CN105317453B - The dust collection method that spoil is crushed in a kind of underground coal mine chamber - Google Patents

The dust collection method that spoil is crushed in a kind of underground coal mine chamber Download PDF

Info

Publication number
CN105317453B
CN105317453B CN201510785964.6A CN201510785964A CN105317453B CN 105317453 B CN105317453 B CN 105317453B CN 201510785964 A CN201510785964 A CN 201510785964A CN 105317453 B CN105317453 B CN 105317453B
Authority
CN
China
Prior art keywords
chamber
crushed
spoil
return airway
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510785964.6A
Other languages
Chinese (zh)
Other versions
CN105317453A (en
Inventor
杨威
林柏泉
刘统
黄展博
王瑞
宋吴兵
郑苑楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201510785964.6A priority Critical patent/CN105317453B/en
Publication of CN105317453A publication Critical patent/CN105317453A/en
Application granted granted Critical
Publication of CN105317453B publication Critical patent/CN105317453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires
    • E21F5/20Drawing-off or depositing dust
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/08Ventilation arrangements in connection with air ducts, e.g. arrangements for mounting ventilators
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/10Air doors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/06Filling-up mechanically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Ventilation (AREA)

Abstract

The dust collection method that spoil is crushed in a kind of underground coal mine chamber, it is adaptable to the big operation chamber dedusting of underground coal mine dust-producing amount, depositing dust.The crushing chamber of construction connection air intake lane and return airway between air intake lane and return airway;Air exhauster is installed in return airway, the regulation door of side installation one that chamber is connected with return airway is being crushed;Again a pulverizer is installed in crushing chamber, the chamber side that with air intake lane is connected is crushed to enter cash belt provided with what is with pulverizer be connected and go out cash belt, pulverizer is shipped for through entering cash belt by downhole gangue, spoil after pulverizer is crushed transports chamber through going out cash belt, during spoil is crushed in pulverizer, by air exhauster exhausting, the air pressure in control air intake lane is higher than the air pressure in return airway, make distinguished and admirable by the size-reduced chamber inflow return airway of air intake lane, progress dedusting.So as to ensure the cleaning of workman's working space air.This method need not increase cleaner, and design is simple, safe and reliable during use.

Description

The dust collection method that spoil is crushed in a kind of underground coal mine chamber
Technical field
The present invention relates to the dust collection method that spoil in a kind of underground coal mine chamber is crushed, be particularly suitable for use in underground coal mine dust The big operation chamber dedusting of amount, depositing dust.
Background technology
In order to reduce the environmental problems such as the subsidence caused by coal mining, by the spoil produced in progress of coal mining Will gradually expanded application for goaf backfill reduction subsidence.It is mined out backfilling because the size of spoil differs Usually require spoil being crushed to some scale before area.For a long time, the crushing of spoil is general completes on ground, and this is accomplished by Spoil is first transported to earth's surface, underground is transported to after crushing again and implements filling, so as to increase substantial amounts of lifting cost.In order to reduce Cost is lifted, chamber can be crushed in underground construction spoil, implement spoil crushing, it is to avoid spoil gug.The crushing of spoil is production The great operation of dust quantity, due to underground coal mine narrow space, the dust of generation is difficult to trap, and a large amount of dust is caused greatly to workman Injury, traditional dust falling in coal mining method mainly have pre-wetting spoil, water spray, spraying, using dedusting machine etc., although these Dust Capacity can be reduced to a certain extent, but effect is still undesirable.
The content of the invention
Technical problem:The present invention invents spoil powder in a kind of underground coal mine chamber by combining underground coal mine ventilating system Dust, the mine return air system of unmanned entrance is directly discharged into by mine ventilation system so that dust is or not broken dust collection method Into operating area, harm of the reduction dust to people.
Technical scheme:The dust collection method that spoil is crushed in a kind of underground coal mine chamber of the present invention, comprises the following steps:
A. construction connects the crushing chamber of air intake lane and return airway between air intake lane and return airway;
B. air exhauster is installed in return airway, the air duct of air exhauster is connected with crushing chamber;
C. the regulation door of side installation one that chamber is connected with return airway is being crushed;
D. a pulverizer is installed crushing in chamber, crush chamber and be connected side with air intake lane provided with being connected with pulverizer Enter cash belt and to go out cash belt, pulverizer be shipped for through entering cash belt by downhole gangue, pulverizer crush after spoil through going out cash Belt transports chamber, carries out downhole gangue backfill;
E. during spoil is crushed in pulverizer, by air exhauster exhausting, the air pressure in control air intake lane is higher than back Air pressure in air way so that distinguished and admirable to flow into return airway by the size-reduced chamber of air intake lane, carries out dedusting.
The regulation door includes two parts up and down, and top is divided into brickwork construction, is reserved with the circular hole for passing through air duct, air duct Combined closely with circular hole, bottom is the left and right sliding door coordinated with top split-phase.
In the case where being not turned on air exhauster by adjusting the aperture of sliding door come airflow regulation from the size-reduced cave of air intake lane Room flows into the wind speed of return airway, realizes dedusting.
Beneficial effect:The present invention is by improving mine ventilation system, and chamber is crushed in design between air intake lane and return airway, So that spoil turnover is all in the upwind of pulverizer, air is than comparatively fresh, and it is then direct to crush the dust produced during spoil Stream enters workman in air return system, whole process and is not exposed to dust with the wind, has ensured workers ' health.The invention enables spoil powder It is broken directly to be carried out in underground, the lifting cost of mine is reduced, while dedusting depends on improvement on Ventilation System, is reduced Input in terms of dedusting equipment.Present invention operation is upper simple and easy to apply, and effect significantly, there is significant economic benefit and promotion price Value.
Brief description of the drawings
Fig. 1 is the dust collection method arrangement schematic diagram that spoil is crushed in the underground coal mine chamber of the present invention.
Fig. 2 is the regulation door schematic diagram of the present invention.
In figure:1- pulverizers, 2- enters cash belt, and 3- goes out cash belt, 4- air intake lanes, 5- return airways, 6- air ducts, 7- exhausting Machine, 8 regulation doors, 9- crushes chamber, 10- sliding doors.
Embodiment
The embodiment to the present invention is further described below in conjunction with the accompanying drawings:
Below the dust collection method that spoil is crushed in the underground coal mine chamber of the present invention, specific steps:
A. construction connects the crushing chamber 9 of air intake lane 4 and return airway 5 between air intake lane 4 and return airway 5;
B. air exhauster 7 is installed in return airway 5, the air duct 6 of air exhauster 7 is connected with crushing chamber 9;
C. the regulation door 8 of side installation one that chamber 9 is connected with return airway 5 is being crushed;The regulation door 8 includes two up and down Point, top is divided into brickwork construction, is reserved with the circular hole for passing through air duct 6, and air duct 6 is combined closely with circular hole, and bottom is and top The left and right sliding door 10 that split-phase coordinates.
D. install a pulverizer 1 crushing in chamber 9, crush chamber 9 be connected with air intake lane 4 side provided with and pulverizer 1 It is connected to enter cash belt 2 and go out cash belt 3, pulverizer 1 is shipped for through entering cash belt 2 by downhole gangue, after pulverizer 1 is crushed Spoil transports chamber through going out cash belt 2, carries out downhole gangue backfill;
E. during spoil is crushed in pulverizer 1, by the exhausting of air exhauster 7, the air pressure in control air intake lane 4 is higher than Air pressure in return airway 5 so that distinguished and admirable to flow into return airway 5 by the size-reduced chamber 9 of air intake lane 4, carries out dedusting.It is being not turned on exhausting In the case of machine 7 return airway 5 is flowed into by adjusting the aperture of sliding door 10 come airflow regulation from the size-reduced chamber 9 of air intake lane 4 Wind speed, realizes dedusting.
As shown in figure 1, air intake lane 4 and return airway 5 are necessary tunnels during mine normal production, cave is crushed in construction Exist before room 9, chamber 9 is crushed in construction between air intake lane 4 and return airway 5, and the size for crushing chamber 9 must be able to simultaneously The requirement for installing pulverizer 1, entering cash belt 2 and going out cash belt 3 is met, the connection air intake lane 4 of chamber 9 and return airway 5 is crushed;Returning Air exhauster 7 is installed in air way 5, air exhauster 7 is connected through air duct 6 with crushing chamber 9;It is distinguished and admirable from air intake lane 4 to return air in order to adjust Lane 5 flow speed, crush chamber 9 be connected with return airway 5 side be installed on regulation door 8, adjust door 8 be made up of two parts, Top is brickwork construction and a reserved circular hole, and circular hole, which is generally stayed, to be located at the top lateral wall of regulation door 8, and air duct 6 passes through circular hole simultaneously Combine closely, prevent from existing between air duct 6 and circular hole space and gas leakage, regulation door 8 bottom is installed on sliding door 10, sliding door 10 The aperture of door can be adjusted;Crush chamber 9 in install pulverizer 1, bulk spoil can be ground into preferable granularity so as to For bashing, regulation door need not be installed by crushing the side that is connected with air intake lane 4 of chamber 9, but is equipped with into cash belt 2 With go out cash belt 3, spoil is transported to pulverizer 1 through entering cash belt 2, and the spoil after crushing transports chamber through going out cash belt 2;In powder During broken machine 1 crushes spoil, close sliding door 10, open air exhauster 7 carry out exhausting so that it is distinguished and admirable by air intake lane 4 through powder Broken chamber 9 flows into return airway 5, and the distinguished and admirable dust that pulverizer 1 is crushed spoil and produced brings the return airway 5 of unmanned entrance into, from And workman can be in fresh distinguished and admirable middle work from the harm of dust.The air pressure in air intake lane 4 is higher than return air under normal circumstances Air pressure in lane 5, can also be by adjusting the aperture of sliding door 10 come airflow regulation from entering in the case where being not turned on air exhauster 7 The size-reduced chamber 9 of air way 4 flows into the wind speed of return airway 5.

Claims (3)

1. the dust collection method that spoil is crushed in a kind of underground coal mine chamber, it is characterised in that comprise the following steps:
A. in air intake lane(4)And return airway(5)Between construction connection air intake lane(4)And return airway(5)Crushing chamber(9);
B. in return airway(5)Inside install air exhauster(7), make air exhauster(7)Air duct(6)With crushing chamber(9)It is connected;
C. chamber is being crushed(9)With return airway(5)Install one and adjust door in connected side(8);
D. chamber is being crushed(9)Inside install a pulverizer(1), crush chamber(9)With air intake lane(4)Connected side is provided with and crushing Machine(1)Connected enters cash belt(2)With go out cash belt(3), through entering cash belt(2)Downhole gangue is shipped for pulverizer(1), powder Broken machine(1)Spoil after crushing is through going out cash belt(3)Chamber is transported, downhole gangue backfill is carried out;
E. spoil is in pulverizer(1)In crush during, pass through air exhauster(7)Exhausting, controls air intake lane(4)Interior air pressure is high In return airway(5)Interior air pressure so that distinguished and admirable by air intake lane(4)Size-reduced chamber(9)Flow into return airway(5), carry out dedusting.
2. the dust collection method that spoil is crushed in underground coal mine chamber according to claim 1, it is characterised in that:The regulation Door(8)Including two parts up and down, top is divided into brickwork construction, and being reserved with makes air duct(6)The circular hole passed through, air duct(6)With circular hole Combine closely, bottom is the left and right sliding door coordinated with top split-phase(10).
3. the dust collection method that spoil is crushed in underground coal mine chamber according to claim 1, it is characterised in that:It is being not turned on Air exhauster(7)In the case of, by adjusting door(8)The aperture of middle sliding door carrys out airflow regulation from air intake lane(4)Size-reduced chamber (9)Flow into return airway(5)Wind speed, realize dedusting.
CN201510785964.6A 2015-11-16 2015-11-16 The dust collection method that spoil is crushed in a kind of underground coal mine chamber Active CN105317453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510785964.6A CN105317453B (en) 2015-11-16 2015-11-16 The dust collection method that spoil is crushed in a kind of underground coal mine chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510785964.6A CN105317453B (en) 2015-11-16 2015-11-16 The dust collection method that spoil is crushed in a kind of underground coal mine chamber

Publications (2)

Publication Number Publication Date
CN105317453A CN105317453A (en) 2016-02-10
CN105317453B true CN105317453B (en) 2017-07-11

Family

ID=55245655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510785964.6A Active CN105317453B (en) 2015-11-16 2015-11-16 The dust collection method that spoil is crushed in a kind of underground coal mine chamber

Country Status (1)

Country Link
CN (1) CN105317453B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105840238B (en) * 2016-05-09 2018-03-20 中国矿业大学 Main fan Explosion-proof cap vapour-pressure type automatic open close control device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629490A (en) * 2009-08-12 2010-01-20 抚顺矿业集团有限责任公司 Full air pressure air borrowing method for coal mine underground tunneling roadway
CN102061918A (en) * 2009-11-12 2011-05-18 中国矿业大学 Coal mining method for co-mining gas in mine
RU2453703C1 (en) * 2011-01-12 2012-06-20 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method for dust and gas removal from dead stope ore
CN104453979A (en) * 2014-11-11 2015-03-25 兖州煤业股份有限公司 Method for improving underground coal mine negative pressure suction dust removal technology
PL221081B1 (en) * 2011-09-14 2016-02-29 Inst Technik Innowacyjnych Emag Measurement method for determining the distribution of dust and coal dust in the mine workings

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629490A (en) * 2009-08-12 2010-01-20 抚顺矿业集团有限责任公司 Full air pressure air borrowing method for coal mine underground tunneling roadway
CN102061918A (en) * 2009-11-12 2011-05-18 中国矿业大学 Coal mining method for co-mining gas in mine
RU2453703C1 (en) * 2011-01-12 2012-06-20 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method for dust and gas removal from dead stope ore
PL221081B1 (en) * 2011-09-14 2016-02-29 Inst Technik Innowacyjnych Emag Measurement method for determining the distribution of dust and coal dust in the mine workings
CN104453979A (en) * 2014-11-11 2015-03-25 兖州煤业股份有限公司 Method for improving underground coal mine negative pressure suction dust removal technology

Also Published As

Publication number Publication date
CN105317453A (en) 2016-02-10

Similar Documents

Publication Publication Date Title
CN108194084B (en) End slope mining method of continuous coal mining machine for open-pit end slope mine
CN107355252A (en) A kind of fully mechanized workface air curtain dust-collecting dedusting system
CN203145985U (en) Underground multilevel station partial concentrated ventilation structure
CN105525939A (en) Dry type filtration dust removal system for roadway driving working face
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN203925502U (en) The system that a kind of hydraulic coal mining and filling are synchronously carried out
WO2020192078A1 (en) Method for radial mining of opencast end slope remnant coal
CN104481570B (en) A kind of down-hole dead face ventilating system
CN102031972B (en) L-shaped mining method under open-underground mining
CN105240012B (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN105317453B (en) The dust collection method that spoil is crushed in a kind of underground coal mine chamber
CN104975857B (en) Full well work area section non-pillar goaf-side-drift-free coal mining method
CN104612692B (en) Formation continuous filling mining method followed by segmentation ore caving polycrystalline substance
CN106368715B (en) A kind of slag tapping method constructed during double-shielded TBM assembling
RU2447286C1 (en) Method to extract coal from mining face with ancillary mining of methane
CN207920608U (en) A kind of fully mechanized workface multiple spot control dirt system
CN105179002A (en) Construction method for dynamic ventilation channels of underground mining of thick ore body
CN105863666B (en) A kind of rock tunnel(ling) machine slag-draining device and the no-dig technique rock tunnel(ling) machine with the device
CN108194118A (en) A kind of fire damp ventilation device
CN216714439U (en) Underground mine driving roadway ventilation system
CN109915198A (en) Coal working face advance borehole full blast presses drawing-off gas method
CN112761704B (en) Dust removing method and device for ground horizontal well of coal mine tunnel tunneling working face
CN106014404B (en) A kind of high speed hard rock driving mining all-in-one machine
Kolobe et al. Evolution of the Henderson mine ventilation system
CN105587333A (en) Ventilating and dust removing device of tunneling work face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant