CN109695341A - A kind of CONSTRUCTION OPERATIONS platform - Google Patents
A kind of CONSTRUCTION OPERATIONS platform Download PDFInfo
- Publication number
- CN109695341A CN109695341A CN201711004222.0A CN201711004222A CN109695341A CN 109695341 A CN109695341 A CN 109695341A CN 201711004222 A CN201711004222 A CN 201711004222A CN 109695341 A CN109695341 A CN 109695341A
- Authority
- CN
- China
- Prior art keywords
- stock
- attached
- wall
- platform
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention provides a kind of CONSTRUCTION OPERATIONS platforms.A kind of CONSTRUCTION OPERATIONS platform, including column and platform;Column is provided with the platform stock that can be moved up and down along it, mobile attached wall stock and bottom wall-attached frame from top to bottom;Stage+module is on platform stock, when platform is run along column, platform stock is not connect with building, and multiple clamp systems, which are arranged, in mobile attached wall stock can clamp the main limb of column, and connect with building, bottom wall-attached frame is connect with building by detachable wall-attached frame;When mobile attached wall stock is moved along column, platform stock, mobile attached wall stock and bottom wall-attached frame are connect with building by detachable wall-attached frame;Column along platform stock, move attached wall stock and climb when, platform stock, mobile attached wall stock are connect with building by detachable wall-attached frame, and bottom wall-attached frame is not connect with building.
Description
Technical field
The present invention relates to a kind of construction operating platforms, and in particular to a kind of CONSTRUCTION OPERATIONS platform.
Background technique
Construction is divided into main body construction and internal and external ornament is constructed two stages, at present for applying in domestic construction work progress
The facility of worker person's operation more falls behind, and still can be suitble to main body construction without one kind but also be applied to construction exterior simultaneously
Adorn the safe and reliable operation facility or equipment of construction.Work progress needs to install and use two different operation facilities, causes
The increase of manpower, waste of time and use cost.
There is company to be introduced from abroad electronic construction lifting platform, such equipment purposes is only limitted to the building external decoration stage and applies
Work, as shown in Fig. 1 .2.3: in skyscraper outer decoration construction, column connects height since ground, and using wall-attached frame, every
One fixed spacing is connected and fixed with building.When depth of building is higher, a large amount of column standard knot and wall-attached frame are needed, is used
Higher cost can not individually be competed in the use of building external decoration stage from economy with aerial work basket, at present in engineering
In be rarely employed.
Summary of the invention
In order to overcome above-mentioned technical deficiency, the present invention provides a kind of CONSTRUCTION OPERATIONS platforms.
The present invention is realized using following measures:
A kind of CONSTRUCTION OPERATIONS platform, it is characterised in that: including column and platform;Column is provided with from top to bottom can be along it
Platform stock, mobile attached wall stock and the bottom wall-attached frame moved up and down;Stage+module on platform stock, transport along column by platform
When row, platform stock is not connect with building, and multiple clamp systems, which are arranged, in mobile attached wall stock can clamp column
Main limb, and connect with building, bottom wall-attached frame is connect with building by detachable wall-attached frame;Mobile attached wall stock is along column
When mobile, platform stock, mobile attached wall stock and bottom wall-attached frame are connect with building by detachable wall-attached frame;Column is along flat
When platform stock, mobile attached wall stock climb, platform stock, mobile attached wall stock are connected with building by detachable wall-attached frame
It connects, bottom wall-attached frame is not connect with building.
Further, platform stock, mobile attached wall stock include frame body;On column, frame body leans on frame body four sides shroud ring
The one side of nearly building is equipped with opening, and frame body upper and lower ends are all made of multiple idler wheels and contact with 4 main limbs of column.
Further, wall-attached frame is the space truss knot being connected as one by pin shaft being arranged on frame body opening face
Structure.
Further, mobile attached wall stock clamp system includes mounting rack and adjustment bolt nut assembly, and idler wheel is mounted on
On mounting rack, adjustment bolt nut assembly includes adjustment bolt and adjusting nut, and adjusting nut is mounted in frame body, adjustment bolt
One end is mounted in frame body, and the other end is connect with mounting rack.
Further, mobile attached wall stock and bottom wall-attached frame lower part are equipped with an operating platform.
Further, platform stock, mobile attached wall stock frame body upper and lower end faces corner location are all made of 2 idler wheels and stand
The main limb of column contacts.
The present invention mainly has following characteristics:
1) one side of building is leaned in platform stock, mobile attached wall stock and bottom wall-attached frame, devising can connect with building
, the wall-attached frame of fast demountable, when platform stock, mobile attached wall stock and bottom wall-attached frame are in operation working condition,
Remove wall-attached frame;When platform stock and mobile attached wall stock climb guiding device as column, installation wall-attached frame and building
Connection, operating mechanism can be used as the power mechanism that column climbs;
2) present invention uses in skyscraper especially super high-rise building, can save a large amount of column standard knot and attached wall
Use cost is greatly reduced in frame, enhances the feasibility of CONSTRUCTION OPERATIONS platform popularization and use;
3) stock is together with column shroud ring, and is equipped with opening, and makes operating platform closer to building, convenient for construction, it is not necessary to
Install expansion platform additional;
4) platform stock, mobile attached wall stock and bottom wall-attached frame are equipped with can put down for the operation of construction personnel's dismounting wall-attached frame
Platform, safe operation are reliable.
Detailed description of the invention
Fig. 1 is electronic construction lifting platform schematic side view;
Fig. 2 is electronic construction lifting platform stock and wall-attached frame schematic diagram;
Fig. 3 is electronic construction lifting platform schematic front view;
Fig. 4 is platform stock of the present invention and wall-attached frame schematic diagram;
Fig. 5 is schematic side view of the present invention;
Fig. 6 is schematic front view of the present invention;
Fig. 7 is the attached view schematic diagram of the present invention;
Fig. 8 is A enlarged drawing in Fig. 5;
Fig. 9 is mobile attached wall stock schematic diagram;
Figure 10 is B enlarged drawing in Fig. 9;
Figure 11 is that each stock installs wall-attached frame structural schematic diagram;
Figure 12 is that mobile attached wall stock runs 2 layer height to a upper attachment point position;
Figure 13 is mobile attached wall stock in upper attachment point position installation wall-attached frame;
Figure 14 is that attached wall stock in bottom removes wall-attached frame;
Figure 15 is that bottom attached wall stock and column climb 2 layer height to a upper attachment point position;
Figure 16 is that bottom wall-attaching equipment installs wall-attached frame;
Figure 17 is the present invention in a upper position operation schematic diagram.
In figure, 1- column, 2- platform stock, 3- platform, 4- building, 5- mobile attached wall stock, the bottom 6- attached wall set
Frame, 7- wall-attached frame, 8- adjustment bolt, 9- adjusting nut, 10- mounting rack, 11- operating platform, a- frame body, b- idler wheel, 7-1- connect
Outbound axis, 7-2- truss structure.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and detailed description.
With reference to attached drawing 5.6.7, a kind of CONSTRUCTION OPERATIONS platform, including column 1 and platform 3;Column 1 is arranged from top to bottom
There are the platform stock 2 that can be moved up and down along it, mobile attached wall stock 5 and bottom wall-attached frame 6;Platform 3 is mounted on platform stock 2
On, when platform 3 is run along column 1, platform stock 2 is not connect with building 4, and multiple clamp systems are arranged in mobile attached wall stock 5
The main limb of column 1 can be clamped, and is connect with building 4, bottom wall-attached frame 6 and building 4 pass through detachable attached wall
Frame 7 connects;When mobile attached wall stock 5 is moved along column 1, mobile attached wall stock 5 is not connect with building 4, and platform stock 2 moves
Dynamic attached wall stock 5 and bottom wall-attached frame 6, which are connect with building by detachable wall-attached frame, passes through detachable wall-attached frame with building 4
7 connections;Column 1 along platform stock 2, move attached wall stock 5 and climb when, platform stock 2, mobile attached wall stock 5 with building 4
It is detachably connected by wall-attached frame 7, bottom wall-attached frame 6 is not connect with building 4.
With reference to attached drawing 4, platform stock 2, mobile attached wall stock 5 and bottom attached wall stock 6 include frame body a;The four sides frame body a
For shroud ring on column 1, frame body a is equipped with opening close to the one side of building 4, and frame body a upper and lower ends are all made of multiple idler wheel b and stand
The main limb contact of 4 of column 1.
With reference to attached drawing 4, wall-attached frame 7 is the purlin being connected as one by connecting pin shaft 7-1 being arranged on frame body a opening face
Frame structure 7-2.In practice, frame body a upper and lower end faces corner location is all made of 2 idler wheel b and contacts with the main limb of column 1.
With reference to attached drawing 8,9,10, clamp system includes mounting rack 10 and adjustment bolt nut assembly, and idler wheel b is mounted on installation
On frame 10, adjustment bolt nut assembly includes adjustment bolt 8 and adjusting nut 9, and adjusting nut 9 is mounted in frame body a, adjusts spiral shell
8 one end of bolt is mounted in frame body a, and the other end is connect with mounting rack 10.
With reference to attached drawing 5, mobile attached wall stock 5 and 6 lower part of bottom wall-attached frame are equipped with an operating platform 11.
A kind of installation method of CONSTRUCTION OPERATIONS platform, comprising the following steps:
1) platform stock 2 and platform are run into building under the working condition of CONSTRUCTION OPERATIONS platform with reference to attached drawing 11
Platform stock 2 and building 4 are connected and fixed by 4 tops, installation wall-attached frame 7;
2) attached drawing 12 is referred to, the wall-attached frame 7 of mobile attached wall stock 5 is removed, mobile attached wall stock 5 is made to climb 2 layers along column 1
Height arrives next attached wall position;
3) attached drawing 13 is referred to, in next attached wall position, the wall-attached frame 7 of mobile attached wall stock 5 is installed;
4) attached drawing 14 is referred to, the wall-attached frame 7 of bottom wall-attached frame 6 is removed;
5) attached drawing 15 is referred to, platform stock 2 and mobile attached wall stock 5 are guiding device, and column 1 climbs 2 layer height;
6) attached drawing 16 is referred to, the wall-attached frame 7 of bottom wall-attached frame 6 is installed, then, removes the wall-attached frame 7 of platform stock 2;
7) attached drawing 17 is referred to, CONSTRUCTION OPERATIONS platform terminates climb mode, into working condition.
Above only describes basic principle of the invention and preferred embodiment, those skilled in the art can be according to foregoing description
Many changes may be made and improves, and these changes and improvements should be within the scope of protection of the invention.
Claims (5)
1. a kind of CONSTRUCTION OPERATIONS platform, it is characterised in that: including column and platform;Column is provided with from top to bottom being capable of edge
Its platform stock moved up and down, mobile attached wall stock and bottom wall-attached frame;Stage+module is on platform stock, and platform is along column
When operation, platform stock is not connect with building, and the multiple clamp systems of mobile attached wall stock setting can clamp vertical
The main limb of column, and connect with building, bottom wall-attached frame is connect with building by detachable wall-attached frame;Mobile attached wall stock is along vertical
When column is mobile, platform stock and bottom wall-attached frame are connect with building by detachable wall-attached frame;Column along platform stock, move
When attached wall stock climbs, platform stock, mobile attached wall stock are connect with building by detachable wall-attached frame, bottom wall-attached frame
It is not connect with building, platform stock, mobile attached wall stock include frame body;For frame body four sides shroud ring on column, frame body is close
The one side of building is equipped with opening, and frame body upper and lower ends are all made of multiple idler wheels and contact with 4 main limbs of column.
2. building construction operation platform according to claim 1, it is characterised in that: wall-attached frame is to be arranged on frame body opening face
The space truss structure being integrated by connecting pin axis connection.
3. CONSTRUCTION OPERATIONS platform according to claim 1, it is characterised in that: clamp system includes mounting rack and adjustment spiral shell
Bolt nut assembly, idler wheel are mounted on mounting rack, and adjustment bolt nut assembly includes adjustment bolt and adjusting nut, adjusting nut
It is mounted in frame body, adjustment bolt one end is mounted in frame body, and the other end is connect with mounting rack.
4. the according to claim 1 or 2 or 3 CONSTRUCTION OPERATIONS platforms, it is characterised in that: mobile attached wall stock and bottom are attached
Wall stand lower part is equipped with an operating platform.
5. the CONSTRUCTION OPERATIONS platform according to Claims 2 or 3, it is characterised in that: frame body upper and lower end faces corner location
2 idler wheels are all made of to contact with the main limb of column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711004222.0A CN109695341A (en) | 2017-10-24 | 2017-10-24 | A kind of CONSTRUCTION OPERATIONS platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711004222.0A CN109695341A (en) | 2017-10-24 | 2017-10-24 | A kind of CONSTRUCTION OPERATIONS platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109695341A true CN109695341A (en) | 2019-04-30 |
Family
ID=66229445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711004222.0A Pending CN109695341A (en) | 2017-10-24 | 2017-10-24 | A kind of CONSTRUCTION OPERATIONS platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109695341A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114704068A (en) * | 2022-06-07 | 2022-07-05 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
-
2017
- 2017-10-24 CN CN201711004222.0A patent/CN109695341A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114704068A (en) * | 2022-06-07 | 2022-07-05 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
CN114704068B (en) * | 2022-06-07 | 2022-08-19 | 中铁城建集团第一工程有限公司 | Attached lifting scaffold system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109625173B (en) | Process for marine module construction | |
CN103003509A (en) | An assembly rig for assembling a wind turbine tower or wind turbine tower sections and a respective method | |
CN109695341A (en) | A kind of CONSTRUCTION OPERATIONS platform | |
CN204081426U (en) | Subway tunnel removes scaffold car | |
CN103741939B (en) | The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method | |
CN206753471U (en) | A kind of power construction repairing ladder | |
CN205081385U (en) | Safe climbing platform | |
CN208632047U (en) | Lifting device is used in a kind of maintenance of High-Pole Lamp | |
CN104847283A (en) | Drilling module drill pipe ramp for offshore cluster wells | |
CN104860245A (en) | Boiler two-stage economizer overhauling platform | |
CN204237532U (en) | Substation's in-vehicle operation jacking system | |
CN104417499B (en) | For dismounting the supporting arrangement of non-penetrating broken bridge of car | |
CN203640251U (en) | Climbing type building construction operating platform outside building | |
CN204482046U (en) | A kind of box emergency base station | |
WO2010013252A1 (en) | A modular canopy | |
CN203284168U (en) | Overall dual platforms for horizontal boiler | |
CN106081903B (en) | A kind of bridge crane diving platform structure and its mounting process | |
CN207657935U (en) | A kind of plug-in air-conditioning job platform of automobile | |
CN205610069U (en) | Novel electric power that improves structure overhauls frame | |
CN104876165A (en) | Mobile mounting and maintenance platform of photovoltaic component | |
CN204657792U (en) | Welding assistance platform | |
CN204727565U (en) | A kind of power equipment maintaining engineering truck | |
CN109530445A (en) | A kind of mill housing top platform modularization method for rapidly mounting | |
CN212002150U (en) | Scaffold frame for construction with safeguard function | |
CN204983594U (en) | Construction of steel construction transformer substation is with C shape hoist and mount platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190430 |