CN109704535A - The buried sewage-treatment plant of intelligence equipmentization - Google Patents

The buried sewage-treatment plant of intelligence equipmentization Download PDF

Info

Publication number
CN109704535A
CN109704535A CN201910134737.5A CN201910134737A CN109704535A CN 109704535 A CN109704535 A CN 109704535A CN 201910134737 A CN201910134737 A CN 201910134737A CN 109704535 A CN109704535 A CN 109704535A
Authority
CN
China
Prior art keywords
box
equipmentization
sewage
biochemical
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910134737.5A
Other languages
Chinese (zh)
Inventor
丁树涛
何晓英
汪海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan yunshuiqing Ecological Environment Technology Co.,Ltd.
Original Assignee
Sichuan Li Lan Water Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Li Lan Water Co Ltd filed Critical Sichuan Li Lan Water Co Ltd
Priority to CN201910134737.5A priority Critical patent/CN109704535A/en
Publication of CN109704535A publication Critical patent/CN109704535A/en
Pending legal-status Critical Current

Links

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The buried sewage-treatment plant of intelligence equipmentization.By septic tank, ground divides into the anaerobism transporting box body made with anti-corrosion material and biochemical cabinet, the former inner-use clapboard are separated into the anaerobic box of the filler containing anaerobism and the conveying box containing pressure pump;It is the biochemical case containing aerobic and oxygen, local anaerobic filler and ventilating system in the latter.The sensors such as water level, pH value, DO are filled in three casees;Flow, COD and ammonia nitrogen detector are filled at discharge outlet, while setting cloud server and controller, can become unattended underground sewage Treatment stations.If then adding the pretreatment box of a cabinet containing pretreatment, barrier and automatic control cleaning device by building, domestic effluents row's mouth.Using body structure can in factory it is prefabricated, scene only need to put into outlet pipe etc., greatly reduce field engineering amount, labor intensity, difficulty of construction and period.Day processing 1000m can be built up by starting 1 month3Sewage device can solve the urgent need problem of current serious pollution.Effluent quality is good, as clear as crystal.Without foul smell, can reuse make flushing water, watering pours water and fountain water.

Description

The buried sewage-treatment plant of intelligence equipmentization
(1) technical field: the present invention is a kind of sewage disposal system, relates generally to configuration, the knot of sewage-treatment plant Structure, maintenance and remote control etc..Belong to sewage treatment class (C02F), control to adjust class (G05B).
(2) background technique
It is domestic earliest to be used for sanitary sewage underground treatment in situ technology, mainly there are integrated oxidation ditch and other buried processing Facility, these facilities need to be aerated mechanism and Treatment of Sludge, but are aerated mechanism operating cost height, and reason Yang causes at a large amount of dirt mud Secondary pollution.And from principle, anaerobic and aerobic microbial action only considered, and ignore the special work of facultative microbe With.
In view of the above problems, the sanitary sewage underground treatment in situ system provided in recent years, flows to sequentially using by sewage Efficient anaerobic tank, the conveying device pond, comprehensive biochemical treatment tank of connection are set.It is placed with and contains in the comprehensive biochemical treatment tank The filler of oxygen and oxygen, local anaerobic microorganism.It realizes in operation and is not required to aeration, dosing, heating, operating cost is low, and is discharged Water quality is good.
But there are still following problems for above-mentioned this sewage underground treatment in situ system: 1) because of the sewage using three connections Pond, then pond must be carried out at the scene from all Engineering Task amounts such as excavating, build, fit up and finally install, constructing operation person Heavy workload, condition is poor, and difficulty is big, and the duration is longer.2) due to not providing intelligent automaticization surveillance and control measure, in influent quality When unusual fluctuation occurs for water, advanced processes technical staff is needed to be adjusted system operation, it is big to personnel requirement height, difficulty.
(3) summary of the invention
The buried sewage-treatment plant of intelligence equipmentization provided by the invention, exactly solves existing structure, and site operation is difficult The problems such as degree is big, and the duration is longer and maintenance requirement is high, and difficulty is big.
Technical solution:
The buried sewage-treatment plant of intelligence equipmentization, comprising: it is set to septic tank or building, domestic effluents row's mouth, or It is interior to be sequentially arranged the Anaerobic Treatment part containing filler, the transport portion containing pressure pump along sewage flow direction and contain by Bilge Aerobic and oxygen, local anaerobic microorganism filler and artificial ventilation systems synthesis biochemical treatment part;It is characterized in that:
1) following two cabinets: anaerobism transporting box body 1A and biochemical cabinet 1B are sequentially arranged along sewage flow direction;Anaerobism conveying It is intermediate in cabinet to set partition 1.3, cabinet is split up into 2 two parts of anaerobic box 1 and conveying box, opens partition outlet pass 1.4 on partition With aqueduct 1.5 in dress;Anaerobic box is corresponded on anaerobism transporting box body top cover and conveying box two positions are detested at least provided with one respectively Oxygen observes well 1.6 and conveying observation well 2.3;Comprehensive biochemical treatment part is set in biochemical cabinet 1B, forms biochemical case 3;Conveying box With the water-supply-pipe 2.2 for being connected to two case pressure water routes from top is set in biochemical case;It is discharge outlet 1.3 below biochemical case.2) two A cabinet is the seal case made of anti-corrosion material;Observe the equal with closure of well.3) robot control system(RCS) 9 is set, includes: 1. to exist In anaerobic box, conveying box and biochemical case, at least one group of following three of sensor is respectively configured: water level sensor 9a, pH value are passed Sensor 9b, DO sensor 9c;At biochemical case discharge outlet 1.3, following three detector: flow monitoring instrument 9d, COD is at least configured Detector 9e, ammonia nitrogen detector 9f;2. setting cloud server: at least data-interface, processor CPU, memory, display, WEB Page end, the end APP;3. setting acquisition sensing data, being transmitted to process equipment and execute signal and to cloud server receiving and transmitting signal Controller;Pressure pump, artificial ventilation systems' outer fan in process equipment at least conveying box.
The buried sewage-treatment plant of above-mentioned intelligence equipmentization, if setting is in building, domestic effluents row's mouth or Bilge Pretreatment box 8 is then added between building, domestic effluents row's mouth and anaerobic box in side;Pretreatment box include: pretreatment cabinet 8A, Barrier 7, automatic control barrier cleaning device 7.2, barrier sensor 7a, pretreated water outlet 8.1 and pretreatment outlet pipe 8.2 in it (see embodiment 2).Above-mentioned anti-corrosion material can be metal, glass reinforced plastic or container material therefor.Above-mentioned anaerobic box inner stuffing can Include suspension type filler.It may be disposed so that piston flow fluid structure in above-mentioned anaerobic box.There can be water-supply-pipe in above-mentioned conveying box Flowing full conveying device.Catalysis filler and fixed filler can be equipped in above-mentioned biochemistry case.On above-mentioned artificial ventilation systems include: Lower ventilation pipe and outer fan, airflow direction are from top to bottom.The above-mentioned nonventilated water seal of discharge outlet band.
Beneficial effects of the present invention:
1) due to the equipment using two cabinets or increase pretreatment cabinet, then it can be used anticorrosive material prefabricated in factory It is good, it then installs at the scene, scene need to only install water-supply-pipe of sewage water inlet pipe, processing water drainpipe, connection two tanks etc. i.e. It can.Greatly reduce field engineering amount, difficulty of construction and period.Day processing 1000m can be built up by generally starting 1 month3Sewage device, It can solve the urgent need problem of current serious pollution.2) since intelligent robot control system(RCS) is arranged, can be passed through at a distance with smart phone Cloud server is remotely controlled the sewage farm, it can be achieved that unattended, and the exception of energy automated intelligent reply influent quality water Variation.3) effluent quality is good, as clear as crystal.Be discharged CODcr value can in 20mg/L hereinafter, NH3-N value can in 3mg/L hereinafter, and Without foul smell, can reuse make flushing water, watering pours water and fountain water.Use scope is wide, handles sewage quantity 1--500000m3/ day, water inlet CODcr value range can be 0-1000mg/L.Processing technique abbreviation PASG technology of the invention.4) it due to there is no aeration mechanism, transports Row expense is low;It because of not dosing, do not heat, be not aerated, energy consumption is in 0.1-0.25 degree electricity/m3, direct running cost is less than 0.15 yuan/m3。 5) since mud handling capacity is few, manpower financial capacity is saved, and is conducive to keep live Amenities, debugs normal rear noiseless foul smell Equal secondary pollutions.
(4) Detailed description of the invention:
The anaerobism transporting box body 1A of Fig. 1 embodiment 1, biochemical cabinet 1B stereoscopic schematic diagram.
(embodiment 1 is that sewage-treatment plant is located at by septic tank)
Fig. 2 is the A-A cross-sectional view of Fig. 1, i.e., positive schematic cross-sectional view.
Pretreatment cabinet 8A, anaerobism transporting box body 1A, the biochemical cabinet 1B stereoscopic schematic diagram of Fig. 3 embodiment 2.
(embodiment 2 is that sewage-treatment plant is located at building, domestic effluents are arranged by mouth or Bilge)
Fig. 4 is the A-A cross-sectional view of Fig. 3, i.e., positive schematic cross-sectional view.
Fig. 5 robot control system(RCS) schematic block diagram.
2.2 sectional view of water-supply-pipe in Fig. 6 flowing full conveying device.
Fig. 7 tradition gravity flow mode of movement water-supply-pipe sectional view.
(5) specific embodiment:
Embodiment 1: see Fig. 1, Fig. 2, Fig. 5, Fig. 6, Fig. 7.
The buried sewage-treatment plant of intelligence equipmentization, is located at by septic tank.Its structure is as follows:
1) see Fig. 1, Fig. 2, the anaerobic box 1 in septic tank discharge line 5.1 and anaerobism transporting box body 1A that septic tank 5 is arranged The sewage inlet 1.1 of lower section is connected to.Anaerobic box inner stuffing 1.2 is suspension type filler;And it is living that sewage is arranged as in anaerobic box Plug flow fluid structure or plug-flow pattern structure.
See Fig. 2, the intermediate partition 1.3 that sets separates in anaerobism transporting box body 1A, becomes 2 two parts of anaerobic box 1 and conveying box.Every Opened on plate the mouth of a river 1.4 and this at fill in aqueduct 1.5, making in anaerobic box that treated, sewage imports conveying box 2.In conveying box There is pressure pump 2.1 and pressure water is sent into the water-supply-pipe 2.2 of biochemical 3 top of case, and has automatic open close control water-supply-pipe flowing full Conveying device manages interior flowing full and sees Fig. 6.Fig. 7 is traditional gravity flow mode of movement water-supply-pipe sectional view, both comparisons, it is seen that the former Transfer efficiency is high.See on Fig. 1, Fig. 2 anaerobism transporting box body 1A top cover to correspond to and sets anaerobism observation well 1.6 at anaerobic box;Corresponding conveying Case position top cover sets conveying observation well 2.3.See Fig. 1, Fig. 3, there is the water-supply-pipe 2.2 of connection between two tanks 1A, 1B.See Fig. 2, it is biochemical Water (flow) direction from top to down, is sprayed downwards by water-supply-pipe 2.2 in case 3, the interior filler for having contained catalytic action and increase bacterium The fixed filler of residence time, fixed filler 3.2, can be used sand, stone, wood, palm fibre, plastics, ceramics, cement etc..Upper, Lower snorkel 3.3 is connected with outer fan 3.4.Biochemical 3 bottom side of case is provided with discharge outlet 3.1.
2) two cabinets are the seal case for having top cover made of anti-corrosion material metal.1.6 He of well is looked into anaerobism sight Conveying sight looks into well 2.3 and is equipped with sealing cover.
3) the present embodiment 1 configures following robot control system(RCS) 9: seeing Fig. 5
It is filled respectively in anaerobic box 1, conveying box 2, biochemical case 3 ternary such as lower sensor: water level sensor 9a, PH It is worth sensor 9b, DO sensor 9c.At entire processing unit water outlet, i.e., at Fig. 1, Fig. 2 mesophytization case discharge outlet 3.1, fill three A following detector: flow monitoring instrument 9d, COD detector 9e, ammonia nitrogen detector 9f.12 sensor 9a-9f acquisition sewage letters Breath, 12 groups of electric signal lead-out wires 9.1 meet the acquisition signal end 9.2A of controller 9.2, and 9.2 actuating station 9.2B of controller connects following work Skill equipment: 3.4 signal input part of pressure pump 2.1 and blower.Cloud server 9.3 and controller 9.2 upload with wireless network, under Up to data.
The course of work: see that Fig. 1, Fig. 2,5 sewage of septic tank flow into sewage inlet 1.1 through pipeline 5.1, sewage is in anaerobic box Degradation is come into full contact with by filler and anaerobe and reaches purification sewage, and then water is from partition outlet pass 1.4 and interior water guide Pipe 1.5 is put into conveying box 2, and water in conveying box is pumped into flowing full input pipe 2.2 automatically and is re-fed into biochemical case 3 by pressure pump, is passed through Case inner stuffing 3.2 comes into full contact with aerobic and oxygen, local anaerobic microorganism, and the organic matter in sewage of degrading makes sewage into one Step purification, is discharged from discharge outlet 3.1.Discharge outlet 3.1 is the discharge outlet with stuffy water seal, prevents air from the short stream of discharge outlet. Airflow direction is from top to down in artificial ventilation systems: seeing Fig. 2,3.4 direction of rotation of air blower makes air-flow from the upcast ventilation pipe of air hose 3.3 Into lower air conduit outflow.Fig. 2 middle term 4 is ground.
See Fig. 5, Fig. 2, anaerobic box 1, conveying box 2, the water level of the sensor in biochemical case 3 and detector test, pH value, The data such as DO, flow, COD, ammonia nitrogen value upload cloud server 9.3 by controller 9.2, and cloud server is according to acquisition number According to study analysis is carried out, decision of making adjustment is assigned again through wireless network and sends controller and actuating station 9.2B to, then passes through work Skill equipment pressure pump 2.1 and 3.4 signal input line automatic pressure control of blower pump and blower, adjust operational mode and mode, make System normal table low consumption operation makes to be discharged qualified discharge.Manager can be by the intelligent hand that is connected to the network with cloud server Machine is remotely controlled, and becomes the unattended buried sewage-treatment plant of intelligent equipmentization.
Embodiment 2: see Fig. 3, Fig. 4, Fig. 5
The intelligence buried sewage-treatment plant of equipmentization is located at building, domestic effluents are arranged by mouth.
The present embodiment 2 is not identical as embodiment 1 except following characteristics, remaining is identical:
1) see Fig. 4, Fig. 5, pretreatment box 8 is set between domestic effluents row's mouth 6 and anaerobic box 1, pretreatment box includes: pretreatment It is cabinet 8A (while seeing Fig. 3), the barrier 7 in it, automatic control barrier cleaning device 7.2, barrier sensor 7a (while seeing Fig. 5), pre- Handle water out 8.1, pretreatment outlet pipe 8.2.Bulk dregs can be isolated in grid by the grid 7 of pretreatment box inlet dress It excludes above.Pretreatment box lower end rear sets pretreated water outlet 8.1, and is entered with pretreatment outlet pipe 8.2 with anaerobic box sewage Mouth 1.1 is connected to, sewage after being sent into pretreatment to anaerobic box.See Fig. 3, Fig. 4, pre-processes cabinet 8A, anaerobism transporting box body 1A, biochemistry Three top cover of box surface levels such as cabinet 1B are identical, concordant with ground 4.
2) see Fig. 4, Fig. 5, grating sensor 7a is housed at grid 7, electrical signal line 7.1 meets controller collection terminal 9.2A. Grid cleaning device 7.2 is also equipped at grid 7,7.2 signal input part of grid cleaning device meets controller actuating station 9.2B.Automatic control Mode principle is same as Example 1: when controller 9.2 detects that grid blocks, it is clear to control grid by actuating station 9.2B Cleaning device 7.2 cleans grid, and grid is made to restore to operate normally automatically.

Claims (9)

1. the buried sewage-treatment plant of intelligence equipmentization, comprising: setting arranges mouth in septic tank or building, domestic effluents, or dirty It is interior to be sequentially arranged the Anaerobic Treatment part containing filler, the transport portion containing pressure pump along sewage flow direction and contain by ditch The synthesis biochemical treatment part of oxygen and oxygen, local anaerobic microorganism filler and artificial ventilation systems;It is characterized in that:
1) following two cabinets: anaerobism transporting box body (1A) and biochemical cabinet (1B) are sequentially arranged along sewage flow direction;Anaerobism conveying It is intermediate in cabinet to set partition (1.3), cabinet is split up into anaerobic box (1) and conveying box (2) two parts, opens partition water flowing on partition Aqueduct (1.5) in mouth (1.4) and dress;Anaerobic box is corresponded on anaerobism transporting box body top cover and conveying box two positions are at least set respectively One anaerobism observation well (1.6) and conveying observation well (2.3);Comprehensive biochemical treatment part is set in biochemical cabinet, forms biochemical case (3);In conveying box and biochemical case set the water-supply-pipe (2.2) for two case pressure water routes being connected to from top;It is row below biochemical case The mouth of a river (1.3);
2) two cabinets are the seal case made of anti-corrosion material;Observe the equal with closure of well;
3) robot control system(RCS) (9) are set, include: that at least following three one is respectively configured 1. in anaerobic box, conveying box and biochemical case The sensor of group: water level sensor (9a), pH value sensor (9b), DO sensor (9c);At biochemical case discharge outlet, at least match Set following three detector: flow monitoring instrument (9d), COD detector (9e), ammonia nitrogen detector (9f);2. setting cloud server: At least data-interface, processor CPU, memory, display, WEB page end, the end APP;3. setting acquisition sensing data, Xiang Gong The transmission of skill equipment executes signal and the controller to cloud server receiving and transmitting signal;Pressure in process equipment at least conveying box (2.1), artificial ventilation systems are pumped with outer fan (3.4).
2. by the intelligent buried sewage-treatment plant of equipmentization described in claim 1, it is characterized in that in building, domestic effluents row's mouth Pretreatment box (8) are added between anaerobic box;Pretreatment box include: pretreatment cabinet (8A), the barrier (7) in it, automatic control every Grid cleaning device (7.2), barrier sensor (7a), pretreated water outlet (8.1) and pretreatment outlet pipe (8.2).
3. by the intelligent buried sewage-treatment plant of equipmentization described in claim 1, it is characterized in that the anti-corrosion material is metal, glass Glass steel or container material therefor.
4. by the intelligent buried sewage-treatment plant of equipmentization described in claim 1, it is characterized in that anaerobic box inner stuffing is comprising hanging Hanging filler.
5. by the intelligent buried sewage-treatment plant of equipmentization described in claim 1, it is characterized in that being arranged as piston flow in anaerobic box Fluid structure.
6. by the intelligent buried sewage-treatment plant of equipmentization described in claim 1, it is characterized in that there is expiring for water-supply-pipe in conveying box Flow conveying device.
7. being filled by the intelligent buried sewage-treatment plant of equipmentization described in claim 1 it is characterized in that being equipped with to be catalyzed in biochemical case Object and fixed filler.
8. by the intelligent buried sewage-treatment plant of equipmentization described in claim 1, it is characterized in that artificial ventilation systems include: upper and lower Ventilation pipe and outer fan, airflow direction are from top to bottom.
9. by the intelligent buried sewage-treatment plant of equipmentization described in claim 1, it is characterized in that the nonventilated water seal of discharge outlet band.
CN201910134737.5A 2019-02-23 2019-02-23 The buried sewage-treatment plant of intelligence equipmentization Pending CN109704535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910134737.5A CN109704535A (en) 2019-02-23 2019-02-23 The buried sewage-treatment plant of intelligence equipmentization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910134737.5A CN109704535A (en) 2019-02-23 2019-02-23 The buried sewage-treatment plant of intelligence equipmentization

Publications (1)

Publication Number Publication Date
CN109704535A true CN109704535A (en) 2019-05-03

Family

ID=66263884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910134737.5A Pending CN109704535A (en) 2019-02-23 2019-02-23 The buried sewage-treatment plant of intelligence equipmentization

Country Status (1)

Country Link
CN (1) CN109704535A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709245A (en) * 2020-12-17 2021-04-27 广东省建筑工程机械施工有限公司 Intelligent control system and control method for drainage of constructional engineering

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201534810U (en) * 2009-08-20 2010-07-28 丁树久 Underground high-efficiency and low-running cost complete plant for domestic sewage treatment
CN201534809U (en) * 2009-08-20 2010-07-28 丁树久 Whole set of device for treating sewage water of a landscape water source
CN206069627U (en) * 2016-07-29 2017-04-05 湖南永清水务有限公司 A kind of sewage treatment plant's water quality monitoring system and sewage treatment plant
CN209721896U (en) * 2019-02-23 2019-12-03 四川立蓝水务有限公司 The buried sewage-treatment plant of intelligence equipmentization

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201534810U (en) * 2009-08-20 2010-07-28 丁树久 Underground high-efficiency and low-running cost complete plant for domestic sewage treatment
CN201534809U (en) * 2009-08-20 2010-07-28 丁树久 Whole set of device for treating sewage water of a landscape water source
CN206069627U (en) * 2016-07-29 2017-04-05 湖南永清水务有限公司 A kind of sewage treatment plant's water quality monitoring system and sewage treatment plant
CN209721896U (en) * 2019-02-23 2019-12-03 四川立蓝水务有限公司 The buried sewage-treatment plant of intelligence equipmentization

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709245A (en) * 2020-12-17 2021-04-27 广东省建筑工程机械施工有限公司 Intelligent control system and control method for drainage of constructional engineering

Similar Documents

Publication Publication Date Title
CN105507410B (en) Sewage vacuum collection processing system implementing
CN207799448U (en) The centralized monitoring system of one pipe of enterprise is realized applied to industrial park
CN108442478B (en) Ecological lavatory device is retrieved to nutrient substance normal position based on excrement and urine source separation
CN204325092U (en) A kind of container type sewage treatment equipment
CN103159380A (en) Zero-energy-consumption sewage treatment system and method for constructed wetlands
CN109851165A (en) A kind of small-scale waste water treatment for reuse integration afforestation equipment and method
CN210012658U (en) Rural excrement and sewage treatment integrated equipment
CN102424475A (en) Septic tank with duplex biochemical functions
CN206188573U (en) It collects and SBR sewage treatment in energy -conserving anti -pollution system of an organic whole to collect vacuum sewage
CN209721896U (en) The buried sewage-treatment plant of intelligence equipmentization
CN203187497U (en) Zero-energy-consumption artificial wetland sewage treatment system
CN109704535A (en) The buried sewage-treatment plant of intelligence equipmentization
CN206089379U (en) Sewage treatment plant is used at distributed family
CN201485959U (en) On-line vacuum drainage system
CN209721895U (en) Intelligence equipmentization is suitble to extremely frigid zones sewage subsurface processes device
CN209652117U (en) Intelligence equipmentization sewage landscape water source treatment device
CN205348353U (en) Sewage vacuum collection processing system
CN207002379U (en) Integrated buried type SBR sewage-treatment plants
CN206328278U (en) Integrate the energy-conservation pollution treatment system of vacuum sewage collection and A20 sewage disposals
CN206069524U (en) Integrate vacuum sewage and collect the energy-conservation pollution treatment system with artificial wetland treatment
CN107285521A (en) Full-automatic pressure type water purification station
CN105541047A (en) Buried sewage treatment system and control method thereof
CN209397698U (en) A kind of sewage lifter with backwashing function
CN208650180U (en) A kind of sanitary sewage centralized collection device of hydroelectric project underground power house
CN207031146U (en) Full-automatic pressure formula water purification station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210722

Address after: Room 1402, 14th floor, building 1, 56 Tianhui middle street, high tech Zone, Chengdu, Sichuan 610000

Applicant after: Sichuan yunshuiqing Ecological Environment Technology Co.,Ltd.

Address before: No. 1105, 11 / F, unit 1, building 2, No. 1700, North Tianfu Avenue, Chengdu hi tech Zone, China (Sichuan) pilot Free Trade Zone, Chengdu, Sichuan 610041

Applicant before: SICHUAN LILAN WATER Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503