of being easy establishes Ventilation by main and auxiliary fans system
Determining duty parameter is resolved according to simulation in step S21, type selecting is carried out to main fan 12, by selected master Ventilating fan 12 is mounted at preset main fan installation point;
Remote auto damper 8 is mounted at preset remote auto damper installation point, remote auto is adjusted Air door 8 resolves determining duty parameter according to simulation in step S21 and each middle section air quantity is adjusted;
By main fan 12 and each 8 co-operation of remote auto damper, constitutes ventilation as shown in Figure 1 and be easy period Underground Ventilation by main and auxiliary fans system;
S4, multi fan station ventilation system is established in ventilation hard time
Determining duty parameter is resolved according to simulation in step S22, and type selecting is carried out to I grade of machine station blower 13, it will be selected I grade of machine station blower 13 is mounted at preset I grade of machine station blower installation point, is keeping mounted 12 operating point of main fan not On the basis of change, main fan 12 is subjected to co-operation as II grade of machine station blower and I grade of machine station blower 13, constitutes such as Fig. 2 Shown in divulge information hard time down-hole multilevel machine station ventilating system.
In the present invention, remote auto damper 8 can be used such as Zaozhuang and the production of Shunda mechanical & electronic equipment corporation, Ltd The long-range air door of intelligent no calender control self closing door SZFM or double leaf without the pressure long-range air door of balance air door light-operated intelligent, can also be used as Authorization Notice No. is a kind of mining automatic control storm door disclosed in CN207393242U, when pedestrian, vehicle pass through, remote auto Damper 8 can automatic open close, be not necessarily to human attendance, avoid influence of the fan noise to underground operators.

Claims (2)

1. a kind of method of the major-minor fan automatic conversion multi fan station ventilation system in underground, which comprises the following steps:
S1, entire production period is divided into ventilation and is easy period, ventilation difficulty in conjunction with mining depth according to mine capacity planning Two stages of period
Using the middle section back production period for being located at mine superficial part as the period of being easy of divulging information, the middle section back production period of mine deep part will be located at As ventilation hard time;Pass through total windstone gate and returnairshaft and the ventilating shaft of falling section phase positioned at the uppermost middle section of mine superficial part It is logical, pass through middle section windstone gate and the ventilating shaft of falling section phase positioned at other middle sections of mine superficial part and positioned at the middle section of mine deep part It is logical;
S2, respectively to mine ventilation be easy period, divulge information hard time ventilation network carry out simulation resolving
It divulges information the period of being easy, the air quantity and wind pressure, middle section for determining main fan installation point at total windstone gate is resolved by simulation The air quantity of remote auto damper installation point at windstone gate;When hard time simulation of divulging information resolves, ventilation is being kept to be easy On the basis of period main fan duty parameter is constant, I grade of machine station blower installation point at the windstone gate of mine deep part middle section is determined Air quantity and wind pressure;
S3, divulging information, the period of being easy establishes Ventilation by main and auxiliary fans system
Determining duty parameter is resolved to main fan type selecting according to simulation, and main fan is mounted in total windstone gate and is set Installation point at;Remote auto damper is mounted at the installation point set in each middle section windstone gate, remote auto tune Section air door resolves determining duty parameter according to simulation and each middle section air quantity is adjusted, by main fan and each remote auto tune Air door co-operation is saved, the underground Ventilation by main and auxiliary fans system in the period of being easy of divulging information is constituted;
S4, multi fan station ventilation system is established in ventilation hard time
Determining duty parameter is resolved to I grade of machine station Fan Selection, by I grade of machine station assembling in mine deep part according to simulation At the installation point set in section windstone gate, on the basis of keeping mounted main fan operating point constant, by main pectinid Machine carries out co-operation as II grade of machine station blower and I grade of machine station blower, and the down-hole multilevel machine station for constituting ventilation hard time is logical Wind system.
2. the method for the major-minor fan automatic conversion multi fan station ventilation system in underground according to claim 1, it is characterised in that: In above-mentioned steps S2, simulation resolving is carried out to ventilation network using mine three-dimensional ventilation simulation system.
CN201910151403.9A 2019-02-28 2019-02-28 Method for automatically converting underground main fan and auxiliary fan into multi-stage machine station ventilation system Active CN109707432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910151403.9A CN109707432B (en) 2019-02-28 2019-02-28 Method for automatically converting underground main fan and auxiliary fan into multi-stage machine station ventilation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910151403.9A CN109707432B (en) 2019-02-28 2019-02-28 Method for automatically converting underground main fan and auxiliary fan into multi-stage machine station ventilation system

Publications (2)

Publication Number Publication Date
CN109707432A true CN109707432A (en) 2019-05-03
CN109707432B CN109707432B (en) 2020-09-15

Family

ID=66266081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910151403.9A Active CN109707432B (en) 2019-02-28 2019-02-28 Method for automatically converting underground main fan and auxiliary fan into multi-stage machine station ventilation system

Country Status (1)

Country Link
CN (1) CN109707432B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118098A (en) * 2019-05-14 2019-08-13 中钢集团马鞍山矿山研究院有限公司 A kind of winterization system for extremely frigid zones underground mine Intake shaft
CN110259499A (en) * 2019-07-22 2019-09-20 中国计量大学 A kind of mine different location multi fan combined operating operating condition adjusting method
CN110469358A (en) * 2019-08-16 2019-11-19 长沙有色冶金设计研究院有限公司 Main return remodeling method suitable for underground centralized return air system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215973A (en) * 2007-12-29 2008-07-09 中铁隧道集团有限公司 Tunnel construction jet flow laneway ventilation method
CN102889092A (en) * 2012-10-29 2013-01-23 中钢集团马鞍山矿山研究院有限公司 Multi-stage station ventilation technical system of mine
CN103089268A (en) * 2013-02-20 2013-05-08 中南大学 Intensive mining method of ore cluster in ore-concentrated area
CN106351682A (en) * 2016-09-13 2017-01-25 中钢集团马鞍山矿山研究院有限公司 Ventilation system capable of quickly realizing multi-stage fan station reverse ventilation of underground metal mine
CN108868860A (en) * 2018-07-11 2018-11-23 辽宁工程技术大学 A kind of Local Ventilation Equipment in Coal Mine intelligent decision system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215973A (en) * 2007-12-29 2008-07-09 中铁隧道集团有限公司 Tunnel construction jet flow laneway ventilation method
CN102889092A (en) * 2012-10-29 2013-01-23 中钢集团马鞍山矿山研究院有限公司 Multi-stage station ventilation technical system of mine
CN103089268A (en) * 2013-02-20 2013-05-08 中南大学 Intensive mining method of ore cluster in ore-concentrated area
CN106351682A (en) * 2016-09-13 2017-01-25 中钢集团马鞍山矿山研究院有限公司 Ventilation system capable of quickly realizing multi-stage fan station reverse ventilation of underground metal mine
CN108868860A (en) * 2018-07-11 2018-11-23 辽宁工程技术大学 A kind of Local Ventilation Equipment in Coal Mine intelligent decision system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭彪: "试论多级机站可控式通风系统在江西金属矿山的应用前景", 《江西有色金属》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118098A (en) * 2019-05-14 2019-08-13 中钢集团马鞍山矿山研究院有限公司 A kind of winterization system for extremely frigid zones underground mine Intake shaft
CN110118098B (en) * 2019-05-14 2020-10-09 中钢集团马鞍山矿山研究总院股份有限公司 Anti-freezing system for air inlet shaft of underground mine in alpine region
CN110259499A (en) * 2019-07-22 2019-09-20 中国计量大学 A kind of mine different location multi fan combined operating operating condition adjusting method
CN110259499B (en) * 2019-07-22 2021-03-02 中国计量大学 Method for adjusting working condition of multi-fan combined operation in different places of mine
CN110469358A (en) * 2019-08-16 2019-11-19 长沙有色冶金设计研究院有限公司 Main return remodeling method suitable for underground centralized return air system
CN110469358B (en) * 2019-08-16 2020-08-11 长沙有色冶金设计研究院有限公司 Method for modifying main return air duct suitable for underground centralized return air

Also Published As

Publication number Publication date
CN109707432B (en) 2020-09-15

Similar Documents

Publication Publication Date Title
CN109707432A (en) The method of the major-minor fan automatic conversion multi fan station ventilation system in underground
CN203145985U (en) Underground multilevel station partial concentrated ventilation structure
CN207420614U (en) A kind of working face in the pit dash system
CN102720519B (en) Novel tunnel ventilation system for subway station
De Souza Cost saving strategies in mine ventilation
CN102720520A (en) Method for ventilating drainage tunnel of extremely-long double-hole tunnel of expressway during construction
CN105756697A (en) Dynamical staged safe regulating and controlling method for mine ventilation system
CN207934931U (en) A kind of energy dissipating decompressor and filling system
CN105569724A (en) Method for optimizing outburst-prevention technical measures for coal and gas outburst mine
CN109578048B (en) Intelligent ventilation system for mine and control method
CN106351682B (en) A kind of ventilating system that can fast implement underground metal mine Multi stages ventilation inverted ventilation
CN2806764Y (en) Air throttle interlocking device
CN110318799B (en) Ventilation method for long and large tunnel construction
CN204357475U (en) Deep-well ore body U-shaped stall ventilation system
CN109882230A (en) It is a kind of exploit the intensive vein deposit of multilayer parallel stage method of ventilation and network
CN101338685B (en) Elevated plain mine artificial supercharging and aeration method
CN203240687U (en) Integrated airtight constant-pressure expansion device used for mid-rise building and low-rise building ground-source heat pump system
CN202811437U (en) Mine ventilation energy-saving automatic speed adjusting system
CN210067755U (en) Ground rail laying structure of side revolving door
CN204609922U (en) Counterweight air door interlocking control device
Lowndes et al. The application of GA optimisation methods to the design of practical ventilation systems for multi-level metal mine operations
CN206409267U (en) A kind of underground mining exhaust ventilation structure
CN105317453B (en) The dust collection method that spoil is crushed in a kind of underground coal mine chamber
CN2690598Y (en) Induced draught distributing valve in the pit of mine
CN206071636U (en) A kind of mine air door regulation wind window

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant