CN109706843A - Moving device is swung in a kind of lifting of suspension bridge steel truss girder - Google Patents

Moving device is swung in a kind of lifting of suspension bridge steel truss girder Download PDF

Info

Publication number
CN109706843A
CN109706843A CN201910065307.2A CN201910065307A CN109706843A CN 109706843 A CN109706843 A CN 109706843A CN 201910065307 A CN201910065307 A CN 201910065307A CN 109706843 A CN109706843 A CN 109706843A
Authority
CN
China
Prior art keywords
rope
suspender
steel truss
truss girder
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910065307.2A
Other languages
Chinese (zh)
Inventor
杨恒
朱立山
刘玉兰
杨晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Road and Bridge Construction Group Co Ltd
Original Assignee
Hunan Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Road and Bridge Construction Group Co Ltd filed Critical Hunan Road and Bridge Construction Group Co Ltd
Priority to CN201910065307.2A priority Critical patent/CN109706843A/en
Publication of CN109706843A publication Critical patent/CN109706843A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of liftings of suspension bridge steel truss girder, swing moving device, including the lifting hoist engine being mounted at the top of Sarasota, it is mounted on swinging on river levee and hangs hoist engine, one end connect the hoist cable that the other end is fixed on main push-towing rope by anchoringwire folder with lifting hoist engine, the upper pulley of hoist cable is fixed on main push-towing rope and hung previously by main rope folder positioned at anchoring cord clip, the lower block being suspended on hoist cable, the suspender being suspended on lower block, connect the adjusting suspender rope and fixed length suspender rope of suspender and steel truss girder, one end connect with lower block and suspender the other end with swing hang that hoist engine connect swing to hang and pull rope.The advantages of present invention economical good, high reliablity.

Description

Moving device is swung in a kind of lifting of suspension bridge steel truss girder
Technical field
The invention belongs to suspension bridge steel truss girder stringers, and in particular to moving device is swung in a kind of lifting of suspension bridge steel truss girder.
Background technique
Steel truss girder is hung on trestle there are many device now.Common wirerope straddles on main rope folder, plays upper pulley, This mode upper pulley is easy by drawing deviation, is biased to, and is influenced by cord clip rope groove, and swinging drift angle when hanging should not be too large;Suspender Frequently with the shoulder pole girder of adjustable hoisting point position, this beam is generally all very heavy because to bear very big moment of flexure;Also useful steel Twisted wire lifting, speed are slower.
Summary of the invention
The purpose of the present invention is the lifting of the suspension bridge steel truss girder of good economy performance, high reliablity, swing moving device.
Realize the object of the invention the technical solution adopted is as follows:
Moving device is swung in suspension bridge steel truss girder provided by the invention lifting, including being mounted on lifting hoist engine at the top of Sarasota, installation Swinging on river levee hangs hoist engine, one end connect the other end with lifting hoist engine and presss from both sides the lifting being fixed on main push-towing rope by anchoringwire Rope is fixed on main push-towing rope and has hung the upper pulley of hoist cable previously by main rope folder positioned at anchoring cord clip, has been suspended on hoist cable Lower block, be suspended on lower block suspender, connection suspender and the adjusting suspender rope and fixed length suspender rope of steel truss girder, one end with Lower block and the suspender connection other end with swing hang that hoist engine connect swing to hang and pull rope.
The suspender connect to form triangle tension hanging mode with steel truss girder by adjusting suspender rope and fixed length suspender rope.
The adjusting suspender rope is connect by regulating device with steel truss girder.
Secondary hinge plate that the suspender is flexibly connected by block by suspender pin shaft, main hinge board group are at described hinge plate, main hinge plate On be equipped with shield rope sheave and hang the adjusting suspender rope and fixed length suspender rope.
The first end of the adjusting suspender rope, the both ends of fixed length suspender rope are connect by suspender cable anchorage with steel truss girder, are adjusted The other end of section suspender rope is connect by the regulating device with steel truss girder.
The regulating device is by being respectively equipped with the upper connector for protecting rope sheave, lower connector and being wound on upper connector, lower connection In device protect rope sheave on adjusting Suo Zucheng, the upper connector, lower connector respectively with adjust suspender rope second end and steel truss Beam connection.
Beneficial effect
Of the invention suspension bridge steel truss girder lifting swings moving device and drives hoist cable and upper lower block by operation lifting hoist engine The height of the supreme trestle of fast lifting steel truss girder, because upper pulley connects with main rope clamp pin, the torsion of upper pulley horizontal plane is by about Beam, the phenomenon that dangerous torsion will not be generated, and big drift angle can be accomplished by swinging when hanging;It swings shifting and pulls the pin shaft that power acts on suspender Middle part can guarantee that all power is all directed at node, will not generate additional deflection moment of flexure, torque;Suspender is by 2 pieces of hinge board groups of primary and secondary At angle permissible range is big, does not need precise manipulation, adjusts suspender rope and fixed length suspender rope utilizes the anchor of existing permanent hoist cable The pin ear pin joint of tool and steel truss girder, securely and reliably, all primary structure members are all no Moment by pulling force, stock utilization pole Height, thus whole device is light-weighted;The adjusting rope of regulating device is 1 smaller wirerope, and regulating device is weighed with separate The suspender rope of the heart connects, and adjusting Suo Shouli drops to very little and is easily adjusted length, and suspender alignment center of gravity can easily accomplish.Cord clip Using ready-made cord clip die cast, many expenses are also saved.Suspender, connector include shield rope sheave, and material uses slab, strictly It manufactures, had not only saved but also safe according to wirerope related specifications.All components are reusable in other Large-scale Hoistings.
Below in conjunction with attached drawing, detailed description of the preferred embodiments.It should be understood that this place is retouched The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to restrict the invention.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of apparatus of the present invention.
Fig. 2 is the working state schematic representation of apparatus of the present invention.
Fig. 3 to Fig. 5 is the enlarged drawing in Fig. 2 at A, B, C respectively.
Description of symbols:
1, hoist engine, 2, hoist cable, 3, upper pulley, 4, main rope folder, 5, anchoring cord clip, 6, lower block, 7, suspender, 8, adjusting are lifted by crane Suspender rope, 9, fixed length suspender rope, 10, regulating device, 11, swing to hang and pull rope, 12, swing and hang hoist engine, 13, anchoring pin shaft, 14, hang Have pin shaft, 15, hoist cable anchorage, 16, upper connector, 17, lower connector, 18, adjusting rope, 19, main push-towing rope, 20, steel truss girder, 21, stack Bridge, 22, upper pulley pin shaft, 701, secondary hinge plate, 702, main hinge plate, 703,1601,1701, shield rope sheave.
Specific embodiment
Suspension bridge steel truss girder provided by the invention lifts by crane, swings moving device, as shown in Figures 1 to 5, comprising: be mounted on Sarasota The lifting hoist engine 1 at top is mounted on that swinging on river levee hangs hoist engine 12, one end connect the other end and pass through with lifting hoist engine 1 Anchoring cord clip 5 be fixed on main push-towing rope 19 rise hoist cable 2, positioned at anchoring cord clip 5 previously by main rope folder 4 be fixed on main push-towing rope 19 and The upper pulley 3 for having hung hoist cable 2, the lower block 6 being suspended on hoist cable 2, the suspender 7 being suspended on lower block 6, connection suspender 7 and steel truss girder 20 adjusting suspender rope 8 and fixed length suspender rope 9, one end and lower block 6 and suspender 7 the connection other end and swing and hang volume Raise swinging to hang and pulling rope 11 for the connection of machine 12;The adjusting suspender rope 8 is connect by regulating device 10 with steel truss girder 20.
Steel truss girder 20 is hung to the position higher than 21 top surface of trestle by operation lifting hoist engine 1, and operation, which is swung, hangs the general of hoist engine 11 Steel truss girder 20 is pulled to 21 top of trestle, and steel truss girder 20 is placed on trestle 21 by operation lifting hoist engine 1, recycles preceding 3 step Until all steel truss girders 20 are all transferred on trestle 21.
In the apparatus of the present, specifically, the upper pulley 3 passes through upper pulley pin shaft 22 hingedly with main rope folder 4, main rope Folder 4 is clamped on main push-towing rope 19, and pin shaft can constrain coaster 3 because movable end and the unequal production of fixing end power of hoist cable 2 are played in two sides Raw horizontal torsion;Simultaneously because upper pulley pin shaft 22 and 3 pulley wheel centre distance of upper pulley are smaller, the river side that hoist cable 2 generates is played The amplitude that pulling force causes upper pulley 3 to swing can be sufficiently small, swings smaller safer.
In the apparatus of the present, specifically, described 2 one end of hoist cable is fixed on the anchoring pin shaft of anchoring 5 lower end of cord clip 13 one end, anchoring cord clip 5 are clamped on main push-towing rope 19, are played the one end of the anchored end connection upper pulley 3 of hoist cable 2 on the inside of bridge, are risen The one end of the movable end connection upper pulley 3 of hoist cable 2 on the outside of bridge, so energy negative function is in most of horizontal on upper pulley 3 Moment of flexure, meanwhile, main push-towing rope 19 can also be avoided by playing hoist cable 2, be connected in the lifting hoist engine 1 at the top of Sarasota.
In the apparatus of the present, specifically, the lower block 6 is connect with suspender 7 by suspender pin shaft 14, and described swing is hung The one end for pulling rope 11 is connected to the intermediate position of suspender pin shaft 14, and all power all intersects at this node of suspender pin shaft 14 On, during swinging shifting, it is constant to adjust suspender rope 8, fixed length suspender 9 stress of rope, therefore steel truss girder 20 is stable during swinging shifting.
In the apparatus of the present, specifically, suspender 7 is connected by adjusting suspender rope 8 and fixed length suspender rope 9 and steel truss girder 20 It connects to form triangle tension hanging mode, wherein adjusting one end of suspender rope 8, the both ends of fixed length suspender rope 9 pass through suspender rope anchor Tool 15 is connect with steel truss girder 20, and the other end for adjusting suspender rope 8 is connect by regulating device 10 with steel truss girder 20.
Suspender cable anchorage 15 is the anchorage of permanent hoist cable, does not need additional designs, also most can guarantee the pin ear of steel truss girder 20 It is injury-free.
In the apparatus of the present, specifically, the regulating device 10 protects the upper company of rope sheave 1601,1701 by being respectively equipped with It connects device 16, lower connector 17 and is wound on connector 16, protects 18 groups of adjusting rope on rope sheave 1601,1701 in lower connector 17 At upper connector 16, lower connector 17 are connect with the other end and steel truss girder 20 for adjusting suspender rope 8 respectively.Rope 18 is adjusted relatively to adjust It is thin many to save suspender rope 8, stress only adjusts the 1/4 of suspender rope 8, and adjusts suspender rope 8 relative to fixed length suspender rope 9 far from steel truss Beam center of gravity, suffered power adjust 18 two ends of rope also much smaller than fixed length suspender rope 9, so can be changed easily with the power of very little Relative position changes upper connector 16 at a distance from lower connector 17, to reach the bridge lengthwise position of adjustment suspender 7, makes Suspender 7 is placed in the surface of the center of gravity of steel truss girder 20, adjusting suspender rope 8, the fixed length suspender rope 9 of suspender 7 and connection steel truss girder 20 Form triangle tension hanging mode.Such mode is most stable, most efficient mechanical mode, and it is logical by 2 pieces that this is attributed to suspender 7 Cross the secondary hinge plate 701 of the flexible connection of suspender pin shaft 14, the structure that can be adjusted the angle on a large scale that main hinge plate 702 forms.On suspender 7 Secondary hinge plate 701, be equipped with the shield suspension of rope sheave 703 on main hinge plate 702 and adjust suspender rope 8, fixed length suspender rope 9.

Claims (6)

1. moving device is swung in a kind of lifting of suspension bridge steel truss girder, it is characterized in that including being mounted on lifting hoist engine at the top of Sarasota, peace Swinging on river levee hangs hoist engine, one end connect the other end with lifting hoist engine and is fixed on rising on main push-towing rope by anchoringwire folder Hoist cable is fixed on main push-towing rope and has hung the upper pulley of hoist cable previously by main rope folder positioned at anchoring cord clip, has been suspended on hoist cable On lower block, be suspended on lower block suspender, connect suspender and steel truss girder adjusting suspender rope and fixed length suspender rope, one end Connect with lower block and suspender the other end with swing hang that hoist engine connect swing to hang and pull rope.
2. moving device is swung in suspension bridge steel truss girder lifting according to claim 1, it is characterized in that the suspender passes through the tune Section suspender rope and fixed length suspender rope connect to form triangle tension hanging mode with steel truss girder.
3. moving device is swung in suspension bridge steel truss girder lifting according to claim 2, it is characterized in that the adjusting suspender rope passes through Regulating device is connect with steel truss girder.
4. moving device is swung in suspension bridge steel truss girder lifting according to claim 3, it is characterized in that the suspender is by passing through suspender Secondary hinge plate that pin shaft is flexibly connected, main hinge board group on the described time hinge plate, main hinge plate at being equipped with to protect rope sheave and hang described adjust and hang Have rope and fixed length suspender rope.
5. moving device is swung in suspension bridge steel truss girder according to claim 4 lifting, it is characterized in that described adjust the of suspender rope One end, fixed length suspender rope both ends connect with steel truss girder by suspender cable anchorage, the other end of adjusting suspender rope passes through the tune Regulating device is connect with steel truss girder.
6. moving device is swung in suspension bridge steel truss girder lifting according to claim 5, it is characterized in that the regulating device is by respectively Equipped with the shield upper connector of rope sheave, lower connector and it is wound on upper connector, protects the adjusting Suo Zucheng on rope sheave, institute in lower connector Connector, lower connector is stated to connect with the second end and steel truss girder for adjusting suspender rope respectively.
CN201910065307.2A 2019-01-23 2019-01-23 Moving device is swung in a kind of lifting of suspension bridge steel truss girder Pending CN109706843A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910065307.2A CN109706843A (en) 2019-01-23 2019-01-23 Moving device is swung in a kind of lifting of suspension bridge steel truss girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910065307.2A CN109706843A (en) 2019-01-23 2019-01-23 Moving device is swung in a kind of lifting of suspension bridge steel truss girder

Publications (1)

Publication Number Publication Date
CN109706843A true CN109706843A (en) 2019-05-03

Family

ID=66262767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910065307.2A Pending CN109706843A (en) 2019-01-23 2019-01-23 Moving device is swung in a kind of lifting of suspension bridge steel truss girder

Country Status (1)

Country Link
CN (1) CN109706843A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164758A (en) * 2021-11-16 2022-03-11 中铁广州工程局集团有限公司 Construction method for swinging and moving tunnel anchor cable saddle under space-limited condition

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020082713A (en) * 2001-04-25 2002-10-31 현대자동차주식회사 Balanceable wire sling
CN201785123U (en) * 2010-09-16 2011-04-06 南车戚墅堰机车车辆工艺研究所有限公司 Turn-over hanger
CN102838037A (en) * 2011-06-23 2012-12-26 三一电气有限责任公司 Turnover hoisting method for wind turbine main shaft, and apparatus thereof
CN106049293A (en) * 2016-07-29 2016-10-26 四川天元机械工程股份有限公司 Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method
CN107119567A (en) * 2017-04-28 2017-09-01 武汉智汇高桥科技股份有限公司 Suspension bridge steel box-girder deck erection gantry and spreading hoist cable swing shifting construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020082713A (en) * 2001-04-25 2002-10-31 현대자동차주식회사 Balanceable wire sling
CN201785123U (en) * 2010-09-16 2011-04-06 南车戚墅堰机车车辆工艺研究所有限公司 Turn-over hanger
CN102838037A (en) * 2011-06-23 2012-12-26 三一电气有限责任公司 Turnover hoisting method for wind turbine main shaft, and apparatus thereof
CN106049293A (en) * 2016-07-29 2016-10-26 四川天元机械工程股份有限公司 Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method
CN107119567A (en) * 2017-04-28 2017-09-01 武汉智汇高桥科技股份有限公司 Suspension bridge steel box-girder deck erection gantry and spreading hoist cable swing shifting construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵宇清: "杭瑞洞庭大桥钢桁梁架设施工技术要点分析", 《中外建筑》, no. 7, pages 264 - 268 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164758A (en) * 2021-11-16 2022-03-11 中铁广州工程局集团有限公司 Construction method for swinging and moving tunnel anchor cable saddle under space-limited condition
CN114164758B (en) * 2021-11-16 2024-03-12 中铁广州工程局集团有限公司 Tunnel anchor cable saddle-moving installation construction method under space-limited condition

Similar Documents

Publication Publication Date Title
CN204897151U (en) Transmission line tower integral hoisting specialized tool that acts as go -between
CN207891749U (en) A kind of steel box-girder suspender
CN207878295U (en) Suspension bridge changes rope device
CN107476195B (en) Girder transporting pulley system for transporting stiffening girder by suspension bridge
CN109706843A (en) Moving device is swung in a kind of lifting of suspension bridge steel truss girder
CN102838045A (en) Extra-heavy type offshore crane three-hoisting point lifting mechanism
CN203411911U (en) Concrete precast box beam hoisting device
CN203159080U (en) Floating-type crane
CN210086060U (en) Suspension bridge steel truss lifting and swinging device
CN206692241U (en) A kind of cable crane tackling system of serial power and double lifting point
CN105398944B (en) Steel structure component bikini lifts by crane erecting device
CN203767902U (en) Hoisting crane structure of folding block of steel box girder of cable-stayed bridge
CN213923753U (en) Load-bearing device and bridge crane
CN213085209U (en) Balance beam type component hoisting device
CN109279499A (en) It is a kind of to suffer from one's own actions balance hanging beam and crane for the dedicated of long materials lifting
CN213141136U (en) I-steel lifting hook and lifting appliance thereof
RU110361U1 (en) DEVICE FOR RESTRICTING LOAD VIBRATIONS ON CRANE ARROWS
CN209161316U (en) A kind of modified grab bucket
CN105776019A (en) Weight floating crane swinging stopping device
CN205099226U (en) Waist rope device, cantilever crane supporting arrangement and hoist
CN204873421U (en) Frame bridge crane hoist
CN207143742U (en) A kind of large-span steel girder hoisting appliance
CN111634813A (en) Hoisting mechanism of crane
CN111874816A (en) Crane boom and using method thereof
CN206615940U (en) A kind of swing arm tower crane with integral type arm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination