CN109682047A - A kind of concealed pipeline docking facilities of air cleaning facility - Google Patents
A kind of concealed pipeline docking facilities of air cleaning facility Download PDFInfo
- Publication number
- CN109682047A CN109682047A CN201811588763.7A CN201811588763A CN109682047A CN 109682047 A CN109682047 A CN 109682047A CN 201811588763 A CN201811588763 A CN 201811588763A CN 109682047 A CN109682047 A CN 109682047A
- Authority
- CN
- China
- Prior art keywords
- butt tube
- air cleaning
- bar
- mounting base
- fixed thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
- F24F13/0209—Ducting arrangements characterised by their connecting means, e.g. flanges
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Cleaning In General (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention discloses a kind of concealed pipeline docking facilities of air cleaning facility, including side plate and cross bar, cross bar is equipped with adjustment structure, single adjustment structure is equipped with Pipe installing structure, adjusting structure includes adjusting seat, vertical supporting bar and defelctor apron, the top of defelctor apron is equipped with top plate, Pipe installing structure includes mounting base, steel plate, fixed thread bar and butt tube, mounting base is equipped with shaft, shaft passes through steel plate, shaft is equipped with the first nut, first nut is tightened against on the side of steel plate, fixed thread bar is set on steel plate, fixed thread bar is slidably connected on defelctor apron, butt tube is set in mounting base.The present invention can mounting height to butt tube and horizontal position be adjusted, so that the nozzle of butt tube and workshop is mutually aligned connection, then top plate is set at the top of defelctor apron, so that the concealed design of butt tube, extraneous pipeline is avoided to be damaged, the inner end of butt tube and the nozzle Dock With Precision Position of workshop simultaneously, improve the leakproofness and reliability of junction.
Description
Technical field
The invention belongs to air cleaning facility pipeline docking technique field more particularly to a kind of air cleaning facility are concealed
Pipeline docking facilities.
Background technique
Air cleaning facility is the product for referring to filter out or kill air pollutants, effectively improve air cleanliness, mesh
It is preceding to remove based on the household and business air cleaning equipment of room air pollution.Air cleaning facility can filter air suspension
The pollutants such as particle, bacterium, virus, fungal spore, pollen, asbestos, radon gas decay constant.
Can be divided into according to application field: domestic air purification equipment, vehicle-mounted air purification equipment, medical air purification are set
Standby, industrial air cleaning facility and Engineering air cleaning facility etc..It, will in industrial air cleaning facility technical field
Air cleaning facility is mounted on by the side of workshop, then pre-buried mounting plate on the ground, is then set air cleaning using butt tube
It is standby to be connect with the nozzle of workshop, it is then using clip that butt tube is fixed on a mounting board.But the butt tube is exposed at mounting plate
Outside, be easily damaged.
Summary of the invention
It is hidden to provide a kind of air cleaning facility for above-mentioned technical problem present in present invention aims to solve the prior art
Mounting base can be adjusted to horizontality, be convenient for by concealed pipeline docking facilities by the elastic effect of the first nut in shaft
Butt tube is fixed in mounting base, then by the elastic effect of the first nut in shaft, mounting base is rotated, it can be to docking
The mounting height of pipe is adjusted, so that the setting height of butt tube is identical as the setting height of the nozzle of workshop, then by solid
Determine threaded rod to be slidably connected on defelctor apron, the horizontal position of butt tube is adjusted, so that the pipe of butt tube and workshop
Mouth is mutually aligned, and then the nozzle of the inner end of butt tube and workshop, can be connected with each other by pull butt tube, then will be right using pipeline
The outer end of adapter tube is connect with air cleaning facility, and top plate then is arranged at the top of defelctor apron, sets so that butt tube is concealed
Meter, avoids extraneous pipeline from being damaged, while the nozzle energy Dock With Precision Position of the inner end of butt tube and workshop, improves the sealing of junction
Property and reliability.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of concealed pipeline docking facilities of air cleaning facility, it is characterised in that: including two blocks of side plates and cross bar, cross bar
It is welded between two blocks of side plates, cross bar is set there are two symmetrically arranged adjustment structure, and the single structure that adjusts is equipped with Pipe installing knot
Structure, adjustment structure includes that adjusting seat, vertical supporting bar and defelctor apron, adjusting seat are slidably connected on cross bar, vertical supporting bar
It is welded in the top of adjusting seat, defelctor apron is welded in the top of vertical supporting bar, and the top of defelctor apron is equipped with top plate, pipeline
Mounting structure is set to the lower section of top plate, and Pipe installing structure includes mounting base, steel plate, fixed thread bar and butt tube, steel plate weldering
It is connected on the side of mounting base, mounting base is equipped with shaft, and shaft passes through steel plate, and shaft is equipped with the first nut, and the first nut is tightened
In on the side of steel plate, fixed thread bar is welded on steel plate, and fixed thread bar is slidably connected on defelctor apron, and butt tube is set
In in mounting base.Mounting base can be adjusted to horizontality, be convenient for by the present invention by the elastic effect of the first nut in shaft
Butt tube is fixed in mounting base, then by the elastic effect of the first nut in shaft, mounting base is rotated, it can be to docking
The mounting height of pipe is adjusted, so that the setting height of butt tube is identical as the setting height of the nozzle of workshop, then by solid
Determine threaded rod to be slidably connected on defelctor apron, the horizontal position of butt tube is adjusted, so that the pipe of butt tube and workshop
Mouth is mutually aligned, and then the nozzle of the inner end of butt tube and workshop, can be connected with each other by pull butt tube, then will be right using pipeline
The outer end of adapter tube is connect with air cleaning facility, and top plate then is arranged at the top of defelctor apron, sets so that butt tube is concealed
Meter, avoids extraneous pipeline from being damaged, while the nozzle energy Dock With Precision Position of the inner end of butt tube and workshop, improves the sealing of junction
Property and reliability.
Further, adjusting seat is equipped with casing, and casing passes through cross bar, and casing threads is connected with fastener, and fastener is fixed on
On cross bar., can be mobile at cross bar by adjusting seat when fastener unclamps, it, will after the completion of the horizontal position adjustment of butt tube
Fastener is fixed on cross bar, realizes that adjusting seat is slidably connected on cross bar.
Further, the top of defelctor apron is equipped with retention bead, and top plate is equipped with limiting groove, limiting groove and retention bead
Match, top plate can be arranged on the top of defelctor apron.
Further, the side of defelctor apron is equipped with guide pipe, and fixed thread bar passes through guide pipe, increases fixed thread bar and exists
The stability slided on defelctor apron.
Further, the side of vertical supporting bar is equipped with limit plate, and limit plate is equipped with limit hole, and fixed thread bar passes through limit
Hole, fixed thread bar are set there are two the second nut, and two the second nuts are tightened against respectively on the two sides of limit plate.By adjusting solid
Determine two the second nuts of threaded rod, realizes that fixed thread bar is slidably connected on defelctor apron.
Further, the outer end of fixed thread bar is threaded with anti-drop end cover, and fixed thread bar slides on defelctor apron
When, anti-drop end cover can be against on limit plate, prevent fixed thread bar from deviating from from the limit hole of limit plate.
Further, the top surface of mounting base is welded with pipe fixing clip hoop, and the fixed butt tube of pipe fixing clip hoop can will dock
Pipe is set in mounting base.
The present invention is by adopting the above-described technical solution, have the advantages that
The present invention during installation, first installs butt tube, then is adjusted to the position of butt tube.First pass through shaft
On the first nut elastic effect, mounting base can be adjusted to horizontality, convenient for butt tube to be installed in mounting base.Tool
Body installs butt tube are as follows: butt tube is placed at the design position of mounting base, then solid in the top surface welded pipe line of mounting base
Determine clip, butt tube can be set in mounting base by the fixed butt tube of pipe fixing clip hoop.Pass through the first nut in shaft again
Elastic effect, mounting base is rotated, and can be adjusted to the mounting height of butt tube, so that the setting height and workshop of butt tube
Nozzle setting height it is identical.It is slidably connected on defelctor apron by fixed thread bar again, to the horizontal position of butt tube
It is adjusted, so that the nozzle of butt tube and workshop is mutually aligned.Then pull butt tube, can be by the inner end of butt tube and workshop
Nozzle be connected with each other.The outer end of butt tube is connect with air cleaning facility using pipeline again, then on the top of defelctor apron
Top plate is arranged in portion, so that the concealed design of butt tube, avoids extraneous pipeline from being damaged.The inner end of butt tube and the pipe of workshop simultaneously
Mouth energy Dock With Precision Position, improves the leakproofness and reliability of junction.
Adjusting seat is equipped with casing, and casing passes through cross bar, and casing threads is connected with fastener, and fastener is fixed on cross bar.
, can be mobile at cross bar by adjusting seat when fastener unclamps, after the completion of the horizontal position adjustment of butt tube, fastener is consolidated
Due on cross bar, realization adjusting seat is slidably connected on cross bar.
The side of vertical supporting bar is equipped with limit plate, and limit plate is equipped with limit hole, and fixed thread bar passes through limit hole, fixed
Threaded rod is set there are two the second nut, and two the second nuts are tightened against respectively on the two sides of limit plate.By adjusting fixed thread
Two the second nuts of bar realize that fixed thread bar is slidably connected on defelctor apron.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is a kind of structural schematic diagram of the concealed pipeline docking facilities of air cleaning facility in the present invention;
Fig. 2 is the structural schematic diagram that structure is adjusted in the present invention;
Fig. 3 is the structural schematic diagram of Pipe installing structure in the present invention;
Fig. 4 is the present invention in structural schematic diagram when installing butt tube;
Structural schematic diagram when Fig. 5 is height of the present invention in adjustment butt tube;
Fig. 6 is the present invention in structural schematic diagram when adjusting butt tube horizontal position;
Fig. 7 is the structural schematic diagram in the present invention after the completion of butt tube adjustment.
In figure, 1- side plate;2- cross bar;3- adjusts structure;4- Pipe installing structure;5- adjusting seat;6- vertical supporting bar;7-
Defelctor apron;8- top plate;9- mounting base;10- steel plate;11- fixed thread bar;12- butt tube;13- shaft;The first nut of 14-;
15- casing;16- fastener;17- retention bead;18- anti-drop end cover;19- guide pipe;20- limit plate;21- limit hole;22-
Two nuts;23- pipe fixing clip hoop.
Specific embodiment
It as shown in Figures 1 to 7, is a kind of concealed pipeline docking facilities of air cleaning facility of the present invention, including two pieces of sides
Plate 1 and cross bar 2, cross bar 2 are welded between two blocks of side plates 1.Cross bar 2 is set there are two symmetrically arranged adjustment structure 3, single to adjust
Structure 3 is equipped with Pipe installing structure 4.Side plate 1 is welded in the pre-set fixed plate in ground, the region between two blocks of side plates 1
For the region of pipeline docking.
Adjusting structure 3 includes adjusting seat 5, vertical supporting bar 6 and defelctor apron 7, and adjusting seat 5 is slidably connected on cross bar 2,
Vertical supporting bar 6 is welded in the top of adjusting seat 5, and defelctor apron 7 is welded in the top of vertical supporting bar 6.In order to enable guiding
Cover board 7 can play fixed and guiding role, defelctor apron 7 is generally designed as L-type, and be arranged in the vertex of defelctor apron 7
Radian plate improves the safety of installation.The top of defelctor apron 7 is equipped with top plate 8, and Pipe installing structure 4 is set under top plate 8
Side.Adjusting seat 5 is equipped with casing 15, and casing 15 passes through cross bar 2, and casing 15 is threaded with fastener 16, and fastener 16 is fixed on
On cross bar 2., can be mobile at cross bar 2 by adjusting seat 5 when fastener 16 unclamps, when the horizontal position adjustment of butt tube is completed
Afterwards, fastener 16 is fixed on cross bar 2, realizes that adjusting seat 5 is slidably connected on cross bar 2.The top of defelctor apron 7 is equipped with limit
Position protrusion 17, top plate 8 is equipped with limiting groove, and limiting groove matches with retention bead 17, and top plate 8 can be arranged in defelctor apron
On 7 top.
Pipe installing structure 4 includes mounting base 9, steel plate 10, fixed thread bar 11 and butt tube 12, and steel plate 10 is welded in peace
On the side for filling seat 9.Mounting base 9 is equipped with shaft 13, and shaft 13 passes through steel plate 10, and shaft 13 is equipped with the first nut 14, the first spiral shell
Mother 14 is tightened against on the side of steel plate 10.Fixed thread bar 11 is welded on steel plate 10, and fixed thread bar 11, which is slidably connected to, leads
To on cover board 7.The side of defelctor apron 7 is equipped with guide pipe 19, and fixed thread bar 11 passes through guide pipe 19, increases fixed thread bar
11 stability slided on defelctor apron 7.Butt tube 12 is set in mounting base 9, the inner end of butt tube 12 and the nozzle of workshop
It is connected with each other, is connect the outer end of butt tube 12 with air cleaning facility using pipeline, inner end and workshop due to butt tube 12
Nozzle be directly connected to, therefore the bore of the inner end of butt tube 12 is done greatly.The side of vertical supporting bar 6 is equipped with limit plate 20,
Limit plate 20 is equipped with limit hole 21, and fixed thread bar 11 passes through limit hole 21, and fixed thread bar 11 is set there are two the second nut 22,
Two the second nuts 22 are tightened against respectively on the two sides of limit plate 20.By adjusting two the second nuts of fixed thread bar 11
22, realize that fixed thread bar 11 is slidably connected on defelctor apron 7.The outer end of fixed thread bar 11 is threaded with anti-drop end cover
18, when sliding on defelctor apron 7, anti-drop end cover 18 can be against on limit plate 20 fixed thread bar 11, prevent fixed thread bar
11 deviate from from the limit hole 21 of limit plate 20.The top surface of mounting base 9 is welded with pipe fixing clip hoop 23, pipe fixing clip hoop 23
Butt tube 12 can be set in mounting base 9 by fixed butt tube 12.
The present invention during installation, first installs butt tube 12, then is adjusted to the position of butt tube 12.It first passes through
Mounting base 9 can be adjusted to horizontality, convenient for being installed on butt tube 12 by the elastic effect of the first nut 14 in shaft 13
In mounting base 9.Specifically butt tube 12 is installed are as follows: be placed in butt tube 12 at the design position of mounting base 9, then in mounting base
Butt tube 12 can be set to mounting base 9 by 9 top surface welded pipe line fixing hoop 23, the fixed butt tube 12 of pipe fixing clip hoop 23
On.Again by the elastic effect of the first nut 14 in shaft 13, mounting base 9 is rotated, it can be to the mounting height of butt tube 12
It is adjusted, so that the setting height of butt tube 12 is identical as the setting height of the nozzle of workshop.Pass through fixed thread bar 11 again
It is slidably connected on defelctor apron 7, the horizontal position of butt tube 12 is adjusted, so that the nozzle phase of butt tube 12 and workshop
Mutually alignment.The nozzle of the inner end of butt tube 12 and workshop can be connected with each other by then pull butt tube 12.It again will be right using pipeline
The outer end of adapter tube 12 is connect with air cleaning facility, top plate 8 then is arranged at the top of defelctor apron 7, so that butt tube 12 is hidden
Concealed design, avoids extraneous pipeline from being damaged.The inner end of butt tube 12 and the nozzle energy Dock With Precision Position of workshop simultaneously improve connection
The leakproofness and reliability at place.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair
Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made simple change, etc.
With replacement or modification etc., all it is covered by among protection scope of the present invention.
Claims (7)
1. a kind of concealed pipeline docking facilities of air cleaning facility, it is characterised in that: including two blocks of side plates and cross bar, the cross
Bar is welded between two blocks of side plates, and the cross bar is set there are two symmetrically arranged adjustment structure, the single adjustment structure
Equipped with Pipe installing structure, the adjustment structure includes adjusting seat, vertical supporting bar and defelctor apron, and the adjusting seat sliding connects
It is connected on the cross bar, the vertical supporting bar is welded in the top of the adjusting seat, and the defelctor apron is welded in described perpendicular
To the top of support rod, the top of the defelctor apron is equipped with top plate, and the Pipe installing structure is set to the lower section of the top plate,
The Pipe installing structure includes mounting base, steel plate, fixed thread bar and butt tube, and the steel plate is welded in the mounting base
On side, the mounting base be equipped with shaft, the shaft pass through the steel plate, the shaft be equipped with the first nut, described first
Nut is tightened against on the side of the steel plate, and the fixed thread bar is welded on the steel plate, the fixed thread bar sliding
It is connected on the defelctor apron, the butt tube is set in the mounting base.
2. the concealed pipeline docking facilities of a kind of air cleaning facility according to claim 1, it is characterised in that: the tune
Bed rearrangement is equipped with casing, and described sleeve pipe passes through the cross bar, and described sleeve pipe is threaded with fastener, and the fastener is fixed on institute
It states on cross bar.
3. the concealed pipeline docking facilities of a kind of air cleaning facility according to claim 1, it is characterised in that: described to lead
It is equipped with retention bead to the top of cover board, the top plate is equipped with limiting groove, the limiting groove and the retention bead phase
Match.
4. the concealed pipeline docking facilities of a kind of air cleaning facility according to claim 1, it is characterised in that: described to lead
It is equipped with guide pipe to the side of cover board, the fixed thread bar passes through the guide pipe.
5. the concealed pipeline docking facilities of a kind of air cleaning facility according to claim 1, it is characterised in that: described perpendicular
It is equipped with limit plate to the side of support rod, the limit plate is equipped with limit hole, and the fixed thread bar passes through the limit hole, institute
It states fixed thread bar to set there are two the second nut, two second nuts are tightened against respectively on the two sides of the limit plate.
6. the concealed pipeline docking facilities of a kind of air cleaning facility according to claim 5, it is characterised in that: described solid
The outer end for determining threaded rod is threaded with anti-drop end cover.
7. the concealed pipeline docking facilities of a kind of air cleaning facility according to claim 1, it is characterised in that: the peace
The top surface of dress seat is welded with pipe fixing clip hoop, the fixed butt tube of the pipe fixing clip hoop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811588763.7A CN109682047B (en) | 2018-12-25 | 2018-12-25 | Hidden pipeline interfacing apparatus of air purification equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811588763.7A CN109682047B (en) | 2018-12-25 | 2018-12-25 | Hidden pipeline interfacing apparatus of air purification equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109682047A true CN109682047A (en) | 2019-04-26 |
CN109682047B CN109682047B (en) | 2020-11-17 |
Family
ID=66189164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811588763.7A Active CN109682047B (en) | 2018-12-25 | 2018-12-25 | Hidden pipeline interfacing apparatus of air purification equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109682047B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110260050A (en) * | 2019-06-27 | 2019-09-20 | 浙江蓝炬星电器有限公司 | A kind of support device and its installation method for integrated kitchen range smoke exhaust pipe |
CN110464276A (en) * | 2019-08-22 | 2019-11-19 | 浙江蓝炬星电器有限公司 | A kind of dishwasher drain pipe guiding ejector and its installation method |
CN111981198A (en) * | 2020-07-29 | 2020-11-24 | 武汉华兴隆新能源科技有限公司 | Multi-connected air conditioner energy-saving environment-friendly fresh air system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4750662A (en) * | 1987-02-10 | 1988-06-14 | Larry And Associates | Pipe welding alignment tool |
JPH09300098A (en) * | 1996-05-13 | 1997-11-25 | Suzukiisamu Shoten:Kk | Jig for piping welding of wide flange shape |
CN105058300A (en) * | 2015-08-25 | 2015-11-18 | 芜湖恒隆汽车转向系统有限公司 | Auxiliary tool for assembling steering gear oil pipe |
CN207362978U (en) * | 2017-09-18 | 2018-05-15 | 浙江天策市政园林工程有限公司 | Position pipelayer attachment |
CN207694128U (en) * | 2017-12-23 | 2018-08-07 | 深圳市中嘉建科股份有限公司 | A kind of support device of fire protection pipeline |
-
2018
- 2018-12-25 CN CN201811588763.7A patent/CN109682047B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4750662A (en) * | 1987-02-10 | 1988-06-14 | Larry And Associates | Pipe welding alignment tool |
JPH09300098A (en) * | 1996-05-13 | 1997-11-25 | Suzukiisamu Shoten:Kk | Jig for piping welding of wide flange shape |
CN105058300A (en) * | 2015-08-25 | 2015-11-18 | 芜湖恒隆汽车转向系统有限公司 | Auxiliary tool for assembling steering gear oil pipe |
CN207362978U (en) * | 2017-09-18 | 2018-05-15 | 浙江天策市政园林工程有限公司 | Position pipelayer attachment |
CN207694128U (en) * | 2017-12-23 | 2018-08-07 | 深圳市中嘉建科股份有限公司 | A kind of support device of fire protection pipeline |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110260050A (en) * | 2019-06-27 | 2019-09-20 | 浙江蓝炬星电器有限公司 | A kind of support device and its installation method for integrated kitchen range smoke exhaust pipe |
CN110260050B (en) * | 2019-06-27 | 2024-02-02 | 浙江蓝炬星电器有限公司 | Support device for smoke exhaust pipe of integrated kitchen range and installation method of support device |
CN110464276A (en) * | 2019-08-22 | 2019-11-19 | 浙江蓝炬星电器有限公司 | A kind of dishwasher drain pipe guiding ejector and its installation method |
CN111981198A (en) * | 2020-07-29 | 2020-11-24 | 武汉华兴隆新能源科技有限公司 | Multi-connected air conditioner energy-saving environment-friendly fresh air system |
Also Published As
Publication number | Publication date |
---|---|
CN109682047B (en) | 2020-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109682047A (en) | A kind of concealed pipeline docking facilities of air cleaning facility | |
CN108555501B (en) | A kind of fixed length welding method for blower housing connector | |
CN208478974U (en) | A kind of plank frame power distribution cabinet with high heat dissipation effect | |
CN205435281U (en) | Gaseous recoil type filter equipment | |
CN206263522U (en) | A kind of pipe fitting spot welding fixture (SWFX) | |
CN211118011U (en) | Assembled comprehensive support and hanger | |
CN209005457U (en) | A kind of sprinkling dust-removing device | |
CN205496817U (en) | Gas shielded arc welding back of weld gas protection frock | |
CN208703386U (en) | Oil-gas gathering and transferring pipeline stress compensation device | |
CN208340329U (en) | A kind of gas tank locellus bag-type dust splicing apparatus | |
CN108223924A (en) | A kind of assembled vertical shaft air hose combined bracket | |
CN212041813U (en) | High-pressure purging mechanism with adjustable corner | |
CN105537731B (en) | A kind of gas shielded arc welding back of weld gas shield frock | |
CN206666470U (en) | Fine coal pipeline feeding device | |
CN215768158U (en) | Flexible performance testing device for detecting automobile filter | |
CN208579090U (en) | A kind of plug type skid all-metal frame | |
CN209323944U (en) | A kind of communication tower platform convenient for disassembly and assembly | |
CN204321500U (en) | The supporting tool regulated is installed for Surge line piping | |
CN219548894U (en) | Underground ventilation device for coal mine | |
CN208816865U (en) | A kind of seismatic method for pipeline suspension and support of combined convenient installation | |
CN208213901U (en) | A kind of reactor front water conservancy diversion flue | |
CN209671749U (en) | A kind of supporting protection device for pneumatic ash conveying pipe | |
CN218281162U (en) | Dust collector is used in highway construction | |
CN107174166A (en) | A kind of collection device of industrial equipment dust particle | |
CN211491465U (en) | Support capable of placing inverted L-shaped steam guide pipe of steam turbine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201103 Address after: 7-5-b-32, 8 Xingguo Road, Gaogang District, Taizhou City, Jiangsu Province 225300 Applicant after: Taizhou JINDA Electronic Technology Co., Ltd Address before: 312400 No. 41, Wang Jia Shu'ao Village, Sanjie Town, Shengzhou City, Shaoxing City, Zhejiang Province Applicant before: SHENGZHOU KAIFENG TEXTILE MACHINERY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |