CN109696606A - A kind of header box integrated testing platform - Google Patents
A kind of header box integrated testing platform Download PDFInfo
- Publication number
- CN109696606A CN109696606A CN201811511961.3A CN201811511961A CN109696606A CN 109696606 A CN109696606 A CN 109696606A CN 201811511961 A CN201811511961 A CN 201811511961A CN 109696606 A CN109696606 A CN 109696606A
- Authority
- CN
- China
- Prior art keywords
- test
- controller
- header box
- voltage
- several
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/12—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
- G01R31/1227—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
- G01R31/1263—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of solid or fluid materials, e.g. insulation films, bulk material; of semiconductors or LV electronic components or parts; of cable, line or wire insulation
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The present invention provides a kind of header box integrated testing platform, including resistance test circuit, on off test circuit and controller, the resistance test circuit includes beating pressure-resistant position to header box to provide the voltage resistant instrument of pressure resistance output, and for switching the test point conversion equipment for beating pressure-resistant position, the controller is used to receive the test voltage of voltage resistant instrument, the controller is used to control the switching of test point conversion equipment, and the controller is for controlling main contactor and several branch's contactors.The test equipment of dispersion is fitted into cabinet by the present invention by integrated test platform, so that original manual testing is converted into intelligence test, is both improved testing efficiency, and the maloperation of people and the objective judgement result of people are in turn avoided.
Description
Technical field
The present invention relates to photovoltaic intelligent electric power network technique fields, and in particular to a kind of pressure resistance and on off test for header box
Integrated testing platform.
Background technique
Support with country to Photovoltaic new energy, this nearest several years photovoltaic products achieve quick development, match with it
The photovoltaic combiner box product of set is also largely used, and in process of production, since detection device disperses, leads to photovoltaic conflux
The testing efficiency of case is lower, the test of especially each branch current, such as adds electric current all the way manually, has a look test software, imitates
Rate is low, easy to operate by mistake.
Traditional header box test method is first to survey pressure test, by anode over the ground, cathode over the ground, it is positive and negative between test,
It to go to switch manually, it is time-consuming;In addition, the test of each branch current, software show value and device value pair are had a look in survey all the way
According to low efficiency is easy to operate by mistake.Traditional header box test is distributing manual testing, and testing efficiency is low, easy to operate by mistake,
Determine that result is objective, though such mode can guarantee header box product quality, has ignored testing efficiency and maloperation and people
For result judgement, go down to seriously affect testing progress and manufacturing schedule for a long time.
Summary of the invention
For solve distributing header box test inefficiency and maloperation the problems such as, the present invention provides a kind of header box one
Body test platform realizes the automatic switchover to the voltage-withstand test of photovoltaic combiner box, automatically switches to test every road electric current and result
Judgement, realize safer more efficient test job, concrete scheme is as follows:
A kind of header box integrated testing platform, comprising:
Resistance test circuit, the resistance test circuit include beating pressure-resistant position to header box to provide the voltage resistant instrument of pressure resistance output, with
And for switching the test point conversion equipment for beating pressure-resistant position;
On off test circuit, the on off test circuit include the constant-current source being sequentially connected in series, main contactor, several branch's contactors
With several probes, one end is connected with main contactor after several described branch's contactors are in parallel, the other end and several probes
One end after parallel connection is connected, and the other end after several probes are in parallel is used to connect the fuse of busbar, the main contactor
The other end be connected with the output end of constant-current source;
Controller, the controller are used to receive the test voltage of voltage resistant instrument, and the controller is for controlling test point conversion equipment
Switching, the controller is for controlling main contactor and several branch's contactors.
Further, the test point conversion equipment includes the several groups electromagnet at corresponding several dozen of pressure-resistant positions and micro-
Dynamic switch, the controller can control the corresponding pressure resistance output for beating pressure-resistant position of electromagnetic actuation conducting, the electromagnetic actuation
The normally opened node action of the microswitch of its same group afterwards, and fed back to the controller.
Preferably, it is sequentially connected between the voltage resistant instrument and controller by decompression transmitter and voltage transmitter.
Preferably, the controller is also connected with header box breaker signal test lead and header box Surge Protector signal
Test lead.
From the above technical scheme, the test equipment of dispersion is packed into cabinet by integrated test platform by the present invention
In, so that original manual testing is converted into intelligence test, both improve testing efficiency, in turn avoids the maloperation of people and the visitor of people
It sees and determines result.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of test platform of the present invention.
Specific embodiment
A kind of preferred embodiment of the invention is described in detail with reference to the accompanying drawing.
Header box resistance test predominantly detect positive bus and negative bus-bar over the ground, to zero or positive and negative anodes busbar connector it
Between pressure resistance, pressure-resistant position is beaten to needs and applies experimental voltage (experimental voltage is according to relevant criterion adjustment), former voltage-withstand test is
Man-hour manually hand-held prod point touches pressure-resistant position, and there are poor contact, missing inspection and security risks.It is changed to detect automatically and will change this
A little defects, while controller connects host computer, test action can be shown in host computer, and recordable test process and test knot
Fruit, to the voucher after product number as product quality retrospect.
As shown in Figure 1, the header box integrated testing platform includes resistance test circuit and on off test circuit, difference
The pressure resistance and on-off of header box are detected.
The resistance test circuit includes voltage resistant instrument 1 and test point conversion equipment 2, and wherein voltage resistant instrument is used for header box
Multiple to play pressure-resistant position offer pressure resistance output, the pressure resistance output of voltage resistant instrument passes through decompression transmitter 3, is depressurized to voltage transmitter 4,
Pressure-resistant output signal is fed back to controller 5 by voltage transmitter.
The automatic detection of header box pressure resistance is that test point conversion equipment is controlled by controller, and when test only needs each survey
Pilot connects voltage lead, and presses testing button, and controller automatically controls test point conversion equipment, applies to pressure-resistant position is beaten
Voltage.In the present embodiment, beat pressure-resistant position have positive bus, negative bus-bar, and zero, having for pressure resistance output can be applied
Positive bus-negative bus-bar, positive bus-zero, positive bus-ground, negative bus-bar-zero and negative bus-bar-
Ground, test voltage and testing time can be set, and test voltage is fed back into controller when test, can then sentence when there is voltage downslide
Fixed pressure resistance is unqualified, and warning note, test terminates, and is as a result stored in host computer.
The test point conversion equipment 2 beats pressure-resistant position for switching comprising if corresponding several dozen of pressure-resistant positions
Dry group electromagnet 21 and microswitch 22, the controller can control the corresponding pressure resistance for beating pressure-resistant position of electromagnetic actuation conducting
It exports, the normally opened node action of the microswitch of its same group after the electromagnetic actuation, and is fed back to the controller.Using electromagnetism
Iron acts the principle of contact, and contactor gap is greater than 3000V discharging gap.
Header box on off test is that whether fuse installs fusible core before testing busbar connector, is had between positive bus and fuse
Current transformer gives positive bus to apply electric current when test, while testing whether current transformer is qualified, and negative bus-bar is molten
Disconnected device has only tested whether fusible core, former manual testing there are poor contact, missing inspection, time-consuming the problems such as.
If the on off test circuit include the constant-current source 6 being sequentially connected in series, main contactor 7, several branch's contactors 8 and
Dry probe 9, one end is connected with main contactor after several described branch's contactors are in parallel, and the other end is in parallel with several probes
Rear one end is connected, and the other end after several probes are in parallel is used to connect the fuse of busbar, the main contactor it is another
One end is connected with the output end of constant-current source.
The constant-current source 6 accesses main contactor 7, and the normally opened contact of branch's contactor 8 is connected to probe 9, and probe is inserted into direct current
At header box anode fuse pile crown screw, controller control branch's contactor is successively attracted, to direct current conflux case branch current
It is tested.
Header box on-off detects automatically, is to control one group of contactor by controller, in turn to positive bus and fusing
Device inlet wire applies electric current, while detecting current transformer test electric current, says as mutual inductor output electric current is equal to application test electric current
The success of open-wire line road proper testing, otherwise warning note, manual intervention detection are fuse failure or mulual inductor malfunction, and cathode converges
Stream row and cathode fuse only test whether to be connected, and test terminates, and is as a result stored in host computer.
The controller 5 is used to receive the test voltage of voltage resistant instrument, and the controller is for controlling test point conversion equipment
Switching, the controller is for controlling main contactor and several branch's contactors.The controller is also connected with header box open circuit
Device signal testing end 10 and header box Surge Protector signal testing end 11.
Embodiment described above is only that preferred embodiments of the present invention will be described, not to model of the invention
It encloses and is defined, without departing from the spirit of the design of the present invention, those of ordinary skill in the art are to technical side of the invention
The various changes and improvements that case is made, should fall within the scope of protection determined by the claims of the present invention.
Claims (4)
1. a kind of header box integrated testing platform characterized by comprising
Resistance test circuit, the resistance test circuit include beating pressure-resistant position to header box to provide the voltage resistant instrument of pressure resistance output, with
And for switching the test point conversion equipment for beating pressure-resistant position;
On off test circuit, the on off test circuit include the constant-current source being sequentially connected in series, main contactor, several branch's contactors
With several probes, one end is connected with main contactor after several described branch's contactors are in parallel, the other end and several probes
One end after parallel connection is connected, and the other end after several probes are in parallel is used to connect the fuse of busbar, the main contactor
The other end be connected with the output end of constant-current source;
Controller, the controller are used to receive the test voltage of voltage resistant instrument, and the controller is for controlling test point conversion equipment
Switching, the controller is for controlling main contactor and several branch's contactors.
2. header box integrated testing platform according to claim 1, which is characterized in that the test point conversion equipment packet
The several groups electromagnet and microswitch at corresponding several dozen pressure-resistant position are included, the controller can control electromagnetic actuation and lead
Lead to the corresponding pressure resistance output for beating pressure-resistant position, the normally opened node action of the microswitch of its same group after the electromagnetic actuation, and give
The controller feedback.
3. header box integrated testing platform according to claim 1, which is characterized in that the voltage resistant instrument and controller it
Between by decompression transmitter and voltage transmitter be sequentially connected.
4. header box integrated testing platform according to claim 1, which is characterized in that the controller is also connected with remittance
Flow case breaker signal test lead and header box Surge Protector signal testing end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811511961.3A CN109696606A (en) | 2018-12-11 | 2018-12-11 | A kind of header box integrated testing platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811511961.3A CN109696606A (en) | 2018-12-11 | 2018-12-11 | A kind of header box integrated testing platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109696606A true CN109696606A (en) | 2019-04-30 |
Family
ID=66230489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811511961.3A Pending CN109696606A (en) | 2018-12-11 | 2018-12-11 | A kind of header box integrated testing platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109696606A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201707416U (en) * | 2009-12-25 | 2011-01-12 | 北京铁路信号工厂 | Electronic device for automatic wirecable and wiring testing |
CN202383228U (en) * | 2011-12-23 | 2012-08-15 | 无锡隆玛科技股份有限公司 | Intelligent combiner box testing system |
CN102867871A (en) * | 2012-08-28 | 2013-01-09 | 深圳蓝波幕墙及光伏工程有限公司 | Intelligent header box and photovoltaic system thereof |
CN202676801U (en) * | 2012-06-12 | 2013-01-16 | 特变电工新疆新能源股份有限公司 | Wiring tester used for photovoltaic array header box |
CN102983628A (en) * | 2012-10-31 | 2013-03-20 | 泰豪科技(深圳)电力技术有限公司 | Photovoltaic combiner box |
CN103630801A (en) * | 2012-08-29 | 2014-03-12 | 致茂电子(苏州)有限公司 | Voltage withstanding test device with positive and negative polarity voltage output |
CN103633936A (en) * | 2013-11-30 | 2014-03-12 | 国家电网公司 | Photovoltaic header box automatic test system |
CN206411152U (en) * | 2016-12-30 | 2017-08-15 | 杭州优特电源有限公司 | A kind of Hi-pot Tester automatic switching control equipment |
CN107064716A (en) * | 2017-05-05 | 2017-08-18 | 广东正力通用电气有限公司 | A kind of power transmission line break monitoring system and method |
-
2018
- 2018-12-11 CN CN201811511961.3A patent/CN109696606A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201707416U (en) * | 2009-12-25 | 2011-01-12 | 北京铁路信号工厂 | Electronic device for automatic wirecable and wiring testing |
CN202383228U (en) * | 2011-12-23 | 2012-08-15 | 无锡隆玛科技股份有限公司 | Intelligent combiner box testing system |
CN202676801U (en) * | 2012-06-12 | 2013-01-16 | 特变电工新疆新能源股份有限公司 | Wiring tester used for photovoltaic array header box |
CN102867871A (en) * | 2012-08-28 | 2013-01-09 | 深圳蓝波幕墙及光伏工程有限公司 | Intelligent header box and photovoltaic system thereof |
CN103630801A (en) * | 2012-08-29 | 2014-03-12 | 致茂电子(苏州)有限公司 | Voltage withstanding test device with positive and negative polarity voltage output |
CN102983628A (en) * | 2012-10-31 | 2013-03-20 | 泰豪科技(深圳)电力技术有限公司 | Photovoltaic combiner box |
CN103633936A (en) * | 2013-11-30 | 2014-03-12 | 国家电网公司 | Photovoltaic header box automatic test system |
CN206411152U (en) * | 2016-12-30 | 2017-08-15 | 杭州优特电源有限公司 | A kind of Hi-pot Tester automatic switching control equipment |
CN107064716A (en) * | 2017-05-05 | 2017-08-18 | 广东正力通用电气有限公司 | A kind of power transmission line break monitoring system and method |
Non-Patent Citations (1)
Title |
---|
中华人民共和国国家质量监督检验检疫总局: "《中华人民共和国国家标准 GB/T 34933-2017》", 1 November 2017 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106251747B (en) | Power distribution network simulation system | |
CN106371009A (en) | Test device and test method of safety type relay | |
CN103149517B (en) | Oil-immersed equipment insulation ag(e)ing non-destructive testing device based on virtual instrument and method | |
CN107271899B (en) | A kind of test method of more specification voltage generating sets | |
CN207557429U (en) | The test device of Morse Shi Mite relays | |
CN102033181B (en) | Portable spare power automatic switching calibrator | |
CN107271945B (en) | System-level electronic transformer electromagnetic compatibility test system and method | |
CN108061853A (en) | The power switch contact adhesion detecting system and method for electric vehicle DC charging | |
CN113687220B (en) | Simulation device and method for spring energy storage type vacuum circuit breaker | |
CN109696606A (en) | A kind of header box integrated testing platform | |
CN201774175U (en) | Intelligent high-voltage switch equipment | |
CN203927005U (en) | Electric valve control circuit and the electric operated valve instrument that comprises this circuit | |
CN201392370Y (en) | Mimic-disconnecting switch used for protecting tester | |
CN107761065B (en) | Coating wire planar cathode short circuit repair method | |
CN206877529U (en) | A kind of mulual inductor malfunction simulation and training device | |
CN207066733U (en) | A kind of secondary conditioning device of switch cubicle mechanical characteristic test | |
CN205301492U (en) | Fuse test system for car | |
CN104849584B (en) | The function test system and method for overload protection fastener | |
CN208433876U (en) | A kind of generator shaft voltage, shaft current measuring device and the generating set containing it | |
CN209280824U (en) | Failure simulation device based on battery simulator | |
CN209570614U (en) | A kind of movable type pressure test platform | |
CN208350911U (en) | A kind of pair of towed SVG modular debugging platform | |
CN105911484B (en) | The secondary power supply simulation system and method for aircraft power supply ground system test | |
CN208207019U (en) | A kind of leakage current test conversion device box | |
CN109739147A (en) | Control equipment, control method and computer readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190430 |
|
RJ01 | Rejection of invention patent application after publication |