CN109698519A CN201710997335.9A CN201710997335A CN109698519A CN 109698519 A CN109698519 A CN 109698519A CN 201710997335 A CN201710997335 A CN 201710997335A CN 109698519 A CN109698519 A CN 109698519A
Authority
CN
China
Prior art keywords
energy
photovoltaic
storage system
photovoltaic plant
starting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710997335.9A
Other languages
Chinese (zh)
Other versions
CN109698519B (en
Inventor
崔红芬
桑丙玉
李官军
胡安平
庄俊
周晨
余豪杰
杨波
陶以彬
刘欢
曹远志
鄢盛驰
李跃龙
侯书毅
李�灿
张亦磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710997335.9A priority Critical patent/CN109698519B/en
Publication of CN109698519A publication Critical patent/CN109698519A/en
Application granted granted Critical
Publication of CN109698519B publication Critical patent/CN109698519B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/383
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

The present invention relates to a kind of accumulation energy type photovoltaic plants for supporting power grid"black-start" to start method and system, this method comprises: when grid collapses, when the continuous and effective power output of photovoltaic plant in accumulation energy type photovoltaic plant meets according to the first determining criterion of photovoltaic plant continuous and effective power output, black starting-up power supply of the photovoltaic plant as power system restoration is selected;The starting strategy of energy-storage system in accumulation energy type photovoltaic plant is determined according to the real-time voltage of accumulation energy type photovoltaic plant, starts energy-storage system;It determines the corresponding initial state of charge of energy-storage system of maximum starting quantity of the maximum starting quantity and photovoltaic DC-to-AC converter of photovoltaic DC-to-AC converter, and restores operation of power networks using the photovoltaic DC-to-AC converter of starting.This method realizes the black starting-up of power grid by configuring the photovoltaic plant energy storage association system of energy accumulation current converter, under the premise of guaranteeing voltage, the frequency stabilization of system, controllability, the vulnerability to jamming of photovoltaic plant are improved, to make photovoltaic plant black starting-up and quickly restore regional power grid, reduces loss of outage.

Description

A kind of accumulation energy type photovoltaic plant starting method and system supporting power grid"black-start"
Technical field
The present invention relates to generation of electricity by new energy and technical field of energy storage, in particular to a kind of energy storage for supporting power grid"black-start" Type photovoltaic plant starts method and system.
Background technique
With the growth of power demand, the scale of electric system constantly expands, and internetwork connection is increasingly close, occurs big The probability of area power outage also gradually rises, and has higher requirement to the power supply reliability of electric system, fast and effeciently Restoring power grid power supply is to reduce causality loss most efficient method.Power grid"black-start" refers to that whole system or power grid are most of for some reason After barrier is stopped transport, the unit of non self starting is driven by the unit (black starting-up unit) in system with self-startup ability, so The recovery range of system is gradually expanded afterwards, the final recovery for realizing whole system.Power grid"black-start" process is generally divided into three ranks Section: black starting-up stage, rack reconstruction stage, load restoration stage.Power grid realizes that the primary condition of black starting-up most critical is desirable Reliable black starting-up power supply is provided.In recent years, photovoltaic power generation is grown rapidly in China, increasingly with photovoltaic power generation technology Maturation sufficiently excavates its ability for supporting power grid"black-start", new thinking is provided for power system recovery.
Currently, participating in power grid"black-start" technology for photovoltaic plant both at home and abroad lacks system and in-depth study, related work Urgently carry out;Due to the fluctuation of photovoltaic power generation power output, intermittent feature, photovoltaic electric in traditional network system starting method The voltage and frequency stabilization of system cannot be effectively ensured by standing when supporting power grid"black-start" separately as black starting-up power supply;Therefore, it needs The stabilization of power grids can be guaranteed and efficiently restore photovoltaic plant starting method by providing one kind.
Summary of the invention
It is an object of the invention to propose a kind of support power grid that can guarantee the stabilization of power grids and quick start photovoltaic plant The accumulation energy type photovoltaic plant of black starting-up starts method and system.
The purpose of the present invention is adopt the following technical solutions realization:
A kind of accumulation energy type photovoltaic plant starting method and system supporting power grid"black-start", it is improved in that described Method includes:
When grid collapses, sentence when the continuous and effective power output of photovoltaic plant in the accumulation energy type photovoltaic plant meets first According to when, select black starting-up power supply of the photovoltaic plant as power system restoration;
Opening for energy-storage system in the accumulation energy type photovoltaic plant is determined according to the real-time voltage of the accumulation energy type photovoltaic plant Dynamic strategy, starts energy-storage system;
Determine that the maximum starting quantity of photovoltaic DC-to-AC converter and the photovoltaic are inverse in accumulation energy type photovoltaic plant according to Second Criterion Become the corresponding initial state of charge of energy-storage system of maximum starting quantity of device, and restores power grid using the photovoltaic DC-to-AC converter of starting Operation;
Preferably, first criterion, such as following formula::
min{PPV(m)}≥Pst
In formula, min { PPV(m) } it contributes for photovoltaic plant continuous and effective, PpvIt (m) is to connect since the power grid"black-start" moment Photovoltaic power prediction data in the continuous period, m are that the photovoltaic power since the power grid"black-start" moment in continuous time predicts number According to the set of composition;PstFor the auxiliary system power of conventional power unit;
Preferably, the real-time voltage according to accumulation energy type photovoltaic plant determines energy storage system in the accumulation energy type photovoltaic plant The starting strategy of system, comprising:
The real-time voltage of the accumulation energy type photovoltaic plant is detected, it is pre- same using energy storage if detecting the real-time voltage Step starting strategy starts the energy-storage system, if the real-time voltage is not detected, using three-phase independently sagging control starting The energy-storage system.
Preferably, it is described according to Second Criterion determine photovoltaic DC-to-AC converter in accumulation energy type photovoltaic plant maximum starting quantity and The corresponding initial state of charge of energy-storage system of maximum starting quantity of the photovoltaic DC-to-AC converter, and utilize the photovoltaic inversion of starting Device restores operation of power networks, comprising:
S1. the maximum for being currently up the photovoltaic DC-to-AC converter for meeting the Second Criterion in period i is obtained according to Second Criterion Start quantity and the initial state of charge of energy-storage system;
S2. compare the current state of charge S of energy-storage systemnow(i) with initial state of charge S0(i) value whether phase Deng;
If Snow(i)≠S0(i), discharge condition is currently at for energy-storage system, then enabling energy-storage system is photovoltaic inversion Device, which charges to, is currently up end cycle, enables i=i+1, and jump procedure S1;Charged state is currently at for energy-storage system , then it enables the photovoltaic DC-to-AC converter pre-actuated charge to for energy-storage system and is currently up end cycle, enable i=i+1, and jump step Rapid S1, the photovoltaic DC-to-AC converter quantity pre-actuated are determined within first starting period;
Until Snow(i)=S0(i), then the photovoltaic DC-to-AC converter for the maximum starting quantity that starting step S1 is determined, and restore electricity Net operation.
Further, the Second Criterion, such as following formula:
In formula, PGIt (m) is the force data out of conventional power unit in photovoltaic plant in starting period i;PPVIt (m) is starting period i Interior predicting power of photovoltaic plant data;N is the starting number of units of photovoltaic DC-to-AC converter;S0(i) initial for energy-storage system in starting period i State of charge;SminAnd SmaxThe respectively minimum and maximum state of charge of energy-storage system;PESNFor the specified function of energy-storage system Rate;ENFor energy-storage system rated capacity;Ts is predicting power of photovoltaic plant data sampling period, PstFor the subsidiary engine system of conventional power unit System power.
Further, the energy-storage system is currently at discharge condition or the Rule of judgment of charged state includes:
If Snow(i) > S0(i), the energy-storage system is currently at discharge condition;Otherwise, the energy-storage system is currently located In charged state.
Further, it is determined that the photovoltaic DC-to-AC converter quantity pre-actuated includes:
According to the minimum operation power allowances of energy storage system capacity and photovoltaic DC-to-AC converter, the photovoltaic for needing to pre-actuate is determined The power output of inverter number and each inverter.
A kind of accumulation energy type photovoltaic plant activation system supporting power grid"black-start", the system comprises:
The analysis of predicting power of photovoltaic plant data and evaluation module, for when photovoltaic plant in the accumulation energy type photovoltaic plant Continuous and effective power output meet the first criterion when, select black starting-up power supply of the photovoltaic plant as power system restoration;
Energy-storage system starts judgment module, for determining the energy storage according to the real-time voltage of the accumulation energy type photovoltaic plant The starting strategy of energy-storage system in type photovoltaic plant;
Photovoltaic plant starting capacity and timing computing module, for determining that the maximum of photovoltaic DC-to-AC converter opens according to Second Criterion The corresponding initial state of charge of energy-storage system of the maximum starting quantity of dynamic quantity and the photovoltaic DC-to-AC converter, and utilize starting Photovoltaic DC-to-AC converter restores operation of power networks.
Further, the predicting power of photovoltaic plant data analysis and evaluation module include:
Analytical unit determines that the photovoltaic plant persistently has for analyzing as the following formula according to predicting power of photovoltaic plant data Effect power output:
min{PPV(m)}
Assessment unit, for determining first criterion: min { P according to photovoltaic plant continuous and effective power output as the following formulaPV (m)}≥Pst
In formula, PpvIt (m) is the photovoltaic power prediction data since the power grid"black-start" moment in continuous time, m is from electricity The net black starting-up moment starts the set of the composition of the photovoltaic power prediction data in continuous time;PstFor the auxiliary system of conventional power unit Power, m=0,1,2 ... M;
Further, the energy-storage system starting judgment module includes:
Detection unit, for detecting the real-time voltage of the accumulation energy type photovoltaic plant;
Start unit, for starting the energy-storage system according to the real-time voltage of the accumulation energy type photovoltaic plant;
If detecting the real-time voltage, the energy-storage system is started using energy storage presynchronization starting strategy, if not examining The real-time voltage is measured, then independently sagging control starts the energy-storage system using three-phase.
Further, the photovoltaic plant starting capacity and timing computing module include:
First computing unit, for inverse according to the photovoltaic for meeting the Second Criterion in Second Criterion acquisition starting period i Become the maximum starting quantity and the initial state of charge of energy-storage system of device, wherein i takes positive integer, initial value 1;
Judging unit, for comparing the current value S of energy-storage systemnow(i) and initial state-of-charge S0(i) value whether phase Deng;
First execution unit, for working as Snow(i)≠S0(i), discharge condition is currently at for energy-storage system, then enabled Energy-storage system charges to for photovoltaic DC-to-AC converter and is currently up end cycle, enables i=i+1;Charging is currently at for energy-storage system State, then it enables the photovoltaic DC-to-AC converter for pre-actuating quantity charge to for energy-storage system and is currently up end cycle, enable i=i+1;
Second execution unit, for working as Snow(i)=S0(i), then the photovoltaic inversion obtained according to first computing unit Device maximum starts quantity and starts photovoltaic DC-to-AC converter, and restores operation of power networks;
Second computing unit, for being transported in the first starting period according to energy storage system capacity and the minimum of photovoltaic DC-to-AC converter Row power allowances determine the power output for needing the photovoltaic DC-to-AC converter quantity and each inverter that pre-actuate.
Further, the Second Criterion determines as the following formula:
In formula, PGIt (m) is the force data out of conventional power unit in starting period i;PPVIt (m) is photovoltaic plant in starting period i Power prediction data;N is the starting number of units of photovoltaic DC-to-AC converter;S0It (i) is the initial state-of-charge of energy-storage system in starting period i Value;SminAnd SmaxThe respectively minimum and maximum limit value of energy-storage system;PESNFor energy-storage system rated power;ENFor energy-storage system Rated capacity;Ts is predicting power of photovoltaic plant data sampling period.
Compared with prior art, the invention has the following beneficial effects:
When grid collapses, sentence when the continuous and effective power output of photovoltaic plant in the accumulation energy type photovoltaic plant meets first According to when, select black starting-up power supply of the photovoltaic plant as power system restoration;
Opening for energy-storage system in the accumulation energy type photovoltaic plant is determined according to the real-time voltage of the accumulation energy type photovoltaic plant Dynamic strategy, starts energy-storage system;
Determine that the maximum starting quantity of photovoltaic DC-to-AC converter and the photovoltaic are inverse in accumulation energy type photovoltaic plant according to Second Criterion Become the corresponding initial state of charge of energy-storage system of maximum starting quantity of device, and restores power grid using the photovoltaic DC-to-AC converter of starting Operation;
Wherein, first criterion is contributed according to photovoltaic plant continuous and effective and is determined.
The technical solution that the application uses, in grid collapses, when photovoltaic plant in the accumulation energy type photovoltaic plant Continuous and effective power output meet the first criterion when, select black starting-up power supply of the photovoltaic plant as power system restoration;According to institute The real-time voltage for stating accumulation energy type photovoltaic plant determines the starting strategy of energy-storage system in the accumulation energy type photovoltaic plant, starts energy storage System;The maximum starting quantity of photovoltaic DC-to-AC converter and the maximum starting quantity pair of the photovoltaic DC-to-AC converter are determined according to Second Criterion The initial state of charge of the energy-storage system answered, and restore operation of power networks using the photovoltaic DC-to-AC converter of starting;Technical side of the invention Under the premise of case determines photovoltaic plant as black starting-up power supply according to photovoltaic effective output, it can guarantee the stabilization of power grids and quickly open Dynamic photovoltaic plant.
The technical solution that the application uses, builds pressure by energy-storage system self-starting, provides startup environment for photovoltaic plant, and It makes full use of the energy-storage system voltage of configuration and frequency adjusts and fast charging and discharging characteristic, calculated, realized by accurate capacity The optimal startup of photovoltaic plant reduces starting percussion, provides fastly for power grid to maximally utilize photovoltaic plant power output Fast, effective black starting-up power reduces failure damage rate.
Detailed description of the invention
Fig. 1 is a kind of flow chart for the accumulation energy type photovoltaic plant starting method for supporting power grid"black-start" of the present invention;
Fig. 2 is a kind of detail process signal for the accumulation energy type photovoltaic plant starting method for supporting power grid"black-start" of the present invention Figure;
Fig. 3 is a kind of structural schematic diagram for the accumulation energy type photovoltaic plant activation system for supporting power grid"black-start" of the present invention.
Specific embodiment
It elaborates with reference to the accompanying drawing to a specific embodiment of the invention.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art All other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
After power grid"black-start" refers to whole system or the most of stoppage in transit because of failure of power grid, by having self-starting energy in system The unit (black starting-up unit) of power drives the unit of non self starting, and the recovery range of system is gradually expanded, finally realizes whole The recovery of a system.Power grid"black-start" process is generally divided into three phases: black starting-up stage, rack reconstruction stage, load restoration Stage.
The present invention provides a kind of accumulation energy type photovoltaic plants for supporting power grid"black-start" to start method and system, carries out below Explanation.
Fig. 1 shows the process that the accumulation energy type photovoltaic plant starting method of power grid"black-start" is supported in the embodiment of the present invention Figure, as shown in Figure 1, the method may include:
When grid collapses, sentence when the continuous and effective power output of photovoltaic plant in the accumulation energy type photovoltaic plant meets first According to when, select black starting-up power supply of the photovoltaic plant as power system restoration;
Opening for energy-storage system in the accumulation energy type photovoltaic plant is determined according to the real-time voltage of the accumulation energy type photovoltaic plant Dynamic strategy, starts energy-storage system;
Determine that the maximum starting quantity of photovoltaic DC-to-AC converter and the photovoltaic are inverse in accumulation energy type photovoltaic plant according to Second Criterion Become the corresponding initial state of charge of energy-storage system of maximum starting quantity of device, and restores power grid using the photovoltaic DC-to-AC converter of starting Operation;
Fig. 2 shows it is of the invention it is a kind of support power grid"black-start" accumulation energy type photovoltaic plant starting method detail process show It is intended to, when electric system, which is broken down, stops transport, as shown in Fig. 2, carrying out photovoltaic plant according to predicting power of photovoltaic plant data The analysis and assessment of continuous and effective power output judge whether to use photovoltaic plant as black starting-up power supply using this:
According to photovoltaic plant as black starting-up power supply, then enter black starting-up step;
Otherwise, using traditional power grid"black-start" process.
The analysis of photovoltaic plant continuous and effective power output referred to since the power grid"black-start" moment in the present invention, light in continuous time The analysis of power prediction data is lied prostrate, continuous time can be set as the conventional power unit starting limitation time;
Specifically, first criterion can be determined according to photovoltaic plant continuous and effective power output as the following formula:
min{PPV(m)}≥Pst
In formula, min { PPV(m) } it contributes for photovoltaic plant continuous and effective, PpvIt (m) is to connect since the power grid"black-start" moment Photovoltaic power prediction data in the continuous period, m are that the photovoltaic power since the power grid"black-start" moment in continuous time predicts number According to the set of composition, m=0,1,2 ... M, M are photovoltaic power prediction data number in continuous time, PstFor the auxiliary of conventional power unit Machine system power.
Preferably, the real-time voltage according to accumulation energy type photovoltaic plant determines energy storage system in the accumulation energy type photovoltaic plant The starting strategy of system may include:
The real-time voltage for detecting the accumulation energy type photovoltaic plant judges whether system has it when the starting of current energy accumulation current converter He has been turned on success by current transformer, if detecting the real-time voltage, starts the energy storage using energy storage presynchronization starting strategy System, if the real-time voltage is not detected, using three-phase, independently sagging control starts the energy-storage system.
Preferably, it is described according to Second Criterion determine photovoltaic DC-to-AC converter maximum starting quantity and the photovoltaic DC-to-AC converter The corresponding initial state of charge of energy-storage system of maximum starting quantity, and restore operation of power networks using the photovoltaic DC-to-AC converter of starting, Include:
S1. the maximum for being currently up the photovoltaic DC-to-AC converter for meeting the Second Criterion in period i is obtained according to Second Criterion Start quantity and the initial state of charge of energy-storage system;
Specifically, the start up curve and climbing characteristic for considering conventional power unit to be launched, according to the starting time of auxiliary system With the capacity and limit value of startup power constraint, energy-storage system, the conventional power unit to be launched starting time refers to from subsidiary engine in the present invention System starts to conventional power unit and climbs duration when reaching auxiliary system power to power output.Start the time with auxiliary system It is maximally utilized with photovoltaic power generation as target according to the power prediction data of photovoltaic plant for a starting period, carries out i-th The accounting of the discharge and recharge of energy-storage system, determines the capacity for needing photovoltaic plant to be started, i.e. photovoltaic inversion in a starting period The starting number of units of device determines the initial state of charge of energy-storage system;
The Second Criterion is determined as the following formula:
In formula, PGIt (m) is the force data out of conventional power unit in photovoltaic plant in starting period i;PPVIt (m) is starting period i Interior predicting power of photovoltaic plant data;N is the starting number of units of photovoltaic DC-to-AC converter;S0(i) initial for energy-storage system in starting period i State of charge;SminAnd SmaxThe respectively minimum and maximum state of charge of energy-storage system;PESNFor the specified function of energy-storage system Rate;ENFor energy-storage system rated capacity;Ts is predicting power of photovoltaic plant data sampling period, PstFor the subsidiary engine system of conventional power unit System power;
The maximum investment light under the different initial state-of-charges of several groups of system constraints can be obtained meeting according to above formula Inverter number is lied prostrate, the maximum input quantity of photovoltaic DC-to-AC converter and corresponding optimal initial is obtained from the result of the above several groups State-of-charge.
S2.. compare the current state of charge S of energy-storage systemnow(i) with initial state of charge S0(i) value whether phase Deng;
If Snow(i)≠S0(i), discharge condition is currently at for energy-storage system, then enabling energy-storage system is photovoltaic inversion Device, which charges to, is currently up end cycle, enables i=i+1, and jump procedure S1;Charged state is currently at for energy-storage system , then it enables the photovoltaic DC-to-AC converter pre-actuated charge to for energy-storage system and is currently up end cycle, enable i=i+1, and jump step Rapid S1, the photovoltaic DC-to-AC converter quantity pre-actuated are determined within first starting period;
Until Snow(i)=S0(i), then the photovoltaic DC-to-AC converter for the maximum starting quantity that starting step S1 is determined, and restore electricity Net operation.
The current charging and discharging state of the determining energy-storage system includes: the current value S by comparing energy-storage systemnow(i) and Initial state-of-charge S0(i) value determines the current charging and discharging state of energy-storage system;
If Snow(i) > S0(i), the energy-storage system is currently at discharge condition;Otherwise, the energy-storage system is currently located In charged state.
Further, it is determined that the photovoltaic DC-to-AC converter quantity pre-actuated, may include:
According to the minimum operation power allowances of energy storage system capacity and photovoltaic DC-to-AC converter, the photovoltaic for needing to pre-actuate is determined The power output of inverter number and each inverter;
As the current value S of energy-storage systemnow(i) and initial state-of-charge S0(i) value is equal, determines that final photovoltaic is inverse After becoming device starting quantity and energy-storage system incipient nucleus electricity condition, using photovoltaic plant station level AGC system, adjusts and to assign photovoltaic inverse The power output instruction for becoming device, charges to energy-storage system.Collection electric line when in view of photovoltaic DC-to-AC converter starting, in photovoltaic plant Impact can be generated to system with transformer starting charging, according to current collection line parameter circuit value, transformer capacity, pass through preparatory simulation calculation Quantitative analysis is carried out to the charging impact of line and transformer, so that it is determined that the boot sequence of photovoltaic DC-to-AC converter, pre-actuates Photovoltaic DC-to-AC converter is energy-storage system charging;
Then, the photovoltaic DC-to-AC converter of quantification, photovoltaic are inverse after the boot sequence starting determined according to above-mentioned steps adjusts Become device work in maximal power tracing mode, the transmission line of electricity and transformer of photovoltaic plant to conventional power unit to be launched are filled Electricity is powered for conventional power unit auxiliary system to be launched, and after auxiliary system completes starting, conventional power unit to be launched starts and with station-service Electricity operation, accumulation energy type photovoltaic plant and conventional power unit paired running, the subsequent recovery for power grid.
Based on the accumulation energy type photovoltaic plant starting method of above-mentioned support power grid"black-start", based on the same inventive concept, The embodiment of the invention also provides the accumulation energy type photovoltaic plant activation systems of support power grid"black-start", since the solution of these equipment is asked The principle of topic is similar to the accumulation energy type photovoltaic plant starting method of support power grid"black-start", therefore overlaps will not be repeated, below It is illustrated.
Fig. 3, which is shown in the embodiment of the present invention, supports the structure of the accumulation energy type photovoltaic plant activation system of power grid"black-start" to show It is intended to, as shown in figure 3, the system may include:
The analysis of predicting power of photovoltaic plant data and evaluation module, for carrying out the power prediction data point of photovoltaic plant Analysis, and photovoltaic plant continuous and effective power producing characteristics are assessed, when the continuous and effective of photovoltaic plant in the accumulation energy type photovoltaic plant goes out When power meets the first criterion, black starting-up power supply of the photovoltaic plant as power system restoration is selected;
Energy-storage system starts judgment module, for being in the real-time voltage judgement system according to the accumulation energy type photovoltaic plant No existing energy accumulation current converter starts successfully, so that it is determined that in the accumulation energy type photovoltaic plant energy-storage system starting strategy;
Photovoltaic plant starting capacity and timing computing module, for determining light in accumulation energy type photovoltaic plant according to Second Criterion It lies prostrate the maximum starting quantity of inverter and the maximum of the photovoltaic DC-to-AC converter starts the corresponding energy-storage system of quantity initially charged shape State value determines photovoltaic plant capacity, inverter distribution power and the boot sequence for needing to pre-actuate, and utilizes the photovoltaic of starting Inverter restores operation of power networks.
Wherein, the corresponding energy storage of the maximum starting quantity of the maximum starting quantity of photovoltaic DC-to-AC converter and the photovoltaic DC-to-AC converter The initial state of charge of system according to for according to the starting time of conventional power unit auxiliary system to be launched and startup power and Climbing characteristic, stored energy capacitance and the limit value and current SOC of unit, photovoltaic power prediction data etc. determine;
Further, the predicting power of photovoltaic plant data analysis and evaluation module may include:
Analytical unit determines that the photovoltaic plant persistently has for analyzing as the following formula according to predicting power of photovoltaic plant data Effect power output:
min{PPV(m)}
Assessment unit, for determining first criterion according to photovoltaic plant continuous and effective power output as the following formula:
min{PPV(m)}≥Pst
In formula, PpvIt (m) is the photovoltaic power prediction data since the power grid"black-start" moment in continuous time, m is from electricity The net black starting-up moment starts the set of the composition of the photovoltaic power prediction data in continuous time, m=0, and 1,2 ... M, M are from electricity The net black starting-up moment starts photovoltaic power prediction data number in continuous time;PstFor the auxiliary system power of conventional power unit;
Wherein, continuous time can be determined according to operating condition;Photovoltaic power prediction data can be by well known in the art pre- Survey means obtain;
Further, the energy-storage system starts judgment module, may include:
Detection unit, for detecting the real-time voltage of the accumulation energy type photovoltaic plant;
Start unit, for starting the energy-storage system according to the real-time voltage of the accumulation energy type photovoltaic plant;
If detecting the real-time voltage, the energy-storage system is started using energy storage presynchronization starting strategy, if not examining The real-time voltage is measured, then independently sagging control starts the energy-storage system using three-phase.
The photovoltaic plant starting capacity and timing computing module may include:
First computing unit, is used for:
Specifically, the maximum for meeting the photovoltaic DC-to-AC converter of the Second Criterion in starting period i is obtained according to Second Criterion Start quantity and the initial state of charge of energy-storage system, wherein i takes positive integer, initial value 1;
Judging unit is used for:
Compare the current value S of energy-storage systemnow(i) and initial state-of-charge S0(i) whether value is equal;
First execution unit, is used for:
If Snow(i)≠S0(i), discharge condition is currently at for energy-storage system, then enabling energy-storage system is photovoltaic inversion Device, which charges to, is currently up end cycle, enables i=i+1;Charged state is currently at for energy-storage system, then enables and pre-actuating The photovoltaic DC-to-AC converter of quantity charges to for energy-storage system and is currently up end cycle, enables i=i+1;
Second computing unit, is used for:
According to the minimum operation power allowances of energy storage system capacity and photovoltaic DC-to-AC converter in the first starting period, determining is needed It is preparatory
The photovoltaic DC-to-AC converter quantity of starting and the power output of each inverter;
Second execution unit, is used for:
If Snow(i)=S0(i), then the photovoltaic DC-to-AC converter maximum starting quantity obtained according to first computing unit opens Dynamic photovoltaic DC-to-AC converter, and restore operation of power networks;.
Further, the Second Criterion determines as the following formula:
In formula, PGIt (m) is the force data out of conventional power unit in photovoltaic plant in starting period i;PPVIt (m) is starting period i Interior predicting power of photovoltaic plant data;N is the starting number of units of photovoltaic DC-to-AC converter;S0(i) initial for energy-storage system in starting period i State of charge;SminAnd SmaxThe respectively minimum and maximum state of charge of energy-storage system;PESNFor the specified function of energy-storage system Rate;ENFor energy-storage system rated capacity;Ts is predicting power of photovoltaic plant data sampling period, PstFor the subsidiary engine system of conventional power unit System power.
The controllability of photovoltaic plant, vulnerability to jamming can be improved by configuring energy-storage system in technical solution provided by the invention, makes The photovoltaic plant that energy-storage system must be configured has black start-up ability, while the resume speed of regional power grid can be improved, and reduces and has a power failure Loss, to realize the fast quick-recovery of regional power grid.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Technical solution of the present invention steadily restores operation of power networks using energy accumulation current converter and energy-storage system, is become by energy storage Stream device realizes that the four-quadrant of power control is flexibly run, voltage and the frequency variation of support and responsive electricity grid, while can be smooth Photovoltaic plant goes out fluctuation, improves the digestion capability of photovoltaic plant;It can by configure that energy-storage system can be improved photovoltaic plant Control property, vulnerability to jamming, so that the photovoltaic plant of configuration energy-storage system has black start-up ability, to quickly restore regional power grid
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention Modification or equivalent replacement, should all cover within the scope of the claims of the present invention.

Claims (12)

1. a kind of accumulation energy type photovoltaic plant for supporting power grid"black-start" starts method, which is characterized in that the described method includes:
When grid collapses, when the continuous and effective power output of photovoltaic plant in the accumulation energy type photovoltaic plant meets the first criterion When, select black starting-up power supply of the photovoltaic plant as power system restoration;
The starting plan of energy-storage system in the accumulation energy type photovoltaic plant is determined according to the real-time voltage of the accumulation energy type photovoltaic plant Slightly, start energy-storage system;
The maximum starting quantity of photovoltaic DC-to-AC converter and the photovoltaic DC-to-AC converter in accumulation energy type photovoltaic plant are determined according to Second Criterion The corresponding initial state of charge of energy-storage system of maximum starting quantity, and restore power grid using the photovoltaic DC-to-AC converter of starting and transport Row.
2. the accumulation energy type photovoltaic plant of support power grid"black-start" starts method as described in claim 1, which is characterized in that described First criterion, such as following formula:
min{PPV(m)}≥Pst
In formula, min { PPV(m) } it contributes for photovoltaic plant continuous and effective, PpvIt (m) is the continuous time since the power grid"black-start" moment Interior photovoltaic power prediction data;PstFor the auxiliary system power of conventional power unit, m is the consecutive hours since the power grid"black-start" moment The set of photovoltaic power prediction data composition in section.
3. the accumulation energy type photovoltaic plant of support power grid"black-start" starts method as described in claim 1, which is characterized in that described The starting strategy of energy-storage system in the accumulation energy type photovoltaic plant is determined according to the real-time voltage of accumulation energy type photovoltaic plant, comprising:
The real-time voltage of the accumulation energy type photovoltaic plant is detected, if detecting the real-time voltage, is opened using energy storage presynchronization Dynamic strategy starts the energy-storage system, if the real-time voltage is not detected, using described in three-phase independently sagging control starting Energy-storage system.
4. the accumulation energy type photovoltaic plant of support power grid"black-start" starts method as described in claim 1, which is characterized in that described Determine that the maximum starting quantity of photovoltaic DC-to-AC converter and the photovoltaic DC-to-AC converter are most in accumulation energy type photovoltaic plant according to Second Criterion It is big to start the corresponding initial state of charge of energy-storage system of quantity, and restore operation of power networks, packet using the photovoltaic DC-to-AC converter of starting It includes:
S1. the maximum starting for being currently up the photovoltaic DC-to-AC converter for meeting the Second Criterion in period i is obtained according to Second Criterion Quantity and the initial state of charge of energy-storage system;
S2. compare the current state of charge S of energy-storage systemnow(i) with initial state of charge S0(i) whether value is equal;
If Snow(i)≠S0(i), discharge condition is currently at for energy-storage system, then enables energy-storage system fill for photovoltaic DC-to-AC converter Electricity enables i=i+1, and jump procedure S1 to end cycle is currently up;Charged state is currently at for energy-storage system, then It enables the photovoltaic DC-to-AC converter pre-actuated charge to for energy-storage system and is currently up end cycle, enable i=i+1, and jump procedure S1, The photovoltaic DC-to-AC converter quantity pre-actuated is determined within first starting period;
Until Snow(i)=S0(i), then the photovoltaic DC-to-AC converter for the maximum starting quantity that starting step S1 is determined, and restore power grid fortune Row.
5. the accumulation energy type photovoltaic plant of support power grid"black-start" as described in claim 1 or 4 starts method, which is characterized in that The Second Criterion, such as following formula:
In formula, PGIt (m) is the force data out of conventional power unit in photovoltaic plant in starting period i;PPVIt (m) is light in starting period i Overhead utility power prediction data;N is the starting number of units of photovoltaic DC-to-AC converter;S0(i) initially charged for energy-storage system in starting period i State value;SminAnd SmaxThe respectively minimum and maximum state of charge of energy-storage system;PESNFor energy-storage system rated power;EN For energy-storage system rated capacity;Ts is predicting power of photovoltaic plant data sampling period, PstFor the auxiliary system function of conventional power unit Rate.
6. the accumulation energy type photovoltaic plant of support power grid"black-start" starts method as claimed in claim 4, which is characterized in that described Energy-storage system is currently at discharge condition or the Rule of judgment of charged state includes:
If Snow(i) > S0(i), the energy-storage system is currently at discharge condition;Otherwise, the energy-storage system is currently at charging State.
7. the accumulation energy type photovoltaic plant of support power grid"black-start" starts method as claimed in claim 4, which is characterized in that determine The photovoltaic DC-to-AC converter quantity pre-actuated, comprising:
According to the minimum operation power allowances of energy storage system capacity and photovoltaic DC-to-AC converter, the photovoltaic inversion for needing to pre-actuate is determined The power output of device quantity and each inverter.
8. a kind of accumulation energy type photovoltaic plant activation system for supporting power grid"black-start", the system comprises:
The analysis of predicting power of photovoltaic plant data and evaluation module, in the accumulation energy type photovoltaic plant photovoltaic plant hold When continuous effective output meets the first criterion, black starting-up power supply of the photovoltaic plant as power system restoration is selected;
Energy-storage system starts judgment module, for determining the accumulation energy type light according to the real-time voltage of the accumulation energy type photovoltaic plant The starting strategy of energy-storage system in overhead utility;
Photovoltaic plant starting capacity and timing computing module, for determining that photovoltaic is inverse in accumulation energy type photovoltaic plant according to Second Criterion Become the corresponding initial state of charge of energy-storage system of maximum starting quantity of the maximum starting quantity and the photovoltaic DC-to-AC converter of device, And restore operation of power networks using the photovoltaic DC-to-AC converter of starting.
9. the accumulation energy type photovoltaic plant activation system of support power grid"black-start" as claimed in claim 8, which is characterized in that described The analysis of predicting power of photovoltaic plant data and evaluation module include:
Analytical unit, for determining that the photovoltaic plant continuous and effective is contributed according to the analysis of predicting power of photovoltaic plant data;
Assessment unit, for determining first criterion according to photovoltaic plant continuous and effective power output as the following formula:
min{PPV(m)}≥Pst
In formula, PpvIt (m) is the photovoltaic power prediction data since the power grid"black-start" moment in continuous time, m is from Power Grid Black Startup time starts the set of the composition of the photovoltaic power prediction data in continuous time;PstFor the auxiliary system function of conventional power unit Rate, m=0,1,2 ... M.
10. the accumulation energy type photovoltaic plant activation system of support power grid"black-start" as claimed in claim 8, which is characterized in that institute Stating energy-storage system starting judgment module includes:
Detection unit, for detecting the real-time voltage of the accumulation energy type photovoltaic plant;
Start unit, for starting the energy-storage system according to the real-time voltage of the accumulation energy type photovoltaic plant;
If detecting the real-time voltage, the energy-storage system is started using energy storage presynchronization starting strategy, if being not detected The real-time voltage, then using three-phase, independently sagging control starts the energy-storage system.
11. the accumulation energy type photovoltaic plant activation system of support power grid"black-start" as claimed in claim 8, which is characterized in that institute It states photovoltaic plant starting capacity and timing computing module includes:
First computing unit, for obtaining the photovoltaic DC-to-AC converter for meeting the Second Criterion in starting period i according to Second Criterion Maximum starting quantity and the initial state of charge of energy-storage system, wherein i takes positive integer, initial value 1;
Judging unit, for comparing the current value S of energy-storage systemnow(i) and initial state-of-charge S0(i) whether value is equal;
First execution unit, for working as Snow(i)≠S0(i), discharge condition is currently at for energy-storage system, then enables energy storage system System charges to for photovoltaic DC-to-AC converter and is currently up end cycle, enables i=i+1;Charged state is currently at for energy-storage system, It then enables the photovoltaic DC-to-AC converter for pre-actuating quantity charge to for energy-storage system and is currently up end cycle, enable i=i+1;
Second execution unit, for working as Snow(i)=S0(i), then according to first computing unit obtain photovoltaic DC-to-AC converter most Big starting quantity starts photovoltaic DC-to-AC converter, and restores operation of power networks;
Second computing unit, for running function according to energy storage system capacity and the minimum of photovoltaic DC-to-AC converter in the first starting period Rate limit determines the power output of the photovoltaic DC-to-AC converter quantity and each inverter that pre-actuate.
12. the accumulation energy type photovoltaic plant activation system of support power grid"black-start" as claimed in claim 11, which is characterized in that institute Second Criterion is stated to determine as the following formula:
In formula, PGIt (m) is the force data out of conventional power unit in starting period i;PPVIt (m) is photovoltaic plant power in starting period i Prediction data;N is the starting number of units of photovoltaic DC-to-AC converter;S0It (i) is the initial state of charge of energy-storage system in starting period i;Smin And SmaxThe respectively minimum and maximum limit value of energy-storage system;PESNFor energy-storage system rated power;ENFor the specified appearance of energy-storage system Amount;Ts is predicting power of photovoltaic plant data sampling period.
CN201710997335.9A 2017-10-24 2017-10-24 Energy storage type photovoltaic power station starting method and system for supporting black start of power grid Active CN109698519B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710997335.9A CN109698519B (en) 2017-10-24 2017-10-24 Energy storage type photovoltaic power station starting method and system for supporting black start of power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710997335.9A CN109698519B (en) 2017-10-24 2017-10-24 Energy storage type photovoltaic power station starting method and system for supporting black start of power grid

Publications (2)

Publication Number Publication Date
CN109698519A true CN109698519A (en) 2019-04-30
CN109698519B CN109698519B (en) 2022-11-11

Family

ID=66226901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710997335.9A Active CN109698519B (en) 2017-10-24 2017-10-24 Energy storage type photovoltaic power station starting method and system for supporting black start of power grid

Country Status (1)

Country Link
CN (1) CN109698519B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110492537A (en) * 2019-09-16 2019-11-22 国电南瑞科技股份有限公司 A kind of energy storage device method for controlling power balance and system
CN111668862A (en) * 2020-05-19 2020-09-15 南京南瑞继保电气有限公司 Black start sequence control method for energy storage system
CN111817338A (en) * 2020-05-29 2020-10-23 中国电力科学研究院有限公司 Black start control method and system for wind-solar energy storage new energy power station

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104836254A (en) * 2015-05-19 2015-08-12 东南大学 Power grid black start-up system and black start-up participation method of photovoltaic power station
CN104993513A (en) * 2015-06-30 2015-10-21 华北电力科学研究院有限责任公司 Method and system for controlling battery energy storage power station of supporting black start of light-preserved power generation system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104836254A (en) * 2015-05-19 2015-08-12 东南大学 Power grid black start-up system and black start-up participation method of photovoltaic power station
CN104993513A (en) * 2015-06-30 2015-10-21 华北电力科学研究院有限责任公司 Method and system for controlling battery energy storage power station of supporting black start of light-preserved power generation system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110492537A (en) * 2019-09-16 2019-11-22 国电南瑞科技股份有限公司 A kind of energy storage device method for controlling power balance and system
CN110492537B (en) * 2019-09-16 2022-11-15 国电南瑞科技股份有限公司 Energy storage device power balance control method and system
CN111668862A (en) * 2020-05-19 2020-09-15 南京南瑞继保电气有限公司 Black start sequence control method for energy storage system
CN111668862B (en) * 2020-05-19 2022-08-26 南京南瑞继保电气有限公司 Black start sequence control method for energy storage system
CN111817338A (en) * 2020-05-29 2020-10-23 中国电力科学研究院有限公司 Black start control method and system for wind-solar energy storage new energy power station
CN111817338B (en) * 2020-05-29 2023-11-03 中国电力科学研究院有限公司 Black-start control method and system for wind-solar new energy power station

Also Published As

Publication number Publication date
CN109698519B (en) 2022-11-11

Similar Documents

Publication Publication Date Title
CN104993513B (en) Light is supported to store up the battery energy storage power station control method and system of electricity generation system black starting-up
CN106356892B (en) Micro-capacitance sensor black-start method
CN106849166B (en) Energy storage type wind power plant is as power grid"black-start" power-supply battery energy-storage system configuration method
CN106992519B (en) A kind of network load recovery robust Optimal methods based on information gap decision theory
CN109698519A (en) A kind of accumulation energy type photovoltaic plant starting method and system supporting power grid"black-start"
CN107037733B (en) Wind farm energy storage hardware in-loop test adjustment system and method
CN104682448A (en) Operation and monitoring method for battery energy storage power station based on power prediction
CN104701873A (en) Battery energy storage system optimization control method for tracking planed wind power output
CN109617103A (en) A kind of echelon of energy storage unit utilizes energy-storage battery energy control method and system
CN106992537A (en) A kind of power grid"black-start" method and device
CN109884434B (en) Joint debugging test method, system and medium for battery energy storage power station system
CN103532194A (en) Self-balance control strategy for battery SOC (State-of-Charge) in chain type energy storage system powered by independent batteries
CN104505907B (en) A kind of supervising device of the battery energy storage system with Reactive-power control function
CN104569691B (en) The parameter detection method and system of polymorphic type energy-storage system
CN104410064A (en) Asynchronous control method for distributed electric automobile participating in power grid frequency response
CN110581553B (en) Off-grid autonomous operation method and device for micro-grid system and micro-grid system
CN110994601A (en) Power distribution network black start method based on energy storage system
CN103312001B (en) Battery-charging method and system with super capacitor for energy storage system
CN103560505B (en) Electric automobile charge and discharge store up integrated power station from net virtual connections control method
CN104659800A (en) Power prediction based monitoring device for battery energy storage power station
CN104538981A (en) Monitoring method for battery energy storage system with reactive power regulation function
CN110061316A (en) Energy storage cell charging-discharging management method, device and management of charging and discharging device
CN104009489B (en) A kind of micro-capacitance sensor management system and its management method
CN109995036B (en) Automatic black start path optimizing method and system for wind-solar energy storage isolated network
CN108418257A (en) Photovoltaic virtual synchronous machine light stores up control method for coordinating and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant