CN109681599A - 一种用于靶板三向围压机的丝杆传动结构 - Google Patents
一种用于靶板三向围压机的丝杆传动结构 Download PDFInfo
- Publication number
- CN109681599A CN109681599A CN201910074475.8A CN201910074475A CN109681599A CN 109681599 A CN109681599 A CN 109681599A CN 201910074475 A CN201910074475 A CN 201910074475A CN 109681599 A CN109681599 A CN 109681599A
- Authority
- CN
- China
- Prior art keywords
- support bracket
- plate
- guide
- confining pressure
- pressure machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 16
- 238000002474 experimental method Methods 0.000 abstract description 8
- 238000000926 separation method Methods 0.000 abstract description 4
- 230000006378 damage Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005422 blasting Methods 0.000 abstract description 2
- 230000009514 concussion Effects 0.000 abstract description 2
- 238000013461 design Methods 0.000 description 5
- 230000035515 penetration Effects 0.000 description 4
- 239000003638 chemical reducing agent Substances 0.000 description 1
- 238000005474 detonation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 230000002427 irreversible effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16H—GEARING
- F16H25/00—Gearings comprising primarily only cams, cam-followers and screw-and-nut mechanisms
- F16H25/18—Gearings comprising primarily only cams, cam-followers and screw-and-nut mechanisms for conveying or interconverting oscillating or reciprocating motions
- F16H25/20—Screw mechanisms
- F16H25/24—Elements essential to such mechanisms, e.g. screws, nuts
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Transmission Devices (AREA)
Abstract
本发明涉及一种用于靶板三向围压机的丝杆传动结构,包括:支护架、驱动电机、丝杆螺母副、驱动板,所述的支护架固定安装在靶板三向围压机的机架上,支护架内部设有平行的导轨槽,丝杆螺母副通过轴座安装在支护架内部,驱动电机安装在支护架左端的机架上并通过减速机构与丝杆螺母副的丝杆连接,驱动板安装在支护架的导轨槽内并在导轨槽内运行,驱动板底面与丝杆螺母副的连接板固定连接,驱动板的右侧端通过销轴与围压机的加载板相铰接;本发明的有益效果是:本发明结构简单,传动时不易发生偏斜,并在实验过程中可实现传动结构与加载板的分离,可有效避免爆破震动对传动机构的损害。
Description
技术领域
本发明涉及弹体侵彻实验技术,具体是一种用于靶板三向围压机的丝杆传动结构。
背景技术
为了研究地应力条件下围压对弹体的侵彻过程、弹道极限、靶板破坏的影响规律,为各种地应力条件下的弹体运动规律和侵彻效应提供系统研究,为深钻地弹体结构设计和深部国防工程防御提供可靠分析数据,需进行深侵彻试验的靶板三向围压加载的设计。目前,我们自行设计的三向围压机是利用小角度斜板的增压原理,在上部开口的箱体内安装三个轴向互相垂直的加载斜板,对箱体内的混凝土靶板进行模拟地应力的压力加载,为了保证加载压力能够达到实验要求,其各个方向均采用的是液压缸组来进行驱动。但在实际实验过程中,当模拟压力较小时,弹体爆炸瞬间所引起的震动较大,很容易对驱动加载板的传动机构造成不可逆的损伤,因此需要将传动机构与加载板分离,但即使这样,机架的震动仍会影响到液压传动机构的使用寿命,因此,对于加载压力较小的实验,需要另外设计一种传动结构。
发明内容
本发明的目的是提出一种用于靶板三向围压机的丝杆传动结构,适用于模拟地应力较小时的弹体深侵彻实验,其结构便于和被测靶板的加载板分离,从而避免爆炸震动造成设备故障。
为达到上述目的,本发明通过以下技术方案实现:
一种用于靶板三向围压机的丝杆传动结构,包括:支护架、驱动电机、丝杆螺母副、驱动板,所述的支护架固定安装在靶板三向围压机的机架上,支护架内部设有平行的导轨槽,丝杆螺母副通过轴座安装在支护架内部,驱动电机安装在支护架左端的机架上并通过减速机构与丝杆螺母副的丝杆连接,驱动板安装在支护架的导轨槽内并在导轨槽内运行,驱动板底面与丝杆螺母副的连接板固定连接,驱动板的右侧端通过销轴与围压机的加载板相铰接;所述的驱动板整体为矩形板,其宽度大于等于所驱动的加载板的宽度,驱动板两侧设置有与支护架的导轨槽相匹配的导轨,驱动板右端间隔设置有平行的铰接耳,每个铰接耳上均设有铰接孔。
所述的铰接孔均为腰型孔,其长度方向平行于支护架的导轨槽。
所述的支护架其导轨槽为燕尾槽,燕尾槽内设有用以调整导轨配合间隙的镶条。
本发明的原理是:当围压箱体内装入靶板并安装好加载板后,电机通过丝杠螺母副带动驱动板靠近加载板,将驱动板与加载板通过销轴铰接在一起,然后继续启动电机,驱动加载板对箱体内的靶板进行加载;当加载达到预定值时,电机反转,驱动板稍向后退,此时由于加载板与箱体内的加载组件相互锁紧,利用腰型孔的设计,可以将销轴退出而不会使加载压力受到影响,实现传动结构与加载板的分离;当实验完毕,可将驱动板与加载板再次铰接并将加载板从箱体内退出。
本发明的有益效果是:本发明结构简单,传动时不易发生偏斜,并在实验过程中可实现传动结构与加载板的分离,可有效避免爆破震动对传动机构的损害。
附图说明
图1为本发明的整体结构示意图。
图2为驱动板的仰视图。
图3为支护架的侧视图。
图中,1、支护架,2、驱动电机,3、丝杆螺母副,4、驱动板,5、导轨槽,6、连接板,7、机架,8、加载板,9、铰接孔,10、轴座,11、减速机构,12、导轨。
具体实施方式
下面结合说明书附图对本发明作进一步的详细说明。
如图1所示,一种用于靶板三向围压机的丝杆传动结构,包括:支护架1、驱动电机2、丝杆螺母副3、驱动板4,所述的支护架1固定安装在靶板三向围压机的机架7上,支护架1内部设有平行的导轨槽5,丝杆螺母副3通过轴座10安装在支护架1内部,驱动电机2安装在支护架1左端的机架7上并通过减速机构11与丝杆螺母副3的丝杆连接,驱动板4安装在支护架1的导轨槽5内并在导轨槽5内运行,驱动板1底面与丝杆螺母副3的连接板6固定连接,驱动板4的右侧端通过销轴与围压机的加载板8相铰接;所述的驱动板4整体为矩形板,其宽度大于等于所驱动的加载板8的宽度,驱动板4两侧设置有与支护架1的导轨槽5相匹配的导轨12,驱动板4右端间隔设置有平行的铰接耳,每个铰接耳上均设有铰接孔9。
所述的铰接孔9均为腰型孔,其长度方向平行于支护架1的导轨槽5。
所述的支护架1其导轨槽为燕尾槽,燕尾槽内设有用以调整导轨配合间隙的镶条。
本发明的原理是:当围压箱体内装入靶板并安装好加载板8后,电机2通过丝杠螺母副3带动驱动板4靠近加载板8,将驱动板4与加载板8通过销轴铰接在一起,然后继续启动电机2,驱动加载板8对箱体内的靶板进行加载;当加载达到预定值时,电机2反转,驱动板4稍向后退,此时由于加载板8与箱体内的加载组件相互锁紧,利用腰型孔的设计,可以将销轴退出而不会使加载压力受到影响,实现传动结构与加载板8的分离;当实验完毕,可将驱动板4与加载板8再次铰接并将加载板8从箱体内退出。
本发明未详述部分为现有技术。
Claims (3)
1.一种用于靶板三向围压机的丝杆传动结构,其特征是:包括:支护架、驱动电机、丝杆螺母副、驱动板,所述的支护架固定安装在靶板三向围压机的机架上,支护架内部设有平行的导轨槽,丝杆螺母副通过轴座安装在支护架内部,驱动电机安装在支护架左端的机架上并通过减速机构与丝杆螺母副的丝杆连接,驱动板安装在支护架的导轨槽内并在导轨槽内运行,驱动板底面与丝杆螺母副的连接板固定连接,驱动板的右侧端通过销轴与围压机的加载板相铰接;所述的驱动板整体为矩形板,其宽度大于等于所驱动的加载板的宽度,驱动板两侧设置有与支护架的导轨槽相匹配的导轨,驱动板右端间隔设置有平行的铰接耳,每个铰接耳上均设有铰接孔。
2.根据权利要求1所述的一种用于靶板三向围压机的丝杆传动结构,其特征是:所述的铰接孔均为腰型孔,其长度方向平行于支护架的导轨槽。
3.根据权利要求1所述的一种用于靶板三向围压机的丝杆传动结构,其特征是:所述的支护架其导轨槽为燕尾槽,燕尾槽内设有用以调整导轨配合间隙的镶条。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910074475.8A CN109681599B (zh) | 2019-01-25 | 2019-01-25 | 一种用于靶板三向围压机的丝杆传动结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910074475.8A CN109681599B (zh) | 2019-01-25 | 2019-01-25 | 一种用于靶板三向围压机的丝杆传动结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109681599A true CN109681599A (zh) | 2019-04-26 |
CN109681599B CN109681599B (zh) | 2024-02-27 |
Family
ID=66193981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910074475.8A Active CN109681599B (zh) | 2019-01-25 | 2019-01-25 | 一种用于靶板三向围压机的丝杆传动结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109681599B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113776769A (zh) * | 2021-09-28 | 2021-12-10 | 重庆三峡学院 | 一种产生岩石累积损伤的锤击试验机 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH578697A5 (zh) * | 1973-08-21 | 1976-08-13 | Schwerionenforsch Gmbh | |
US5701814A (en) * | 1996-08-02 | 1997-12-30 | Robert Herpst | Hydraulic press assembly |
KR20000050625A (ko) * | 1999-01-12 | 2000-08-05 | 김경현 | 사격훈련용 자동 표적장치 |
JP2006097868A (ja) * | 2004-09-30 | 2006-04-13 | Nsk Ltd | 真空精密位置決め装置および、これに用いられる真空チャンバ |
KR20130131180A (ko) * | 2012-05-23 | 2013-12-03 | 주식회사 에프나인 | 정밀도가 향상된 사격용 자동 표적장치 |
CN103852373A (zh) * | 2014-03-20 | 2014-06-11 | 中国人民解放军理工大学 | 霍普金森压杆冲击实验三向围压温度联合加载装置 |
CN106092756A (zh) * | 2016-06-07 | 2016-11-09 | 中国科学院武汉岩土力学研究所 | 一种可施加围压的空心环剪仪 |
CN108978657A (zh) * | 2018-09-21 | 2018-12-11 | 中国人民解放军军事科学院国防工程研究院 | 一种多功能植桩设备专用万向固定装置 |
CN109029129A (zh) * | 2018-10-12 | 2018-12-18 | 尤志翔 | 一种对槽锁定式靶板固定装置及使用方法 |
CN209604505U (zh) * | 2019-01-25 | 2019-11-08 | 中国人民解放军军事科学院国防工程研究院 | 一种用于靶板三向围压机的丝杆传动结构 |
-
2019
- 2019-01-25 CN CN201910074475.8A patent/CN109681599B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH578697A5 (zh) * | 1973-08-21 | 1976-08-13 | Schwerionenforsch Gmbh | |
US5701814A (en) * | 1996-08-02 | 1997-12-30 | Robert Herpst | Hydraulic press assembly |
KR20000050625A (ko) * | 1999-01-12 | 2000-08-05 | 김경현 | 사격훈련용 자동 표적장치 |
JP2006097868A (ja) * | 2004-09-30 | 2006-04-13 | Nsk Ltd | 真空精密位置決め装置および、これに用いられる真空チャンバ |
KR20130131180A (ko) * | 2012-05-23 | 2013-12-03 | 주식회사 에프나인 | 정밀도가 향상된 사격용 자동 표적장치 |
CN103852373A (zh) * | 2014-03-20 | 2014-06-11 | 中国人民解放军理工大学 | 霍普金森压杆冲击实验三向围压温度联合加载装置 |
CN106092756A (zh) * | 2016-06-07 | 2016-11-09 | 中国科学院武汉岩土力学研究所 | 一种可施加围压的空心环剪仪 |
CN108978657A (zh) * | 2018-09-21 | 2018-12-11 | 中国人民解放军军事科学院国防工程研究院 | 一种多功能植桩设备专用万向固定装置 |
CN109029129A (zh) * | 2018-10-12 | 2018-12-18 | 尤志翔 | 一种对槽锁定式靶板固定装置及使用方法 |
CN209604505U (zh) * | 2019-01-25 | 2019-11-08 | 中国人民解放军军事科学院国防工程研究院 | 一种用于靶板三向围压机的丝杆传动结构 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113776769A (zh) * | 2021-09-28 | 2021-12-10 | 重庆三峡学院 | 一种产生岩石累积损伤的锤击试验机 |
CN113776769B (zh) * | 2021-09-28 | 2023-06-06 | 重庆三峡学院 | 一种产生岩石累积损伤的锤击试验机 |
Also Published As
Publication number | Publication date |
---|---|
CN109681599B (zh) | 2024-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9970844B2 (en) | Mechanical high-G shock testing machines | |
EP2833118A1 (en) | Simulated impact-type rock burst experiment apparatus | |
CN206095834U (zh) | 多功能高速撞击实验设备 | |
CN102121869A (zh) | 气动式冲击响应谱试验机 | |
CN109681599A (zh) | 一种用于靶板三向围压机的丝杆传动结构 | |
CN112067469B (zh) | 一种适用于不同边界条件的岩石节理动态剪切实验装置 | |
CN201885864U (zh) | 气动式冲击响应谱试验机 | |
CN102636382A (zh) | 模拟冲击型岩爆实验设备 | |
CN209604505U (zh) | 一种用于靶板三向围压机的丝杆传动结构 | |
CN105043850B (zh) | 一种可调节横向霍普金森入射压杆束导向装置 | |
CN105179374B (zh) | 单缸插销装置、缸头总成及起重机 | |
DE3151011A1 (de) | Daempfungseinrichtung fuer erdbebengefaehrdete gebaeude | |
CN210268377U (zh) | 一种弹体压药工具 | |
EP0109067A1 (de) | Verfahren zum Brechen von hartem kompaktem Material und Vorrichtung zur Durchführung des Verfahrens | |
CN116398169A (zh) | 一种煤矿巷道防冲击地压联合支护设备 | |
CN105783613A (zh) | 一种水下探测设备分离装置 | |
CN104896009A (zh) | 落锤实验系统用防反冲装置 | |
CN114674688A (zh) | 适用于真三轴霍普金森压杆的瞬态卸荷试验装置及方法 | |
CN107643221A (zh) | 一种低速轻气炮冲击试验装置 | |
CN108981502B (zh) | 一种内弹道高速摩擦力仿真模拟测试试验台 | |
CN112660421A (zh) | 一种卧式非火工解锁器 | |
CN203808941U (zh) | 利用滑轮组的自平衡抽油机尾游梁 | |
CN109612841B (zh) | 一种用于弹体深侵彻试验的靶板三向围压机 | |
CN104132029A (zh) | 一种大型、高精度、超低速两自由度电液伺服转台 | |
CN216010023U (zh) | 一种矿山机电设备减震结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |