CN109687362A - A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method - Google Patents

A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method Download PDF

Info

Publication number
CN109687362A
CN109687362A CN201910039433.0A CN201910039433A CN109687362A CN 109687362 A CN109687362 A CN 109687362A CN 201910039433 A CN201910039433 A CN 201910039433A CN 109687362 A CN109687362 A CN 109687362A
Authority
CN
China
Prior art keywords
gantry
capping
side plate
buckle ear
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910039433.0A
Other languages
Chinese (zh)
Inventor
张铜俊
张银久
张铜吉
徐国富
於文武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingyi Ltd By Share Ltd
Original Assignee
Jingyi Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingyi Ltd By Share Ltd filed Critical Jingyi Ltd By Share Ltd
Priority to CN201910039433.0A priority Critical patent/CN109687362A/en
Publication of CN109687362A publication Critical patent/CN109687362A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0456Ladders or other supports
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0406Details thereof
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0406Details thereof
    • H02G3/0412Heat or fire protective means

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The invention discloses a kind of retarding corrosion-resisting cable bridge frame and its manufacturing methods, retarding corrosion-resisting cable bridge frame includes gantry capping, side plate and bottom plate, the two sides of the bottom plate are welded with the side plate of parallel opposition setting, being horizontally disposed between two side plates has support rod, several are installed at equal intervals on support rod and is connected to the side of gantry capping jointly for placing the cable roller of cable, the top of two side plates.The present invention uses the molding that cold-rolled steel sheet is stamped, bending welding sequence completes gantry main body, by carrying out zinc-plated and spray painting after soldering, it is able to maintain the integrality of zinc coat, avoids in operation damaging zinc coat, is conducive to the anti-corrosive properties for ensureing internal cold-rolled steel sheet.The present invention is used using upper buckle ear and the lower buckled design of buckle ear, is saved installation space, is avoided direct contact with high temp objects and damage to inside cable, is reduced resistance when cable dragging, is reduced the abrasion of cable surface, rapid operation.

Description

A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method
Technical field
The invention belongs to cable bridge device technical fields, and in particular to a kind of retarding corrosion-resisting cable bridge frame and its manufacturer Method.
Background technique
Cable testing bridge facilitates cable distribution for being supported to cable.As application No. is CN201820309019.8 Patent, it discloses a kind of cable testing bridge with fire protecting performance, including gantry main body, gantry lid, polyvinyl chloride flame-retardant layer, The side wall of the equal scoreboard of cable and connecting cavity, the gantry body interior is equipped with polyvinyl chloride flame-retardant layer, polyvinyl chloride flame-retardant layer The center position on top is equipped with the equal scoreboard of equidistant cable, and the top of the equal scoreboard of cable is heavy equipped with equidistant bolt Chamber, the bolt sink the center position in intracavitary portion and are threaded with cable fixing bolt, and the top of the gantry main body is equipped with bridge Frame lid, the center position of gantry lid bottom end are fixed with oxygen barrier layer, all fix on the two sidewalls of gantry main body one end There is a link block, the gantry main body is far from being all equipped with connecting cavity on two outer walls of link block side.Above-mentioned utility model not only mentions Convenience degree when high gantry connection, extends the service life of cable testing bridge, avoids and send out between each cable inside gantry The phenomenon that raw winding.
But above scheme is needed gantry when having following defects that gantry lid is connect with gantry main body in use Lid is pushed into gantry main body since one end, needs longer mounting distance, inconvenient;Meanwhile when generation fire or gantry When close to heat source, it will directly transfer heat to cable by bridge joint side and bottom surface, have an adverse effect to cable.
Summary of the invention
The purpose of the present invention is to provide a kind of retarding corrosion-resisting cable bridge frame and its manufacturing methods, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the invention provides the following technical scheme: a kind of retarding corrosion-resisting cable bridge frame, including gantry seal Lid, side plate and bottom plate, the two sides of the bottom plate are welded with the side plate of parallel opposition setting, the top integration of the side plate Equipped with lower buckle ear, being horizontally disposed between two side plates has support rod, is equipped with several use at equal intervals on the support rod In the cable roller for placing cable, the top of two side plates is connected to the side of gantry capping jointly.
Preferably, the edge integration of the gantry capping is bent with buckle ear.
Preferably, the upper buckle ear and lower buckle ear are in be arranged at equal intervals, are suppressed with locating slot on the lower buckle ear, described It is suppressed on upper buckle ear and the matched protrusion of locating slot.
This setting is cooperated using locating slot and protrusion, so that upper buckle ear is more stable when docking with lower buckle ear, is prevented Anti-avulsion is fallen.
Preferably, the inside of the side plate is equipped with the placing groove being distributed at equal intervals and vertically, the both ends point of the support rod Cha Ru not be in placing groove, the both ends of the support rod have also been connected through a screw thread nut, and the surface of the nut and side plate pushes against.
This setting is supported cable using cable roller, is conducive to reduce resistance when cable dragging, and operation saves Power, while reducing the abrasion of cable surface.
Preferably, it is also welded with positioning guide plate in the gantry capping, the bottom end of the positioning guide plate and side plate interior sides paste It closes.
This is arranged under the action of positioning guide plate, positions to gantry capping, be conducive to upper buckle ear and lower buckle ear into Row docking.
Preferably, it raises upward in the middle part of the bottom plate.
This setting enables bottom plate far from ignition point using protrusion, while cooperating cable roller, avoids conductive cable contacts Cable testing bridge main body, only bottom plate two sides are attached with carrier, are avoided direct contact with high temp objects and are caused to damage to inside cable It is bad.
A kind of manufacturing method of retarding corrosion-resisting cable bridge frame, including following operating procedure:
S1: punching press, using 2mm thickness cold-rolled steel sheet be raw material, be placed in press machine, successively to gantry capping, side plate, bottom plate into Row punching press, the smooth upper buckle ear so that the both sides of the edge of gantry capping are spacedly distributed, so that the one side edge of side plate is at equal intervals It is distributed smooth lower buckle ear while stamping out placing groove, so that raise upward in the middle part of bottom plate, it is spare;
S2: bending respectively covers the gantry after punching press using bending machine and side plate is bent, so that upper buckle ear forms opening Catching groove in horizontal direction, so that lower buckle ear perpendicular side plate extends outwardly, it is spare;
S3: the side plate after bending is used soldering into fixation, forms gantry main body by welding with bottom plate, spare;
S4: surface treatment by gantry main body and gantry closure surface cleaning, drying, is placed in Thermal zinc plating bath and carries out zinc-plated processing, After zinc-plated, component is transferred to paint spray booth, one layer of phenolic aldehyde base fireproof coating is sprayed, is taken out after drying, it is spare;
S5: cable roller pin joint is fixed on support rod by assembling, then the both ends of support rod are slid into the placing groove of side plate interior sides Interior, last tightening nut completes the fixation to support rod, cable is placed on cable roller so that nut is close to side plate It is routed, after wiring, gantry is covered and is positioned using positioning guide plate, gantry capping fastening is mounted on side plate top Portion.
Preferably, when positioning in step S5 to gantry capping, so that upper buckle ear and the dislocation of lower buckle ear are opposite, bridge is pressed Gantry capping is laterally urged after frame capping again, so that upper buckle ear and lower buckle ear complete snapping.
Technical effect and advantage of the invention:
The present invention uses cold-rolled steel sheet for raw material, and stamped, bending welding sequence completes the molding of gantry main body, by welding Zinc-plated and spray painting is carried out after processing, is able to maintain the integrality of zinc coat, is avoided in operation damaging zinc coat, Be conducive to ensure the anti-corrosive properties of internal cold-rolled steel sheet.Again by sprayed fire proofing coating, further cable testing bridge is protected.
The present invention is used using upper buckle ear and the lower buckled design of buckle ear, saves installation space, easy to operate, utilizes cable Guide wheel avoids conductive cable contacts cable testing bridge main body, and only bottom plate two sides are attached with carrier, avoid direct contact with high temp objects Resistance when damaging to inside cable, while reducing cable dragging, reduces the abrasion of cable surface, rapid operation.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is side plate overlooking structure diagram of the invention;
Fig. 3 is that gantry of the invention covers present invention looks up structural representation.
In figure: the capping of Bridge 1 frame, buckle ear on 101,102 positioning guide plates, 2 side plates, 201 placing grooves, 202 lower buckle ears, 3 bottom plates, 4 support rods, 5 cable rollers, 6 nuts.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
As shown in Figure 1-3, a kind of retarding corrosion-resisting cable bridge frame, including gantry capping 1, side plate 2 and bottom plate 3, the bottom plate 3 Two sides be welded with the side plate 2 of parallel opposition setting, the top integration of the side plate 2 is equipped with lower buckle ear 202, two institutes It states to be horizontally disposed between side plate 2 and has support rod 4, several are installed at equal intervals for placing the electricity of cable on support rod 4 Cable guide wheel 5, the top of two side plates 2 are connected to the side of gantry capping 1 jointly.
The edge integration of the gantry capping 1 is bent with buckle ear 101.
The upper buckle ear 101, in being arranged at equal intervals, is suppressed with locating slot on the lower buckle ear 202, institute with lower buckle ear 202 It states and is suppressed on buckle ear 101 and the matched protrusion of locating slot.
The inside of the side plate 2 is equipped with the placing groove 201 being distributed at equal intervals and vertically, the both ends difference of the support rod 4 It is inserted into placing groove 201, the both ends of the support rod 4 have also been connected through a screw thread nut 6, the surface of the nut and side plate 2 It pushes against.
It is also welded with positioning guide plate 102 in the gantry capping 1, is pasted on the inside of the bottom end of the positioning guide plate 102 and side plate 2 It closes.
The middle part of the bottom plate 3 raises upward.
A kind of manufacturing method of retarding corrosion-resisting cable bridge frame, including following operating procedure:
S1: punching press is raw material using the cold-rolled steel sheet of 2mm thickness, is placed in press machine, successively covers 1, side plate 2, bottom plate to gantry 3 carry out punching press, the smooth upper the buckle ear 101 so that both sides of the edge of gantry capping 1 are spacedly distributed, so that a side of side plate 2 Edge, which is spacedly distributed, smooth lower buckle ear 202 while stamping out placing groove 201, so that the middle part of bottom plate 3 raises upward, it is spare;
S2: bending, using bending machine respectively to after punching press gantry capping 1 and side plate 2 bend so that 101 shape of upper buckle ear At the catching groove that open horizontal is inside, so that 202 perpendicular side plate 2 of lower buckle ear extends outwardly, it is spare;
S3: the side plate 2 after bending is used soldering into fixation, forms gantry main body by welding with bottom plate 3, spare;
S4: gantry main body and gantry are covered the drying of 1 surface clean, are placed in Thermal zinc plating bath and carry out zinc-plated processing by surface treatment, After zinc-plated, component is transferred to paint spray booth, one layer of phenolic aldehyde base fireproof coating is sprayed, is taken out after drying, it is spare;
S5: 5 pin joint of cable roller is fixed on support rod 4 by assembling, then the both ends of support rod 4 are slid into putting for 2 inside of side plate It sets in slot 201, last tightening nut 6, so that nut 6 is close to side plate 2, completes the fixation to support rod 4, cable is placed on It is routed on cable roller 5, after wiring, gantry capping 1 is positioned using positioning guide plate 102, gantry is covered 1 Fastening is mounted on 2 top of side plate.
When positioning in step S5 to gantry capping 1, so that upper buckle ear 101 and lower buckle ear 202 misplace relatively, bridge is pressed Gantry capping 1 is laterally urged after frame capping 1 again, so that upper buckle ear 101 and lower buckle ear 202 complete snapping.Peace needed for gantry capping 1 Dress space is approximately equal in length with gantry main body, saves operating space.
The present invention uses cold-rolled steel sheet for raw material, and stamped, bending welding sequence completes the molding of gantry main body, by Zinc-plated and spray painting is carried out after soldering, is able to maintain the integrality of zinc coat, is avoided in operation causing zinc coat It destroys, is conducive to the anti-corrosive properties for ensureing internal cold-rolled steel sheet.Again by sprayed fire proofing coating, further cable testing bridge is protected Shield.
The present invention saves installation space using use and upper buckle ear 101 and the buckled design of lower buckle ear 202, easy to operate, Using cable roller 5, conductive cable contacts cable testing bridge main body is avoided, only 3 two sides of bottom plate are attached with carrier, avoid directly connecing Touching high temp objects damage inside cable, while resistance when reducing cable dragging, reduce the abrasion of cable surface, operate It is laborsaving.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (8)

1. a kind of retarding corrosion-resisting cable bridge frame, including gantry capping (1), side plate (2) and bottom plate (3), it is characterised in that: the bottom The two sides of plate (3) are welded with the side plate (2) of parallel opposition setting, and the top integration of the side plate (2) is equipped with lower buckle ear (202), being horizontally disposed between two side plates (2) has support rod (4), is equipped at equal intervals on the support rod (4) several A cable roller (5) for being used to place cable, the top of two side plates (2) are connected to the side of gantry capping (1) jointly.
2. a kind of retarding corrosion-resisting cable bridge frame according to claim 1, it is characterised in that: the side of the gantry capping (1) Edge integration is bent with buckle ear (101).
3. a kind of retarding corrosion-resisting cable bridge frame according to claim 2, it is characterised in that: the upper buckle ear (101) is under Buckle ear (202) in being arranged at equal intervals, is suppressed with locating slot, is suppressed on the upper buckle ear (101) on the lower buckle ear (202) With the matched protrusion of locating slot.
4. a kind of retarding corrosion-resisting cable bridge frame according to claim 1, it is characterised in that: set on the inside of the side plate (2) There is the placing groove (201) being distributed at equal intervals and vertically, the both ends of the support rod (4) are inserted into respectively in placing groove (201), described The both ends of support rod (4) have also been connected through a screw thread nut (6), and the surface of the nut and side plate (2) pushes against.
5. a kind of retarding corrosion-resisting cable bridge frame according to claim 1, it is characterised in that: on the gantry capping (1) also It is welded with positioning guide plate (102), is bonded on the inside of the bottom end of the positioning guide plate (102) and side plate (2).
6. a kind of retarding corrosion-resisting cable bridge frame according to claim 1, it is characterised in that: the middle part of the bottom plate (3) to Upper protrusion.
7. a kind of manufacturing method of retarding corrosion-resisting cable bridge frame described in -6 any one according to claim 1, it is characterised in that: Including following operating procedure:
S1: punching press, using 2mm thickness cold-rolled steel sheet be raw material, be placed in press machine, successively to gantry capping (1), side plate (2), Bottom plate (3) carries out punching press, so that the upper buckle ear (101) that the both sides of the edge of gantry capping (1) are spacedly distributed smooth, so that side plate (2) lower buckle ear (202) that one side edge is spacedly distributed smooth while stamping out placing groove (201), so that in bottom plate (3) Portion raises upward, spare;
S2: bending covers (1) to the gantry after punching press respectively using bending machine and side plate (2) is bent, so that upper buckle ear (101) the inside catching groove of open horizontal is formed, so that lower buckle ear (202) perpendicular side plate (2) extends outwardly, it is spare;
S3: the side plate (2) after bending is used soldering into fixation, forms gantry main body by welding with bottom plate (3), spare;
S4: gantry main body and gantry capping (1) surface clean drying are placed in Thermal zinc plating bath and carry out zinc-plated place by surface treatment Reason, after zinc-plated, is transferred to paint spray booth for component, sprays one layer of phenolic aldehyde base fireproof coating, take out after drying, spare;
S5: cable roller (5) pin joint is fixed on support rod (4) by assembling, then the both ends of support rod (4) are slid into side plate (2) In the placing groove (201) of inside, last tightening nut (6) is completed so that nut (6) is close to side plate (2) to support rod (4) Fixation, cable is placed on cable roller (5) and is routed, after wiring, by gantry capping (1) utilize positioning guide plate (102) it is positioned, gantry capping (1) fastening is mounted at the top of side plate (2).
8. a kind of manufacturing method of retarding corrosion-resisting cable bridge frame according to claim 7, it is characterised in that: right in step S5 When gantry capping (1) is positioned, so that upper buckle ear (101) and the dislocation of lower buckle ear (202) are opposite, after pressing gantry capping (1) Gantry capping (1) is laterally urged again, so that upper buckle ear (101) and lower buckle ear (202) complete snapping.
CN201910039433.0A 2019-01-16 2019-01-16 A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method Pending CN109687362A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910039433.0A CN109687362A (en) 2019-01-16 2019-01-16 A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910039433.0A CN109687362A (en) 2019-01-16 2019-01-16 A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method

Publications (1)

Publication Number Publication Date
CN109687362A true CN109687362A (en) 2019-04-26

Family

ID=66193311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910039433.0A Pending CN109687362A (en) 2019-01-16 2019-01-16 A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method

Country Status (1)

Country Link
CN (1) CN109687362A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431105A (en) * 2020-04-09 2020-07-17 遵义华正电缆桥架有限公司 Method for manufacturing antistatic cable bridge

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1584382A (en) * 2004-06-11 2005-02-23 马纪财 Manufacturing process for energy-saving light electric cable bridge structure
CN2847617Y (en) * 2005-07-29 2006-12-13 许庆晖 Metal glass fiber reinforced plastic cable bridge frame
CN201038666Y (en) * 2007-04-29 2008-03-19 黄干初 Combined and assembled type bridge frame slot
DE102014006184A1 (en) * 2014-04-29 2015-10-29 Thomas Brügge Modular cable bridge
CN205298826U (en) * 2016-01-21 2016-06-08 福州云阳电气有限公司 Fire prevention crane span structure structure
CN207801388U (en) * 2018-01-26 2018-08-31 广东粤明动力有限公司 A kind of cable laying holder
CN109023090A (en) * 2018-09-10 2018-12-18 镇江朝阳机电科技有限公司 A kind of alloy reinforced plastic cable bridge frame and preparation method thereof
CN109149461A (en) * 2018-09-10 2019-01-04 镇江朝阳机电科技有限公司 A kind of board plug type cable testing bridge and preparation method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1584382A (en) * 2004-06-11 2005-02-23 马纪财 Manufacturing process for energy-saving light electric cable bridge structure
CN2847617Y (en) * 2005-07-29 2006-12-13 许庆晖 Metal glass fiber reinforced plastic cable bridge frame
CN201038666Y (en) * 2007-04-29 2008-03-19 黄干初 Combined and assembled type bridge frame slot
DE102014006184A1 (en) * 2014-04-29 2015-10-29 Thomas Brügge Modular cable bridge
CN205298826U (en) * 2016-01-21 2016-06-08 福州云阳电气有限公司 Fire prevention crane span structure structure
CN207801388U (en) * 2018-01-26 2018-08-31 广东粤明动力有限公司 A kind of cable laying holder
CN109023090A (en) * 2018-09-10 2018-12-18 镇江朝阳机电科技有限公司 A kind of alloy reinforced plastic cable bridge frame and preparation method thereof
CN109149461A (en) * 2018-09-10 2019-01-04 镇江朝阳机电科技有限公司 A kind of board plug type cable testing bridge and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431105A (en) * 2020-04-09 2020-07-17 遵义华正电缆桥架有限公司 Method for manufacturing antistatic cable bridge

Similar Documents

Publication Publication Date Title
CN109687362A (en) A kind of retarding corrosion-resisting cable bridge frame and its manufacturing method
CN210640275U (en) Battery box and battery system
CN207581990U (en) New-energy automobile inverter heat sink parcel plating jig
CN212702584U (en) Energy-saving environment-friendly continuous surface anti-corrosion equipment for copper strips
CN201984603U (en) Device capable of preventing fire alarm battery from being inversely installed and omitted
CN206610634U (en) Photovoltaic DC-to-AC converter high-performance flexible link
CN216879926U (en) Spraying transverse bayonet hanger capable of clamping multiple side plates
CN214263021U (en) Cleaning and drying device for copper strips
CN219458035U (en) Electrical circuit protector
CN219591846U (en) Low-voltage distribution cabinet line management module
CN215528544U (en) Integral bus duct connector of anticorrosive type
CN216163041U (en) Control box body structure with long service life and good heat dissipation
CN219610950U (en) Auxiliary jig for carbon brush box installation
CN209358098U (en) A kind of electric automatization distribution box
CN218922384U (en) Intelligent electric heating towel rack
CN201115281Y (en) An enclosure with shielding structure
CN211455831U (en) Lead-acid storage battery device
CN211701167U (en) Anticorrosive treatment equipment for shaping box transformer substation box body
CN220358348U (en) Straight sheet Kong Duanzi
CN207354733U (en) Electric-controlled box and multi-line system
CN113097889B (en) Static-removing power distribution cabinet and production process thereof
CN108391392B (en) Antistatic and anticorrosive bottom panel of cabinet and preparation process thereof
CN210053707U (en) Gas holder for acetylene production
CN212478776U (en) Dustproof and waterproof baffle for constructional engineering
CN220205381U (en) Stamping sheet metal part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190426