CN109707038A - 大面积螺栓球网架高空散装模块化安装方法 - Google Patents

大面积螺栓球网架高空散装模块化安装方法 Download PDF

Info

Publication number
CN109707038A
CN109707038A CN201910139651.1A CN201910139651A CN109707038A CN 109707038 A CN109707038 A CN 109707038A CN 201910139651 A CN201910139651 A CN 201910139651A CN 109707038 A CN109707038 A CN 109707038A
Authority
CN
China
Prior art keywords
unit module
lower edge
installation
ball
large area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910139651.1A
Other languages
English (en)
Inventor
于晓利
李社增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910139651.1A priority Critical patent/CN109707038A/zh
Publication of CN109707038A publication Critical patent/CN109707038A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及一种大面积螺栓球网架高空散装模块化安装方法。首先网架起步跨安装完毕,形成基准面,剩余螺栓球部分先提前拼装为模块,单元模块由两种形式组成:一种形式是由一个上弦球、两根上弦杆和两根腹杆;另一种形式由一个下弦球、两根下弦杆和两根腹杆组成;拼装时应将单元模块节点球处的所有螺栓全部拧到位,单元模块拼装完后再进行整体高空安装,用吊装机械吊装就位,配合高空安装人员作业,由已经安装完毕的基准面扩展网格安装,形成网架整体。本发明避免了避免了网架整体多机抬吊,且对于高空是否搭设操作平台无特殊要求,加快了工期节约了成本。

Description

大面积螺栓球网架高空散装模块化安装方法
技术领域
本发明涉及建筑施工技术领域,具体是一种大面积螺栓球网架高空散装模块化安装方法。
背景技术
随着国家环保政策的日益加紧,诸多钢厂、水泥厂、电厂等工厂的原料场封闭成为大势所趋的环保工程,且大型公用及民用建筑内部对于使用空间的要求越来越高,空间网架结构由于其跨度大、自重轻,满足了上述建筑在空间及成本上的需求,此结构形式备受业主们的青睐。
大面积空间网架一般结构复杂,安装难度高,起步跨安装完成后,剩余网架传统的施工方法有两种,第一种施工方法是大面积搭设满堂红脚手架作为操作平台进行安装,此方法将会长时间、大面积占用施工场地,且脚手架的租赁费用将会大大的加大施工成本;第二种施工方法是将剩余网架在地面拼装为整体后,用多台大型吊车进行整体抬吊,此方法除去大型吊车机械费的不利因素外,因至少需四台大型吊车同时作业,多机抬吊的安全系数也会随之降低。
发明内容
本发明旨在解决上述问题,从而提供一种操作简单,降低施工成本的大面积螺栓球网架高空散装模块化安装方法。
本发明解决所述问题,采用的技术方案是:
一种大面积螺栓球网架高空散装模块化安装方法,包括如下步骤:
(1)首先进行起步跨安装;
(2)起步跨安装后,进行下弦单元模块的拼装;
(3)用吊装机械设备将下弦单元模块进行整排安装;
(4)进行上弦单元模块的拼装;
(5)当整排下弦单元模块安装完成后,用吊装机械设备进行后一排的上弦单元模块安装,整排上弦单元模块安装完成后,再进行下一排的下弦单元模块安装;
(6)不断循环上述步骤交替安装上弦单元模块和下弦单元模块,直至网架安装完成。
采用上述技术方案的本发明,与现有技术相比,其突出的特点是:
①避免了满堂红脚手架的搭设及施工场地被大面积、长时间占用,节约了大量的租赁费用。
②避免了多机抬吊,因单元模块重量一般比较轻,仅需一台小型吊车即可将其安装就位,安全性大大提高。
③操作简单,降低了施工成本,提高了施工效率。
作为优选,本发明更进一步的技术方案是:
每个上弦单元模块包括一个上弦球、两根上弦杆和两根腹杆,拼装时,将单元模块节点球处的所有螺栓全部拧紧。
每个下弦单元模块包括一个下弦球、两根下弦杆和两根腹杆,拼装时,将单元模块节点球处的所有螺栓全部拧紧。
附图说明
图1 是本发明实施例起步跨安装平面结构示意图;
图2 是图1中A-A剖视结构示意图;
图3 是本发明实施例下弦单元模块结构示意图;
图4 是本发明实施例上弦单元模块结构示意图;
图5 是本发明实施例下弦单元模块安装时的平面示意图;
图6 是本发明实施例下弦单元模块安装时立面示意图;
图7 是本发明实施例上弦单元模块安装时平面示意图;
图8 是本发明实施例上弦单元模块安装时立面示意图;
图9 是本发明实施例网架模块逐渐扩散安装的平面示意图;
图10 是本发明实施例网架模块逐渐扩散安装的立面示意图;
图中:起步跨1;下弦球2;腹杆3;下弦杆4;上弦球5;上弦杆6。
具体实施方式:
下面结合实施例对本发明作进一步说明,目的仅在于更好地理解本发明内容,因此,所举之例并不限制本发明的保护范围。
参见图1、图2、图3、图4、图5、图6、图7、图8、图9、图10,一种大面积螺栓球网架高空散装模块化安装方法,包括如下步骤:
(1)首先进行起步跨1的安装。
(2)起步跨1安装后,进行下弦单元模块的拼装,每个下弦单元模块包括一个下弦球2、两根下弦杆4和两根腹杆3,拼装时,将单元模块节点球处的所有螺栓全部拧紧。
(3)用吊装机械设备将下弦单元模块进行整排安装。
(4)进行上弦单元模块的拼装,每个上弦单元模块包括一个上弦球5、两根上弦杆6和两根腹杆3,拼装时,将单元模块节点球处的所有螺栓全部拧紧。
(5)当整排下弦单元模块安装完成后,用吊装机械设备进行后一排的上弦单元模块安装,整排上弦单元模块安装完成后,再进行下一排的下弦单元模块安装。
(6)不断循环上述步骤交替安装上弦单元模块和下弦单元模块,直至网架安装完成。
本发明首先网架起步跨1安装完毕,形成基准面,剩余螺栓球部分先提前拼装为模块,单元模块由两种形式组成:一种形式是由一个上弦,5、两根上弦杆6和两根腹杆3;另一种形式由一个下弦球2、两根下弦杆4和两根腹杆3组成;拼装时应将单元模块节点球处的所有螺栓全部拧到位,单元模块拼装完后再进行整体高空安装,用吊装机械吊装就位,配合高空安装人员作业,由已经安装完毕的基准面扩展网格安装,形成网架整体;避免了网架整体多机抬吊,且对于高空是否搭设操作平台无特殊要求,因单元模块重量一般比较轻,仅需一台小型吊车即可将其安装就位,安全性大大提高;避免了满堂红脚手架的搭设及施工场地被大面积、长时间占用,节约了大量的租赁费用;操作简单,降低了施工成本,提高了施工效率。
以上所述仅为本发明较佳可行的实施例而已,并非因此局限本发明的权利范围,凡运用本发明说明书及其附图内容所作的等效变化,均包含于本发明的权利范围之内。

Claims (3)

1.一种大面积螺栓球网架高空散装模块化安装方法,其特征在于,包括如下步骤:
(1)首先进行起步跨安装;
(2)起步跨安装后,进行下弦单元模块的拼装;
(3)用吊装机械设备将下弦单元模块进行整排安装;
(4)进行上弦单元模块的拼装;
(5)当整排下弦单元模块安装完成后,用吊装机械设备进行后一排的上弦单元模块安装,整排上弦单元模块安装完成后,再进行下一排的下弦单元模块安装;
(6)不断循环上述步骤交替安装上弦单元模块和下弦单元模块,直至网架安装完成。
2.根据权利要求1所述的大面积螺栓球网架高空散装模块化安装方法,其特征在于:每个上弦单元模块包括一个上弦球、两根上弦杆和两根腹杆,拼装时,将单元模块节点球处的所有螺栓全部拧紧。
3.根据权利要求1所述的大面积螺栓球网架高空散装模块化安装方法,其特征在于:每个下弦单元模块包括一个下弦球、两根下弦杆和两根腹杆,拼装时,将单元模块节点球处的所有螺栓全部拧紧。
CN201910139651.1A 2019-02-26 2019-02-26 大面积螺栓球网架高空散装模块化安装方法 Pending CN109707038A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910139651.1A CN109707038A (zh) 2019-02-26 2019-02-26 大面积螺栓球网架高空散装模块化安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910139651.1A CN109707038A (zh) 2019-02-26 2019-02-26 大面积螺栓球网架高空散装模块化安装方法

Publications (1)

Publication Number Publication Date
CN109707038A true CN109707038A (zh) 2019-05-03

Family

ID=66265151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910139651.1A Pending CN109707038A (zh) 2019-02-26 2019-02-26 大面积螺栓球网架高空散装模块化安装方法

Country Status (1)

Country Link
CN (1) CN109707038A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113123609A (zh) * 2021-04-20 2021-07-16 贵州建工集团第一建筑工程有限责任公司 一种两端低中间高的钢结构穹顶网架安装方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009150136A (ja) * 2007-12-21 2009-07-09 Ogasawara Sekkei:Kk ドームの構築方法
CN102345393A (zh) * 2011-07-14 2012-02-08 中建八局第四建设有限公司 螺栓球网架高空散装工艺
CN108612194A (zh) * 2018-05-17 2018-10-02 中国十九冶集团有限公司 三段式网架起步拱段安装方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009150136A (ja) * 2007-12-21 2009-07-09 Ogasawara Sekkei:Kk ドームの構築方法
CN102345393A (zh) * 2011-07-14 2012-02-08 中建八局第四建设有限公司 螺栓球网架高空散装工艺
CN108612194A (zh) * 2018-05-17 2018-10-02 中国十九冶集团有限公司 三段式网架起步拱段安装方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113123609A (zh) * 2021-04-20 2021-07-16 贵州建工集团第一建筑工程有限责任公司 一种两端低中间高的钢结构穹顶网架安装方法

Similar Documents

Publication Publication Date Title
EP2541047B1 (en) Wind turbine assembling method and wind turbine assembled according to said method
CN102345393B (zh) 螺栓球网架高空散装工艺
CN102213033A (zh) 风力发电机混合塔架的建造方法
KR19990072014A (ko) 위에서지면으로건축물을건설하는리프트업공법
US9366456B2 (en) Concentrated solar tower assembly and method
CN206692235U (zh) 一种钢结构穹顶起吊安装装置
CN203247868U (zh) 大跨度钢结构施工临时支撑架
CN202785351U (zh) 塔式起重机附着操作平台
CN109707038A (zh) 大面积螺栓球网架高空散装模块化安装方法
EP3786393A1 (en) Movable module for hoisting telescopic towers and method for hoisting telescopic towers
CN202658590U (zh) 整体装配式钻孔平台
CN112049235B (zh) 高空大跨度悬挑结构施工平台及方法
CN102277900B (zh) 宝瓶形空间钢结构的分段累积顶升安装方法
CN202220435U (zh) 逆作地下混凝土结构降模设备
CN104328922B (zh) 高空多层悬垂钢结构逆做法吊装施工技术
CN104060841A (zh) 大跨度钢梁安装施工方法
CN217150619U (zh) 一种环形钢结构安装结构
EP3670899A1 (en) Method for assembling a wind turbine and wind turbine assembled according to said method
CN113756504B (zh) 一种带有阳角的直角铝合金网壳的施工方法
JP4476096B2 (ja) 大型高層風力発電所の建設方法
CN108951430A (zh) 一种路桥现场安装结构、方法及吊机
CN111877789B (zh) 一种新老钢屋盖整体提升更换施工方法
CN103938908A (zh) 采用空间水平支撑体系的筒仓仓顶滑模提升施工方法
CN109138398B (zh) 一种拼装式悬吊钢平台及其施工方法
CN113137102A (zh) 一种拼装式库顶房结构及其安装方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190503