CN109685301A - Method for managing resource, device, equipment and readable storage medium storing program for executing - Google Patents

Method for managing resource, device, equipment and readable storage medium storing program for executing Download PDF

Info

Publication number
CN109685301A
CN109685301A CN201810952421.2A CN201810952421A CN109685301A CN 109685301 A CN109685301 A CN 109685301A CN 201810952421 A CN201810952421 A CN 201810952421A CN 109685301 A CN109685301 A CN 109685301A
Authority
CN
China
Prior art keywords
project
working hour
item
personnel
hour module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810952421.2A
Other languages
Chinese (zh)
Inventor
张瑞宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Puhui Enterprise Management Co Ltd
Original Assignee
Ping An Puhui Enterprise Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Puhui Enterprise Management Co Ltd filed Critical Ping An Puhui Enterprise Management Co Ltd
Priority to CN201810952421.2A priority Critical patent/CN109685301A/en
Publication of CN109685301A publication Critical patent/CN109685301A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of method for managing resource, device, equipment and readable storage medium storing program for executing, the described method includes: obtaining the item attribute information and project duration of the destination item from the configuration file of destination item when the project personnel for detecting destination item distribute instruction;The corresponding working hour module collection of the project duration is obtained, for each of set working hour module, executes step: item label processing is carried out to the working hour module based on the item attribute information;The personnel's attribute for obtaining the project personnel prestored carries out counterpart personnel's tag processes to the working hour module based on personnel's attribute;The corresponding item label and People Tab are matched, the working hour module of successful match is obtained, the project task for carrying out respective item personnel to the working hour module of successful match distributes, wherein project task is associated with the item label of the working hour module of successful match.During the present invention solves off-the-shelf item personnel assignment, the more technical problem of human and material resources waste.

Description

Method for managing resource, device, equipment and readable storage medium storing program for executing
Technical field
The present invention relates to field of communication technology more particularly to a kind of method for managing resource, device, equipment and readable storage mediums Matter.
Background technique
Enterprise generally requires the multiple projects of exploitation, thus, how to be reasonably allocation of items appropriate personnel, is each enterprise Industry need solve the problems, such as, and currently, most of enterprise is all the artificial distribution for carrying out project personnel, and manually carry out project people The distribution of member, needs to distribute the costly mental and physical efforts of personnel, this will cause the waste of human and material resources.
Summary of the invention
The main purpose of the present invention is to provide a kind of method for managing resource, device, equipment and readable storage medium storing program for executing, it is intended to The technical issues of solving the artificial distribution for carrying out project personnel, will cause the waste of human and material resources.
To achieve the above object, the present invention provides a kind of method for managing resource, and the method for managing resource includes:
When the project personnel for detecting destination item distribute instruction, the mesh is obtained from the configuration file of destination item The item attribute information and project duration of mark project;
The corresponding working hour module collection of the project duration is obtained, for each of working hour module collection working hour Module executes following steps:
Item label processing is carried out to the working hour module based on the item attribute information;
The personnel's attribute for obtaining the project personnel prestored carries out corresponding people to the working hour module based on personnel's attribute Member's tag processes;
Match the corresponding item label of the working hour module and People Tab, obtain the working hour module of successful match, to The project task distribution of respective item personnel is carried out with successful working hour module, wherein the project task is matched into described The item label of the working hour module of function is associated with.
Optionally, the corresponding item label of the matching working hour module and People Tab, obtain the work of successful match When module, the project task allocation step for carrying out respective item personnel to the working hour module of successful match includes:
The corresponding item label of the working hour module and People Tab are matched, and judges the corresponding project of the working hour module Label whether there is multiple matched People Tabs;
When there are when multiple matched People Tabs, obtain the mesh prestored for the corresponding item label of the working hour module The project important level of mark project;
Project important level based on the destination item chooses target person from multiple matched People Tabs Label, and obtain the successful working hour module of Corresponding matching;
Using the corresponding target person of the target person label as the project personnel of the successful working hour module of Corresponding matching, And the destination item personnel are carried out with the distribution of respective item task.
Optionally, the project important level based on the destination item, from multiple matched People Tabs Target person label is chosen, and obtains the successful working hour module step of Corresponding matching and includes:
Each matched People Tab is parsed, to obtain the length of service of corresponding project personnel, wherein personnel's mark The length of service information of corresponding project personnel is carried in label;
Each matched People Tab is sorted from large to small based on each length of service, obtains the first sequence;
When the project important level of the destination item is higher than the first predetermined level, arrangement the is chosen from the first sequence One People Tab obtains the successful working hour module of Corresponding matching as target person label.
Optionally, the project important level based on the destination item, from multiple matched People Tabs Target person label is chosen, and obtaining the successful working hour module step of Corresponding matching includes: to obtain each matched personnel's mark Sign length of service and the work scoring of corresponding project personnel;
The length of service for obtaining each project personnel respectively and work scoring are in target person label selection operation Shared weight proportion;
Based on each weight proportion, and the corresponding project personnel the length of service and the work comment Point, the matching score value of each matched People Tab is calculated;
The personnel that each matched People Tab is sorted from large to small based on each matching score value, obtain second row Sequence;
When the project important level of the destination item is higher than the second predetermined level, the row of selection from second sequence The People Tab of column first obtains the successful working hour module of Corresponding matching as target person label.
Optionally, the item attribute information includes project stage information, item classification information;
Carrying out item label processing step to the working hour module based on the item attribute information includes:
It obtains and the project stage based on the destination item obtains working hour module progress divided stages processing The phase tag of the working hour module;
After obtaining phase tag, the working hour module is carried out at tag along sort according to preset term developing way type Reason, to obtain the project development direction label of the working hour module.
Optionally, the corresponding item label of the matching working hour module and People Tab, obtain the work of successful match When module step further include:
Obtain the project stage subtab in item label and the job sharing attribute subtab in People Tab;
Judge whether the corresponding project stage subtab of the working hour module and job sharing attribute subtab are consistent, when one When cause, the successful working hour module of Corresponding matching is obtained, wherein the project stage subtab and the job sharing attribute mark The label composition rule of label is identical.
Optionally, the corresponding item label of the matching working hour module and People Tab, obtain the work of successful match When module, the working hour module of successful match is carried out include: after the project task allocation step of respective item personnel
Obtain carried out project task distribution project personnel communication account, the communication account include telephone number, Wechat, nail nail and email address;
Communication account based on project personnel, by the corresponding notice of the project task of distribution to project personnel.
The present invention also provides a kind of resource management apparatus, the resource management apparatus includes:
First obtains module, when for instructing in the project personnel's distribution for detecting destination item, from matching for destination item Set the item attribute information and project duration that the destination item is obtained in file;
Second obtains module, for obtaining the corresponding working hour module collection of the project duration, for the working hour module Each of set working hour module, the resource management apparatus further include:
Third obtains module, for obtaining personnel's attribute of the project personnel prestored, based on personnel's attribute to described Working hour module carries out counterpart personnel's tag processes;
Matching module obtains successful match for matching the corresponding item label of the working hour module and People Tab Working hour module, the project task for carrying out respective item personnel to the working hour module of successful match distribute, wherein the project task It is associated with the item label of the working hour module of the successful match.
Optionally, the matching module includes:
Matching unit for matching the corresponding item label of the working hour module and People Tab, and judges the working hour The corresponding item label of module whether there is multiple matched People Tabs;
First acquisition unit, for there are multiple matched People Tabs when the corresponding item label of the working hour module When, obtain the project important level of the destination item prestored;
Selection unit, for the project important level based on the destination item, from multiple matched People Tabs Middle selection target person label, and obtain the successful working hour module of Corresponding matching;
Allocation unit, for using the corresponding target person of the target person label as the successful working hour mould of Corresponding matching The project personnel of block, and the destination item personnel are carried out with the distribution of respective item task.
Optionally, the selection unit includes:
Parsing subunit, for parsing each matched People Tab, to obtain the length of service of corresponding project personnel, Wherein, the length of service information of corresponding project personnel is carried in the People Tab;
First sorting subunit, for sorting from large to small each matched personnel's mark based on each length of service Label, obtain the first sequence;
First choose subelement, for when the project important level of the destination item be higher than the first predetermined level when, from The People Tab of arrangement first is chosen in first sequence as target person label, and obtains the successful working hour mould of Corresponding matching.
Optionally, the selection unit further include:
First obtain subelement, corresponded to for obtaining each matched People Tab project personnel length of service, with And work scoring;
Second obtains subelement, and the length of service and work scoring for obtaining each project personnel respectively are in target Shared weight proportion in People Tab's selection operation;
Computation subunit, for being based on each weight proportion, and the length of service of the corresponding project personnel And the work scoring, the matching score value of each matched People Tab is calculated;
Second sorting subunit, for sorting from large to small each matched People Tab based on each matching score value Personnel, obtain the second sequence;
Second choose subelement, for when the project important level of the destination item be higher than the second predetermined level when, from The People Tab of arrangement first is chosen in second sequence as target person label, and obtains Corresponding matching successful working hour Module.
Optionally, the item attribute information includes project stage information, item classification information;
Described second, which obtains module, includes:
Second acquisition unit carries out the working hour module for obtaining and the project stage based on the destination item Divided stages processing, obtains the phase tag of the working hour module;
Taxon, for after obtaining phase tag, according to preset term developing way type to the working hour module Tag along sort processing is carried out, to obtain the project development direction label of the working hour module.
Optionally, the matching module includes:
Third acquiring unit, for obtaining the project stage subtab in item label and the work in People Tab Packet attributes subtab;
Judging unit, for judging the corresponding project stage subtab of the working hour module and job sharing attribute subtab It is whether consistent, when consistent, obtain the successful working hour module of Corresponding matching, wherein the project stage subtab and the work The label composition rule for making packet attributes subtab is identical.
Optionally, the source control device further include:
4th obtains module, for obtaining the communication account for having carried out the project personnel of project task distribution, the communication Account includes telephone number, wechat, nail nail and email address;
Notification module gives the corresponding notice of the project task of distribution to project people for the communication account based on project personnel Member.
In addition, to achieve the above object, the present invention also provides a kind of asset management device, the asset management device packet It includes: memory, processor, communication bus and the resource manager being stored on the memory,
The communication bus is for realizing the communication connection between processor and memory;
The processor is for executing the resource manager, to perform the steps of
When the project personnel for detecting destination item distribute instruction, the mesh is obtained from the configuration file of destination item The item attribute information and project duration of mark project;
The corresponding working hour module collection of the project duration is obtained, for each of working hour module collection working hour Module executes following steps:
Item label processing is carried out to the working hour module based on the item attribute information;
The personnel's attribute for obtaining the project personnel prestored carries out corresponding people to the working hour module based on personnel's attribute Member's tag processes;
Match the corresponding item label of the working hour module and People Tab, obtain the working hour module of successful match, to The project task distribution of respective item personnel is carried out with successful working hour module, wherein the project task is matched into described The item label of the working hour module of function is associated with.
Optionally, the corresponding item label of the matching working hour module and People Tab, obtain the work of successful match When module, the project task allocation step for carrying out respective item personnel to the working hour module of successful match includes:
The corresponding item label of the working hour module and People Tab are matched, and judges the corresponding project of the working hour module Label whether there is multiple matched People Tabs;
When there are when multiple matched People Tabs, obtain the mesh prestored for the corresponding item label of the working hour module The project important level of mark project;
Project important level based on the destination item chooses target person from multiple matched People Tabs Label, and obtain the successful working hour module of Corresponding matching;
Using the corresponding target person of the target person label as the project personnel of the successful working hour module of Corresponding matching, And the destination item personnel are carried out with the distribution of respective item task.
Optionally, the project important level based on the destination item, from multiple matched People Tabs Target person label is chosen, and obtains the successful working hour module step of Corresponding matching and includes:
Each matched People Tab is parsed, to obtain the length of service of corresponding project personnel, wherein personnel's mark The length of service information of corresponding project personnel is carried in label;
Each matched People Tab is sorted from large to small based on each length of service, obtains the first sequence;
When the project important level of the destination item is higher than the first predetermined level, arrangement the is chosen from the first sequence One People Tab obtains the successful working hour module of Corresponding matching as target person label.
Optionally, the project important level based on the destination item, from multiple matched People Tabs Target person label is chosen, and obtaining the successful working hour module step of Corresponding matching includes: to obtain each matched personnel's mark Sign length of service and the work scoring of corresponding project personnel;
The length of service for obtaining each project personnel respectively and work scoring are in target person label selection operation Shared weight proportion;
Based on each weight proportion, and the corresponding project personnel the length of service and the work comment Point, the matching score value of each matched People Tab is calculated;
The personnel that each matched People Tab is sorted from large to small based on each matching score value, obtain second row Sequence;
When the project important level of the destination item is higher than the second predetermined level, the row of selection from second sequence The People Tab of column first obtains the successful working hour module of Corresponding matching as target person label.
Optionally, the item attribute information includes project stage information, item classification information;
Carrying out item label processing step to the working hour module based on the item attribute information includes:
It obtains and the project stage based on the destination item obtains working hour module progress divided stages processing The phase tag of the working hour module;
After obtaining phase tag, the working hour module is carried out at tag along sort according to preset term developing way type Reason, to obtain the project development direction label of the working hour module.
Optionally, the corresponding item label of the matching working hour module and People Tab, obtain the work of successful match When module step further include:
Obtain the project stage subtab in item label and the job sharing attribute subtab in People Tab;
Judge whether the corresponding project stage subtab of the working hour module and job sharing attribute subtab are consistent, when one When cause, the successful working hour module of Corresponding matching is obtained, wherein the project stage subtab and the job sharing attribute mark The label composition rule of label is identical.
Optionally, the corresponding item label of the matching working hour module and People Tab, obtain the work of successful match When module, the working hour module of successful match is carried out include: after the project task allocation step of respective item personnel
Obtain carried out project task distribution project personnel communication account, the communication account include telephone number, Wechat, nail nail and email address;
Communication account based on project personnel, by the corresponding notice of the project task of distribution to project personnel.
In addition, to achieve the above object, the present invention also provides a kind of readable storage medium storing program for executing, the readable storage medium storing program for executing storage Have one perhaps more than one program the one or more programs can be held by one or more than one processor Row is to be used for:
When the project personnel for detecting destination item distribute instruction, the mesh is obtained from the configuration file of destination item The item attribute information and project duration of mark project;
The corresponding working hour module collection of the project duration is obtained, for each of working hour module collection working hour Module executes following steps:
Item label processing is carried out to the working hour module based on the item attribute information;
The personnel's attribute for obtaining the project personnel prestored carries out corresponding people to the working hour module based on personnel's attribute Member's tag processes;
Match the corresponding item label of the working hour module and People Tab, obtain the working hour module of successful match, to The project task distribution of respective item personnel is carried out with successful working hour module, wherein the project task is matched into described The item label of the working hour module of function is associated with.
When the present invention in the project personnel's distribution for detecting destination item by instructing, from the configuration file of destination item Obtain the item attribute information and project duration of the destination item;The corresponding working hour module collection of the project duration is obtained, For each of working hour module collection working hour module, following steps are executed: based on the item attribute information to institute It states working hour module and carries out item label processing;The personnel's attribute for obtaining the project personnel prestored, based on personnel's attribute to institute It states working hour module and carries out counterpart personnel's tag processes;The corresponding item label of the working hour module and People Tab are matched, is obtained The working hour module of successful match, the project task for carrying out respective item personnel to the working hour module of successful match distribute, wherein institute Project task is stated to be associated with the item label of the working hour module of the successful match.It in this application, is no longer manually to project The distribution of project personnel is carried out, but automates and realizes personnel assignment, that is, is based on working hour module, item label and People Tab, Realize the automatic distribution of project personnel, entire personnel assignment process is full-automatic, during avoiding manually carrying out personnel assignment The work such as information identification, information matches, personnel's classification, rapid and simple realization project personnel distribution, avoid human and material resources Waste, thus, present application addresses the distribution for manually carrying out project personnel in the prior art, will cause the wave of human and material resources The technical issues of taking.
Detailed description of the invention
Fig. 1 is the flow diagram of method for managing resource first embodiment of the present invention;
Fig. 2 is the flow diagram of method for managing resource second embodiment of the present invention;
Fig. 3 is the device structure schematic diagram for the hardware running environment that present invention method is related to.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention provides a kind of method for managing resource, in the first embodiment of method for managing resource of the present invention, referring to figure 1, the method for managing resource includes:
Step S10 is obtained from the configuration file of destination item when the project personnel for detecting destination item distribute instruction Take the item attribute information and project duration of the destination item;
Step S20 obtains the corresponding working hour module collection of the project duration, for every in the working hour module collection One working hour module executes step:
Step S30 carries out item label processing to the working hour module based on the item attribute information;
Step S40 obtains personnel's attribute of the project personnel prestored, based on personnel's attribute to the working hour module into Row counterpart personnel's tag processes;
Step S50 matches the corresponding item label of each working hour module and People Tab, obtains the work of successful match When module, the project task for carrying out respective item personnel to the working hour module of successful match distributes, wherein the project task with The item label of the working hour module of the successful match is associated with.
Specific step is as follows:
Step S10 is obtained from the configuration file of destination item when the project personnel for detecting destination item distribute instruction Take the item attribute information and project duration of the destination item;
It should be noted that in the present embodiment, method for managing resource is applied to resource management system, in resource management system In system, there are personal information repository, in the personal information repository, it is stored with personnel's attribute letter of each project personnel Breath, wherein personnel's attribute information includes length of service, work item or the content of project personnel, job sharing, work establishment Etc. information, for example, be stored in personal information repository a project personnel corresponding length of service such as 3 years, work item or Content is WEB front-end exploitation, and job sharing is development group, work establishment to there is establishment, and work grading system is middle rank etc..Its In, it specifically can be the job sharing according to locating for project personnel in personal information repository and each project personnel divided Class storage.
In resource management system, project personnel's distribution function can be realized, specifically, batch operation personnel can provide The personnel assignment function interface of management system triggers the item of destination item by touching or clicking allocation of items icon mode Mesh personnel assignment instruction, when obtaining the item attribute information of the destination item from the configuration file of destination item with project It is long, finally to realize the personnel assignment of destination item, before the project personnel of triggering destination item distribute instruction, have been introduced into The destination item for needing allocated items personnel is each file such as mesh for having imported the destination item for needing allocated items personnel The information such as project profile are marked, thus, when the project personnel for detecting destination item distribute instruction, it can realize and obtain The configuration file of destination item obtains the destination item after obtaining configuration file from the configuration file of destination item Item attribute information and project duration, wherein item attribute information includes project name, Item version, project task validity Section, classification of the items mark etc., wherein project task validity section includes the validity section of each project segmentation task, For example, project task includes system development, test, deployment design, goes into operation and evaluate equal segments task, thus, project task has Effect property section includes the segmentation validity section of system development, test, deployment design, evaluation equal segments task of going into operation, wherein In the present embodiment, classification of the items mark includes project development direction signs, as project has backstage developing way, client exploitation side To etc..Other than it can obtain the item attribute information of destination item from configuration file, the project of destination item can also be obtained Duration, wherein the project duration refers to estimated completion target item object time.
Step S20 obtains the corresponding working hour module collection of the project duration, for every in the working hour module collection One working hour module executes following steps:
After obtaining project duration, the corresponding working hour module collection of the project duration is obtained, is acquisition project duration Corresponding each working hour module, wherein can be that unit distributes working hour module according to hour, as project duration was if 1 month 30 days, daily 8 hours, then the corresponding working hour number of modules of project duration was 240, wherein each working hour module carries attribute I.e. natural quality has: date, initial time, terminal time, time span etc..It is illustrated to specific embodiment, working hour Module is corresponding to be can be from 9 points to 2018 10 points of mornings of on May 24, of morning on May 24th, 2018, and time span is 1 hour, The working hour module is the corresponding working hour module of destination item, and destination item includes multiple working hour modules, institute The time span for stating each working hour module can be with not just 1 hour.
Step S30 carries out item label processing to the working hour module based on the item attribute information;
After obtaining working hour module collection, for each of working hour module collection working hour module, executes: being based on The item attribute information carries out item label processing to the working hour module, carries out each item label to the working hour module Processing is referred to the working hour module add items attribute tags, is that can identify to working hour module addition machine Item attribute label.
Wherein, the item attribute information includes project stage information, item classification information;
Carrying out item label processing step to the working hour module based on the item attribute information includes:
Step S21, acquisition and the project stage based on the destination item, the working hour module is carried out at divided stages Reason, obtains the phase tag of the working hour module;
After obtaining needing each working hour module of add items label, each project working hour module is segmented Processing, if project working hour module is 150, the time corresponds to the system development stage near 70 preceding working hour modules, and the time is slightly 30 forward working hour modules correspond to test phase, and 30 working hour modules of the time after are deployment design phase, time 20 working hour modules after are to go into operation to comment audit phase etc., can be right to distinguish the working hour module after each divided stages Each working hour module corresponding label first is added different subtabs, such as by the corresponding mark of system development stage corresponding working hour module Label first corresponding addition K subtab, adds C subtab for the corresponding working hour module of test phase, will dispose the design phase pair The working hour module addition B subtab answered, comments the corresponding working hour module of audit phase to add T subtab operation, obtains each work When module each stage subtab after.It should be noted that may be used also after carrying out divided stages processing to each working hour module It is handled with carrying out further sub-stage division to each working hour module after divided stages, as the system development stage can be segmented For demand analysis sub-stage, software design sub-stage, program coding sub-stage etc., each sub-stage corresponds to working hour module Second bit identification of label, as demand analysis sub-stage, software design sub-stage, program coding sub-stage correspond to working hour module mark The subtab of label is x, s and m, thus system development stage corresponding comprehensive label can be divided into Kx, Ks and Km etc..Exist In the present embodiment, obtains and the project stage based on the destination item obtains working hour module progress divided stages processing To the phase tag of the working hour module.
Step S22 divides the working hour module according to preset term developing way type after obtaining phase tag Class tag processes, to obtain the project development direction label of the working hour module.
After obtaining each phase tag, contingency table is carried out to the working hour module according to preset term developing way type Label processing specifically, carries out detailed programs classification to working hour module to obtain the project development direction label of the working hour module The processing of classification subtab, detailed programs classification subtab is in the label third position of working hour module, classification of the items mark Label include project development direction subtab, and if project has backstage developing way, the backstage exploitation subtab is #, client is opened Originating party is to the client developing way subtab is % etc., is carrying out detailed programs classification to each working hour module Classify after subtab processing, each item label of each working hour module can be obtained, as certain working hour module is 2018051209Kx#, wherein 2018051209 start for working hour module start time information i.e. 09 point of May 12 in 2018, Kx is the demand analysis sub-stage in the system development stage, and it is backstage exploitation mark that #, which identifies the project,.
Step S40 obtains personnel's attribute of the project personnel prestored, based on personnel's attribute to the working hour module into Row counterpart personnel's tag processes;
Obtain personnel's attribute of the project personnel prestored, wherein the project personnel prestored refer to storing in personal information Each project personnel in library, in addition, the project personnel prestored may also refer to correspond to certain in personal information repository It is corresponding each in the sub- repository of certain in the project personnel or personal information repository of one subsidiary or group internal Project personnel, wherein personal information repository is classified according to floor or place subsidiary etc. where project personnel, is obtained Each sub- repository, further, each project personnel prestored can also be the project personnel in triggering destination item Distribution instruction before, manually choose for importing each project personnel, after the project personnel prestored, obtain it is described pre- Personnel's attribute of each project personnel deposited specifically obtains the job sharing attribute of each project personnel, action attribute Deng after obtaining the job sharing attribute of project personnel, based on personnel's attribute to working hour module progress counterpart personnel Tag processes accordingly add the label of personnel's attribute of all project personnel prestored to working hour module, if a certain purpose Project personnel share 4, then the label addition for carrying out 4 People Tabs to certain any working hour module of the project is handled, According to the job sharing attribute of project personnel, action attribute etc., wherein there are structures in the item label and People Tab At the identical subtab of rule, if the job sharing attribute of 4 project personnel is system development group, action Attribute is respectively demand analysis, software design, program coding, program coding, then 4 project personnel counterpart personnel's subtab Respectively Kx#, Ks#, Km# and Km# etc., K indicate project personnel's job sharing attribute be system development group, and x, s, m with And m indicates that project personnel's action is demand analysis, software design, program coding, program coding, i.e., the described expression project people The label of member's action is identical as the item label sub-stage division corresponding composition rule of label, and # indicates that the project is to correspond to Backstage developing way, then it is described after the label addition processing for carrying out 4 People Tabs to any working hour module of the project Any working hour module has 4 People Tabs: 2018051209Kx#, 2018051209Ks#, 2018051209Km#, 2018051209Km# label, wherein 2018051209 open for working hour module start time information i.e. 09 point of May 12 in 2018 Begin, it should be noted that People Tab can also include the length of service information and work score information etc. of project personnel, such as People Tab can be 2018051209Kx#58, wherein 5 have 5 years lengths of service for the project personnel, are described in 8 expressions Project personnel's scoring is 8 points.
Step S50 matches the corresponding item label of the working hour module and People Tab, obtains the working hour mould of successful match Block, the project task for carrying out respective item personnel to the working hour module of successful match distribute, wherein the project task with it is described The item label of the working hour module of successful match is associated with.
Match the corresponding item label of the working hour module and People Tab, obtain the working hour module of successful match, to The project task distribution of respective item personnel is carried out with successful working hour module, wherein the project task is matched into described The item label of the working hour module of function is associated with.If certain working hour module item label is 2018051209Kx#, corresponding each personnel's mark Label are 2018051209Kx#, 2018051209Ks#, 2018051209Km#, 2018051209Km#, then to the working hour module For, there are a People Tab 2018051209Kx# to match with item attribute label, that is, 2018051209Kx#, the working hour Module is the working hour module of successful match, and the project task for carrying out respective item personnel to the working hour module of successful match distributes, The 2018051209Kx# corresponded into project task distribute to 2018051209Kx# and correspond to project personnel, i.e., project task with The item label of the working hour module of the successful match is associated with.
Specifically, described to match the corresponding item label of each working hour module and People Tab, obtain successful match Working hour module step further include:
Step S41 obtains the project stage subtab in item label and job sharing attribute in People Tab Label;
In the present embodiment, it is the matching for quickly carrying out each working hour module corresponding item label and People Tab, obtains It takes and obtains the project stage subtab in item label and the job sharing attribute subtab in People Tab.
Step S42 judges whether are the corresponding project stage subtab of the working hour module and job sharing attribute subtab Unanimously, when consistent, the successful working hour module of Corresponding matching is obtained, wherein the project stage subtab and the work point The label composition rule of group attribute subtab is identical.
After obtaining project stage subtab and job sharing attribute subtab, the corresponding item of a certain working hour module is judged Whether mesh stage subtab and job sharing attribute subtab are consistent or identical, and when identical, it is successful to obtain Corresponding matching Working hour module, wherein the project stage subtab is identical as the label composition rule of job sharing attribute subtab.
When the present invention in the project personnel's distribution for detecting destination item by instructing, from the configuration file of destination item Obtain the item attribute information and project duration of the destination item;The corresponding working hour module collection of the project duration is obtained, For each of working hour module collection working hour module, following steps are executed: based on the item attribute information to institute It states working hour module and carries out item label processing;The personnel's attribute for obtaining the project personnel prestored, based on personnel's attribute to institute It states working hour module and carries out counterpart personnel's tag processes;The corresponding item label of the working hour module and People Tab are matched, is obtained The working hour module of successful match, the project task for carrying out respective item personnel to the working hour module of successful match distribute, wherein institute Project task is stated to be associated with the item label of the working hour module of the successful match.It in this application, is no longer manually to project The distribution of project personnel is carried out, but automates and realizes personnel assignment, that is, is based on working hour module, item label and People Tab, Realize the automatic distribution of project personnel, entire personnel assignment process is full-automatic, during avoiding manually carrying out personnel assignment The work such as information identification, information matches, personnel's classification, rapid and simple realization project personnel distribution, avoid human and material resources Waste, thus, present application addresses the distribution for manually carrying out project personnel in the prior art, will cause the wave of human and material resources The technical issues of taking.
Further, the present invention provides another embodiment of method for managing resource, in the described embodiment, the matching institute The corresponding item label of each working hour module and People Tab are stated, the working hour module of successful match is obtained, to the work of successful match When module carry out respective item personnel project task allocation step include:
Step S43 matches the corresponding item label of the working hour module and People Tab, and judges the working hour module pair The item label answered whether there is multiple matched People Tabs;
In the present embodiment, it is understood that there may be the case where multiple project personnel can be handled project details, I.e. there may be multiple matched People Tabs for the corresponding item label of working hour module, such as: certain working hour module item label is 2018051209Km#, corresponding each People Tab are 2018051209Kx#, 2018051209Ks#, 2018051209Km#, 2018051209Km# etc., wherein then for the working hour module, exist at least two People Tab 2018051209Km# with Item attribute label, that is, 2018051209Km# matching.
Step S44, when the corresponding item label of the working hour module is there are when multiple matched People Tabs, acquisition is prestored The destination item project important level;
There are when multiple matched People Tabs, obtain the target prestored for the corresponding item label of each working hour module The project important level of project, wherein project grade is information entrained by each project, or is obtaining matching for destination item When setting file, the project important level of destination item can be obtained, the project grade includes extremely important, important, inferior heavy The grades such as want, be common, is inessential.
Step S45, the project important level based on the destination item are chosen from multiple matched People Tabs Target person label, and obtain the successful working hour module of Corresponding matching;
Specifically, the project important level based on the destination item, from multiple matched People Tabs Target person label is chosen, and obtains the successful working hour module step of Corresponding matching and includes:
Step A1 parses each matched People Tab, to obtain the length of service of corresponding project personnel, wherein institute State the length of service information that corresponding project personnel are carried in People Tab;
Due to may include the length of service information of project personnel in People Tab, thus after obtaining People Tab, solution The matched People Tab is analysed, to obtain the length of service of each matched project personnel.
Step A2 sorts from large to small each matched People Tab based on each length of service, obtains first row Sequence;
Each matched People Tab is sorted from large to small based on each length of service, obtains the first sequence, such as work Before 5 years project personnel's counterpart personnel's labels of work come work 3 years project personnel's counterpart personnel's labels.
Step A3 is selected from the first sequence when the project important level of the destination item is higher than the first predetermined level It takes the People Tab of arrangement first as target person label, and obtains the successful working hour mould of Corresponding matching.
When the project important level of the destination item is higher than the first predetermined level, such as work as the project of the destination item When important level is higher than common grade (the first predetermined level), the People Tab of arrangement first is chosen from the first sequence as mesh People Tab is marked, and obtains the successful working hour module of Corresponding matching.Be since destination item is critically important, thus, for quickly or The completion destination item task of person's high quality, thus, it chooses working year limit for length and chooses working experience project personnel abundant, into The processing of row destination item task, and obtain the successful working hour module of Corresponding matching.
Further, there are project personnel's length of service is few, but task completes the high situation of quality, thus, it is accurate Choose the project personnel for completing destination item, the project important level based on the destination item, from multiple matchings People Tab in choose target person label, and obtain the successful working hour module step of Corresponding matching further include:
Step B1 obtains length of service and work scoring that each matched People Tab corresponds to project personnel;
In the present embodiment, length of service and the work scoring of project personnel is comprehensively considered, accurately to choose project people Member.
Step B2, the length of service and work scoring for obtaining each project personnel respectively are chosen in target person label Shared weight proportion in operation;
After obtaining each matched People Tab and corresponding to length of service and the work scoring of each project personnel, obtain The length of service is taken and the scoring weight proportion shared in target person label selection operation that works, such as the weight of length of service Ratio is 40%, and the weight proportion for the scoring that works is 60%.
Step B3, is based on each weight proportion, and length of service of the corresponding project personnel and described Work scoring, is calculated the matching score value of each matched People Tab;
After obtaining weight proportion, it is based on each weight proportion, and the working year of the corresponding project personnel Limit and work scoring, are calculated the matching score value of each matched People Tab, and such as project personnel corresponding It can be 7,8 etc. with score value.
Step B4 is sorted from large to small the personnel of each matched People Tab based on each matching score value, obtained Second sequence;
The personnel that each matched People Tab is sorted from large to small based on each matching score value, obtain second row Sequence, in the second sequence, score value is high stands out for matching.
Step B5, when the project important level of the destination item is higher than the second predetermined level, from second sequence The middle People Tab for choosing arrangement first obtains the successful working hour module of Corresponding matching as target person label.
When the project important level of the destination item is higher than the second predetermined level, the row of selection from second sequence The People Tab of column first obtains the successful working hour module of Corresponding matching as target person label.Such as when the target item When purpose project important level is higher than important level (the second predetermined level), personnel's mark of arrangement first is chosen from the second sequence Label are used as target person label, and obtain the successful working hour module of Corresponding matching.It should be noted that there are multiple arrangements the When one People Tab, the corresponding project personnel of People Tab of the multiple arrangement first are notified, for the project personnel Oneself choose whether the corresponding project task of alignment processing.
In the present embodiment, by parsing each matched People Tab, to obtain the working year of corresponding project personnel Limit, wherein the length of service information of corresponding project personnel is carried in the People Tab;Based on each length of service from greatly to Small each matched People Tab of sequence, obtains the first sequence;When the project important level of the destination item is higher than first When predetermined level, the People Tab of arrangement first is chosen from the first sequence as target person label, and obtain Corresponding matching Successful working hour mould.Working experience project personnel abundant are chosen since working year limit for length can be chosen in the present embodiment, The processing of destination item task is carried out, thus improves project treatment effeciency.
Further, the present invention provides another embodiment of method for managing resource, in the described embodiment, the matching institute The corresponding item label of each working hour module and People Tab are stated, the working hour module of successful match is obtained, to the work of successful match When module carry out respective item personnel project task allocation step after include:
Step S50, obtains the communication account for having carried out the project personnel of project task distribution, and the communication account includes electricity Talk about number, wechat, nail nail and email address;
In the present embodiment, after the working hour module to successful match carries out the project task distribution of respective item personnel, People Tab based on project personnel obtains the project personnel's for having carried out project task distribution from personal information repository Account is communicated, the communication account includes telephone number, wechat, nail nail and email address etc.
Step S60, the communication account based on project personnel, by the corresponding notice of the project task of distribution to project personnel.
After obtaining the communication account of project personnel, by short message, wechat, the forms such as nail and mail are followed closely by project task Corresponding notice is to project personnel, so that project personnel obtain waiting task to be treated in time.
In the present embodiment, the communication account of the project personnel of project task distribution, the communication have been carried out by obtaining Account includes telephone number, wechat, nail nail and email address;Communication account based on project personnel appoints the project of distribution The corresponding notice of business is to project personnel.Since project personnel can be allowed to obtain waiting task to be treated in time.Thus, it is promoted Project treatment effeciency.
Referring to Fig. 3, Fig. 3 is the device structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to.
Asset management device of the embodiment of the present invention can be PC, be also possible to smart phone, tablet computer, e-book reading Device, MP3 (Moving Picture Experts Group Audio Layer III, dynamic image expert's compression standard audio Level 3) player, MP4 (Moving Picture Experts Group Audio Layer IV, dynamic image expert compression Standard audio level 3) terminal devices such as player, portable computer.
As shown in figure 3, the asset management device may include: processor 1001, such as CPU, memory 1005, communication is always Line 1002.Wherein, communication bus 1002 is for realizing the connection communication between processor 1001 and memory 1005.Memory 1005 can be high speed RAM memory, be also possible to stable memory (non-volatile memory), such as disk is deposited Reservoir.Memory 1005 optionally can also be the storage equipment independently of aforementioned processor 1001.
Optionally, which can also include target user interface, network interface, camera, RF (Radio Frequency, radio frequency) circuit, sensor, voicefrequency circuit, WiFi module etc..Target user interface may include display screen (Display), input unit such as keyboard (Keyboard), optional target user interface can also include that the wired of standard connects Mouth, wireless interface.Network interface optionally may include standard wireline interface and wireless interface (such as WI-FI interface).
It will be understood by those skilled in the art that asset management device structure shown in Fig. 3 is not constituted to resource management The restriction of equipment may include perhaps combining certain components or different component cloth than illustrating more or fewer components It sets.
As shown in figure 3, as may include that operating system, network are logical in a kind of memory 1005 of computer storage medium Believe module and resource manager.Operating system is to manage and control the program of asset management device hardware and software resource, The operation of support resource management program and other softwares and/or program.Network communication module is for realizing in memory 1005 Communication between each component in portion, and communicated between hardware and softwares other in asset management device.
In asset management device shown in Fig. 3, processor 1001 is for executing the resource pipe stored in memory 1005 The step of managing program, realizing method for managing resource described in any of the above embodiments.
Asset management device specific embodiment of the present invention and each embodiment of above-mentioned method for managing resource are essentially identical, herein It repeats no more.
The present invention also provides a kind of resource management apparatus, the resource management apparatus includes:
First obtains module, when for instructing in the project personnel's distribution for detecting destination item, from matching for destination item Set the item attribute information and project duration that the destination item is obtained in file;
Second obtains module, for obtaining the corresponding working hour module collection of the project duration, for the working hour module Each of set working hour module, the resource management apparatus further include:
Third obtains module, for obtaining personnel's attribute of the project personnel prestored, based on personnel's attribute to described Working hour module carries out counterpart personnel's tag processes;
Matching module obtains successful match for matching the corresponding item label of the working hour module and People Tab Working hour module, the project task for carrying out respective item personnel to the working hour module of successful match distribute, wherein the project task It is associated with the item label of the working hour module of the successful match.
Resource management apparatus specific embodiment of the present invention and each embodiment of above-mentioned method for managing resource are essentially identical, herein It repeats no more.
The present invention provides a kind of readable storage medium storing program for executing, the readable storage medium storing program for executing is stored with one or more than one journey Sequence, the one or more programs can also be executed by one or more than one processor for realizing above-mentioned The step of method for managing resource described in one.
Readable storage medium storing program for executing specific embodiment of the present invention and each embodiment of above-mentioned method for managing resource are essentially identical, herein It repeats no more.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field similarly includes in patent process range of the invention.

Claims (10)

1. a kind of method for managing resource, which is characterized in that the method for managing resource includes:
When the project personnel for detecting destination item distribute instruction, the target item is obtained from the configuration file of destination item Purpose item attribute information and project duration;
The corresponding working hour module collection of the project duration is obtained, for each of working hour module collection working hour mould Block executes following steps:
Item label processing is carried out to the working hour module based on the item attribute information;
The personnel's attribute for obtaining the project personnel prestored carries out counterpart personnel's mark to the working hour module based on personnel's attribute Label processing;
Match the corresponding item label of the working hour module and People Tab, obtain the working hour module of successful match, to matching at The working hour module of function carries out the project task distribution of respective item personnel, wherein the project task and the successful match The item label of working hour module is associated with.
2. method for managing resource as described in claim 1, which is characterized in that described to match the corresponding project of the working hour module Label and People Tab obtain the working hour module of successful match, carry out respective item personnel's to the working hour module of successful match Project task allocation step includes:
The corresponding item label of the working hour module and People Tab are matched, and judges the corresponding item label of the working hour module With the presence or absence of multiple matched People Tabs;
When there are when multiple matched People Tabs, obtain the target item prestored for the corresponding item label of the working hour module Purpose project important level;
Project important level based on the destination item chooses target person mark from multiple matched People Tabs Label, and obtain the successful working hour module of Corresponding matching;
Using the corresponding target person of the target person label as the project personnel of the successful working hour module of Corresponding matching, and it is right The destination item personnel carry out the distribution of respective item task.
3. method for managing resource as claimed in claim 2, which is characterized in that
The project important level based on the destination item chooses target person from multiple matched People Tabs Label, and obtain the successful working hour module step of Corresponding matching and include:
Each matched People Tab is parsed, to obtain the length of service of corresponding project personnel, wherein in the People Tab Carry the length of service information of corresponding project personnel;
Each matched People Tab is sorted from large to small based on each length of service, obtains the first sequence;
When the project important level of the destination item is higher than the first predetermined level, arrangement first is chosen from the first sequence People Tab obtains the successful working hour module of Corresponding matching as target person label.
4. method for managing resource as claimed in claim 2, which is characterized in that the project based on the destination item is important Grade chooses target person label from multiple matched People Tabs, and obtains the successful working hour module of Corresponding matching Step includes: length of service and the work scoring for obtaining each matched People Tab and corresponding to project personnel;
Length of service and the work scoring for obtaining each project personnel respectively are shared in target person label selection operation Weight proportion;
Based on the length of service and the work scoring of each weight proportion, and the corresponding project personnel, meter Calculation obtains the matching score value of each matched People Tab;
The personnel that each matched People Tab is sorted from large to small based on each matching score value, obtain the second sequence;
When the project important level of the destination item is higher than the second predetermined level, arrangement the is chosen from second sequence One People Tab obtains the successful working hour module of Corresponding matching as target person label.
5. method for managing resource as described in claim 1, which is characterized in that the item attribute information includes project stage letter Breath, item classification information;
Carrying out item label processing step to the working hour module based on the item attribute information includes:
It obtains and the project stage based on the destination item obtains described working hour module progress divided stages processing The phase tag of working hour module;
After obtaining phase tag, tag along sort processing is carried out to the working hour module according to preset term developing way type, To obtain the project development direction label of the working hour module.
6. method for managing resource as described in claim 1, which is characterized in that described to match the corresponding project of the working hour module Label and People Tab obtain the working hour module step of successful match further include:
Obtain the project stage subtab in item label and the job sharing attribute subtab in People Tab;
Judge whether the corresponding project stage subtab of the working hour module and job sharing attribute subtab are consistent, when consistent When, obtain the successful working hour module of Corresponding matching, wherein the project stage subtab and the job sharing attribute subtab Label composition rule it is identical.
7. method for managing resource as claimed in any one of claims 1 to 6, which is characterized in that the matching working hour module pair The item label answered and People Tab obtain the working hour module of successful match, carry out corresponding entry to the working hour module of successful match Include: after the project task allocation step of mesh personnel
Obtain carried out project task distribution project personnel communication account, the communication account include telephone number, wechat, Nail nail and email address;
Communication account based on project personnel, by the corresponding notice of the project task of distribution to project personnel.
8. a kind of resource management apparatus, which is characterized in that the resource management apparatus includes:
First obtains module, for when the project personnel for detecting destination item distribute instruction, the configuration from destination item to be literary The item attribute information and project duration of the destination item are obtained in part;
Second obtains module, for obtaining the corresponding working hour module collection of the project duration, for the working hour module collection Each of working hour module, the resource management apparatus further include:
Third obtains module, for obtaining personnel's attribute of the project personnel prestored, based on personnel's attribute to the working hour Module carries out counterpart personnel's tag processes;
Matching module obtains the working hour of successful match for matching the corresponding item label of the working hour module and People Tab Module, the project task for carrying out respective item personnel to the working hour module of successful match distribute, wherein the project task and institute State the item label association of the working hour module of successful match.
9. a kind of asset management device, which is characterized in that the asset management device includes: memory, processor, communication bus And it is stored in the resource manager on the memory,
The communication bus is for realizing the communication connection between processor and memory;
The processor is for executing the resource manager, to realize the resource as described in any one of claims 1 to 7 The step of management method.
10. a kind of readable storage medium storing program for executing, which is characterized in that resource manager is stored on the readable storage medium storing program for executing, it is described It realizes when resource manager is executed by processor such as the step of method for managing resource of any of claims 1-7.
CN201810952421.2A 2018-08-21 2018-08-21 Method for managing resource, device, equipment and readable storage medium storing program for executing Pending CN109685301A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810952421.2A CN109685301A (en) 2018-08-21 2018-08-21 Method for managing resource, device, equipment and readable storage medium storing program for executing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810952421.2A CN109685301A (en) 2018-08-21 2018-08-21 Method for managing resource, device, equipment and readable storage medium storing program for executing

Publications (1)

Publication Number Publication Date
CN109685301A true CN109685301A (en) 2019-04-26

Family

ID=66184441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810952421.2A Pending CN109685301A (en) 2018-08-21 2018-08-21 Method for managing resource, device, equipment and readable storage medium storing program for executing

Country Status (1)

Country Link
CN (1) CN109685301A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110428133A (en) * 2019-06-27 2019-11-08 平安科技(深圳)有限公司 Personnel's packet control process, device, computer equipment and storage medium
CN111062580A (en) * 2019-11-26 2020-04-24 北京云测信息技术有限公司 Matching method of staff and target project and electronic equipment
CN112766719A (en) * 2021-01-18 2021-05-07 中国工商银行股份有限公司 Task allocation method and device
CN112907210A (en) * 2021-03-02 2021-06-04 岭东核电有限公司 Execution work order distribution method, execution work order distribution device, computer equipment and storage medium
CN113256108A (en) * 2021-05-24 2021-08-13 平安普惠企业管理有限公司 Human resource allocation method, device, electronic equipment and storage medium
CN113487159A (en) * 2021-06-30 2021-10-08 武汉空心科技有限公司 Task demand statistical induction system and method based on labels
CN114219309A (en) * 2021-12-16 2022-03-22 中国建设银行股份有限公司 Project evaluation method, device and equipment and computer storage medium
CN115952444A (en) * 2023-03-10 2023-04-11 潍坊市平安消防工程有限公司 Intelligent detection method and system for building fire-fighting facilities

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006344015A (en) * 2005-06-09 2006-12-21 Hitachi Information Systems Ltd Inquiry item management system and inquiry item management program
US20100115523A1 (en) * 2008-10-30 2010-05-06 International Business Machines Corporation Method and apparatus for allocating tasks and resources for a project lifecycle
CN104700190A (en) * 2014-09-17 2015-06-10 国家电网公司 Method and device for matching item and professionals
US20170124157A1 (en) * 2015-11-04 2017-05-04 International Business Machines Corporation Providing Search Result Content Tailored to Stage of Project and User Proficiency and Role on Given Topic
WO2017130446A1 (en) * 2016-01-29 2017-08-03 日揮株式会社 Project management device, project management system, project management method and program
CN107527163A (en) * 2017-09-30 2017-12-29 新奥(中国)燃气投资有限公司 A kind of project implementation method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006344015A (en) * 2005-06-09 2006-12-21 Hitachi Information Systems Ltd Inquiry item management system and inquiry item management program
US20100115523A1 (en) * 2008-10-30 2010-05-06 International Business Machines Corporation Method and apparatus for allocating tasks and resources for a project lifecycle
CN104700190A (en) * 2014-09-17 2015-06-10 国家电网公司 Method and device for matching item and professionals
US20170124157A1 (en) * 2015-11-04 2017-05-04 International Business Machines Corporation Providing Search Result Content Tailored to Stage of Project and User Proficiency and Role on Given Topic
WO2017130446A1 (en) * 2016-01-29 2017-08-03 日揮株式会社 Project management device, project management system, project management method and program
CN107527163A (en) * 2017-09-30 2017-12-29 新奥(中国)燃气投资有限公司 A kind of project implementation method and device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110428133A (en) * 2019-06-27 2019-11-08 平安科技(深圳)有限公司 Personnel's packet control process, device, computer equipment and storage medium
CN111062580A (en) * 2019-11-26 2020-04-24 北京云测信息技术有限公司 Matching method of staff and target project and electronic equipment
CN111062580B (en) * 2019-11-26 2023-05-23 北京云测信息技术有限公司 Matching method of staff and target item and electronic equipment
CN112766719A (en) * 2021-01-18 2021-05-07 中国工商银行股份有限公司 Task allocation method and device
CN112907210A (en) * 2021-03-02 2021-06-04 岭东核电有限公司 Execution work order distribution method, execution work order distribution device, computer equipment and storage medium
CN112907210B (en) * 2021-03-02 2024-05-21 岭东核电有限公司 Method, device, computer equipment and storage medium for distributing execution worksheet
CN113256108A (en) * 2021-05-24 2021-08-13 平安普惠企业管理有限公司 Human resource allocation method, device, electronic equipment and storage medium
CN113487159A (en) * 2021-06-30 2021-10-08 武汉空心科技有限公司 Task demand statistical induction system and method based on labels
CN114219309A (en) * 2021-12-16 2022-03-22 中国建设银行股份有限公司 Project evaluation method, device and equipment and computer storage medium
CN115952444A (en) * 2023-03-10 2023-04-11 潍坊市平安消防工程有限公司 Intelligent detection method and system for building fire-fighting facilities

Similar Documents

Publication Publication Date Title
CN109685301A (en) Method for managing resource, device, equipment and readable storage medium storing program for executing
CN112541745A (en) User behavior data analysis method and device, electronic equipment and readable storage medium
CN111324786B (en) Method and device for processing consultation problem information
CN113220563B (en) Test case generation method, system, storage medium and computer equipment
CN107301179A (en) The method and apparatus of data base read-write separation
CN115002200A (en) User portrait based message pushing method, device, equipment and storage medium
Mairiza et al. Towards a Catalogue of Conflicts Among Non-functional Requirements.
CN111666298A (en) Method and device for detecting user service class based on flink, and computer equipment
CN113268665A (en) Information recommendation method, device and equipment based on random forest and storage medium
CN107480188B (en) Audit service data processing method and computer equipment
CN112527664A (en) Method and device for generating test case, electronic equipment and storage medium
CN112529100A (en) Training method and device for multi-classification model, electronic equipment and storage medium
CN112631884A (en) Pressure measurement method and device based on data synchronization, computer equipment and storage medium
CN114880368A (en) Data query method and device, electronic equipment and readable storage medium
CN113313211A (en) Text classification method and device, electronic equipment and storage medium
CN116820714A (en) Scheduling method, device, equipment and storage medium of computing equipment
Ponelis et al. A descriptive framework of business intelligence derived from definitions by academics, practitioners and vendors
CN110619541A (en) Application program management method and device, computer equipment and storage medium
CN107045452A (en) Dispatching method of virtual machine and device
CN114691782A (en) Database table increment synchronization method and device and storage medium
CN114896164A (en) Interface optimization method and device, electronic equipment and storage medium
CN114282078A (en) Project data processing method and device, electronic equipment and storage medium
CN112132597A (en) Data processing method, device, equipment and storage medium
CN110471752A (en) Task executing method, device, electronic equipment and computer readable storage medium
CN114723280A (en) Task object allocation method and device, electronic equipment and readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination