CN109707160A - The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry - Google Patents

The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry Download PDF

Info

Publication number
CN109707160A
CN109707160A CN201910114453.XA CN201910114453A CN109707160A CN 109707160 A CN109707160 A CN 109707160A CN 201910114453 A CN201910114453 A CN 201910114453A CN 109707160 A CN109707160 A CN 109707160A
Authority
CN
China
Prior art keywords
side plate
gantry
fixed part
buried
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910114453.XA
Other languages
Chinese (zh)
Inventor
林超颖
莫林茂
黄新棠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Tengan Mechanical And Electrical Installation Engineering Co Ltd
Original Assignee
Guangdong Tengan Mechanical And Electrical Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Tengan Mechanical And Electrical Installation Engineering Co Ltd filed Critical Guangdong Tengan Mechanical And Electrical Installation Engineering Co Ltd
Priority to CN201910114453.XA priority Critical patent/CN109707160A/en
Publication of CN109707160A publication Critical patent/CN109707160A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of pre-buried set of gantry and utilize the method for the pre-buried set erection bridge of the gantry.The pre-buried set of gantry includes: the multiple side plates being sequentially connected end to end, and multiple side plates surround a through-hole.The pre-buried set of gantry further includes the fixed part to connect with formwork for placing, and at least one of multiple described side plates are provided with fixed part.In set erection bridge pre-buried using gantry, the pre-buried set of gantry is fixedly connected with formwork for placing by fixed part.In the pre-buried set periphery casting concrete of gantry to form wall.Due in gantry installation through-hole, pre-embedded pipe is connect with the pre-buried set of gantry, and the pre-buried set of gantry is not removed after forming wall, so as to which the cable in pre-embedded pipe is accessed gantry, and then facilitates and the cable of pre-embedded pipe is accessed into gantry, without pre-buried transition wire box, lateral branch slot is installed and connect lateral branch slot with gantry, improved the installation effectiveness of erection bridge, reduces installation cost.

Description

The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry
Technical field
The present invention relates to gantry mounting technique fields, install more particularly to the pre-buried set of gantry and using the pre-buried set of the gantry The method of gantry.
Background technique
Gantry is used for laying wires or cable.In multilayer or skyscraper, usual vertically erection bridge.Traditional edge In the method for vertical erection bridge, pre-buried wooden box in advance is needed, to reserve the preformed hole of erection bridge.Concrete building to be poured Wooden box is removed after plate again, is just able to for gantry being mounted in preformed hole.In order to which pre-embedded pipe is connect with gantry, it is also necessary to pour When build floor near gantry preformed hole pre-buried transition wire box, and cannot be directly that pre-embedded pipe is pre-buried in wooden box, in order to avoid resistance Hinder the installation of vertical gantry in the future.In erection bridge, need to be close to below transition wire box Roofing slab fixed lateral branch slot, it is horizontal It is adjacent to Roofing slab to the bottom of branch slot, and pre-embedded pipe is drawn into lateral branch trench bottom aperture in the corresponding position of transition wire box Interior cable.Lateral branch slot and vertical gantry touch lead to and connect after, the cable being embedded in structure floor could be by lateral branch slot Into vertical gantry.The method of traditional vertically erection bridge needs pre-buried transition in order to which pre-embedded pipe to be connect with gantry Wire box installs lateral branch slot and simultaneously connect lateral branch slot with gantry, there is a problem of low efficiency, at high cost.
Patent document CN202596173U provides a kind of gantry built-in fitting.But the gantry built-in fitting in the patent document with The connection of gantry, which needs to pass through gantry threaded connection hole by bolt, to be realized, to suffer from the drawback that in general, building The length that story height is combined with every section of gantry or multistage gantry is unequal, and story height is generally 3.3 meters or so, and in the market The length of every section of gantry is generally 2 meters, since the connection of gantry built-in fitting and gantry needs to connect by bolt across gantry screw thread It connects hole and realizes, under story height and the unequal situation of gantry length, it is necessary to which gantry severing and redrilling can just make Fixation is bolted in gantry and built-in fitting, and work efficiency is caused to decline, and due to useless by the short material in corner under cutting out, also leads to production Raw more gantry waste.
Summary of the invention
Based on this, it is necessary to which method low efficiency, problem at high cost for traditional vertically erection bridge provide one Kind can be improved efficiency, reduce the pre-buried set of gantry of cost and the method using the pre-buried set erection bridge of the gantry.
The application provides a kind of pre-buried set of gantry.The pre-buried set of gantry includes: the multiple side plates being sequentially connected end to end, described more A side plate surrounds a through-hole;
The pre-buried set of gantry further includes the fixed part to connect with formwork for placing, and at least one in multiple side plates It is a to be provided with the fixed part.
In set erection bridge pre-buried using gantry, the pre-buried set of gantry is fixedly connected with formwork for placing by fixed part. In the pre-buried set periphery casting concrete of gantry to form wall.After the completion of casting concrete, formwork for placing is removed, but do not remove The pre-buried set of gantry.Gantry is not removed since in gantry installation through-hole, pre-embedded pipe is connect with the pre-buried set of gantry, and after forming wall Pre-buried set so as to which the cable in pre-embedded pipe is accessed gantry, and then facilitates the cable of pre-embedded pipe accessing gantry, nothing Pre-buried transition wire box is needed, lateral branch slot is installed and connect lateral branch slot with gantry, improves installation effectiveness, the drop of erection bridge Low installation cost.
In one embodiment, the fixed part is from the appearance of the side plate towards the side of the outer surface perpendicular to the side plate To extension;
The fixed part is equipped with connecting hole, and the extending direction of the connecting hole is consistent with the extending direction of the through-hole.
In one embodiment, the multiple side plate is respectively the first side plate, the second side plate, third side plate and the 4th side Plate, first side plate, second side plate, the third side plate and the 4th side plate are sequentially connected end to end;
The outer surface of first side plate is provided with the fixed part, and fixed part on first side plate is arranged in from institute The appearance for stating the first side plate extends towards the direction of the outer surface perpendicular to first side plate;
The outer surface of the third side plate is provided with the fixed part, and fixed part on first side plate is arranged in from institute The appearance for stating the first side plate extends towards the direction of the outer surface perpendicular to first side plate.
In one embodiment, the multiple side plate is respectively the first side plate, the second side plate, third side plate and the 4th side Plate, first side plate, second side plate, the third side plate and the 4th side plate are sequentially connected end to end;
Second side plate is equipped with spool hole;And/or the 4th side plate is equipped with spool hole.
In one embodiment, the multiple side plate is respectively the first side plate, the second side plate, third side plate and the 4th side Plate, first side plate, second side plate, the third side plate and the 4th side plate are sequentially connected end to end;
First side plate is opposite with the third side plate, and second side plate is opposite with the 4th side plate;Described Two side plates are detachably connected with the first side plate and third side plate respectively;4th side plate respectively with the first side plate and third side plate It is detachably connected.
In one embodiment, the both ends of first side plate are respectively equipped with the first slot, and first slot is set to described The surface in face of the third side plate of first side plate;
The both ends of the third side plate are respectively equipped with third slot, and the third slot is set to facing for the third side plate The surface of first side plate;
First slot is inserted into one end of second side plate, and the other end is inserted into the third slot, so that described the Two side plates are connect with first side plate and the third side plate respectively;
First slot is inserted into one end of 4th side plate, and the other end is inserted into the third slot, so that described the Four side plates are connect with first side plate and the third side plate respectively.
In one embodiment, first side plate includes the first noumenon and what is be fixedly connected with the first noumenon first prolong Extending portion, the both ends of the first noumenon are respectively arranged with first extension, and first extension is from the first noumenon Surface towards close to the third side plate direction extend, first slot be set to first extension;
The third side plate includes third ontology and the third extension that is fixedly connected with the third ontology, the third The both ends of ontology are respectively arranged with the third extension, and the third extension is from the surface of the third ontology towards close to institute The direction for stating the first side plate extends, and the third slot is set to the third extension.
In one embodiment, the outer surface of the first noumenon is provided with the fixed part, is arranged in the first noumenon On fixed part extend from the appearance of the first noumenon towards the direction of the outer surface perpendicular to the first noumenon;
The outer surface of first extension connecting with the first noumenon is provided with the fixed part, is arranged described Fixed part on first extension is from the appearance of first extension towards the outer surface perpendicular to first extension Direction extends;
The outer surface of the third ontology is provided with the fixed part, and fixed part on the third ontology is arranged in from institute The appearance for stating third ontology extends towards the direction of the outer surface perpendicular to the third ontology;
The outer surface of the third extension connecting with the third ontology is provided with the fixed part, is arranged described Fixed part on third extension is from the appearance of the third extension towards the outer surface perpendicular to the third extension Direction extends.
In one embodiment, making material used by first side plate and the third side plate is plastics;And/or Making material used by second side plate and the 4th side plate is plastics.
In one embodiment, making material used by first side plate and the third side plate is polyvinyl chloride (PVC)。
In one embodiment, making material used by second side plate and the 4th side plate is polyvinyl chloride (PVC)。
In one embodiment, second side plate is stainless steel plate or galvanized steel plain sheet.
In one embodiment, the 4th side plate is stainless steel plate or galvanized steel plain sheet.
The application also provides gantry described in a kind of any technical solution using in above-mentioned technical proposal pre-buried set installation The method of gantry, method includes the following steps:
The pre-buried set of the gantry is fixedly connected with formwork for placing by the fixed part;
Pre-embedded pipe is connect with the pre-buried set of the gantry;
Filler is clogged in the through-hole;
In the pre-buried set periphery casting concrete of the gantry to form wall;
The filler is taken out out of described through-hole;
The gantry is placed in the through-hole, the cable in the pre-embedded pipe is accessed into the gantry.
In set erection bridge pre-buried using gantry, the pre-buried set of gantry is fixedly connected with formwork for placing by fixed part. In the pre-buried set periphery casting concrete of gantry to form wall.After the completion of casting concrete, formwork for placing is removed, but do not remove The pre-buried set of gantry.Gantry is not removed since in gantry installation through-hole, pre-embedded pipe is connect with the pre-buried set of gantry, and after forming wall Pre-buried set so as to which the cable in pre-embedded pipe is accessed gantry, and then facilitates the cable of pre-embedded pipe accessing gantry, nothing Pre-buried transition wire box is needed, lateral branch slot is installed and connect lateral branch slot with gantry, improves installation effectiveness, the drop of erection bridge Low installation cost.
In one embodiment, gap is formed between the gantry and the pre-buried set of the gantry.
In one embodiment, the side plate is equipped with spool hole, and the pre-embedded pipe is connected to the spool hole;
The step of cable by the pre-embedded pipe accesses the gantry specifically: will be in the pre-embedded pipe Cable passes through the spool hole, so that the cable enters the pre-buried set of the gantry, then the cable is accessed the gantry.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the pre-buried set of gantry of an embodiment;
Fig. 2 is the structural exploded view of the pre-buried set of gantry in Fig. 1;
Fig. 3 is the connection relationship diagram of the gantry pre-buried set and pre-embedded pipe in Fig. 1;
Fig. 4 is the schematic diagram that gantry is mounted on the pre-buried set of the gantry in Fig. 1;
Fig. 5 is the method flow diagram using the pre-buried set erection bridge of gantry of an embodiment.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing Give the preferred embodiment of the present invention.But the invention can be realized in many different forms, however it is not limited to herein Described embodiment.Opposite, the purpose of providing these embodiments is that in order to understand the disclosure It is more thorough and comprehensive.
It should be noted that be referred to as " being fixed on " another portion when portion, it can also be with directly in another portion There are portions placed in the middle.When a portion is considered as that ' attach ' to another portion, it can be directly to another portion or It may be simultaneously present portion placed in the middle.Term as used herein "vertical", "horizontal", "left" and "right" and similar statement For illustrative purposes only, it is not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.It is specific that the term used in the description of the invention herein is intended merely to description Embodiment purpose, it is not intended that in limitation the present invention.Term " and or " used herein includes one or more phases Any and all combinations of the listed item of pass.
Fig. 1 combination Fig. 2 is please referred to, the embodiment of the present application provides a kind of pre-buried set 100 of gantry.The pre-buried set 100 of gantry includes The multiple side plates being sequentially connected end to end, multiple side plates surround a through-hole 101.In the present embodiment, multiple side plates are respectively first Side plate 111, the second side plate 112, third side plate 113 and the 4th side plate 114.First side plate 111, the second side plate 112, third side Plate 113 and the 4th side plate 114 are sequentially connected end to end, and surround through-hole 101.
The pre-buried set 100 of gantry further includes the fixed part 120 to connect with formwork for placing, at least one of multiple side plates It is provided with fixed part 120, so that the pre-buried set 100 of gantry to be connect with formwork for placing.
It is by fixed part 120 that gantry is pre- in 100 erection bridge 300 of set pre-buried using gantry incorporated by reference to Fig. 3 and Fig. 4 It buries set 100 to be fixedly connected with formwork for placing, then connect pre-embedded pipe 200 with the pre-buried set 100 of gantry.Again in through-hole 101 Filler is clogged, into slurry in through-hole 101 when preventing casting concrete, filler can be wooden box, foamed plastics etc..Then exist The peripheral casting concrete of the pre-buried set 100 of gantry is to form wall.After the completion of casting concrete, formwork for placing is removed, but do not tear open Except the pre-buried set 100 of gantry.The filler in through-hole 101 is taken out, then through-hole 101 forms the space of erection bridge 300.Again by gantry 300 are mounted in through-hole 101 and fix the position of gantry 300.
Since in 300 installation through-hole 101 of gantry, pre-embedded pipe 200 is connect with the pre-buried set 100 of gantry, and after formation wall The pre-buried set 100 of gantry is not removed, so as to which the cable in pre-embedded pipe 200 is accessed gantry 300, and then is facilitated built-in line The cable of pipe 200 accesses gantry 300, without pre-buried transition wire box, installs lateral branch slot and connect lateral branch slot with gantry, mentions The high installation effectiveness of erection bridge 300 reduces installation cost.
Compared to the gantry built-in fitting in patent document patent document CN202596173U, in the pre-buried set of the gantry of the application After the completion of 100 is pre-buried, when erection bridge 300, gantry 300 can directly through the pre-buried set 100 of gantry, without cutting gantry 300, Will not the additional remaining short material in corner, so that additional loss will not be generated.Since the pre-buried set 100 of the gantry of the application is not provided with The bolt hole being connected and fixed with gantry 300, therefore gantry 300 is without in addition drilling.In contrast, the pre-buried set of the gantry of the application 100 more save material and artificial, more efficient.
Referring to FIG. 1, in one embodiment, fixed part 120 is equipped with connecting hole 121.Specifically, connecting hole 121 can be with It is screw hole, pin hole etc..It can fix by the way that the connectors such as screw, pin are passed through connecting hole 121 and with formwork for placing, from And the pre-buried set 100 of gantry can mutually be fixed with formwork for placing.In the present embodiment, connecting hole can be passed through using self-tapping screw 121, so that fixed part 120 be fixed with formwork for placing.
In one embodiment, fixed part 120 extends from the appearance of side plate towards the direction of the outer surface perpendicular to side plate, even The extending direction for connecing hole 121 is consistent with the extending direction of through-hole 101, to pass through connecting hole using connectors such as screw, pins 121 with formwork for placing when connecting, and can be improved the verticality of through-hole 101, and then improve the installation accuracy of gantry 300.Specifically, Fig. 1 and Fig. 2 are please referred to, in the present embodiment, the outer surface of the first side plate 111 is provided with fixed part 120, is arranged in the first side plate Fixed part 120 on 111 extends from the appearance of the first side plate 111 towards the direction of the outer surface perpendicular to the first side plate 111.The The outer surface of three side plates 113 is provided with fixed part 120, and fixed part 120 on third side plate 113 is arranged in from third side plate 113 Appearance towards the outer surface perpendicular to third side plate 113 direction extend.
In other embodiments, the outer surface of the second side plate 112, the outer surface of the 4th side plate 114 also can be set admittedly Determine portion 120.
Fig. 1 and Fig. 2 are please referred to, in one embodiment, the second side plate 112 is equipped with spool hole 102.Pre-embedded pipe 200 with Spool hole 102 on second side plate 112 is connected to, so as to pass through the cable in pre-embedded pipe 200 on second side plate 112 Then cable is accessed gantry 300, facilitating will be in pre-embedded pipe 200 so that cable enters the pre-buried set 200 of gantry by spool hole 102 Cable access gantry 300.
Referring to FIG. 3, in one embodiment, the 4th side plate 114 is equipped with spool hole 102, pre-embedded pipe 200 and the 4th side Spool hole 102 on plate 114 is connected to, so as to which the cable in pre-embedded pipe 200 to be passed through to the spool hole on the 4th side plate 114 102, so that cable enters the pre-buried set 200 of gantry, cable is then accessed into gantry 300, is facilitated the cable in pre-embedded pipe 200 Access gantry 300.
The quantity of pre-embedded pipe 200 is usually multiple.Second side plate 112, the 4th side plate 114 can be separately connected different Pre-embedded pipe 200 allows the cable in different pre-embedded pipes 200 respectively by the spool hole on the second side plate 112 102, gantry 300 is accessed in the spool hole 102 on the 4th side plate 114.
In other embodiments, spool hole can also be opened up on the first side plate 111, third side plate 113, and by the first side Plate 111, third side plate 113 are separately connected different pre-embedded pipes 200, make spool hole on the first side plate 111, third side plate Spool hole on 113 is connected to corresponding pre-embedded pipe 200 respectively, equally can be convenient cable in pre-embedded pipe 200 from line Gantry 300 is accessed in pore.
In the pre-buried set 100 of processing bridge, spool hole can be directly opened up on any one or more side plates.
In other embodiments, spool hole can not also be opened up when the pre-buried set 100 of processing bridge.And in erection bridge 300 When according to construction needs, scene drill out spool hole on the pre-buried set 100 of gantry, equally can be convenient pre-embedded pipe 200 from line Pore accesses gantry 300.Also, scene needs to bore spool hole according to construction, more meets installation requirements, facilitates installation.
Fig. 2 combination Fig. 1 is please referred to, in one embodiment, the first side plate 111 is opposite with third side plate 113, the second side plate 112 and the 4th side plate 114 it is opposite.The both ends of first side plate 111 are respectively equipped with the first slot 111a.First slot 111a is set to the The surface in face of third side plate 113 of side plate 111.The both ends of third side plate 113 are respectively equipped with third slot 113a, and third is inserted Slot 113a is set to the surface in face of the first side plate 111 of third side plate 113.
The first slot 111a is inserted into one end of second side plate 112, and the other end is inserted into third slot 113a, to facilitate second Side plate 112 is connect with the first side plate 111 and third side plate 113 respectively.The first slot 111a is inserted into one end of 4th side plate 114, The other end is inserted into third slot 113a, so that the 4th side plate 114 is connect with the first side plate 111 and third side plate 113 respectively.It is needing When transporting the pre-buried set 100 of gantry, the second side plate 112 can be extracted from the first slot 111a and third slot 113a, it will 4th side plate 114 is extracted from the first slot 111a and third slot 113a, thus transport when can by the first side plate 111, Second side plate 112, third side plate 113 and the 4th side plate 114 are stacked up, the pre-buried set 100 of convenient transportation gantry, save transport Cost.In set 100 pre-buried using gantry, by the first side plate 111, the second side plate 112, third side plate 113 and the 4th side plate 114 assemble.
The gantry 300 of different model usually has different length.The length for the gantry 300 mentioned in the application refers to bridge The distance between one end of close third side plate 113 of the one end of close first side plate 111 of frame 300 to gantry 300.Gantry 300 length is different, then needs to select the second side plate 112 and the 4th side plate 114 of different length, so that through-hole 101 is in bridge The size of 300 length direction of frame can be adapted to gantry 300.If the length of gantry 300 is longer, need to select longer second side Plate 112 and the 4th side plate 114.Therefore, the second side plate 112 and the 4th side plate 114 that different lengths can be designed, for different shaped Number gantry 300, in the pre-buried set 100 of gantry use different the second side plate 112 and the 4th side plate 114.
Since the first slot 111a is inserted into one end of the second side plate 112, the other end is inserted into third slot 113a, the second side plate 112 can connect with the first side plate 111 and third side plate 113, thus, by the second side plate 112 of different length respectively with When side plate 111 and third side plate 113 connect, it is only necessary to the distance between the first side plate 111 and third side plate 113 are adjusted, then Second side plate 112 is inserted into respectively in the first slot 111a and third slot 113a.Similarly, by the 4th side of different length When plate 114 is connect with the first side plate 111 and third side plate 113 respectively, it is only necessary to adjust the first side plate 111 and third side plate 113 The distance between, then the 4th side plate 114 is inserted into respectively in the first slot 111a and third slot 113a, thus facilitate by Second side plate 112 of different length and the 4th side plate 114 are connect with the first side plate 111 and third side plate 113 respectively, Jin Erke So that the pre-buried set 100 of gantry can be adapted for the installation of the gantry 300 of different length, and easy for installation and flexible.
In other embodiments, between the second side plate 112 and the first side plate 111 and third side plate 113, the 4th side plate 114 It can also be detachably connected by other means between the first side plate 111 and third side plate 113, equally can be convenient fortune The defeated pre-buried set 100 of gantry can also make the pre-buried set 100 of gantry can be adapted for the installation of gantry 300 of different length, and install It is convenient and flexible.For example, the second side plate 112 can snap connection respectively with the first side plate 111 and third side plate 113 or screw thread connects It connects.
Fig. 2 combination Fig. 1 is please referred to, in one embodiment, the first side plate 111 includes the first noumenon 1111 and and the first noumenon 1111 the first extensions 1112 being fixedly connected.The both ends of the first noumenon 1111 are respectively arranged with the first extension 1112.First Extension 1112 extends from the surface of the first noumenon 1111 towards the direction close to third side plate 113.First slot 111a is set to the One extension 1112.Due to being provided with the first extension 1112 on the first noumenon 1111, the first extension 1112 is from first The surface of body 1111 extends towards the direction close to third side plate 113, prolongs so as to which the first slot 111a can be set to first Extending portion 1112, then the second side plate 112 and the 4th side plate 114 are not necessarily to be inserted into the first noumenon 1111, and then can be by first The thickness of body 1111 is made thin, saves material and cost.Similarly, due to third side plate 113 include third ontology 1131 and with The third extension 1132 that third ontology 1131 is fixedly connected, the both ends of third ontology 1131 are respectively arranged with third extension 1132.Third extension 1132 extends from the surface of third ontology 1131 towards the direction close to the first side plate 111, so as to incite somebody to action Third slot 113a can be set to third extension 1132, then the second side plate 112 and the 4th side plate 114 are without being inserted into third sheet In body 1131, and then the thickness of third ontology 1131 can be made thin, save material and cost.
In one embodiment, making material used by the first side plate 111 and third side plate 113 is plastics, plastics cost It is low, the cost of manufacture of the pre-buried set 100 of gantry can be reduced.Preferably, it is made used by the first side plate 111 and third side plate 113 Making material is polyvinyl chloride (PVC), makes the first side plate 111 and third side plate 113 using PVC material, is infused in batch production It is low to be moulded into shape process costs, and the PVC prices of raw materials are low.
In one embodiment, making material used by the second side plate 112 and the 4th side plate 114 is plastics, plastics cost It is low, the cost of manufacture of the pre-buried set 100 of gantry can be reduced.Preferably, it is made used by the second side plate 112 and the 4th side plate 114 Making material is polyvinyl chloride (PVC), makes the second side plate 112 and the 4th side plate 114 using PVC material, is infused in batch production It is low to be moulded into shape process costs, and the PVC prices of raw materials are low.
In other embodiments, the second side plate 112 and the 4th side plate 114 can also be stainless steel plate or galvanized steel plain sheet.Phase Than there is better fire resistance in polyvinyl chloride (PVC), stainless steel plate or galvanized steel plain sheet, gantry 300 can be played more preferably Fireproofing function.
In addition, in the present embodiment, since the second side plate 112 and the 4th side plate 114 are plate, the processing cost of plate It is low, therefore the second side plate 112 and the 4th side plate 114 can also use stainless steel plate or galvanized steel plain sheet, cost will not be too high and anti- Fiery performance is more preferable.
Referring to FIG. 5, another embodiment of the application also provides a kind of pre-buried set of gantry using in any of the above-described embodiment The method of 100 erection bridges 300.Method includes the following steps:
S100: the pre-buried set 100 of gantry is fixedly connected with formwork for placing by fixed part 120;
In the present embodiment, can by by the connectors such as screw, pin pass through connecting hole 121 and by fixed part 120 with Formwork for placing is mutually fixed, so as to which the first side plate 111 and third side plate 113 are fixed with formwork for placing, and then can be by bridge The pre-buried set 100 of frame is mutually fixed with formwork for placing.
S200: pre-embedded pipe 200 is connect with the pre-buried set 100 of gantry;
In the present embodiment, the second side plate 112 is equipped with spool hole 102.Pre-embedded pipe 200 and the second side plate 112 are connected It connects, and is connected to the spool hole 102 of pre-embedded pipe 200.4th side plate 114 is equipped with spool hole 102.By pre-embedded pipe 200 with The connection of 4th side plate 114, and be connected to the spool hole 102 of pre-embedded pipe 200.
The quantity of pre-embedded pipe 200 is usually multiple.Second side plate 112, the 4th side plate 114 can be separately connected different Pre-embedded pipe 200.
In other embodiments, can also make the first side plate 111, third side plate 113 respectively from different pre-embedded pipes 200 Connection, then connects in the spool hole on the first side plate 111, the spool hole on third side plate 113 with corresponding pre-embedded pipe 200 It is logical.
S300: filler is clogged in through-hole 101;
Filler is clogged in through-hole 101, into slurry in through-hole 101 when preventing casting concrete, filler can be wood Box, foamed plastics etc..
S400: in the peripheral casting concrete of the pre-buried set 100 of gantry to form wall;
In the peripheral casting concrete of the pre-buried set 100 of gantry, wall is then formed after concrete setting.It is complete in casting concrete At rear dismounting formwork for placing, without removing the pre-buried set 100 of gantry.
S500: filler is taken out;
After the completion of casting concrete, formwork for placing is removed, and take out the filler in through-hole 101, then the formation of through-hole 101 The space of erection bridge 300.
S600: gantry 300 is installed in through-hole 101, and the cable in pre-embedded pipe 200 is accessed gantry 300.
Installation verticality of the gantry 300 in through-hole 101 is determined by the method for hanging vertical line, and then gantry 300 is installed In through-hole 101.Since in 300 installation through-hole 101 of gantry, pre-embedded pipe 200 is connect with the pre-buried set 100 of gantry, and form wall The pre-buried set 100 of gantry is not removed afterwards, so as to which the cable in pre-embedded pipe 200 is accessed gantry 300, and then facilitating will be pre-buried The cable of spool 200 accesses gantry 300, without pre-buried transition wire box, installs lateral branch slot and connect lateral branch slot with gantry, It improves the installation effectiveness of erection bridge 300, reduce installation cost.
In one embodiment, cable tube hole is opened up on side plate, pre-embedded pipe 200 is connected to corresponding spool hole.It will be pre-buried The step of cable in spool 200 accesses gantry 300 specifically: the cable in pre-embedded pipe 200 is passed through into spool hole, so that line Cable enters the pre-buried set 100 of gantry, then cable is accessed gantry 300.
In the present embodiment, the cable in pre-embedded pipe 200 can be passed through to the spool hole 102 on the second side plate 112, made It obtains cable and enters the pre-buried set 200 of gantry, cable is then accessed into gantry 300, the cable in pre-embedded pipe 200 is facilitated to access gantry 300.Cable in pre-embedded pipe 200 can also pass through the spool hole 102 on the 4th side plate 114 and enter the pre-buried set 100 of gantry, then Cable is accessed into gantry 300, the cable in pre-embedded pipe 200 is facilitated to access gantry 300.
In other embodiments, spool hole can not also be opened up when the pre-buried set 100 of processing bridge.In erection bridge 300 According to construction needs, scene drills out spool hole on the second side plate 112 and the 4th side plate 114.Again by pre-embedded pipe 200 and second Side plate 112 connects, and is connected to the spool hole 102 on the second side plate 112, and pre-embedded pipe 200 is connect with the 4th side plate 114, And be connected to the spool hole 102 on the 4th side plate 114, it equally can be convenient the cable access gantry 300 in pre-embedded pipe 200. Also, scene needs to bore spool hole according to construction, more meets installation requirements, facilitates installation.
In other embodiments, can also make the first side plate 111, third side plate 113 respectively from different pre-embedded pipes 200 Connection, then connects in the spool hole on the first side plate 111, the spool hole on third side plate 113 with corresponding pre-embedded pipe 200 It is logical.Cable in corresponding pre-embedded pipe 200 can also pass through the spool hole on the first side plate 111, the line on third side plate 113 Pore enters the pre-buried set 100 of gantry, then cable is accessed gantry 300, and the cable in pre-embedded pipe 200 is facilitated to access gantry 300.
Referring to FIG. 4, in one embodiment, forming gap 103 between gantry 300 and the pre-buried set 100 of gantry.Specifically, Between being formed respectively between first side plate 111, the second side plate 112, third side plate 113 and the 4th side plate 114 and gantry 300 Gap 103.In the present embodiment, gap 103 is respectively formed between the first side plate 111 and third side plate 113 and gantry 300.? When gantry 300 is installed in through-hole 101, due to forming gap 103 between gantry 300 and the pre-buried set 100 of gantry, so that Gantry 300 can be movable in gap 103, so that gantry 300 has certain activity space in through-hole 101, and then is pacifying The verticality of the installation of gantry 300 can be improved with the setting angle of flexible modulation gantry 300 when filling gantry 300.If gantry Very close to each other 103 between 300 and the pre-buried set 100 of gantry, then require the pre-buried set of the gantry between upper and lower level 100 must it is pre-buried very Precisely, after otherwise connecting gantry 300, it is possible to because the dislocation of the pre-buried set 100 of gantry, leads to 300 out of plumb of gantry.Because of bridge The pre-buried set 100 of frame has been fully cured in concrete, can not adjust.
In one embodiment, it after the setting angle and installation site for determining gantry 300, can be filled out with fire proofing material Gap 103 is filled in, so as to play the role of fireproof to gantry 300.Specifically, fire proofing material can select solid fire-proof mud Deng.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of pre-buried set of gantry characterized by comprising the multiple side plates being sequentially connected end to end, the multiple side plate surround One through-hole;
The pre-buried set of gantry further includes the fixed part to connect with formwork for placing, and at least one of multiple described side plates are set It is equipped with the fixed part.
2. the pre-buried set of gantry according to claim 1, which is characterized in that
The fixed part extends from the appearance of the side plate towards the direction of the outer surface perpendicular to the side plate;
The fixed part is equipped with connecting hole, and the extending direction of the connecting hole is consistent with the extending direction of the through-hole.
3. the pre-buried set of gantry according to claim 2, which is characterized in that the multiple side plate is respectively the first side plate, Two side plates, third side plate and the 4th side plate, first side plate, second side plate, the third side plate and described Four side plates are sequentially connected end to end;
The outer surface of first side plate is provided with the fixed part, and fixed part on first side plate is arranged in from described The appearance of side plate extends towards the direction of the outer surface perpendicular to first side plate;
The outer surface of the third side plate is provided with the fixed part, and fixed part on first side plate is arranged in from described The appearance of side plate extends towards the direction of the outer surface perpendicular to first side plate.
4. the pre-buried set of gantry according to claim 1, which is characterized in that
The multiple side plate is respectively the first side plate, the second side plate, third side plate and the 4th side plate, first side plate, institute The second side plate, the third side plate and the 4th side plate is stated to be sequentially connected end to end;
Second side plate is equipped with spool hole;And/or
4th side plate is equipped with spool hole.
5. the pre-buried set of gantry according to claim 1, which is characterized in that
The multiple side plate is respectively the first side plate, the second side plate, third side plate and the 4th side plate, first side plate, institute The second side plate, the third side plate and the 4th side plate is stated to be sequentially connected end to end;
First side plate is opposite with the third side plate, and second side plate is opposite with the 4th side plate;
The both ends of first side plate are respectively equipped with the first slot, and first slot is set on first side plate in face of described The surface of third side plate;
The both ends of the third side plate are respectively equipped with third slot, and the third slot is set on the third side plate in face of described The surface of first side plate;
First slot is inserted into one end of second side plate, and the other end is inserted into the third slot, so that described second side Plate is connect with first side plate and the third side plate respectively;
First slot is inserted into one end of 4th side plate, and the other end is inserted into the third slot, so that the 4th side Plate is connect with first side plate and the third side plate respectively.
6. the pre-buried set of gantry according to claim 5, which is characterized in that
First side plate includes the first noumenon and the first extension for being fixedly connected with the first noumenon, the first noumenon Both ends be respectively arranged with first extension, first extension is from the surface of the first noumenon towards close to described the The direction of three side plates extends, and first slot is set to first extension;
The third side plate includes third ontology and the third extension that is fixedly connected with the third ontology, the third ontology Both ends be respectively arranged with the third extension, the third extension is from the surface of the third ontology towards close to described the The direction of side plate extends, and the third slot is set to the third extension.
7. the pre-buried set of gantry according to claim 6, which is characterized in that
The outer surface of the first noumenon is provided with the fixed part, and fixed part on the first noumenon is arranged in from described The appearance of one ontology extends towards the direction of the outer surface perpendicular to the first noumenon;
The outer surface of first extension connecting with the first noumenon is provided with the fixed part, is arranged described first Fixed part on extension is from the appearance of first extension towards the direction of the outer surface perpendicular to first extension Extend;
The outer surface of the third ontology is provided with the fixed part, and fixed part on the third ontology is arranged in from described The appearance of three ontologies extends towards the direction of the outer surface perpendicular to the third ontology;
The outer surface of the third extension connecting with the third ontology is provided with the fixed part, is arranged in the third Fixed part on extension is from the appearance of the third extension towards the direction of the outer surface perpendicular to the third extension Extend.
8. a kind of method using the pre-buried set erection bridge of gantry as described in any one of claim 1~7 claim, It is characterized in that,
The pre-buried set of the gantry is fixedly connected with formwork for placing by the fixed part;
Pre-embedded pipe is connect with the pre-buried set of the gantry;
Filler is clogged in the through-hole;
In the pre-buried set periphery casting concrete of the gantry to form wall;
Take out the filler;
The gantry is placed in the through-hole, the cable in the pre-embedded pipe is accessed into the gantry.
9. according to the method described in claim 8, it is characterized in that, between being formed between the gantry and the pre-buried set of the gantry Gap.
10. according to the method described in claim 8, it is characterized in that,
The side plate is equipped with spool hole, and the pre-embedded pipe is connected to the spool hole;
The step of cable by the pre-embedded pipe accesses the gantry specifically: by the cable in the pre-embedded pipe Across the spool hole, so that the cable enters the pre-buried set of the gantry, then the cable is accessed into the gantry.
CN201910114453.XA 2019-02-14 2019-02-14 The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry Pending CN109707160A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910114453.XA CN109707160A (en) 2019-02-14 2019-02-14 The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910114453.XA CN109707160A (en) 2019-02-14 2019-02-14 The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry

Publications (1)

Publication Number Publication Date
CN109707160A true CN109707160A (en) 2019-05-03

Family

ID=66263548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910114453.XA Pending CN109707160A (en) 2019-02-14 2019-02-14 The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry

Country Status (1)

Country Link
CN (1) CN109707160A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101389791B1 (en) * 2013-08-30 2014-04-29 강승국 Connector for vertical type cable tray
CN103806651A (en) * 2012-05-24 2014-05-21 成都市第四建筑工程公司 Bridge embedded part and method for installing bridge through bridge embedded part
CN205295948U (en) * 2015-11-30 2016-06-08 中国建筑第八工程局有限公司 Hole sleeve is reserved to crane span structure
CN205400051U (en) * 2016-02-25 2016-07-27 北京城建亚泰中天建筑安装工程有限公司 Pre -buried mould of electric wire tube in structure floor
CN109252662A (en) * 2018-09-22 2019-01-22 陕西建工第十建设集团有限公司 Vertical shaft gantry wears cast-in-place concrete floor one-pass molding construction method
CN209620588U (en) * 2019-02-14 2019-11-12 广东腾安机电安装工程有限公司 The pre-buried set of gantry

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806651A (en) * 2012-05-24 2014-05-21 成都市第四建筑工程公司 Bridge embedded part and method for installing bridge through bridge embedded part
KR101389791B1 (en) * 2013-08-30 2014-04-29 강승국 Connector for vertical type cable tray
CN205295948U (en) * 2015-11-30 2016-06-08 中国建筑第八工程局有限公司 Hole sleeve is reserved to crane span structure
CN205400051U (en) * 2016-02-25 2016-07-27 北京城建亚泰中天建筑安装工程有限公司 Pre -buried mould of electric wire tube in structure floor
CN109252662A (en) * 2018-09-22 2019-01-22 陕西建工第十建设集团有限公司 Vertical shaft gantry wears cast-in-place concrete floor one-pass molding construction method
CN209620588U (en) * 2019-02-14 2019-11-12 广东腾安机电安装工程有限公司 The pre-buried set of gantry

Similar Documents

Publication Publication Date Title
AU2015203890B2 (en) An interlocking masonry block
US8359808B2 (en) Polystyrene wall, system, and method for use in an insulated foam building
US6240700B1 (en) Constructing method for underground continuous double-row walls and the structure of continuous double-row walls
CN1981102A (en) Insulated concrete form system with variable length wall ties.
CN102691415B (en) Bridge embedded part and method for mounting bridge using bridge embedded part
CN107558603B (en) Assembled building structure system and construction method thereof
US9399867B2 (en) Concrete panel corner connection
CN104863290B (en) A kind of assembled wall of single dry wall section and construction method
CN103590533B (en) Sandwich type partition plate combined structure
CN208293562U (en) A kind of building leads wall construction
CN209620588U (en) The pre-buried set of gantry
CN109707160A (en) The pre-buried set of gantry and the method for utilizing the pre-buried set erection bridge of the gantry
CN104499625A (en) Profiled steel sheet and composite floor
CN109629732B (en) Cast-in-place concrete hidden beam floor with separated pipelines and construction method
CN109610663B (en) Rock wool composite sheet
CN204266444U (en) A kind of profiled sheet and composite floor
CN211037527U (en) Take vertical connected node structure of floor is assembled to full assembled of hidden beam
CN209129417U (en) Integral bathroom based on polyurethane foam chassis
CN217782464U (en) Box mounting structure on wall body
CN220686413U (en) Prefabricated inner wallboard convenient to lift by crane
CN2359358Y (en) Interlocking type building block structure
CN109098346A (en) A kind of prefabricated assembled light steel wallboard and its interconnection method conducive to straight docking
CN215589462U (en) Through-wall air conditioner sleeve concrete prefabricated section mould that can have enough to meet need
CN215290978U (en) Novel assembled PC-GRC integration composite wall panel
CN1114017C (en) Interlocking building masonry structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination