CN109681256A - A kind of constructing tunnel ventilation device - Google Patents

A kind of constructing tunnel ventilation device Download PDF

Info

Publication number
CN109681256A
CN109681256A CN201910120444.1A CN201910120444A CN109681256A CN 109681256 A CN109681256 A CN 109681256A CN 201910120444 A CN201910120444 A CN 201910120444A CN 109681256 A CN109681256 A CN 109681256A
Authority
CN
China
Prior art keywords
main pipe
pipe
outer exhaust
exhaust
ventilating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910120444.1A
Other languages
Chinese (zh)
Inventor
蔡天成
夏时光
何向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Engineering Co Ltd of China Railway 19 Bureau Group Co Ltd
Original Assignee
Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201910120444.1A priority Critical patent/CN109681256A/en
Publication of CN109681256A publication Critical patent/CN109681256A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/003Ventilation of traffic tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/04Air ducts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/08Ventilation arrangements in connection with air ducts, e.g. arrangements for mounting ventilators

Abstract

Constructing tunnel provided by the invention ventilation device includes the first ventilating pipe component, and the first ventilating pipe component includes the first main pipe and multiple outer exhaust pipes, and multiple outer exhaust pipes are stretched out from the first main pipe, and each outer exhaust pipe is connected to the first main pipe;The extended end portion of first main pipe has external admission mouth, and the first ventilating pipe component further includes being arranged in the first main pipe and towards the first blower of external admission mouth;Multiple interior exhaust outlets are offered on first main pipe, are equipped with the interior exhaust outlet towards the outer exhaust pipe immediately below each outer exhaust pipe.When normal use, outside air enters the first main pipe from external admission mouth, and excludes and reached in tunnel from interior exhaust outlet;When fire occurs in tunnel, dense smoke then enters the first main pipe from interior exhaust outlet, and is excluded by multiple outer exhaust pipes to outside tunnel, guarantees still to keep ventilation in tunnel when fire or other the condition of a disasters occur, ventilation effect effectively improves.

Description

A kind of constructing tunnel ventilation device
Technical field
The present invention relates to construction equipment technical field, specially a kind of constructing tunnel ventilation device.
Background technique
In the constructing tunnels such as railway, highway and city underground engineering, ventilation is indispensable sport technique segment, in machinery It is turned into the case of industry, divulges information and supply fresh air for in-cavity construction place, exclude dust and various toxic and harmful gas, create good Good work situation, ensures the health and safety of construction personnel;Meanwhile ventilation is also that the electromechanical equipment in tunnel is maintained normally to transport Capable necessary condition.
For various tunnels, usually the arrangement and method for construction to entire engineering and Design of Construction Organization are risen not for ventilation Negligible effect, existing draft type have gravity-flow ventilation and Longitudinal Ventilation, and gravity-flow ventilation refers to the vapour by passing through in tunnel The piston effect of vehicle and natural wind action, pernicious gas and flue dust are excluded out of tunnel.Longitudinal Ventilation is from a hole Mouth introduces fresh air, in such a way that another hole decontaminates air.
Gravity-flow ventilation the problem is that, be limited to the size of vehicle flowrate in tunnel, and the unstability of natural wind and Complexity will affect the exchange of the air-flow in tunnel;Longitudinal Ventilation the problem is that, air pollution degree is from entrance to outlet Fang Yixiang is linearly increased, and inlet pollution concentration is minimum, and survey pollution concentration is big in outlet, and meeting fire situation will lead to exit Concentration is high, and smoke evacuation is inconvenient.
Summary of the invention
The purpose of the present invention is to provide a kind of constructing tunnel ventilation devices for effectively improving ventilation effect.
Constructing tunnel provided by the invention ventilation device includes the first ventilating pipe component, and the first ventilating pipe component includes the One main pipe and multiple outer exhaust pipes, multiple outer exhaust pipes are stretched out from the first main pipe, and each outer exhaust pipe and the One main pipe connection;The extended end portion of first main pipe has external admission mouth, and the first ventilating pipe component further includes being arranged first In main pipe and towards the first blower of external admission mouth;Multiple interior exhaust outlets, multiple outer exhaust pipes are offered on first main pipe The extending direction of body and multiple interior exhaust outlets along the first main pipe is arranged, and is all provided with immediately below each outer exhaust pipe There is the interior exhaust outlet towards the outer exhaust pipe.
By above scheme as it can be seen that interior exhaust outlet is located in tunnel, external admission mouth and outer exhaust pipe are arranged at outside tunnel, When normal use, outside air enters the first main pipe from external admission mouth, and excludes and reached in tunnel from interior exhaust outlet;Work as tunnel When fire occurring in road, dense smoke then enters the first main pipe from interior exhaust outlet, and is excluded by multiple outer exhaust pipes to tunnel Outside, guarantee still to keep ventilation in tunnel when fire or other the condition of a disasters occur, ventilation effect effectively improves.
Further embodiment is that the first ventilating pipe component further includes air inlet guard box, air inlet guard box and the first master The bottom of tube body connection and air inlet guard box is connected to external admission mouth;Air inlet guard box has conical top, and air inlet is protected The peripheral wall of protecting box is provided with multiple air inlet long holes.
Therefore the setting of air inlet guard box can effectively stop rainwater, prevent rainwater from entering the first master from air inlet Tube body.
Further embodiment be provided on the peripheral wall of air inlet guard box it is multiple block protrusion, block protrusion from week The outer wall of wall faces outwardly and tilts down extension, and air inlet guard box is provided with one above each air inlet long hole and blocks Protrusion.
Therefore the setting for blocking protrusion places rainwater and enters air inlet long hole, prevents rainwater from entering the first main pipe.
Further embodiment is, the first ventilating pipe component further includes setting in the first intracorporal filter assemblies of supervisor, the On the extending direction of one main pipe, filter assemblies are arranged between the first blower and interior exhaust outlet;Filter assemblies include the first filter Net and the second strainer, the first strainer and the second strainer are arranged along the extending direction of the first main pipe.
Therefore outside air enter tunnel before through the first strainer and the second strainer filtering, can guarantee into tunnel The quality of interior air.
Further embodiment is that filter assemblies further include unidirectional wind deflector component, on the extending direction of the first main pipe, External admission mouth, the first blower, the first strainer, the second strainer and unidirectional wind deflector component are set gradually.
Therefore the setting of unidirectional wind deflector component can stabilize the air-flow being externally entering.
Further embodiment is, on the extending direction of outer exhaust pipe, outer exhaust pipe has far from the first main pipe The first outer exhaust outlet;First ventilating pipe component further includes blocked from the top of the first outer exhaust outlet to the first outer exhaust outlet One baffle, forms the second outer exhaust outlet between first baffle and outer exhaust pipe, the first ventilating pipe component further includes being set to the The third strainer of two outer exhaust ports.
Therefore the setting of first baffle and third strainer can effectively prevent rainwater and dust from the first outer exhaust outlet Into the first main pipe.
Further embodiment is, on the extending direction of outer exhaust pipe, outer exhaust pipe is in itself and first main pipe's phase Outer exhaust entrance is arranged in one end even;First ventilating pipe component further includes second baffle, and second baffle is installed on the first main pipe It is interior, and second baffle is swingable to first position, first position is the position that the external exhaust entrance of second baffle blocks.
Therefore when fire does not occur, controllable second baffle blocks outer exhaust entrance, prevent from external admission mouth into Enter and filtered air is excluded from outer exhaust pipe again, influences ventilatory effect.
Further embodiment is that the first ventilating pipe component further includes the stomata panel for being mounted on interior exhaust ports, stomata face Multiple exhaust long holes are provided on plate, multiple exhaust long hole being arranged circumferentially along stomata panel are vented long hole and the first master Tube body connection.
Therefore the setting of stomata panel can further steady air flow.
Further embodiment is that constructing tunnel ventilation device further includes the second ventilating pipe component, the second ventilating pipe component Including the second main pipe, third main pipe and washing pool;Multiple interior air inlets, the second ventilation duct group are provided on second main pipe Part further includes setting in the second intracorporal second blower of supervisor;On the extending direction of the second main pipe, the one of the second main pipe End has the first washing communication port, and the first washing communication port, the second blower and multiple interior air inlets are set gradually;In third master On the extending direction of tube body, the first end of third main pipe has the second washing communication port, and the second end of third main pipe has The outer exhaust outlet of third;First washing communication port and the second washing communication port are connected in washing pool.
Therefore second ventilating pipe component can will the air in tunnel carry out washing filtering after send to the external world.
Further embodiment is that the second ventilating pipe component further includes being arranged in the second main pipe and being located at the first washing to connect Silencing cotton between port and the second blower.
Therefore the noise that the setting of silencing cotton generates when can effectively reduce the second fan operation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of constructing tunnel ventilation device embodiment of the present invention.
Fig. 2 is the enlarged drawing in Fig. 1 at A.
Fig. 3 is the enlarged drawing in Fig. 1 at B.
Fig. 4 is the enlarged drawing in Fig. 1 at C.
Fig. 5 is the enlarged drawing in Fig. 1 at D.
Fig. 6 is the structural schematic diagram of stomata panel in constructing tunnel ventilation device embodiment of the present invention.
Fig. 7 is the enlarged drawing in Fig. 1 at E.
Fig. 8 is the enlarged drawing in Fig. 1 at F.
Specific embodiment
Referring to Fig. 1, Fig. 1 is the structural schematic diagram of constructing tunnel ventilation device embodiment of the present invention.It is provided by the invention Constructing tunnel ventilation device includes the first ventilating pipe component 1 and the second ventilating pipe component 2, and the first ventilating pipe component 1 is used for will Outside air is pumped into tunnel 1000, and the second ventilating pipe component 2 is used to excluding the air in tunnel 1000 into extraneous, the first ventilation The top in tunnel 1000 is arranged in tube assembly 1, and the bottom in tunnel 1000 is arranged in the second ventilating pipe component 2.
First ventilating pipe component 1 include the first main pipe 10 and multiple outer exhaust pipes 11, multiple outer exhaust pipes 11 from First main pipe 10 stretches out, and each outer exhaust pipe 11 is connected to the first main pipe 10;The extended end portion of first main pipe 10 With external admission mouth 101, the first ventilating pipe component 1 further includes being arranged in the first main pipe 10 and towards external admission mouth 101 First blower 61;Offer multiple interior exhaust outlets 102 on first main pipe 10, interior exhaust outlet 102 is arranged downward and towards tunnel 1000 use space;Multiple outer exhaust pipes 11 and multiple interior exhaust outlets 102 are arranged along the extending direction of the first main pipe 10 Column setting, and the underface of each outer exhaust pipe 11 is equipped with an interior exhaust outlet 102 towards the outer exhaust pipe 11.
Fig. 2 is the enlarged drawing in Fig. 1 at A combined with Figure 1 and Figure 2,.First ventilating pipe component 1 further includes air inlet guard box 4, air inlet guard box 4 is connect with the first main pipe 10 and the bottom of air inlet guard box 4 is connected to external admission mouth 101;Air inlet Mouthful guard box 4 has conical top 41, is provided with and multiple prolongs on the surrounding circumferential surface of the peripheral wall 42 of air inlet guard box 4 along level The air inlet long hole 421 stretched, and multiple air inlet long holes 421 vertically arrange on each circumferential surface;Conical top 41 is in tetrapyamid shape, And the outer circumferential area of conical top 41 is greater than the outer circumferential area of peripheral wall 42, therefore the surrounding of conical top 41 is in the upper rectangular of peripheral wall 42 At eaves shape protrusion 411.
What air inlet guard box 4 was provided with multiple strips on peripheral wall 42 blocks protrusion 43, blocks protrusion 43 from peripheral wall 42 outer wall faces outwardly and tilts down extension, and air inlet guard box 4 is provided with one in the top of each air inlet long hole 421 Block protrusion 43.The setting of air inlet guard box 4 can effectively stop rainwater, prevent rainwater from entering the first master from external admission mouth 101 Tube body 10.
It is the enlarged drawing in Fig. 1 at B in conjunction with Fig. 1 and Fig. 3, Fig. 3.First ventilating pipe component 1 further includes that setting is main first Filter assemblies 5 in tube body 10, on the extending direction of the first main pipe 10, filter assemblies 5 setting the first blower 61 with it is interior Between exhaust outlet 102;Filter assemblies 5 include the first strainer 51, the second strainer 52 and unidirectional wind deflector component 53, in the first supervisor On the extending direction of body 10, external admission mouth 101, the first blower 61, the first strainer 51, the second strainer 52 and unidirectional wind deflector component 53 set gradually.The mesh number of second strainer 52 is greater than the mesh number of the first strainer 51;Unidirectional wind deflector component 53 includes support plate 531, crossbeam 532, swing rod 533 and unidirectional wind deflector 534, support plate 531 are main first along the setting of the section of the first main pipe 10 In tube body 10, ventilation opening 530 is provided in support plate 531, crossbeam 532 is connected in support plate 531 perpendicular to support plate 531, Swing rod 533 and unidirectional wind deflector 534 are mutually permanently connected, and swing rod 533 is pivotably connected on crossbeam 532.Unidirectional wind deflector 534 pairs of ventilation openings 530 are blocked but are not closed, and air-flow is by reaching stable gas with the collision of unidirectional wind deflector 534 after ventilation opening 530 The effect of stream.
It is the enlarged drawing in Fig. 1 at C in conjunction with Fig. 1 and Fig. 4, Fig. 4.On the extending direction of outer exhaust pipe 11, outer exhaust Tube body 11 has the first outer exhaust outlet 111 far from the first main pipe 10;First ventilating pipe component 1 further includes being vented outside first The bottom of the first baffle 141 that the first outer exhaust outlet 111 is blocked in the top of mouth 111, first baffle 141 has multiple stabilizer blades 142, stabilizer blade 142 is connect with the end face of outer exhaust pipe 11, between two adjacent stabilizer blades 142 and first baffle 141 with The second outer exhaust outlet 140 is formed between outer exhaust pipe 11, the first ventilating pipe component 1 further includes being set to the second outer exhaust outlet Third strainer 143 at 140, third strainer 143 are metal block.Since the upper end of outer exhaust pipe 11 stretches out in tunnel 1000 Except, the first outer exhaust outlet 111 positioned at outer 11 upper end of exhaust pipe is exchanged with the external gas that can produce.
It is the enlarged drawing in Fig. 1 at D in conjunction with Fig. 1 and Fig. 5, Fig. 5.On the extending direction of outer exhaust pipe 11, outer exhaust Outer exhaust entrance 112 is arranged in one end that it is connected with the first main pipe 10 in tube body 11;First ventilating pipe component 1 further includes fixing Block 151 and second baffle 152, fixed block 151 are fixedly installed on the roof medial surface of the first main pipe 10, second baffle 152 It is swingably installed on fixed block 151 by shaft, second baffle 152 is swingable to first position, first position second The position that the external exhaust entrance 112 of baffle 152 blocks.
In conjunction with Fig. 1 and Fig. 6, the first ventilating pipe component 1 further includes the stomata panel 13 being mounted at interior exhaust outlet 102, gas Four exhaust long holes, 131, the four exhaust long holes 132 being connected to the first main pipe 10 and four exhausts are provided on hole panel 13 Long hole 133;Four exhaust being arranged circumferentially along stomata panel 13 of long hole 131, four exhaust long holes 132 are along stomata panel 13 Be arranged circumferentially, four exhaust being arranged circumferentially along stomata panel 13 of long hole 133.And it is directed toward from stomata panel 13 outer On the direction in week, exhaust long hole 131, exhaust long hole 132 and exhaust 133 sequential of long hole, exhaust 131 development length of long hole are short Long hole 133 is shorter than vented in exhaust long hole 132, exhaust 132 development length of long hole.
Referring to Fig. 1, the second ventilating pipe component 2 includes the second main pipe 20, third main pipe 30 and washing pool 8;Second is main Multiple interior air inlets 21 are provided on tube body 20, the second ventilating pipe component 2 further includes being arranged in the second main pipe 20 at least Two the second blowers 62;On the extending direction of the second main pipe 20, one end of the second main pipe 20 has the first washing connection Mouth 22, and the first washing communication port 22, the second blower 62 and multiple interior air inlets 21 are set gradually;In prolonging for third main pipe 30 It stretches on direction, the first end of third main pipe 30 has the second washing communication port 31, and the second end of third main pipe 30 has the Three outer exhaust outlets 32, the outer exhaust ports of third are provided with mark pipe.First washing communication port 22 and the second washing communication port 31 are equal It is connected in washing pool 8.
Second ventilating pipe component 2 further includes being arranged in the second main pipe 20 and being located at the first washing communication port 22 and second Silencing cotton 71 and silencing cotton 72 between blower 62, silencing cotton 71 are mounted on the inner wall bottom of the second main pipe 20, silencing cotton 72 It is mounted at the top of the inner wall of the second main pipe 20, forms channel 70 between silencing cotton 71 and silencing cotton 72.
It is the enlarged drawing in Fig. 1 at E in conjunction with Fig. 1, Fig. 7 and Fig. 8, Fig. 7, Fig. 8 is the enlarged drawing in Fig. 1 at F.First supervisor Body 10 is fixed on 1000 roof of tunnel by suspending assembly 91 and fixation kit 92, the second main pipe 20 and third main pipe 30 It is fixed on by fixation kit 92 on the bottom wall in tunnel 1000.By taking the first main pipe 10 as an example, suspending assembly 91 includes fixed peace Fixing piece 911 loaded on 1000 roof of tunnel, the hoist cable 912 stretched out from fixing piece 911, the first main pipe 10 pass through hoist cable 912 Afterwards, lantern ring 913 of the adjusting set outside the hoist cable 912 is seated firmly on the first main pipe 10 and hangs to reduce the space of hoist cable 912 In rope 912.By taking the second main pipe 20 as an example, fixation kit 92 includes the fixing piece 921 for being fixed on 1000 inner wall of tunnel, fixes Hoop 922 and clamping screw 923, after clips 922 change the second main pipe 20 of set, the extension both ends of clips 922 pass through locking screw Bolt 923 is fixed on fixing piece 921, encircles fixation to the second main pipe 20 to realize.
Interior exhaust outlet 102 is located in tunnel, and external admission mouth 101 and outer exhaust pipe 11 are arranged at outside tunnel, normally makes Used time, outside air enters the first main pipe 10 from external admission mouth 101, and excludes from interior exhaust outlet 102 and reach tunnel 1000 It is interior;When fire occurs in tunnel, dense smoke then enters the first main pipe 10 from interior exhaust outlet 102, and passes through multiple outer exhaust pipes Body 11 is excluded to outside tunnel, guarantees still to keep ventilation in tunnel when fire or other the condition of a disasters occur;Second ventilating pipe component 2 It send after the air in tunnel 1000 capable of being carried out washing filtering to the external world, ventilation effect effectively improves.
Finally it is emphasized that the above description is only a preferred embodiment of the present invention, it is not intended to restrict the invention, it is right For those skilled in the art, the present invention can have various change and change, all within the spirits and principles of the present invention, Any modification, equivalent substitution, improvement and etc. done, should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of constructing tunnel ventilation device, it is characterised in that:
Including the first ventilating pipe component, first ventilating pipe component includes the first main pipe and multiple outer exhaust pipes, multiple The outer exhaust pipe is stretched out from first main pipe, and each outer exhaust pipe is connected to first main pipe;
The extended end portion of first main pipe has external admission mouth, and first ventilating pipe component further includes setting described the In one main pipe and towards the first blower of the external admission mouth;
Multiple interior exhaust outlets are offered on first main pipe, multiple outer exhaust pipes and multiple interior exhaust outlets are equal Extending direction along first main pipe is arranged, and is equipped with a direction immediately below each outer exhaust pipe The interior exhaust outlet of the outer exhaust pipe.
2. constructing tunnel ventilation device according to claim 1, it is characterised in that:
First ventilating pipe component further includes air inlet guard box, and the air inlet guard box is connect with first main pipe And the bottom of the air inlet guard box is connected to the external admission mouth;
The air inlet guard box has conical top, and the peripheral wall of the air inlet guard box is provided with multiple air inlet long holes.
3. constructing tunnel ventilation device according to claim 2, it is characterised in that:
Be provided on the peripheral wall of the air inlet guard box it is multiple block protrusion, it is described to block outer wall of the protrusion from the peripheral wall Face outwardly and tilt down extension, the air inlet guard box be provided with one above each air inlet long hole described in block Protrusion.
4. constructing tunnel ventilation device according to claim 1, it is characterised in that:
First ventilating pipe component further includes setting in the intracorporal filter assemblies of first supervisor, in first main pipe Extending direction on, the filter assemblies are arranged between first blower and the interior exhaust outlet;
The filter assemblies include the first strainer and the second strainer, and first strainer and second strainer are main along described first The extending direction of tube body is arranged.
5. constructing tunnel ventilation device according to claim 4, it is characterised in that:
The filter assemblies further include unidirectional wind deflector component, on the extending direction of first main pipe, the external admission Mouth, first blower, first strainer, second strainer and the unidirectional wind deflector component are set gradually.
6. constructing tunnel ventilation device according to claim 1, it is characterised in that:
On the extending direction of the outer exhaust pipe, the outer exhaust pipe has outside first far from first main pipe Exhaust outlet;
First ventilating pipe component further includes blocking from the top of the described first outer exhaust outlet to the described first outer exhaust outlet First baffle forms the second outer exhaust outlet, first ventilating pipe component between the first baffle and the outer exhaust pipe It further include the third strainer for being set to the described second outer exhaust ports.
7. constructing tunnel ventilation device according to claim 6, it is characterised in that:
On the extending direction of the outer exhaust pipe, the outer exhaust pipe is in one end that it is connected with first main pipe Outer exhaust entrance is set;
First ventilating pipe component further includes second baffle, and the second baffle is installed in first main pipe, and institute It is swingable to first position to state second baffle, the first position is the position that the second baffle blocks the outer exhaust entrance It sets.
8. constructing tunnel ventilation device according to claim 1, it is characterised in that:
First ventilating pipe component further includes the stomata panel for being mounted on the interior exhaust ports, is arranged on the stomata panel There are multiple exhaust long holes, multiple exhaust long hole being arranged circumferentially along the stomata panel, the exhaust long hole and institute State the first main pipe connection.
9. constructing tunnel ventilation device according to any one of claims 1 to 8, it is characterised in that:
The constructing tunnel ventilation device further includes the second ventilating pipe component, and second ventilating pipe component includes the second supervisor Body, third main pipe and washing pool;
Multiple interior air inlets are provided on second main pipe, second ventilating pipe component further includes being arranged described second It is responsible for intracorporal second blower;
On the extending direction of second main pipe, one end of second main pipe has the first washing communication port, and institute The first washing communication port, second blower and multiple interior air inlets is stated to set gradually;
On the extending direction of the third main pipe, the first end of the third main pipe has the second washing communication port, institute The second end for stating third main pipe has the outer exhaust outlet of third;
The first washing communication port and the second washing communication port are connected in the washing pool.
10. constructing tunnel ventilation device according to claim 9, it is characterised in that:
Second ventilating pipe component further include be arranged in second main pipe and be located at it is described first washing communication port with Silencing cotton between second blower.
CN201910120444.1A 2019-02-18 2019-02-18 A kind of constructing tunnel ventilation device Pending CN109681256A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910120444.1A CN109681256A (en) 2019-02-18 2019-02-18 A kind of constructing tunnel ventilation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910120444.1A CN109681256A (en) 2019-02-18 2019-02-18 A kind of constructing tunnel ventilation device

Publications (1)

Publication Number Publication Date
CN109681256A true CN109681256A (en) 2019-04-26

Family

ID=66196501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910120444.1A Pending CN109681256A (en) 2019-02-18 2019-02-18 A kind of constructing tunnel ventilation device

Country Status (1)

Country Link
CN (1) CN109681256A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114333189A (en) * 2021-12-08 2022-04-12 湛江市珠江电力设备安装有限公司 Emergent evacuation passageway of electric power engineering fire control based on big data

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1865662A (en) * 2006-06-20 2006-11-22 浙江省交通规划设计研究院 Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device
CN201100733Y (en) * 2007-09-20 2008-08-13 上海惠福空调设备有限公司 A central air-conditioner outlet for easy assembly and installation
KR20100015023A (en) * 2008-08-04 2010-02-12 윤명술 Tunnel with exhausting structure of harmful materials
CN201652731U (en) * 2010-03-23 2010-11-24 深圳市中航大记工程制品有限公司 Novel air outlet for central air-conditioner
CN206449824U (en) * 2017-01-22 2017-08-29 广州利城机电工程有限公司 A kind of Central air-conditioning unit noise processing apparatus
CN207177949U (en) * 2017-07-28 2018-04-03 固岩科技发展有限公司 A kind of mute type ventilating system in ore deposit hole
CN207609440U (en) * 2017-12-05 2018-07-13 长安大学 The device of tunnel dedusting ventilation cleaning based on dust concentration
CN208203331U (en) * 2018-05-14 2018-12-07 中交一公局第二工程有限公司 Railway tunnel construction ventilation device
CN208380622U (en) * 2018-07-09 2019-01-15 吴自升 A kind of subterranean railway construction ventilation device promoting air flowing
CN209621366U (en) * 2019-02-18 2019-11-12 中铁十九局集团广州工程有限公司 A kind of constructing tunnel ventilation device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1865662A (en) * 2006-06-20 2006-11-22 浙江省交通规划设计研究院 Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device
CN201100733Y (en) * 2007-09-20 2008-08-13 上海惠福空调设备有限公司 A central air-conditioner outlet for easy assembly and installation
KR20100015023A (en) * 2008-08-04 2010-02-12 윤명술 Tunnel with exhausting structure of harmful materials
CN201652731U (en) * 2010-03-23 2010-11-24 深圳市中航大记工程制品有限公司 Novel air outlet for central air-conditioner
CN206449824U (en) * 2017-01-22 2017-08-29 广州利城机电工程有限公司 A kind of Central air-conditioning unit noise processing apparatus
CN207177949U (en) * 2017-07-28 2018-04-03 固岩科技发展有限公司 A kind of mute type ventilating system in ore deposit hole
CN207609440U (en) * 2017-12-05 2018-07-13 长安大学 The device of tunnel dedusting ventilation cleaning based on dust concentration
CN208203331U (en) * 2018-05-14 2018-12-07 中交一公局第二工程有限公司 Railway tunnel construction ventilation device
CN208380622U (en) * 2018-07-09 2019-01-15 吴自升 A kind of subterranean railway construction ventilation device promoting air flowing
CN209621366U (en) * 2019-02-18 2019-11-12 中铁十九局集团广州工程有限公司 A kind of constructing tunnel ventilation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114333189A (en) * 2021-12-08 2022-04-12 湛江市珠江电力设备安装有限公司 Emergent evacuation passageway of electric power engineering fire control based on big data

Similar Documents

Publication Publication Date Title
DE60026837T2 (en) ACOUSTIC NOISE MUFFLER NOZZLE
FI100484B (en) Air Conditioning System
KR950704657A (en) Method and device for reducing vortices at a cleanroom celling
CN209621366U (en) A kind of constructing tunnel ventilation device
ES2253153T3 (en) TURBOVENTILATOR.
KR101574780B1 (en) Ventilation apparatus for road tunnel
CN109681256A (en) A kind of constructing tunnel ventilation device
KR101710459B1 (en) Apparatus for supplying and exhausting air in transverse or semi-transverse tunnels
KR100858878B1 (en) Dust collection ventilation apparatus for tunnel construction
JPS62178826A (en) Device for preventing harmful gas from diffusing
CN206581981U (en) A kind of tunnel smoke duct mounting structure
JP4319619B2 (en) Ventilation device in the tunnel
KR102240215B1 (en) Air supply and ventilation air purifier for subway main line
JP3883483B2 (en) Suction duct
JP2006022549A (en) Air purifying apparatus in tunnel
KR100912866B1 (en) Dust cleaning apparatus of vehicles for tunnel construction
JP3505561B2 (en) Road tunnel ventilation station equipment
WO2016093234A1 (en) Blower and ventilating system
CN210602132U (en) Ventilation assembly for building
KR102240826B1 (en) Auto Ventilation System for Subway
KR100529046B1 (en) Air curtain equipment for subway and the method for forming air curtain
CN210948752U (en) Tunnel portal pollutant centralized discharge device and tunnel
KR101525386B1 (en) Construction of offshore welding room flame arrester
JP7390084B1 (en) Air purification equipment and air purification systems
CN217735508U (en) Tunnel secondary lining construction trolley with ventilation and heat dissipation air duct device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210528

Address after: 510000 room 707, No.2, Huafei street, Huangge Town, Nansha District, Guangzhou City, Guangdong Province (office only)

Applicant after: Guangzhou Engineering Co., Ltd. of China Railway 19th Bureau Group

Address before: China railway building, 111 Gangchang Road, Xiawan, Gongbei, Zhuhai, Guangdong 519020

Applicant before: NO.7 ENGINEERING CO., LTD. OF CHINA RAILWAY 19 BUREAU Group